Technical Development Programs (TDP) are modules of technical training on HVAC theory,
system design, equipment selection and application topics. They are targeted at engineers and
designers who wish to develop their knowledge in this field to effectively design, specify, sell or
apply HVAC equipment in commercial applications.
Although TDP topics have been developed as stand-alone modules, there are logical groupings of topics. The modules within each group begin at an introductory level and progress to
advanced levels. The breadth of this offering allows for customization into a complete HVAC
curriculum from a complete HVAC design course at an introductory-level or to an advancedlevel design course. Advanced-level modules assume prerequisite knowledge and do not review
basic concepts.
Water piping and pumping is a fundamentals topic of HVAC design. The correct layout, selection and sizing of the piping system and associated hydronic components is required to
properly deliver chilled and hot water as required to maintain comfort conditions. Piping connections at various equipment are covered, along with piping arrangements for chilled water systems.
Pump basics, pipe sizing, and a pump selection example complete the TDP.
Printed in Syracuse, NY
CARRIER CORPORATION
Carrier Parkway
Syracuse, NY 13221, U.S.A.
Table of Contents
Introduction ..................................................................................................................................... 1
Types of Piping Systems ................................................................................................................. 1
Closed-Loop (Evaporator) ........................................................................................................... 1
Open-Loop (Condenser) .............................................................................................................. 2
Once-Thru.................................................................................................................................... 2
Water Distribution Systems............................................................................................................. 3
1-Pipe Systems............................................................................................................................. 3
2-Pipe Systems............................................................................................................................. 4
3-Pipe Systems............................................................................................................................. 5
4-Pipe Systems............................................................................................................................. 6
Direct and Reverse Return Systems................................................................................................. 7
Direct Return................................................................................................................................ 7
Reverse Return............................................................................................................................. 8
Water Piping Components and Accessories .................................................................................... 8
Pipe Materials .............................................................................................................................. 9
Joints ............................................................................................................................................ 9
Fittings ....................................................................................................................................... 10
Valves ........................................................................................................................................ 11
Hydronic System Components .................................................................................................. 16
Strainers ................................................................................................................................. 16
Expansion Tanks.................................................................................................................... 16
Air Separators ........................................................................................................................ 18
Air Vents................................................................................................................................ 18
Thermometers, Gauges, Petes Plugs..................................................................................... 19
Pipe Hangars and Anchors..................................................................................................... 19
Volume Tanks........................................................................................................................ 20
Typical Piping Details at Equipment ............................................................................................. 21
Chillers....................................................................................................................................... 21
AHU Coil or Fan Coil................................................................................................................ 22
Pumps......................................................................................................................................... 22
System Piping Arrangements ........................................................................................................ 23
Parallel and Series Chiller Evaporators ..................................................................................... 23
Single Water-Cooled Chiller Loop ............................................................................................ 24
Multiple Water-Cooled Chiller Loop with Dedicated Pumps.................................................... 24
Multiple Water-Cooled Chillers with Manifolded Pumps ......................................................... 25
Primary-Secondary Chilled Water System ................................................................................ 25
Primary-Only, Variable-Flow Chilled Water System................................................................ 26
Chiller Head Pressure Control ................................................................................................... 27
Head Pressure Control Piping Methods with Diverting Valve .............................................. 28
Head Pressure Control Piping Method with VFD or Modulating Valve ............................... 29
Pump Basics and Types of Pumps................................................................................................. 29
Pump Curve ............................................................................................................................... 32
Selection..................................................................................................................................... 35
Centrifugal Pump Types ............................................................................................................ 36
Introduction
In this TDP module we will cover major topics associated with chilled water piping, and to a
limited extent, hot water piping. We will discuss the three types of piping systems and the four
basic piping distribution designs used to supply and return water to HVAC hydronic equipment.
There are important components and accessories that are required to complete a water piping
system. These include valves, tanks, and air eliminators. We will examine these system components and define their role in the total hydronic system.
After examining some typical piping hook-ups to commercial HVAC equipment, we will
diagram and discuss popular piping arrangements, such as primary secondary and primary variable flow. We will then discuss a popular pipe-sizing tool from a noted pump manufacturer that
streamlines the sizing process. We will also examine types of water pumps used in HVAC systems and their characteristics and applications.
Upon completion of this TDP, the reader should feel comfortable identifying, selecting, and
applying the major components of water piping systems.
Closed-Loop (Evaporator)
In a closed-loop piping system,
the water is contained within a closed
piping system, or loop, through which
it circulates. While there may be some
nominal contact with the air depending on the type of tank used, the
system is considered closed to the
environment. Typically, closed-loop
systems are chemically treated to control corrosion, scale, slime, and algae
within the piping but their chemical
treatment requirements typically are
not as extensive as an open-loop.
Figure 1
Example of a Closed-Loop Piping System
Distribution Systems
Open-Loop (Condenser)
In an open-loop piping system,
the water is in constant contact with
the air and the system is therefore
open to the atmosphere. A typical example of an open-loop system is a
recirculating condenser water system
with a cooling tower where the water
is circulated through the cooling
tower, sprayed over the tower media
surface, collected into the tower basin,
circulated through the condenser, and
then sent back through the cooling
tower.
Figure 2
Example of an Open-Loop Recirculating System
Once-Thru
In this type of system, water passes through the system once and is then discharged. An example of a once-thru system would be a chiller with river water piped into its water-cooled
condenser. The rejected heat from the
condenser is introduced back into the
river, which is not always acceptable
from an environmental perspective.
In general, once-thru systems that use
city water are not allowed because
they use excessive amounts of water.
Pipe-sizing methods
are virtually the same for all
three types of systems, however
there are differences in friction
loss due to expected corrosion
rates in the pipes. Hence pipesizing charts differ between open
and closed-loop systems. A
once-thru system is considered
an open-loop system, but
typically does not get any
chemical treatment like an open
system does. But because river
water may have more
contaminants, the open-loop
tables should be used, and may
be conservative.
Figure 3
Example of a Once-Thru System
Distribution Systems
1-Pipe Systems
A 1-pipe water distribution system is a system that has a one main pipe looping around the
building and then returning.
1-Pipe System Uses
Since 1-pipe systems are
typically only used for
heating, the supply and return
are shown connecting to a
boiler instead of a chiller.
Distribution Systems
The change in water temperature as the water moves through the system (the water gets
colder after each successive terminal because of mixing) creates the possible need of larger units
at the end of the main, which will complicate the selection of the zone terminal units and add cost
due to oversized units near the end. Also, at part load, the end unit may be over or under capacity.
In order to keep the pressure loss through the unit coils low, the water velocity through the
coils must be kept low. This results in coils with large tube diameter, a greater number of tubes in
parallel, or larger coils than used with other distribution systems. Therefore, a physical space and
terminal cost penalty exist when a 1-pipe system is used.
The 1-pipe system is poorly suited to chilled water distribution for several reasons. The water
quantity used in chilled-water systems is usually considerably higher than that used for heating
because the unit coils work on smaller temperature differentials in the cooling mode than in the
heating mode. In order to economically accommodate higher flow rate, zone terminals used for
chilled water would need to be redesigned so they are not prohibitively large, expensive, or
space-consuming.
2-Pipe Systems
The 2-pipe water distribution system is used with both heating and cooling equipment containing water coils. It is equally useful for room fan coil units and medium or large central air
handlers using combination hot water and chilled water coils. The 2-pipe system can be used to
distribute either hot or cold water, or alternate between the two. The same piping is used for both
heating and cooling so there must be a definite outdoor temperature, which is called the changeover temperature, or some other indicator of building load, at which
point the hot water in the piping is
replaced by the chilled water and vice
versa.
Some 2-pipe fan coil units are
equipped with electric heat in addition
to the heating capability of the hot
water coil. This touch up electric
heat can be used if heating is required
for a fan coil but the system is still not
changed over to the heating mode.
2-pipe system changeover
Figure 5
There are two forms of 2-pipe water distribution systems in common use: 2-pipe direct return
and 2-pipe reverse return. Direct and reverse return will be covered later.
In a 1-pipe system, the supply and return main is the same pipe. The quantity of water flowing through the main is approximately constant and the main is built of one diameter pipe
throughout its length. On the other hand, in the 2-pipe system, the supply and return mains are
separate pipes and water leaving the supply main goes into the return main. As water leaves the
Distribution Systems