Q 1: What are the various characteristics of a project?
What is the importance of each characteristic? Give
examples?
Answer:
It is well known to all that the organizations continue to grow year by year. As there is a
need to grow it becomes necessary for a growing organization to resort to proper growth
plan. The plan needs to be properly prepared. It is possible to prepare proper plans only if
the manager has sufficient knowledge of the various process of the project envisage for
growth. The manager has to work on the various life cycle stages and apply necessary
planning tools to come out with a proper growth plan of the company. The various
techniques of identifying the project items, work break down structure of the project, task
duration, estimation etc are to be done meticulously.
Characteristics
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 1
ASSIGNMENT ON PROJECT MANAGEMENT
a) Resource requirement - During the course of executing the project, it is seen that
the resource requirement increases from start to an intermediate stage of the project.
It further increases at rapid rate and becomes constant while the project is during its
80 to 95% progress stage. Thereafter the resources requirement decreases to zero i.e.
when the project comes to a finish.
b) Funds - The requirement of funds for the completes execution of the project also
follows the same trend as that of the resources. The two are more or less
proportional.
d) Risk - The risks involved in the project affecting its completion time is high at the
initial stages and low at the later stages of the project.
e) Design changes - The project during the course of its progress may be subjected to
changes because of some external factors. The influence of such external factors on
the project may result in changes in the design f the project though not very often. It
is observed that such changes if any are normally high during the initial stages of
the project and decreases as the project approaches finish.
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 2
ASSIGNMENT ON PROJECT MANAGEMENT
American-made car parts were all within specified tolerance levels. On the other hand, the
Japanese car parts had much closer tolerances than the USA-made parts - i.e. if a part was
supposed to be one foot long, plus or minus 1/8 of an inch - then the Japanese parts were
within 1/16 of an inch. This made the Japanese cars run more smoothly and customers
experienced fewer problems. Deming offers a theory of management based on his famous
14 Points for Management. Management's failure to plan for the future brings about loss of
market, which brings about loss of jobs. Management must be judged not only by the
quarterly dividend, but by innovative plans to stay in business, protect investment, ensure
future dividends, and provide more jobs through improved products and services. "Long-
term commitment to new learning and new philosophy is required of any management that
seeks
Transformation. The timid and the fainthearted, and the people that expect quick results, are
doomed to disappointment."
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 3
ASSIGNMENT ON PROJECT MANAGEMENT
End the practice of awarding business on the basis of price tag. Instead, minimize
total cost. Move towards a single supplier for any one item, on a long term
relationship of loyalty and trust.
Improve constantly and forever the system of production and service, to improve
quality and productivity, and thus constantly decrease cost.
Institute training on the job.
Institute leadership. The aim of supervision should be to help people and machines
and gadgets to do a better job. Supervision of management is in need of overhaul, as
well as supervision of production workers.
Drive out fear, so that everyone may work effectively for the company.
Break down barriers between departments. People in research, design, sales, and
production must work as a team, to foresee problems of production and in use that
may be encountered with the product or service.
Eliminate slogans, exhortations, and targets for the work force asking for zero
defects and new levels of productivity. Such exhortations only create adversarial
relationships, as the bulk of the causes of low quality and low productivity belong to
the system and thus lie beyond the power of the work force.
Eliminate work standards (quotas) on the factory floor. Substitute leadership.
Eliminate management by objective. Eliminate management by numbers, numerical
goals. Substitute workmanship.
Remove barriers that rob the hourly worker of his right to pride of workmanship.
The responsibility of supervisors must be changed from sheer numbers to quality.
Remove barriers that rob people in management and in engineering of their right to
pride of workmanship. This means, inter alia, abolishment of the annual or merit
rating and of management by objective.
Institute a vigorous program of education and self-improvement.
Put everyone in the company to work to accomplish the transformation. The
transformation is everyone's work.
Answer:
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 4
ASSIGNMENT ON PROJECT MANAGEMENT
Building concurrency into every activity is essential to reduce the development cycle time
and to counter the technology obsolescence. Many of the tasks that are normally done in a serial
fashion can be done in parallel by synchronizing the flow of information. The practices of the
concurrent engineering where the design of the product and all its associated processes are carried
out simultaneously based on team work and participation. Would not only help in reducing the
development cycle time, but also improves the product functionality with regard to requirements.
Concurrency can be accomplished in many ways both for product development as well as
technology transfer, user evaluation and production. Example - Tactical Aircraft: Concurrency in
Development and Production of F-22 Aircraft Should Be Reduced (Letter Report, 04/19/95,
GAO/NSIAD-95-59).
Because the F-22 fighter plane is not urgently needed and the Defense Department (DOD)
has discovered engine and software problems with the aircraft, GAO urges that the F-22 be
thoroughly tested before large numbers of these expensive aircraft are acquired. Concurrency
between the development and production phases of F-22 means that independent testing of high-
tech features of the aircraft will not be completed before the Air Force makes a significant
commitment to producing the F-22. Among other things, the F-22 boast an advanced architecture
for the integrated avionics system, a propulsion system that will allow cruising a supersonic speeds
without the afterburners that current fighters needs, and low observable technologies. The military
has already disclosed engine and stealth ness problems, and the potential for avionics and software
problems underscore the need to demonstrate the aircraft's capabilities before committing to
production.
Answer:
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 5
ASSIGNMENT ON PROJECT MANAGEMENT
The project manager is responsible for raising issues or concerns that require assistance or
guidance to the attention of the CIO. These items should be communicated whenever they
become known, and not held to the next Project Management Review. The CIO will assign
appropriate OCIO staff available to help resolve open items. The program / project manager
should communicate the status of these items in each quarterly review until the items are
resolved / closed.
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 6
ASSIGNMENT ON PROJECT MANAGEMENT
The program/project manager is responsible for tracking the open items from the review
and communicating the status in each quarterly review until the items are closed. The
supporting the scheduling of reviews will coordinate with the program/project manager
after the quarterly reviews to help ensure that new items have been captured for tracking
and action by the program/project manager.
• CIO Reports:
The staff supporting the CIO Quarterly Reviews will prepare a summary report after each
Project Management Review. The summary report will include the following information:
Summary Status.
Open Issues/Items.
Status Performance Objectives/Measures.
Status of Schedule/Cost
The summary report will be provided to the program/project manager to gain concurrence
on the content. The summary report will be used by the CIO when reporting status to the
CIO Council.
Answer:
It is possible today to establish a system aligned with an organizations supply chain. It can
be an add-on to existing ERP-systems. The main objectives are
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 7
ASSIGNMENT ON PROJECT MANAGEMENT
The main Principles behind is the Integration of supply chain participants, Exchange of
demand
And inventory information, transparency & Visibility of inventories and demands for
multilevel supply chains. It also eliminates time lags in the information flow and ensures
synchronization of demand information. SCMo set up (Initialization) the main steps for the
set up are:
Main Features:
The main features of such system are –
Significance of Documentation:
It might sometimes be difficult for an organization to straightaway launch into a Project
Management exercise, even if they are well equipped, particularly if the project is too large
– for e.g., development of a new product, expansion of capacity, modernization of facilities,
diversification into a totally new business area, getting into a Joint venture etc. In this case,
the core project team itself might feel the need to have some major inputs before even a
tentative plan could be drawn up. A well-drafted Business Plan would ideally serve this
purpose, provided it is handled systematically & professionally. The documentation system
is intranet based to provide immediate access to current, up-to-date process documentation.
The system allows
Users to navigate through graphical structures to relevant documentation and processes
which were created with the ARIS-Toolset. The content of the process Documentation
System includes the area supply chain management from the Odette supply chain
Management Group. The system includes graphical process documentation, in the form of
process chains, as well as the entire range of documentation related to the processes. The
Process Documentation System gives, according to its objectives, as overview and a
detailed view of the relevant processes for SCMo. The entry point in the documentation
system is the model. “Process Overview SCMo”. This model is the starting point for the
navigation to other models. The vertical navigation is the navigation on different levels. The
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 8
ASSIGNMENT ON PROJECT MANAGEMENT
horizontal navigation is the navigation on one level. Microsoft has a team project
management solution that enables project managers and their teams to collaborate on
projects.
The Microsoft Project 2002 products in this solution are Microsoft Project Standard 2002,
Microsoft Project Server 2002, and Microsoft Project Server Client Access License (CAL)
2002.
b) Project Scope-
• To provide an effective, efficient means of amount maintenance activities.
• To allow representatives to provide information.
• To provide a complete picture to the client representatives for account status,
valuation, order status, and trade activity.
• To increase the intelligence of the update process.
a) Objectives-
Strengthen relationship with XYZ by delivered high quality software on time. Become
preferred vendor by developing expensive on XYZ product and systems.
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 9
ASSIGNMENT ON PROJECT MANAGEMENT
·
b) Commitment made to customers.
Requirement trace ability will be done through the requisite pro-tool. Physical data base
design may be refined | later iterations.
·
b. Change request tracking-
Changes requested by customer will be logged in change request and analyzed for impact of
project Major change usually has an effort/delivery-on-time impact on the project. The
customer needs to formally approve these changes.
Requisite tool will be used along with estimated size and effort. This is the estimation
criteria to check everything is in place.
Estimate the total effort with respect to each activity and effort for each phase of a project expressed
as of percentage of man days.
RAHUL GUPTA, MBAHCS (2ND SEM), SUBUJECT CODE- MBOO33, SET-1 Page 10
ASSIGNMENT ON PROJECT MANAGEMENT
· People
· Hardware, software and Tools
· Training Plan
g. Project Tracking-
Prepare a list probable defects & defect distribution table to find out deviation for the same.
There were very few large deviations in the process performance; the actual performance
was close to what is expected. This will give a chance to improve the poor performance.
Prepare a table on risk management indicating the type of risk, actual elapsed time,
estimated time, percentage slippage and reasons for slippage.
· Standardization.
· Modularization.
· Minimum Cutomerization.
· Maximum Micro Structure.