Module 3 - Information Systems Architectures PDF
Module 3 - Information Systems Architectures PDF
Application Architecture
Data Architecture
Module Objectives
The aim of this module is to understand: The objectives of Phase C, Information Systems Architectures The Approach A brief overview of the inputs and outputs
This module is an introduction to the next two modules that look at the two Information Systems Architectures
To define the kinds of application systems necessary to process the data and support the business
Approach
Phase C involves Data and Applications Architecture, in either Order Advocates exist for both sequences: Spewaks Enterprise Architecture Planning recommends a data driven sequence Major applications systems (ERP, CRM, ) often combine technology infrastructure and application logic. An application-driven approach takes core applications(underpinning mission-critical business processes) as the primary focus of the architecture effort. Integration issues often constitute a major challenge. Continued
Mahindra Satyam 2009
Phase C: Inputs
Request for Architecture Work Capability Assessment Communications Plan
10
Phase C: Inputs
Architecture Vision Architecture Repository Draft Architecture Definition Document Draft Architecture Requirements Specification, including: Gap analysis results Relevant technical requirements Business Architecture components of an Architecture Roadmap
11
Steps
The details for these steps will be covered in the next two modules
The steps follow a common pattern with Phases B and D
12
13
Summary
The objective of Phase C is to document the fundamental organization of an organizations IT System. Embodied in the major types of information and the application systems that process them Their relationships to each other and the environment The principles governing its design and evolution It should document how the IT systems meets the business goals of the organization
14
Thank you
mahindrasatyam.net
Safe Harbor This document contains forward-looking statements within the meaning of section 27A of Securities Act of 1933, as amended, and section 21E of the Securities Exchange Act of 1934, as amended. The forward-looking statements contained herein are subject to certain risks and uncertainties that could cause actual results to differ materially from those reflected in the forward-looking statements. Satyam undertakes no duty to update any forward-looking statements. For a discussion of the risks associated with our business, please see the discussions under the heading Risk Factors in our report on Form 6-K concerning the quarter ended September 30, 2008, furnished to the Securities and Exchange Commission on 07 November, 2008, and the other reports filed with the Securities and Exchange Commission from time to time. These filings are available at http://www.sec.gov
15