Autoclave Manual
Autoclave Manual
Autoclave Manual
JA-232X
Product of J&A
OPERATION
MANUAL
JA-232X XpressClave Sterilizer
Please read this manual carefully prior to using your new Autoclave. Following the simple instructions contained in this manual will help to ensure ease of use, trouble-free operation, and a longer working life for your Autoclave.
LOCATION...................................................................................................... 1 SPECIFICATION............................................................................................. 3 PREPARATIONS & INSTALLATION ............................................................... 4 OPERATION................................................................................................... 5 WARNING....................................................................................................... 8 APPENDIX.................................................................................................... 10 SIMPLE TROUBLESHOOTING.................................................................... 12 MAINTENANCE INSTRUCTIONS................................................................ 13
CHAPTER 1 LOCATION
Front View: Hose Holder
Temperature Selector
Backside View:
Fuse Breaker
Power Cord
Underside View:
Hose Fixture
Silicone Hose
G. 4 Min. STERI. TIME INDICATOR K H. I. 15 Min. STERI. TIME INDICATOR 30 Min. STERI. TIME INDICATOR SELECT BUTTON (STERI. TIME) POWER SWITCH WITH LAMP
JA -232X SA-232X
J. K.
CHAPTER 2 SPECIFICATION
Chamber Size 200mm 310mm (Depth) - SA-202X 230mm 400mm (Depth) - SA-232X 260mm 450mm (Depth) - SA-252X (Made of ST. ST. #304) 480mm (W) 400mm (H) 500mm (D) 540mm (W) 450mm (H) 630mm (D) 110V / 0.9 KW (MAX.) / 7.3A - SA-202X 230V / 0.9 KW (MAX.) / 3.9A - SA-202X 110V / 1.2 KW (MAX.) / 7.3A - SA-232X 230V / 1.4 KW (MAX.) / 3.9A - SA-232X 230V / 1.8 KW (MAX.) / 7.8A - SA-252X Safety Valve Low Water (Overheated) Power Cut Temperature Protection Switch Pressure Control Switch 7 years Approved By DNV ISO 13485 Approved By DNV Sterilization Box 1 (ST. ST. #304) Tray Set (Tray 3, Frame 1 Pulling Holder 1) (Made of ST. ST. #304) Spring Holder (Pouch Rack) (Made of ST. ST. #304)
Overall Size
Power Consumption
Safety Device
4. Pouring water (DISTILLED WATER ONLY) into water reservoir until water level near the FULL level sign in the water reservoir. You can also check the water level via water level viewing hose which is located outside the cover. (See Figure 1) CAUTION: Please DO NOT pour water over both signs. 5. Please take power cord out, and plug the male end into a standard single and grounded AC outlet.
POWER SOCKET: 110V / 15A, 230V / 15A
CAUTION: Before plug the power cord, please switch off the power. 6. Press the Power switch. If the lamp is lightened, that means the autoclave is electro-powered and is standby right now.
CHAPTER 4 OPERATION
PLEASE CHECK CHAPTER 3 AT FIRST. 1. Open the door and take out heater cover. 2. Turn the water valve to FILLING to fill water into chamber. (Water level must cover Heater completely.) Then turn the valve to CLOSE to stop filling. 3. Put heater cover back to chamber. Then arrange sterilization items (put in the sterilization box or on the tray first) into chamber. NOTE: Put the steam indicator strip in the meantime if necessary. 4. Select Sterilization Temperature. (118C to 134C by Temperature Selector) 5. Press the POWER switch. (Power switch lamp should be lightened.) 6. Select Sterilization Time. (4, 15, or 30 Min. by SELECT button) 7. Close the door. Then press START button. 8. Start Heating by heater. The HEAT indicator should be lightened right now. In the meantime, the cold air will be exhausting by steam trap. 9. Pressure rises to the preset value. Steam penetrates through the whole chamber. Start Sterilization process for the preset time. (ex.: 4 Min.) 10. Complete Sterilization. Buzzer sounds for 40 seconds. If youd like to take out the sterilization items at this moment, please: A) Turn the water valve to DRAINING, and the chamber pressure will start to decrease. When the Pressure Gauge indicates to 0 position, turn the valve to CLOSE. Then you will be able to open door. Or you can wait chamber pressure back to atmospheric pressure in order to open the door. ANY TIME YOU WANT TO OPEN THE DOOR, PLEASE MAKE SURE THE PRESSURE GAUGE INDICATES TO 0 POSITION.
B)
TURN THE WATER VALVE TO FILLING TO FILL WATER INTO CHAMBER (WATER LEVEL MUST COVER HEATER COMPLETELY)
MAKE SURE THE PRESSURE GAUGE INDICATES TO 0 POSITION, AND THEN OPEN THE DOOR
Figure 2
Put on the cover when sterilization item was put into box. By the way, don't forget to open both side windows before putting sterilization box into chamber.
Figure 3
Please check the level of the heater cover when the heater cover was put into chamber. Heater cover Figure 4 Please check heater cover and sterilization box are not in oblique position when the sterilization box was put into chamber.
CHAPTER 5 WARNING
PLEASE CHECK THE FOLLOWING ARTICLES CAREFULLY. 1. Anytime before opening the door, please double check the pressure gauge. DO NOT opens the door when the pressure inside the chamber is over 0 kg/cm. 2. Use only DISTILLED WATER Or we may not be able to offer the quality guarantee. 3. Remember to fill water into the chamber before every cycle. 4. Dont forget to turn the water valve to CLOSE after filling water. Or the pressure inside the chamber cannot rise. 5. The door knob must be turned tightly. Make sure that it touches the blue O-ring can help the door closed completely. 6. Dont overfill water into the water reservoir. Blue O-ring Door knob
7. The filter inside the chamber and piping system should be cleaned per season at least. 8. We recommend use of chemical indicator strips as a check for sterilization. These strips may also be kept as a record of sterilization. 9. Please pay attention to the high temperature on the top of the housing when its working. 10. In the event of an emergency, or maintenance, please switch off the POWER and unplug the power cord immediately. 11. Signs of CAUTION and INDICATION: Caution! Hot surface.
Grounding terminal. This label is meaning that indicator for power off. This label is meaning that indicator for power on. Consult instructions for use 12. Storage environment: temperature: -10 ~+ 50 / humidity 80% 13. Working environment: temperature: 1 ~ + 40/ humidity 80% 14. Transportation environment: temperature: -10 ~ + 50 / humidity 80% 10
**Temperature at 134C / 273F (Approx. 2.1 kgf / cm) UNWRAPPED WRAPPED Select 4 Min. sterilization time Select 15 Min. sterilization time
**Temperature at 121C / 250F (Approx. 1.2 kgf / cm) UNWRAPPED WRAPPED Select 15 Min. sterilization time Select 30 Min. sterilization time
AFTER RUNNING LIQUID STERILIZATION PROGRAM, DO NOT USE WATER VALVE TO RELEASE THE PRESSURE MANUALLY. CHAMBER PRESSURE QUICK-RELEASING MAY CAUSE THE GLASS CONTAINER CRACKED.
11
6-2
PACKING INSTRUCTIONS:
RE-PACKING INSTRUCTIONS: TO PACK AUTOCLAVE INTO CARTON (PLEASE REFER TO CHAPTER 1 LOCATION OF CONTROLS) 1. Draining off all water from the autoclave, including chamber, water reservoir and hose. 2. Turn off the POWER and unplug the power cord. 3. Place all accessories into the chamber. Close the door firmly. 4. Cover the autoclave with the plastic bag. 5. Put the base carton containing the packing bottom-foam onto the floor. 6. Place the autoclave into the base carton and fixed it in the bottom-foam set. 7. Place the wall piece of carton into the base carton. 8. Put 4 pieces of angle paper fixing in each corner of the carton. 9. Put the top carton piece on. 10. Put top foam (4 pcs) on around the top of the autoclave. 11. Close the top of the carton and seal with tape. 12. Binding with binder to concrete the top carton and base carton. 13. The carton was already designed with 2 holes on each side. Its convenience for carriers. IMPORTANT: We strongly recommend that all packing materials including the carton should to be kept properly. Its for reuse in case the unit needs to be transported again anytime.
12
CHAPTER 7
A.
SIMPLE TROUBLESHOOTING
POWER INDICATOR ISNT LIGHTENED 1. Cause: Power supply isnt connected properly. Solution: Re-connect power cord until power indicator light illuminates. 2. Cause: No Fuse Breaker flicked off. Solution: Please contact your distributor for help. 3. Cause: Over-heating protection is activated. Solution: Wait for 10 minutes and the autoclave will restart automatically.
B.
AUTOCLAVE ISNT OPERATING PROPERLY 1. Cause: Unable to press buttons Solution: Please contact your distributor for help. 2. Cause: Unable to heat up Solution: Please contact your distributor for help. 3. Cause: Unable to enter sterilization step Solution: Please contact your distributor for help. 4. Cause: Unable to complete cycle 4-1. Cause: Forget to fill water or water isnt enough. Solution: Please refill water and try again. 4-2. Cause: Water valve isnt closed. Solution: Please turn the water valve to CLOSE position and try again.
C.
COLOR OF STEAM INDICATOR STRIP DOESNT CHANGE 1. Cause: Select wrong sterilization time. Solution: Please re-select proper sterilization time for the sterilization items and try again.
13
WEEKLY: Drain off the remaining water of water reservoir and refill with distilled water. (*Please use the water level viewing hose to drain off water of water reservoir.) Remove the cap of water reservoir and find the safety valve. Pull the ringlet of the safety valve to check its working status.
MONTHLY: Clean the chamber and piping system with CHAM-MATE. Use clean water to scrub the water reservoir thoroughly. (Its to clean away the mineral residues of water.)
ANNUALLY: (Please contact your distributor for maintenance.) Check the working status of silicone door gasket, steam trap, safety valve, and heater. (Recommendation: Replace the silicone door gasket every year.) Test the functions of PCB (Printed Circuit Board). Check the temperature during sterilization. Use biological indicators to test the validity of sterilization.
14