ESCLICE 3.0 TP Extra Light
ESCLICE 3.0 TP Extra Light
ESCLICE 3.0 TP Extra Light
CONTENTS
Idea Description Plan 1st oor, 2 nd oor. Living Plan 1st oor, 2 nd oor. Mirror Plan 1st oor, 2 nd oor e Plan 1st oor, 2 nd oor. Sauna Plan 1st oor, 2 nd oor. Empty Roof plan Facades Facades Rendered views Foundation plan EL plan HV and water, sewerage plan Section 1-1, 2-2 Details Window and door speci Terrace House transportation covering tent Transportation scheme Emplacement scheme Photos Photos from Milan Furniture Fair 2010 Publications Design award Contacts tion
3.0c - 4 3.0c - 5 3.0c - 7 3.0c - 8 3.0c - 9 3.0c - 10 3.0c - 11 3.0c - 12 3.0c - 13 3.0c - 14 3.0c - 15 3.0c - 16 3.0c - 17 3.0c - 18 3.0c - 19 3.0c - 20 3.0c - 21 3.0c - 22 3.0c - 23 3.0c - 24 3.0c - 25 3.0c - 26 3.0c - 2729 3.0c - 3032 3.0c - 33 3.0c - 34
by arhiidea
IDEA / PROJECT The conception of the house was created deriving inspiration from rye-bread loaf, not just semantically but ideologically as well. To gain a good satiety it is enough with a good hunk of bread and there is no need to eat up the whole loaf that could be referred to overwhelming private house building traditions in Latvia. Industrial production of the house allows reducing house project costs to the utmost that concerns constructive, engineering and technical parts using standard solutions, that allows increasing the quality of interior and exterior decoration of finishing as well as the quality of technical solutions. Developing this project the following guidelines were taken into account: Material and intellectual resources of local origin producers of idea, architecture, design and management ( SIA Arhiidea ), furniture collection mint, interior decoration ( SIA Rauzas kompnija ), constructive solutions ( SIA Kurbads ), materials, windows, doors and realization ( SIA BykoLat ). Flexibility of interior and exterior to meet clients demands. Options possible choosing room planning, interior and exterior decoration. Energy effciency facilities developed in a way to per form the best quality there are used so called blow-test system that indicates heating stability of the building. Mobility of the building building can be delivered anywhere in the world in a finished way.
TEAM CONCEPT World is mystic, World is harmony, we are playing reality Martins Hermansons Toms Kokins Eriks Grube
SIA Arhiidea Alberta street 12 - 15 Riga, Latvia, LV - 1010 www.arhiidea.lv; birojs@arhiidea.lv www.esclice.eu; esclice@arhiidea.lv t: +371 67334004; f : +371 67334005
by arhiidea
3.0c - 4
SIZE
3m
13.5m
PLANNING Total area of the building is 42 m2, it is designed for 2+2 lodgers. Taking into consideration the interior body-size the planning is linear. On the frst floor towards the outside terrace and the portal the living area is situated with its soft furniture group, breakfast counter, where from the other side the kitchen area is situated with its built-in household technique. Further on the hallway leads to bed-room and bathroom with a shower. Stairway situated in the living area leads to lounging area on the second floor. CONSTRUCTIVE SCHEME Floor framework from massive glued wooden beams, cross-section 150x150 mm, beams 144x44 with distance 600 mm, the bottom coated with ASB, the sur face lathing and OSB siding. Walls bearing wooden pillars 144x44 with distance 600mm coated with OSB on the outside and lathing; plywood panel from the inside. Overhead covering - bearing wooden pillars 144x44 with distance 600 mm coated with OSB on the outside and lathing; plywood panel from the inside. Roof wooden rafter 194x44, with distance 600 mm coated with OSB and lathing. Foundation foundation depth and dimensions depend from specifc type of ground and load carr ying capacity. Standard solution provides 300x300 mm pillar - type concrete monolith foundation base . Foundation depth at least 900 mm from the ground level, 250 300 mm recommended between the ground level and building. WINDOWS AND DOORS The building has wooden windows and doors with double-glazing. Door and window specifcation see on page 3.0c-21. TECHNICAL FACTS Accounting results U values: Walls (OSB 10 mm, wooden framework/ rock wool 145 mm, lathing/ rock wool 45 mm, plywood panel 12 mm): 0,213 W/m2K (LBN 0,30); Roof (OSB18mm, beam/ rock wool 195 mm, lathing/ rock wool 45 mm, plywood panel 10 mm): 0,20 W/m2K (LBN 0,20); Floor (OSB 10mm beam/ rock wool 145 mm, lathing/ rock wool 45 mm, OSB 18 mm, parquet 13 mm): 0,25 W/m2K (LBN 0,25); Windows (wooden frames, double-glaze): 1, 49 W/m2K; Front door (wooden frame, double-glaze): 1, 48 W/m2K (LBN 1, 8).
5.3m
by arhiidea
3.0c - 5
1
3 732 1 265 1 505 930 5 892
A
1 440 900 118 700 3 275
1-1
A
1 404 751 118 7 260 200
1-1
124
3
600 845
2
705 45 750 705 6 600
2-2
2 675
836
1 697
1 630
4 770
3 130
2 097
2 485
1
4 013
1 2 3 4 5
LIVING AREA / 13,2 m2 KITCHEN AREA/ 6 m2 WC, BATHROOM / 2,7 m2 BEDROOM / 6,6 m2 CORRIDOR / 2,7 m2
3 100
200
1 700
A
2 400 700 199 2 800 2 960 400
1-1
26.2
2 218
1-1
26.2
2-2
2-2
B
13 324 13 486
1
6 BEDROOM / 10,9 m2
by arhiidea
2
5 892 930 1 505 1 265 3 732
A
200 700 7 260 900 1 440 751 118 1 404 118 3 275
1-1
1-1
2 400
2 960 2 800
2-2
6 600
705
750 45 705
845
600
836
124
1 700
2 675
2-2
200
B
2 097 3 130 4 770 1 630 1 697
2
1 2 3 4 5
2 485
1
3 100 4 013
LIVING AREA / 13,2 m2 KITCHEN AREA/ 6 m2 WC, BATHROOM / 2,7 m2 BEDROOM / 6,6 m2 CORRIDOR / 2,7 m2
A
199
1-1
A
2 400 700
2 960
2 800
26.2
400
2 218
1-1
26.2
2-2
2-2
B
13 324 13 486
2
6 LIVING AREA / 10,9 m2
by arhiidea
1
3 732 1 265 1 505 930 5 892
A
1 440 900 118 700 3 275
1-1
A
1 404 751 7 378 200
1-1
124
3
600 845
2
705 45 750 705 6 600
2-2
2 675
836
1 697
1 630
4 770
3 130
2 097
2 485
1
4 013
1 2 3 4 5
OFFICE AREA / 13,2 m2 KITCHEN AREA/ 6 m2 WC, BATHROOM / 2,7 m2 OFFICE / 6,6 m2 CORRIDOR / 2,7 m2
3 100
A
2 400 700 199 2 800 2 960 400
200
1 700
1-1
26.2
2 218
1-1
26.2
2-2
2-2
B
13 324 13 486
1
6 OFFICE AREA / 10,9 m2
by arhiidea
1
3 732 1 265 1 505 930 5 892
A
900 118
1-1
A
700 3 275 1 404 751 7 378 200
1-1
836
2-2
2 675
124
3
600 845
2
705 45 750 705 6 600
1 697
1 630
4 770
3 130
2 097
2 485
1
4 013
1 2 3 4 5
LIVING AREA / 13,2 m2 KITCHEN AREA/ 6 m2 WC, BATHROOM / 2,7 m2 SAUNA / 6,6 m2 CORRIDOR / 2,7 m2
3 100
A
2 400 700 199 2 800 2 960 400
200
1 700
1-1
26.2
2 218
1-1
26.2
2-2
2-2
B
13 324 13 486
1
6 BEDROOM / 10,9 m2
by arhiidea
1
3 732 1 265 1 505 930 5 892
A
150 700 200
1-1
1-1
1
5 550
2-2
118 150
7 258
2-2
1 700
1 697
1 630
4 770
3 130
2 097
2 485
1
4 013
1 AREA / 31,8 m2
3 100
200
A
2 400 700 199 2 800 2 960 400
1-1
26.2
2 218
1-1
26.2
2-2
2-2
B
13 324 13 486
1
6 AREA / 10,9 m2
by arhiidea
1-1
940
500
1-1
940
2 800 2 960
26.2
80
26.2
2-2
2-2
500
13 324 13 486
1
ROOF MATERIAL Pine wood siding Color - 001 (natural) Roof area 45 m2
1-1
940
500
1-1
940
2 800 2 960
26.2
26.2
80
2-2
2-2
500
13 324 13 486
1
ROOF MATERIAL Titanium Zinc Rheinzink Roof area 45 m2
by arhiidea
486
960
486
960
by arhiidea
486
960
486
960
by arhiidea
by arhiidea
1
300
DETAIL 1
4975 300 2173
DETAIL 2
300 4976
DETAIL 1
2
300
A
300
2200
2800
300
B
13324
DETAIL 2
DETAIL 1
DETAIL 2
DETAIL 1
Drillholes for wood screws d10mm
View A
50
50 50 400 300
View B
50 50 50
100
150
100
100
200
SECTION OF DETAIL 1
VIEW A
VIEW B
DETAIL 2
Sheet thickness 10mm Steel tube welded to sheet View A 50 50 View B 50 50 50 200 50
300
50 50 50
150
200
50
150 300
150
SECTION OF DETAIL 2
VIEW A
VIEW B
75
225
150
50
300
by arhiidea
by arhiidea
B
Opening window with ventilation mechanism L = 30 m/h3
B
Opening door with ventilation mechanism L = 30 m/h3
External network DN25 WC input in oor 110; h = 0.00 output out of house 110; h = -0.24
5 884 3 900
40
650
250
A
S C H
50 40 40
1
BATHROOM EQUIPMENT SPECIFICATION
Bathroom sink - Duravit, D-Code, white, art. 23105500002 Tap for sink - Hansgrohe,Talis E2, chrome, art. 31612000 Water closet - Duravit, D art, 211110100002, 0927000004, 00673100000 Shower equipment - Hansgrohe, Raindance S120 AIR, 3-jet, chrome, art. 27886000 Tap for shower - Hansgrohe, Talis E2, art. 3162000
KITCHEN EQUIPMENT SPECIFICATION Kitchen sink - FRANKE, ROL 610-41, Tap for kitchen sink - FRANKE 115.0032.612, BAT 640, chrome
by arhiidea
+5,128
Detail 4
+1,828 +1,498
+2,208
Detail 5
+0,935
2
min. -1,429
SECTION 1-1
+5,128
Detail 4
0,000 ~ -0,529
2
min. -1,429
SECTION 2-2 INTERIOR FINISHES External walls in axes 1-2 - painted plywood panels, W01 Ceiling, external walls in axes A-B - veneered ash plywood, natural color Inner walls - laminated wall panel, white, art. WA
by arhiidea
DETAIL 1 Roof
Wood siding 28 Vertical lathing Bitumen hidroinsulation 22 OSB Porous wind protection material 220 Bearer/ stone wool Vapor barier 20 Vertical lathing 9 Veneered plywood
20 9 22 220 28
10 145 45 9 28
45 9
45 12 145 12
18
12 Veneered plywood 18 OSB 45 Lathing / stone wool Vapor barrier 145 Beam / stone wool 12 OSB
12 Laminated wall panel, white, art. WA 95 Post / stone wool 12 Laminated wall panel, white, art. WA
12 95 12
12 145 12
28 10 145
Wood siding Vertical lathing OSB Bearer/ stone wool Vapor barrier Vertical lathing /stone wool Veneered plywood
by arhiidea
TITLE L-1
SKETCH
493
TOTAL REMARKS
1
1 453
Non opening wooden window, U = 1,48. Iceland prole, compatible with L-2
1 000
1 950 2 950
961
28 8
1 000
2 100 3 100
2 200
250
L-2
Non opening wooden window + doors with built-in constructive lintel. Iceland prole, compatible with L-1.
L-3
1 600
1 600
2 400
600
L-4
1 265
600
L-5
900
900
L-6
L-7
1 400
940
D-1
2 100
900
by arhiidea
TITLE
SKETCH
3 100 44 44 44 44 44 44 25 581 556 556 556 537 25 2 485
TOTAL REMARKS
1 Terrace Finish - wood planks 28x120 mm, gap between planks 5 mm Constructive frame - 44x144 mm,
4 013
25
by arhiidea
2 750
www.esclice.eu
2 981
2 620
13 442
REMARKS FOR TRANSPORTATION the transportation of the house must correspond to the recommendations given by the supplier and to the overall safety norms for transportation; the emplacement of the house must be organized and adjusted to each location specifically, regarding the actual condition of ground, surroundings etc.; the weight of the lower part of the house is ~ 7,5 t, the upper part ~ 3 t, the loop fastenings for lifting the parts of the house must be able to take min. 4 t
Standard truck
by arhiidea
After removing the tent, the part of the house must be lifted by the loop fastenings (4 loops)
After removing the tent, the part of the house must be lifted by the loop fastenings (2 loops)
by arhiidea
The lower part of the house is placed on the foundations After placing down the lower part of the house the fastening loops should be removed
After placing down the upper part of the house the fastening loops should be removed The fastening loops should be stored for futher transportation if necessary
After connecting both parts of the house the connection line should be covered by wooden planks, facade material
by arhiidea
by arhiidea
3.0c - 26
by arhiidea
by arhiidea
by arhiidea
by arhiidea
3.0c - 30
by arhiidea
3.0c - 31
by arhiidea
3.0c - 32
SIA Arhiidea Alberta str. 12 - 15, Riga, Latvia, LV-1010 www.arhiidea.lv; birojs@arhiidea.lv www.esclice.eu; esclice@arhiidea.lv t: +371 67334004; f : +371 67334005
by arhiidea