Quality Control Reports
Quality Control Reports
Quality Control Reports
DATE REPORT NO
JOB SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE? (If YES attach copy of the meeting minutes) WERE THERE ANY LOST TIME ACCIDENTS THIS DATE? (If YES attach copy of completed OSHA report)
NO NO NO NO
TOTAL WORK HOURS ON JOB SITE, THIS DATE, INCL CON'T SHEETS CUMULATIVE TOTAL OF WORK HOURS FROM PREVIOUS REPORT TOTAL WORK HOURS FROM START OF CONSTRUCTION SAFETY REQUIREMENTS HAVE BEEN MET.
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE? (If YES attach statement or checklist showing inspection performed.) WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT? (If YES attach description of incident and proposed action.) Schedule Activity No. LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER) Schedule Activity No. Submittal # Description of Equipment/Material Received
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER. Schedule Activity No. Owner Description of Construction Equipment Used Today (incl Make and Model) Hours Used
REMARKS
DATE SHEET 1 OF 2
4296/1 (9/98)
SHEET 2 OF 2
DATE REPORT NO
CONTRACT TITLE
PREPARATORY
WAS PREPARATORY PHASE WORK PREFORMED TODAY? IF YES, FILL OUT AND ATTACH SUPPLEMENTAL PREPARATORY PHASE CHECKLIST. Schedule Activity No. Definable Feature of Work
Index #
WAS INITIAL PHASE WORK PREFORMED TODAY? IF YES, FILL OUT AND ATTACH SUPPLEMENTAL INITIAL PHASE CHECKLIST. Schedule Activity No.
YES
NO
INITIAL
Index #
WORK COMPLIES WITH CONTRACT AS APPROVED DURING INITIAL PHASE? WORK COMPLIES WITH SAFETY REQUIREMENTS? Schedule Activity No. Description of Work, Testing Performed & By Whom, Definable Feature of Work, Specification Section, Location and List of Personnel Present
YES YES
NO NO
REWORK ITEMS IDENTIFIED TODAY (NOT CORRECTED BY CLOSE OF BUSINESS) Schedule Activity No. Description
FOLLOW-UP
REWORK ITEMS CORRECTED TODAY (FROM REWORK ITEMS LIST) Schedule Activity No. Description
REMARKS (Also Explain Any Follow-Up Phase Checklist Item From Above That Was Answered "NO"), Manuf. Rep On-Site, etc. Schedule Activity No. Description
On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report.
DATE
DATE
DATE
REPORT NO
Status
WORKING?
WEATHER CONDITIONS:
YES
NO
REMARKS:
Check Points
SUPERINTENDENT ON SITE QC MANAGER ON SITE QC REPORTS CURRENT AS-BUILTS CURRENT SUBMITTALS APPROVED FOR FOR ONGOING WORK DEFICIENCY LIST REVIEWED
WORK OBSERVED/DEFICIENCIES NOTED/SAFETY ISSUES DISCUSSED/QA TESTS AND RESULTS: Schedule Activity No DESCRIBE OBSERVATIONS
DATE
SUPV INITIALS
DATE
SHEET 1 OF 1
SPEC SECTION
DATE
PERSONNEL PRESENT
NAME
COMPANY/GOVERNMENT
IDENTIFIY FULL COMPLIANCE WITH PROCEDURES IDENTIFIED AT PREPARATORY. COORDINATE PLANS, SPECIFICATIONS, AND SUBMITTALS. COMMENTS:
ENSURE PRELIMINARY WORK IS COMPLETE AND CORRECT. IF NOT, WHAT ACTION IS TAKEN?
YES YES
NO NO
(IF YES, MAINTAIN IN PRESENT CONDITION AS LONG AS POSSIBLE AND DESCRIBE LOCATION OF SAMPLE)
REVIEW JOB CONDITIONS USING EM 385-1-1 AND JOB HAZARD ANALYSIS COMMENTS:
OTHER
SHEET 1 OF 2
QC MANAGER
DATE
4296/2C (9/98)
SHEET 2 OF 2
The Hour fields where intentionally not programmed to total. If the Contractor deleted the formula in a field within the range that was to be totaled, the total would be wrong. With the ability to [unlimitedly] expand the Contractor Production Report and Contractor Quality Control Representative Report, their Continuation Sheets are obsolete. In the footer of each form are data fields for the Sheet number and the total number of sheets in the report (Sheet 1 of 2). The first number will generate itself when pages of the report are added. But MS-Word will not automatically update the second number. To update the NumPages field, click the field or the field results and then press F9. You can also click Options in the Tools menu, click the Print tab, and then select the Update fields check box.
SPEC SECTION
DATE
PERSONNEL PRESENT
COMPANY/GOVERNMENT
REVIEW SUBMITTALS AND/OR SUBMITTAL REGISTER. HAVE ALL SUBMITTALS BEEN APPROVED? IF NO, WHAT ITEMS HAVE NOT BEEN SUBMITTED?
YES
NO
SUBMITTALS
YES
NO
CHECK APPROVED SUBMITTALS AGAINST DELIVERED MATERIAL. (THIS SHOULD BE DONE AS MATERIAL ARRIVES.) COMMENTS:
YES
NO
ENSURE PRELIMINARY WORK IS CORRECT AND PERMITS ARE ON FILE. IF NOT, WHAT ACTION IS TAKEN?
SHEET 1 OF 2
WHEN REQUIRED?
TESTING
WHERE REQUIRED?
YES
NO
SAFETY
NAVY/ROICC COMMENTS DURING MEETING.
MEETING COMMENTS
OTHER ITEMS OR REMARKS:
QC MANAGER
DATE
4296/2B (9/98)
SHEET 2 OF 2
1. Appointing letter to the QC manager shall detail his/her authority and responsibility to act for the contractor and outline his/her duties, responsibilities and authority. He/she shall have no job-related responsibilities other than QC unless specifically permitted in the specification. 2. He/she shall be on the site at all times during progress of the work, with complete authority to take any action necessary to ensure conformance with the contract requirements. In the event of his/her absence, approved backup shall be on the site. 3. Authority to immediately stop any segment of work which does not comply with the contract plans and specifications and direct the removal and replacement of any defective work. 4. Conduct daily inspection of work performed for compliance with plans and specifications.
5. Certify daily that all materials and equipment delivered/installed in the work comply with contract plans and specifications. Certify daily that all work performed on the construction site and off the construction site conforms to plans and specifications. Report any deficiencies and remedial action planned and taken. 6. Supervise and coordinate the inspection and tests made by the members of the Quality Control Organization, including subcontractors. 7. Assure QC staff is adequate to meet its responsibilities.
8. Maintain a copy of the ROICC approved QC Plan on file at the jobsite complete with up-to-date approved revisions/filled-in log of submittals. Maintain at the jobsite an up-to-date QC Submittal Register (provided in the specification) showing the status of all submittals required by the contract. 9. Maintain at the jobsite a testing plan showing status of all tests required by the contracts. Ensure that all tests required are performed and report the results of same. Indicate whether test results show the item tested conforms to contract requirements or not. 10. Authority to remove any individual from the site who fails to perform his/her work in a skillful and workmanlike manner or his/her work does not comply with the contract plans and specifications. 11. QC manager does not have authority to deviate from plans and specifications without prior approval, in writing, from the ROICC. 12. Ensure that the contractor's Quality Control Organization is adequately staffed with qualified personnel to perform all the detailed inspections and testing specified in the plans and specifications. 13. Maintain at the jobsite the up-to-date QC Rework Items List.
ATTACHMENT A
4296/3 (9/98)
SHEET 1 of 1
ITEM OF WORK
4296/4 (9/98)
SHEET 1