Micro Hydro Plant Components
Micro Hydro Plant Components
Micro Hydro Plant Components
Topics
Components of Mini/Micro Hydro Subsidy Policy for Pico/Micro/Mini Hydro Issues Lesson Learned
Ecological Regions
8848 m amsl
Tibetan Plateau
67 m amsl
Middle hills
High Mountains
High Himalayas
Classification
Micro-Hydro
Civil Components Mechanical Components Electrical Components Transmission/Distribution Electrical + Mechanical Network
Electro-mechanical Component
7
Overview
Intake
Canal
De
si
gB ltin
n asi
Canal
Crossing
Cr os sin
Forebay
g
Forbay
Sp ilw ay
Anchor Block
Anchor Block Support Pier
Canal
Riv er/ K
ay ilw p S
Kh
ho
la
Support Piers
Spill way
Penstock Pipe Anchor Block
sa ol
e ac ilr Ta
Power House
Power House
Tailra ce
Major Civil Components Of Micro Hydro Scheme
MHP
MHP Components
10
Desilting Basin
Desilting Basin
12
Canal
13
Forebay
14
Support Structures
15
16
17
Transmission Line
Forbay Trasrack Air Vent Pipe Anchor Block Expansion Joint
Penstock pipe
H.T. Lightning Arrestor L.T. Lightning Arrestor
Support Pire
R Y B
Penstock Pipe
Anchor Block
ELC
Drop- out Fuse
Transformer Generator
ELC Board
H. T. Line L. T. Line MCCB Transformer ( T1) 400/11000 V, 15kVA T. Plate form Danger Plate Ground Level
Earthing
Generator Turbine
Turbine
Power House
MHP
MHP Components
Electro-Mechanical Eqpts.
19
Turbine
20
Net Head: 17.5m Flow: 918l/s Turb.speed : 418rpm Wt: 1280 kg Power: 120kW mech. Size: 400d, 800w
Designed by: United technical Support Service (P.) Ltd Manufactured by: Balaju Yantra Shala (P.) Ltd
21
IGC/ELC/Governor
22
Transmission/Distribution Network
Distribution Line
MHP
MHP Components
Transmission/Distribution
24
25
26
Head (m)
Discharge (l/s)
MHP
MHP Components
Power Calculation
P = g*Q*H*
Where, P = Power (kilo Watt) g = Acceleration due to gravity (m/sec2) Q = Discharge (l/sec) H = Head (meter) = Overall efficiency
28
29
30
31
32
33
34
Additional Subsidy
35
36
37
Issues
Transportation: Terrain Habitat Load Consumption Political and Social Issues Economical Issues Technical Issues Sustainability Issues
38
Transportation:
Road access Crossing of Rivers Delivery of Equipments Increases Project Costs
39
Terrain
Complicated Terrain Structure Difficulties of Civil Construction
40
Habitat
Scattered Habitat Large Distances between 2 Habitats.
41
Economical Issues
Lack of Financial Resources. Bank rarely financed RE. Syndicate System and Inflation.
43
Technical Issues
Lack of Trained Operators and Skilled Manpower for the Installation. High Turnover Rate of Youth and Skill Manpower from villages. Overloading of Transformers and Generators.
Hydrology (Discharge measurement) Low Efficiency of the System. Comparatively weak construction of Civil components. 44 Not capable to manufacture turbine (>100
Sustainability Issues
Financial transparency in community Lack of we-feeling (ownership) Weak Management Less Tariff Less IG activities/ End Use promotion (low
HDI, lack of local market, inaccessible, low reliability of MHP, high seasonal migration)
45
46
47
48
Lesson Learned
49
50
51
52