Cement Consumption
Cement Consumption
Cement Consumption
SECTION-I STANDARD CEMENT CONSUMPTION Item No. Name of Work Rate of Cement consumption in bags. 3.10 / Cum 4.10 / cum. 5.20 / cum. 6.20 / cum. 7.00 / cum. 8.20 / cum. 9.90 / cum 1.40 / cum. 1.09/cum 1.70 / cum. 2.10 / cum. 1.15 / cum. 1.40 / cum. 1.70 / cum. 0.28 / m2. 1.70 / cum. 2.00 / cum. 2.50 / cum. 1.90 cum. 2.30 / cum. 2.80 / cum. 2.15 / cum. 2.60/ cum. 3.20 / cum. Remarks Lower limit Remarks Upper Limit 3.40 4.40 5.50 6.50 7.30 8.50 10.20 ------------------------------------
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
C.C. M-75 C.C.M-100 C.C. M-125 C.C. M-150 C.C. M-175 C.C.M-200 C.C. M-225 Brick masonry 2nd class in CM 1:6 without pointing a) Brick masonry 2nd class in CM 1:8 without pointing b) Brick masonry 2nd class in CM 1:5 without pointing c) Brick masonary 2nd class in CM 1:4 without pointing Brick masonary 1st class in CM 1:6 without pointing Brick masonary 1st class in CM 1:5 without pointing. Brick masonary 1st class in CM 1:4 without pointing 115 mm thick Brick masonary CM 1:3 UCR masonry in CM 1:6 UCR masonary in CM 1:5 UCR Masonary in CM 1:4 (35% mortar to be used) UCR masonary CM 1:6 without pointing ( 40 % mortar to be used ) UCR masonary CM 1:5 without pointing (40 % mortar to be used) UCR masonary CM 1:4 without pointing ( 40 % mortar to be used ) UCR masonary CM 1:6 without pointing (45 % mortar to be used). UCR masonary CM 1:5 without pointing ( 45 % mortar to be used) UCR masonary CM 1:4 without pointing ( 45 % mortar to be used).
44
Contractor Executive Engineer
26 27 28 29 30 31 32 33 34
45
Contractor Executive Engineer