Pablo Arce CV (English) v5
Pablo Arce CV (English) v5
Pablo Arce CV (English) v5
Personal Details
Name and surname:
Date of birth:
Place of birth:
Marital status:
ID number:
Address:
Telephone number:
Email:
PTP Radio Link & Fiber Budget Calculation using Pathloss 4 (UTN).
Voice over IP and TCP/IP Networking (UTN)
AI Programming algorithms (Artificial Intelligence) (UTN).
Microprocessor programming: 8051 & 8088, GSM, GPS. (UTN Final Degree Project).
Generic PIC Programming (Huergo),
Secondary-Level:
Language Skills:
Workshops and
Certifications
Experience
2007-Present time COASIN COMUNICACIONES S.A. - CABA
- Operations, Engineering & Repair Laboratory Manager (2013-2014) (30+ staff)
Responsible for the managing and planning aspects of various projects. Some examples are:
- Engineering Manager (2010-2012) (10+ staff) Managing and supervision of detailed engineering developing.
Coordinate the execution of the required topographic surveys, link budget calculations with Pathloss4 and material
procurement assistance. Achieve optimum results both in work quality and delivery dates fulfilment for customers like
Telecom Argentina and Nextel. Responsible for equipment homologation like SAGEMCOM radios in France.
- Repair Laboratory Manager (2008-2009) (10+ staff) - Sector concerned with Harris Stratex, SRTelecom and
other brands equipment repairs. Responsible for overall sector performance, on-time repair services, achievement of
turnover objectives, repairing process implementations and assistance in selecting new personnel. Responsible for dealing
with national and international customers and suppliers. New equipment course development, homologations, test
procedures and reparation. Coordination of on-duty staff (24/7) in radio link maintenance for Nextel Argentina.
- Product Manager in LMDS and Wimax Technology (2007-2008) - SRTelecom AIRSTAR and
SYMMETRY: Project planning and dimensioning for sale support and proposal presentations. Equipment demonstrations
and document preparation for complete RF testing at INTI and homologation at CNC.
- Project Manager (2007) (5+ staff) - Responsible for installation and commissioning of GSM 2G Nokia equipment
at CTI sites being a NOKIA Siemens Networks partner. Dealing with suppliers and customers. Cost management,
developing schedules for implementation and achievement of final customer expectations.
2004-2007 NEW KEISY - San Justo, Pcia. Bs. As.
- Responsible for statistics and analysis of clothing sales and production
- Advertising graphic designer
2002-2004 UKAR Group S.A. - CABA
- Responsible for oral and written English to Spanish translation.
- Responsible for PC and Network installation and maintenance.
Networking & video conferencing to foreign offices in USA, Ukraine and Canada. Staff training.
Translation of brochures, emails and manuals from English to Spanish. Assistant translator. PC maintenance.