Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Survey Request

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PERMOHONAN SURVEY

APPLICATION FOR SURVEY


KEPADA

BIRO KLASIFIKASI INDONESIA

NOMOR

TO

NUMBER

TANGGAL

DATE
DENGAN INI, KAMI MOHON KEHADIRAN SURVEYOR BIRO KLASIFIKASI INDONESIA DI KAPAL UNTUK MELAKSANAKAN SURVEY KAPAL BERIKUT:
HEREWITH, WE REQUEST SURVEYOR OF BIRO KLASIFIKASI INDONESIA ATTENDINGON BOARD TO CARRY OUT SURVEY(S) FOR THE FOLLOWING SHIP:

NAMA KAPAL

NOMOR REGISTER

SHIPS NAME

REGISTER NUMBER

BENDERA

FLAG

PEMILIK / MANAJER

NOMOR IMO :

IMO PERUSAHAAN

IMO NUMBER

IMO COMPANY

TANDA PANGGILAN

OWNER / MANAGER

CALL SIGN

KLASIFIKASI

TEMPAT & TANGGAL SURVEY

CLASSIFICATION

CALL SIGN

Survey yang harus dilaksanakan


Survey to be carried out

1 Survey Penerimaan Klas


Admission to Class survey

Survey Penerimaan Kelas Bangunan Baru


Admission to Class Survey for new Construction

Survey Penerimaan Kelas Kapal Sudah Jadi


Admission to Class Survey for Ship in Service

Dari Anggota IACS

Dari Klas yang diakui

Dari SelainAnggota IACS dan Selain Klas yang diakui

From IACS Member

From Recognized Class Society

From Non IACS Member and Non Recognized Class Society

Terapung

Diatas Dok

Lain-lain

Afloat

On Dry Dock

Others

2 Survey Periodik dan Survey yang lain


Periodical Survey and other surveys

Survey Pembaruan Kelas

Survey Antara

Survey Tahunan

Class Renewal Survey

Intermediate Survey

Annual Survey

Lengkap No.

Lengkap

Survey Penambatan

Complete No.

Complete

Laid Up Survey

Dimulai No.

Dimulai

Survey Bersambung Lambung

Commence No.

Commence

Continuous Hull Survey

Parsial

Parsial

Survey Bersambung Mesin

Partial

Partial

Continuous Machinery Survey

Survey Penerimaan Kelas Kembali

Survey Poros Baling-baling

Re-class Survey

Survey Instalasi Pendingin

Propeller Shaft Survey

Refrigerating Survey

Survey Perpanjangan Kelas

Survey Normal

Survey Ketel/ Pemanas Minyak Panas

Extention for Class Survey

Normal Survey

Boiler Survey / Thermal Oil Heater Survey

Survey Pengedokan

Survey Modifikasi

Docking Survey

Modified Survey

Penundaan Survey Ketel/Pemanas Minyak


Panas

Survey Bawah Air Pengganti Dok

Survey Parsial

Survey Khusus Lambung

In-water Survey in lieu of docking

Partial Survey

Hull Occasional Survey

Postponement for Boiler/Thermal Oil Heater Survey

Penundaan Survey Pengedokan

Penundaan Survey Poros Baling-baling

Survey Khusus Mesin

Postponement for docking Survey

Postponement for propeller shaft Survey

Machinery Occasional Survey

3 Survey Statutoria
Statutory Survey

Konvensi

Non-konvensi

Convention

Non-convention

Survey Item (s)

CAS

NS
INITIAL

JENIS SURVEY

Kind of Surveyii

ES
RS
AS
IS
PS
OS

F11.1.01-2014/Rev.3

LL

SC

SE

SR

DG

OP

SP

AP

GS

CM

NL

AF

HS

SPS

CAP

CG

KAMI SETUJU UNTUK MEMBAYAR SELURUH BIAYA SURVEY DAN BIAYA LAINNYA YANG TIMBUL TERKAIT DENGAN PELAKSANAAN SURVEY INI
SESUAI SYARAT DAN KETENTUAN YANG BERLAKU DI BIRO KLASIFIKASI INDONESIA
WE AGREE TO PAY ALL SURVEY(S) FEE AND EXPENSES INCURED REGARDING THIS SURVEY ACCORDING TO BIRO KLASIFIKASI INDONESIA TERMS
AND CONDITIONS

PEMOHON

APPLICANT

PERUSAHAAN

COMPANY

ALAMAT

ADDRESS

TANDA TANGAN / STEMPEL


SIGNATURE / STAMP

Review of Application for Survey (Filling by Internal BKI)


Date of receipt :
H
Surveyor in
M
Charge
E
#
Check items
Possible to Carry out by this Location
To be supported by Head Office
To be requested to other class
The survey status confirmed
Complied with class rules or statutory requirements
Each item on the application confirmed
Relevant documents for the survey(s) prepared
Survey Fee (Biaya Survey)
a.
Additional Fee (Biaya Tambahan Diluar Biaya Survey) :
b.
Travelling Expenses (Biaya Perjalan Dinas / Peraturan BKI)
iii
Visit Fee (Biaya Kunjungan) :
o Travel / Waiting :
o Additional outside working hour (diluar jam kerja)

SPS No :

Rp.
Rp.

Total
#

Check X as applicable
as not applicable

Rp.
Rp.
Rp.
Review by..............................

(Signature Head of Job Location)


(After review and sign sending back to applicant)

(By Client / Customer)


Dengan ini kami menyetujui biaya survey yang disampaikan diatas
Nama

Jabatan

Perusahaan

Approved by..............................

(Tanda Tangan & Tanggal)

Catatan / Note:
Biaya atas jasa BKI harus dibayar sesuai dengan tarif BKI dan membebankan juga biaya apa saja yang timbul sehubungan dengan pelayanan
jasa tersebut (misalnya biaya perjalanan, pajak dan biaya-biaya lainnya) walaupun Kelas atau Sertifikat tidak diberikan.
For services rendered by BKI fees are to be paid in accordance with the BKIs Tariffs of Fees, even if no classification is granted. In addition to these
fees, BKI will charge for any expenses incurred in connection with the services rendered.
Jatuh tempo untukpembayaran biaya semua jasa yang diberikan oleh BKI tanpa pengurangan tidak lebih dari 28 (dua puluh delapan) hari
kalender setelah invoice diterima. BKI berhak tidak memenuhi permintaan survey berikutnya, menahan sertifikat dan dokumen lainnya atas
kegagalan memenuhi ketentuan di atas.
The fees for all services rendered by BKI are due for payment without deduction not later than 28 (twenty eight) calendar days after the date of received
invoice. On default BKI entitled to withhold next survey, Certificate and other documents.
BKI bertanggung jawab untuk kerugian atau kerusakan, jika dapat dibuktikan bahwa kerugian dihasilkan langsung dari tindakan atau
kelalaian yang dilakukan BKI. Pertanggung jawaban BKI dibatasi maksimum sebesar biaya survey terakhir yang dilakukan.
BKI will be liable for loss or damage, if it proved that the loss resulted directly from an act or omission of BKI done. The liability of BKI shall be limited in
its amount up to maximum of the fee for that particular service.
Pemohon harus mengisi data dengan sebenar-benarnya pada kolom isian. BKI tidak bertanggung jawab atas segala informasi yang diisikan
pada permohonan ini.
Applicant shall fill in the correct data into the blank spaces. BKI shall not be held responsible for any incorrect data inserted to this application.
i

CAS : Condition Assessment Scheme, LL : Load Line , SC : Safety Construction, SE : Safety Equipment, SR : Safety Radio, DG : Dangerous Good, OP : Oil Pollution
Prevention, SP : Sewage Pollution, AP : Air Pollution, GS: Gas Carrier, CM : Chemical Tanker, NL : Noxious Liquid Substance, AF : Anti Fouling System, HS : High Speed
Craft, SPS : Special Purpose Ship,CAP : Condition Assessment Program , P : Passenger Ship
ii

NS: Initial Survey of Ship During Construction, ES : Initial Survey of Existing Ship, RS : Renewal Survey, AS : Annual Survey, IS : Intermediate Survey, PS : Periodical Survey,
OS : Occasional Survey, CG : Cargo Gear
iii

Travel / Waiting : Rp. (Agar Diisi Dengan Nilai Baku Sesuai Buku Tarif BKI)
Survey Dijam kerja : Rp. (Agar Diisi Dengan Nilai Baku Sesuai Buku Tarif BKI)
Survey Diluar Jam Kerja : Rp. (Agar Diisi Dengan Nilai Baku Sesuai Buku Tarif BKI)
Hari jam kerja BKI adalah (senin s/d Jumat jam 08.00 s/d 17.00 waktu setempat
BKI akan melaksanakan survey jika biaya survey tersebut diatas telah mendapat persetujuan dari pemohon.

F11.1.01-2014/Rev.3

You might also like