Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station to Tung Tau II Estate Contract No. DC/2011/04
12. Electrician shall properly lock distribution boxes 13. To combat the hazards of electric shock and fall from height, contractors/employers undertaking renovation works should: 14. Provide a safe temporary power supply system with suitable fuses and residual current devices equipped; 15. Ensure that all electrical cables and joints are properly connected and insulated against any live parts; 16. Ensure that the power supply source to any electrical installation where work has to be done is isolated and locked off using a unique key or combination retained by the person doing the work, with warning notices displayed before starting the work;