Bentley Substation V8i Overview
Bentley Substation V8i Overview
Bentley Substation V8i Overview
Overview
Population
Growth
Infrastructure
Operational
Ineffectiveness
Smart Grid
Initiatives
2 | WWW.BENTLEY.COM
Distributed,
Renewable
Power
Generation
Microgeneration
and
Storage
Carbon
Emissions
Intelligent
substations
Engineering
content
management
and team
collaboration
3 | WWW.BENTLEY.COM
Intelligent
infrastructure for reengineering the 21st
century utility
Transmission and
distribution
design and
management
Nuclear
configuration
management
Faster time to
market
Optimized project
delivery
Better performing
infrastructure across
the lifecycle
4 | WWW.BENTLEY.COM
5 | WWW.BENTLEY.COM
Power Generation
6 | WWW.BENTLEY.COM
Ameren
American Electric Power
Con Edison
Constellation Energy
Consumers Energy
CPS Energy
DTE Energy
Duke Energy
E.ON AG
Electrabel S.A.
ENERGEX
Eskom Holdings
Huntsville Utilities
Iberdrola S.A
RWE AG
Snam Rete Gas SpA
TXU Energy
Vattenfall Europe AG
Western Power
Xcel Energy
American Water
Anne Arundel County
Los Angeles County Sanitation District
East Bay Municipal Utility District
Empresas Publicas de Medelln ESP
Stadtentwsserung Stuttgart
Melbourne Water Corporation
Metropolitan Water District of
Southern California
MidCoast Water
National Water Commission (Jamaica)
Power and Water Corporation
(Australia)
Sabesp
Saur
Societe Wallonne Des Eaux
Thames Water
United Utilities
United Water
Veolia Water
Watercare Services Limited
Waternet
High Voltage
Transmission Lines
Switchyard
Power
Plant
Transmission
Lines
Distribution
Substation
Distribution
Network
End User
7 | WWW.BENTLEY.COM
Alternative
energy sources
Wind
Wave
Solar
Aging
substation infrastructure
8 | WWW.BENTLEY.COM
Strong demand in
developing economies
PECO $45M
SP PowerSystems $16M
Kuwait $400M
Powerlink A$15M
Qatar 500M
14 gas-insulated substations
9 | WWW.BENTLEY.COM
BOM and
Other Reports
Electrical Design
10 | WWW.BENTLEY.COM
11 | WWW.BENTLEY.COM
12 | WWW.BENTLEY.COM
2009 Bentley Systems, Incorporated
What Is Needed?
A design tool specifically for substations:
Integrates physical design with
electrical design
Uses intelligent information
models
Facilitates collaborative
workflows
Provides 100% accurate, complete
documentation automatically
14 | WWW.BENTLEY.COM
Approvals
Materials
Fabrication
Site Work
Planning
2D
Electrical
Design
Substation
Database
3D
Physical
Design
As-Built
Updates
Upgrades
O&M
Greenfield
16 | WWW.BENTLEY.COM
Construction
Energize
Brownfield
17 | WWW.BENTLEY.COM
Results
Fewer design hours and associated cost
Projected Savings
18 | WWW.BENTLEY.COM
Results
Fewer design hours and associated cost
Quicker design cycles getting projects
online sooner
19 | WWW.BENTLEY.COM
Results
Fewer design hours and associated cost
Quicker design cycles getting projects
online sooner
Faster approvals
20 | WWW.BENTLEY.COM
Results
Fewer design hours and associated cost
Quicker design cycles getting projects
online sooner
Faster approvals
Fewer change orders
21 | WWW.BENTLEY.COM
Summary