General Notes ....................................................................................................................... 3 Explanations of the symbols.................................................................................................. 3 General Hints ........................................................................................................................ 3 Qualified Personnel ............................................................................................................... 3 Cleaning ................................................................................................................................ 3 2 Incoming inspection............................................................................................................... 4 3 Ordering key for standard SDF-sensors ............................................................................... 5 4 Mounting instructions ............................................................................................................ 6 4.1 General note.......................................................................................................................... 6 4.2 Determination of the mounting location................................................................................. 6 4.3 Determination of the mounting position................................................................................. 6 4.3.1 Horizontal pipe run: ...................................................................................................... 6 4.3.2 Vertical pipe run and existing risk of condensation: ..................................................... 7 4.4 Orientation of the SDF flow sensor ....................................................................................... 7 4.5 Fitting of the mounting parts.................................................................................................. 7 4.6 Mounting and alignment of SDF flow-sensor ........................................................................ 9 Connecting the differential pressure transmitter to the sensor .......................................................... 10 5.1 Sensor with mounting plate for direct connection of the transmitter to the sensor................ 10 5.2 Sensor with connector nipples for connection of the transmitter via differential pressure lines................................................................................................................................ 11 5.2.1 Connecting the differential pressure pipes at gaseous media...................................... 11 5.2.2 Connecting the differential pressure pipes at liquid media........................................... 12 6 Troubleshooting..................................................................................................................... 13 1.1 1.2 1.3 1.4 1
1 General Notes
1.1 Explanations of the symbols
Warning of a danger place (caution: consider documentation) ISO 3864, No. B.3.1
1.4
Cleaning
Outside sediments on the pitot tube can be cleaned (when dismantled) with a wire brush. It is to be made certain that the profile geometry and the profiles are not damaged. The measuring chambers can be blown free with compressed air. Please note that the pitot tube consists of two measuring chambers (upstream and downstream). Dependent on the degree of contamination of the process medium the pitot tube must be checked however for contamination / blockages and damages. The maintenance intervals are to be determined depending upon system. Experience shows that with the usual maintenance at the latest also the pitot tube should be checked.
2 Incoming inspection
Each delivery leaving S.K.I. GmbH is carefully inspected to the best knowledge. On the packing list included, the employee responsible for the delivery confirms with his signature that the delivery contains all the items specified in the delivery documents. Nevertheless, it is necessary for the customer to carry out a crosscheck as soon as possible after receipt of the delivery. Only then justified complaints can be settled quickly and without further discussion. On receipt of the delivery please check: if the rating plate corresponds to that indicated on the delivery note if the version delivered corresponds to the version ordered especially with respect to sensor length, sensor material and mounting parts material, insofar as this is possible if the scope of delivery corresponds to the standard delivery list
SDF
TAG-plate
Pipeline mounting
Welding socket with cutting ring joint Mounting flange Special version
Profile type
"10" "22" "32" "50"
Internal diameter (value with dimension) Wall thickness (value with dimension) Sensor material
S R H HT X C E X 0 SC GF X M.No. 1.4571 (316 Ti) M.No. 1.4539 M.No. 2.4819 (Hastelloy C276) M.No. 2.4816 (Inconel 602) Special material
End support
none End support with pipe thread and hood End support with flange Special version
Primary shut-off
none Ball valves made of carbon steel Ball valves made of 1.4401 Shut-off valves PN420 made of carbon steel Shut-off valves PN420 made of 1.4571 Shut-off valves PN420 made of 1.7335 mounted 3-way valve of carbon steel (only with flange plate) mounted 3-way valve of 1.4401 (only with flange plate)
Special accessories
none 1 pair of screw joints for pipe connection 12 mm of carbon steel 1 pair of screw joints for pipe connection 12 mm of 1.4571 3-way manifold with 1/2"-NPT socket connection for direct mounting to electrical differential pressure transmitter, carbon steel 3-way manifold as above, but material 1.4571 Multiway cock PN100 with scavenging connections of carbon steel Multiway cock PN100 with scavenging connections of 1.4401 One-side cleaning openings for compressed air connection compressed air connectionruckluftanschlu Inspection and cleaning openings (only practical with end supports)
Pipe run
Horizontal Vertical (also inclined run)
4 Mounting instructions
4.1 General note
With the installation the valid national regulations are to be considered, in particular: The regulations of the Druckgeraeterichtlinie (pressure device directive) 97/23/EG (if applicable). The regulations of the Maschinenrichtlinie (machine directive) 98/37/EG (if applicable). Before the assembly/disassembly the piping or the channel is to be made pressure- free. Poisonous / health-endangering media: before the assembly/disassembly the piping is to be cleaned.
Ein Rohrbogen
FLOW
7*ID
3*ID
Zwei Rohrbogen
FLOW
10*ID 3*ID
A
reduction
Einschnrung
FLOW E A
7*ID
3*ID
controlling element
If you require more information, please contact our consulting and commissioning service.
Take into account obstructions existing in front of and behind the selected mounting location. Passive elements (e.g. bends) cause less interference than active elements (e.g. fans). Harmonic changes in the pipe run (bends with large radii, reductions according to DIN) are more favourable than sudden or less harmonic changes (corners, stops). Contact the manufacturer or responsible sales engineer if necessary!
flow direction from left to right from right to left from top to bottom from bottom to top
welding socket
necessary torque (TA) in acc. to ISO 9974-1/ ISO 6149-1/ DIN 3852-T1Form X/ DIN 3652-T3-Form W (metr. thread) of mounting-part for SDF-M: - SDF-M-10: TA 150 Nm - SDF-M-22: TA 250 NM
SDF-M-10 At the mounting location determined the pipe wall must be provided with a 21 mm diameter hole by boring or burning. The welding socket with screwed cutting ring connection must be tack-welded in such a way that the bore hole remains completely unobstructed. Align the inner bore hole of the mounting part in a position perpendicular to the axis of the pipeline and weld it to the pipeline. SDF-F-10 At the mounting location determined the pipe wall must be provided with a 17 mm diameter hole by boring or burning. The welding socket with flange must be tack-welded in such a way that the alignment of the screw holes relative to the axis of the pipeline meets the generally applicable rules. Make sure that the bore hole in the pipeline remains completely unobstructed, and weld the flange socket to the pipeline. SDF-M-22 At the mounting location determined the pipe wall must be provided with a 37 mm diameter hole by boring or burning. The welding socket with screwed cutting ring connection must be tack-welded in such a way that the bore hole remains completely unobstructed. Align the inner bore hole of the mounting part in a position perpendicular to the axis of the pipeline and weld it to the pipeline. SDF-F-22 At the mounting location determined the pipe wall must be provided with a 38 mm diameter hole by boring or burning. The welding socket with flange must be tack-welded in such a way 7
that the alignment of the screw holes relative to the axis of the pipeline meets the generally applicable rules. Make sure that the bore hole in the pipeline remains completely unobstructed, and weld the flange socket to the pipeline. SDF-F-32 At the mounting location determined the pipe wall must be provided with a 38 mm diameter hole by boring or burning. The welding socket with flange must be tack-welded in such a way that the alignment of the screw holes relative to the axis of the pipeline meets the generally applicable rules. Make sure that the bore hole in the pipeline remains completely unobstructed, and weld the flange socket to the pipeline. SDF-F-50 At the mounting location determined the pipe wall must be provided with a 71 mm diameter hole by boring or burning. The welding socket with flange must be tack-welded in such a way that the alignment of the screw holes relative to the axis of the pipeline meets the generally applicable rules. Make sure that the bore hole in the pipeline remains completely unobstructed, and weld the flange socket to the pipeline.
drilling template: 4 drilling template: 8
If the sensor is fitted with an end support the following mounting procedure is used: First the mounting location of the end support is determined; it is positioned directly opposite the mounting part. Recommended procedure for determining the opposite point: First mark the center of the mounting part to be installed on the pipeline. Then pass a tape of at least 30 mm width and appropriate length tightly around the pipeline, and align it in such a way that after one rotation it exactly covers the first layer. Start by holding one end of the tape to the point marked on the pipeline. Mark the tape at the point which after one rotation is directly adjacent to the marked mounting part centre. The distance from the start of the tape to this point is equal to the outer diameter of the pipeline. Remove the tape, determine the centre between the start of the tape and the point marked on the tape, and mark the centre of the tape. Place the tape around the pipeline again as described above. The point marked last on the tape (centre) is the position exactly opposite the mounting part. Finally you only have to transfer this point to the pipeline. If there is no tape available you can also use a cord to determine the diameter. In this case it is important to check the axial alignment of the cord by measuring the distance to the next flange. The mounting part is then mounted as described above. At the opposite point (see above) a hole of appropriate size is subsequently bored or burned into the pipe wall. Select the appropriate diameter from the following table:
end support with pipe end support with flange sensor thread and hood (SC) (GF) type SDF-...-22 28 mm 36 mm SDF-...-32 36 mm 38 mm SDF-...-50 54 mm 70 mm The end support is tack-welded to the pipeline and aligned with the mounting part previously welded to the pipeline. This ensures perfect insertion of the sensor without tilting.
Attention: For welding end support it is necessary to keep the following values: SDF-22=26mm, SDF32=34mm). Make sure that the bore hole in the pipeline remains completely unobstructed, and weld the end support to the pipeline. Recommended procedure for end support alignment After making the boring insert the sensor or a straight pipe with appropriate outer diameter through the mounting part already mounted, and loosely slide the end support over the projecting sensor end or
pipe. When the end support is correctly aligned (do not tilt!) tack it to the pipeline. Remove the sensor or pipe, and complete the welding. After the sensor has been mounted cover the end support with the supplied cap or blind flange, depending on the version.
SDF-F-10
SDF-M-22
5.1 Sensor with mounting plate for direct connection of the transmitter to the sensor
Sensors with a mounting plate for direct connection of the transmitter offer the most simple and economical way of connecting sensor and transmitter. Sensor, three-way manifold and transmitter thus form a kind of "sandwich" connected by means of 8 screws (4 on either side). This arrangement requires that the permissible temperatures at the transmitter diaphragm are not exceeded. The -side of the transmitter must be connected to the sensor flow side, i.e. the front side of the sensor when looking in the direction of the arrow (see figure). Both sealing faces - the one between sensor and valve block as well as the one between valve block and transmitter - must be fitted on one side with a sealing ring which must be inserted in the groove provided for this purpose. These sealing rings are part of the scope of delivery.
The three-way manifold is usually delivered mounted to the transmitter. The seals are inserted in the grooves and fixed with adhesive tape which, at the same time, covers the bore holes. Before mounting the tape must always be removed.
SDF-sensor for waste gas with direct mounted dp-transmitter and flanged 3-way-manifold: 1. mounting flange 2. SDF flow-sensor 3. differential-pressure transmitter 4. 3-way manifold
Thus a complete parts list for the commissioning of the sensor must comprise the following: sensor including mounting parts for mounting into the pipeline 1 ea. three-way manifold (version for mounting between flanges) for direct mounting to the transmitter and sensor including gaskets and screws 1 ea. differential pressure transmitter; a mounting support is not required!
10
5.2 Sensor with connector nipples for connection of the transmitter via differential pressure lines
If the transmitter is not mounted directly onto the sensor, it is connected via differential pressure lines. Usually pipes are used which are connected to the sensor and the transmitter by means of screwed connections. Normally screwed connections with cutting or clamping rings are used which allow the process connections to be adapted to the selected pipe connection with a diameter of 12 mm. On request these screwed connections can be obtained from S.K.I. GmbH.
SDF flow-sensor for waste gas for horizontal or vertical pipe running with 12mm tube process-connection and screw joints, optional ball valves with screw joints: 1. SDF flow-sensors 2. mounting flange
Thus a complete parts list for the commissioning of the sensor must comprise the following: sensor including mounting parts for mounting into the pipeline 2 ea. ball valves for the primary shut-off of the differential pressure lines of the sensor ea. fittings for adaption of both the process connections to the 12 mm diameter pipeline and the pipeline to the three-way manifold (1/2" 14 NPT female thread) 1 ea. three-way manifold for direct mounting to the transmitter with 1/2" 14 NPT female thread process connection including all screws and gaskets as well as, if required, the necessary oval adapters 1 ea. differential pressure transmitter with a pipe or wall mounting support and an adequate length of pipeline with 12 mm diameter
Please inform your responsible sales engineer or representative if you wish the commissioning of the sensors to be carried out by S.K.I. GmbH.
Water vapour in a bathroom condensates on a cold mirror surface and forms tiny water droplets. With the amount of condensate increasing, drops are formed which finally begin to flow down the mirror. The pressure line piping must therefore be in such a way that possible condensate will not flow towards the transmitter but back into the process. Just imagine: 10 mm of water column corresponds to 1 mbar differential pressure, which means for the measurement of gaseous media that even a small amount of condensate may cause a measuring error in the same order of magnitude as the effective signal itself.
12
6 Troubleshooting
Pos. 1 Description of the failure No or too small differential pressure Possible reason Sensor is not installed in direction of the flow The and connections between sensor and transmitter are exchanged (look at page 7) (the upstream side of the sensor is not connected with the + chamber of the transmitter and the downstream side is not connected to the - chamber of the transmitter. Primary shut off valve +- and/or - side is not opened Short cut valve (part of the 3-way-manifold) is not closed Leakages in the pressure lines Blocking of the sensor especially of the openings Steadying zones in front and behind the sensor are not long enough (look at page Fehler! Textmarke nicht definiert.) Air bubbles in the sensor head/ pressure lines or transmitter (l.a. pos. 3 / only during condensate measurement)) Condensated water in sensor head / differential pressure lines or transmitter (l.a. pos. 4 / only during gas measurement) Not all sensor openings are located in the cross section of the pipe/duct (look at page 9) Measuring range exceeding Steadying zones in front of and behind the sensor are not long enough (look at page Fehler! Textmarke nicht definiert.) Primary shut off valve +- and/or - side is not opened Sensor/drillings clogged Sensor not completely in free tubing cross section with all drillings (l.a. page 9) Trapped air in the sensor/ differential Wrong mounting of the pitot tube (l.a. page 6) pressure lines and/or transmitter (liquid media measurements) Incorrect venting (l.a. operating instruction differential pressure transmitters) Wrong mounting of the pitot tube (l.a. page 6) Water condensation in sensor / differential pressure lines and / or transmitter (gas measurements)) Differential pressure transmitters No or false output signal Wrong mounting of the transmitter (l.a. operating instruction for differential pressure transmitters) Wrong electrical connection of the d/p transmitter (l.a. operating instruction transmitters) Wrong parameterization of the transmitter (l.a. calculation sheet of the flow sensor)
Of course this listing cannot be complete. In the case of occurring errors, which are not contained in this list, please contact us directly.