S T AT E AN D C O N S UM E R S E R V I C E S AG E N C Y D E P AR T M E N T O F G E N E R AL S E R V I C E S
INTERPRETATION
OF
REGULATIONS
Division of the State Architect
The DSA IR Manual
Acceptable methods of achieving compliance with
applicable building codes and regulations
for projects under the jurisdiction of DSA.
Revised 05-20-10
Page ii
Title 24
Code
Part#
1
2
3
4
5
6
7
8
9
10
11
12
Prefix
Title
letter
California Buildings Standards Administrative Code (CAC) .............. A
California Building Code (CBC) ................................................... -California Electrical Code (CEC)................................................... E
California Mechanical Code (CMC)................................................ M
California Plumbing Code (CPC)................................................... P
California Energy Code .............................................................. N
Elevator Operation Code ............................................................-Historical .................................................................................-Fire......................................................................................... F
Conservation............................................................................ -(reserved) ............................................................................... -Reference ................................................................................ --
IRs that have been revised since August of 2002 may include marginal markings. Solid vertical lines in the margins within
the body of the IR indicate a change from the previously published IR, except where a change was minor or editorial. An
arrow is provided in the margin to indicate that a deletion has been made from the previously published version.
As IRs are added, deleted or revised, the changes will be reflected in the on-line version of the IR -Manual. This publication
is available for download or printing (in whole or in part) as Adobe PDF format files on the Publications page of the DSA
web site at www.dsa.dgs.ca.gov.
When referencing IRs, the user can ensure he or she is using the latest version by checking the on-line IR Manual.
Page iii
D S A I R Ma n u a l - T a b l e o f C o n te n ts
#
Title
(previous/
supersedes)
Part 1 - ADMINISTRATIVE
A-1
Temporary Approval for School Use of
HCD Commercial Coaches
issued/
revised
Updated 04-27-10
2001
CBC
2007
CBC
A-2
09-01-99
A-3
11-03-08 (r)
A-4
06-17-09 (r)
A-5
06-02-08 (r)
A-6
11-16-09 (r)
A-7
09-18-07 (r)
A-8
Project Inspector and Assistant Inspector Duties and Performance 11-03-08 (r)
A-9
04-27-10 (r)
07-02-09 (r)
03-11-08 (r)
02-27-09 (r)
04-05-07
08-28-07
03-17-10 (r)
11-01-07
02-01-08
04-27-10 (r)
04-07-08 (r)
08-06-09 (r)
A-21 Design, Installation and Maintenance of Fire Alarm (F/A) Systems 08-21-09 (r)
08-15-08
11-03-08
11-03-08
05-26-09
(CR A-1)
(PL 94-19)
04-19-10 (r)
04-27-10
09-18-07 (r)
N/A
10-15-07
Page iv
D S A I R Ma n u a l - T a b l e o f C o n te n ts
#
Title
(previous/
supersedes)
issued/
revised
Updated 04-27-10
2001
CBC
2007
CBC
06-22-09
11-01-07 (r)
N/A
11-01-07 (r)
N/A
11-01-07 (r)
N/A
11-01-07 (r)
02-04-08
08-01-09 (r)
N/A X
11-19-09
10-15-07 (r)
04-27-10 (r)
04-15-08 (r)
16-2
01-02-08 (r)
N/A
16-3
09-18-07 (r)
16-4
01-02-08 (r)
N/A
16-5
06-02-08 (r)
N/A
16-6
10-15-07 (r)
16-7
12-18-07
N/A X
16-8
04-03-09 (r)
N/A X
16-9
06-22-09
08-06-09
N/A X
(CR 16-1)
(CR 17-2)
10-15-07 (r)
(CR 17-3)
04-07-08 (r)
N/A
11-03-08
N/A X
11-03-08
N/A X
11-03-08
N/A X
11-03-08
N/A X
17-3
Page v
D S A I R Ma n u a l - T a b l e o f C o n te n ts
#
Title
(previous/
supersedes)
issued/
revised
Updated 04-27-10
2001
CBC
03-06-06 (r)
2007
CBC
19-2
09-01-99
19-3
06-10-08
09-18-07 (r)
12-17-09 (r)
09-01-99
11-01-07 (r)
01-02-08 (r)
11-01-07 (r)
07-15-08
N/A X
03-17-10 (r)
(CR 21-1)
22-3
(CR 22-1)
Wood Diaphragms
11-01-07 (r)
N/A
23-3
10-03-07 (r)
23-4
11-01-07 (r)
N/A
23-5
(CR 23-1)
10-15-07 (r)
23-6
(CR 23-2)
08-25-09 (r)
(CR 23-3)
11-01-07 (r)
N/A
12-17-09
08-25-09 (r)
08-15-08
N/A X
(AC 23-1)
23-11 Wood Structural Panels Oriented Strand Board (OSB)(AC 23-2) 12-17-09 (r)
N/A
03-17-10 (r)
09-18-07 (r)
X
N/A
25-2
07-21-05 (r)
25-3
(CR 25-1)
01-02-08 (r)
06-22-09
N/A X
Page vi
D S A I R Ma n u a l - T a b l e o f C o n te n ts
#
Title
(previous/
supersedes)
issued/
revised
Updated 04-27-10
2001
CBC
2007
CBC
08-25-09
Part 3 - ELECTRICAL
E-1
Grounding of Relocatable Buildings
10-03-07 (r)
E-2
10-03-07 (r)
E-3
04-27-10
06-02-08 (r)
07-01-09 (r)
N/A X
Part 5 - PLUMBING
P-1
Nonwater-Supplied Urinal Fixtures
Part 6 - ENERGY
N-1
Pre-Check (PC) Designs Energy Compliance Review
(AC M-1)
Page vii
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-1
Issued 09-06-2007
EFFECTIVE: 10-01-07
Supersedes DSA Policy 97-10
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose:
when fully conforming relocatable buildings are not practical or available. In accordance
with Section 4-302(b), Part 1, Title 24, California Code of Regulations, this DSA IR provides
an expedited process for school districts to use for Division of the State Architect (DSA)
approval of small relocatable buildings.
The school district is highly encouraged to contact DSA immediately if there is intent to
install temporary buildings using this expedited process.
Emergency Use: In case of emergencies, including but not limited to damage to school
buildings as from earthquakes, fires and floods, or for health and safety issues such as mold
or other contamination, or from unanticipated increase in students wherein educational
facilities are immediately needed for displaced or unhoused pupils, the procedure detailed in
this IR permits placement of the HCD temporary use building in advance of securing DSA
temporary approval. This emergency use procedure may also be used for emergency
installation of DSA Pre-Checked relocatable buildings.
DSA must be notified immediately after the emergency of the districts intent to use this
emergency use IR.
Within 14 days following the installation of these emergency temporary use buildings, the
school district will notify DSA of the extent of the damage to their permanent school
DSA IR A-1 (iss 09-06-07)
EFFECTIVE 10-01-07
Page 1 of 5
Page 2 of 5
buildings and the number of temporary buildings installed to house displaced students.
Within 60 days following installation of these emergency temporary use buildings, the
design professional representing the school district shall provide DSA with a complete
submittal package as described in this procedure.
buildings during modernization projects would require DSA review and approval and receipt
of a temporary approval per this procedure prior to placement. The emergency use
procedures of this IR may be used when, during the modernization project, there is an
unanticipated immediate need for a building for displaced or unhoused students.
Submittal: The school district shall provide the following to the Division of the State
Architect (DSA) Regional Office serving its area:
1.
DSA-1 Application for Temporary Approval of Plans and
Specifications: Fill in completely form DSA-1. To describe the project - on line 5 of form
DSA-1 write temporary approval for school use of __ HCD commercial coaches. For
example line 5 would read Construction of: temporary approval for school use of 2 HCD
commercial coaches if two buildings are being installed.
2.
Fee: The school district will submit fees with the initial application per Fee Schedule
II, Section 4-321, Part 1, Title 24 and per Section 5-104, Part 1, Title 24 for access
compliance review. For purposes of calculating the fee, the construction cost should be
based on the cost of any site work, improvements to the building and/or repairs and the
costs for moving the building.
3.
Letter: A letter from the school district (Superintendent) acknowledging that these
buildings are only for temporary use and are limited to use for 24 months from the date of
installation.
4.
following:
Note: Plans, specifications and calculations for the HCD building are not required if
the HCD building is certified per Section 5 and a letter is provided, from the
architect/engineer in responsible charge, stating that the building has not had
alterations, or suffered deterioration, that affect access compliance, structural
safety or fire/life safety code regulated elements. For example; addition of
wall supported casework is an alteration to the building. If altered, complete
plans, specifications and calculations, as needed for the altered portion of the
building, shall be submitted for review and approval. Maintenance work does
not need to be included in the submittal. See the definition of maintenance
in Section 4-314, Part 1 of Title 24, California Code of Regulations.
4.1
Cover Sheet of Plans: Add a note stating that these buildings are only for
temporary use and are limited to use for 24 months from the date of installation.
4.2
Structural Safety (SS): Submitted plans, specifications and calculations shall
indicate the following:
4.2.1
Floor Area: The building is one story and has a floor area of no more than 2,160
square feet. The floor area shall be shown on the drawings. A drawing showing
the footprint of the building, except as noted in this IR, is generally adequate for
the HCD building.
Page 3 of 5
4.2.2
4.2.3
Non Structural Elements: Plans and specifications shall detail the anchorage of
all overhead non-structural elements, labeled as existing or new, as appropriate.
4.3
4.3.1
4.3.2
4.4
Access Compliance (AC): The construction must comply with all Access
Compliance regulations. No alternatives are available. A complete submittal shall
include but is not limited to the following;
For exterior construction: Complete plans and specifications of the disabled
access features of the site placement for the HCD building, including:
An accessible pedestrian route from the main entrance of the site to each
commercial coach and linking accessibility elements.
At least one set of accessible separate sex toilet facilities centrally located and
available for use.
Van-accessible parking.
For interior construction: Code required accessibility features for the HCD
building itself shall be provided. For example:
Accessible lever door hardware and threshold provided at the entrance door
of each commercial coach with allowable closer pressure.
Toilets, or any other code regulated accessibility features inside the HCD
building, must be fully detailed on the plans.
Fire and Life Safety (FLS): Complete and accurate plans, specifications and
calculations shall be submitted as follows:
4.4.1
A site plan must be submitted with the stamp and signature of the local fire
authority indicating approval of the placement of the buildings, the fire apparatus
access road and access gates and water flow and hydrants.
4.4.2
Separation distances, and designated safe dispersal area or areas conform to Fire
and Life Safety code requirements. The path or paths of egress to the public way
or to the safe dispersal area(s) has/have been identified and shown on the site
plans, and all gates in the path(s) of egress have been identified and equipped
with panic hardware. Safe dispersal area(s) has/have been located, size and
occupant loads identified, and the dimensions from buildings clearly indicated
(minimum 50) on the site plan.
Page 4 of 5
4.4.3
4.4.4
Units more than 20 feet from other buildings, including other temporary
buildings, with a stand alone fire alarm system must be provided with two-way
communication with the main administration offices via an intercom system,
permanently mounted telephone or walkie-talkie devises or other similar
systems. Buildings that are less than twenty (20) feet from existing permanent
buildings on the site shall be interconnected with the fire alarm system of the
campus.
4.4.5
Each HCD building must be equipped with at least one minimum rated 2A:10B: C
fire extinguisher, mounted at 48 inches to the handle above the finished floor,
near the main exist(s) and within 75 foot travel distance from any point within
the building. (Note: Travel distance shall not include paths through normally
locked doors.)
5.
DSA Approval of Plan and specifications: DSA will review the submitted
documents. The documents will be returned to the design professional noted on the
application to respond to comments. The design professional shall contact DSA to schedule
a backcheck appointment. Once all the comments have been addressed, DSA will initial and
date the DSA stamp on the drawings and provide a letter by e-mail approving the design of
the project for temporary two year use. In some circumstances the over-the-counter (OTC)
process may be used (See Section 4.3.2 of this policy).
6.
HCD Building Certification: Certification must be provided by a design
professional licensed to practice in California and countersigned by the school district that
each commercial coach to be utilized was built after Dec. 19, 1979. In lieu of the
proceeding sentence, the owner of the HCD building may provide the school district with a
letter that provides the HCD insignia numbers, serial numbers and dates of manufacture for
each building. A copy of the letter will be submitted to DSA. The certification or letter must
also indicate the design live load, snow load, and the wind load for the building.
7.
Inspection Requirements: A DSA certified inspector must perform the required
inspection and complete and sign a verified report (Form DSA-6) which indicates the serial
numbers, insignia numbers, roof load, floor load, and wind load as shown on the building
tag.
The inspector must make specific statements on the final verified report indicating that:
Proper installation of the approved foundation system has been done per
approved drawings.
Anchorage of the nonstructural elements has been done per the approved
drawings;
Installation and testing of the approved fire alarm system, for each building has
been done, Sound levels of fire alarm audible appliances have been measured at
15 dBA above ambient noise level.
8.
Page 5 of 5
All Access Compliance provisions for the project on the final approved drawings
and specifications have been completed.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
CERTIFICATE OF COMPLIANCE
WITHOUT RECEIPT OF ALL DOCUMENTS
Reference: California Administrative Code, Section 4-339
Education Code, Section 17315/81147
IR A-2
Issued 9-1-99
Supercedes IR 5-1 (3/90)
This interpretation is intended for use by the plan review and field engineers of DSA to indicate an acceptable method for achieving
compliance with applicable codes and regulations. Its purpose is to promote more uniform statewide criteria for use in plan review
and supervision of construction of public schools, community colleges and essential services buildings. Other methods proposed by
design professionals to solve a particular problem may be considered by DSA and reviewed for code and regulation compliance.
3. Costs. The school district, at its own expense, will proceed with the examinations, tests,
and/or inspections deemed necessary. The additional reports and documents will be submitted
to DSA. All costs incurred by DSA in implementing this procedure will be billed to the district and
will include time spent by DSA personnel. Payment must be received from the school district
before DSA will issue a certificate of compliance for the project.
4. Correction of Deficiencies. Any deficiencies discovered or exposed during re-inspection or
re-testing will be corrected at the direction of the school districts architect and/or structural
engineer. The school district will be responsible for having this work done and completed in a
timely manner. The correction work will be subject to the requirements of Title 24.
5. Certification of Compliance. The DSA Field Engineer will review the results of the
examinations, tests and/or inspections. The Field Engineer will assemble all submitted
documents and determine their acceptability for conformance with statutes and regulations
governing public school construction. The Field Engineer will make a recommendation and the
entire package will then be reviewed by the Regional Manager. A letter of certification written by
the Regional Manager will indicate the basis for which it is issued.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-3
Revised 11-03-08
Issued 9-1-99
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Publications/default.htm (click on DSA Interpretation of
Regulations Manual) at the time of plan submittal to DSA are considered applicable.
2.
2.2
Without the presence of a general contractor, each subcontractor will enter into an
individual contract directly with the owner to establish conditions for the performance
and payment for his/her work.
Page 1 of 2
Page 2 of 2
2.3
2.4
4.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-4
GEOLOGIC HAZARD
REPORT REQUIREMENTS
Reference: California Building Standards Administrative Code, Section 4-317(e)
2001 California Building Code (CBC) Sections 1629A.4 and 1804A.1
2007 CBC, Sections 1613A and 1802A
Education Code Section 17212.5
Revised 06-17-09
Revised 11-01-07
Revised 07-21-05
Revised 02-03-04
Issued 09-01-99
Discipline: Structural
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, Community Colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
requirements for the submission of a geologic hazard report to the Division of the State
Architect (DSA) for projects within the jurisdiction of DSA.
1.
GENERAL: A geologic hazard is any geologic condition that is a potential danger to
life or property. Geologic hazards include, but are not limited to, earthquake shaking,
surface rupture, liquefaction, and landslides.
The California Building Standards Administrative Code (CAC), Section 4-317(e) includes
requirements for the performance of soils investigation studies and geologic hazard studies
for all construction, including additions and alterations. Note that Geotechnical Reports
(or soils investigation reports) often include soils studies only and may not include complete
geologic hazard studies.
In addition, the California Building Code (CBC), Section 1802A, describes requirements for
engineering geologic reports, supplemental ground-response reports, and geotechnical
reports. Any of these reports may contain elements of the geologic hazard studies, and
these reports should all be submitted as geologic hazards reports.
2.
PROJECTS REQUIRING GEOLOGIC HAZARD REPORTS: Except as noted in
Section 3, a geologic hazard report shall be submitted to the California Geological Survey
(CGS) for projects located in any of the areas described in paragraph 2.1, through 2.7
below.
2.1
2.2
2.3
Earthquake Fault Zones (Public Resources Code (PRC) Div. 2, Ch. 7.5, Sec. 2621
et seq.)
Seismic Hazard Zones for Landslides and Liquefaction (PRC Div 2, Ch. 7.8, Sec.
2690 et. seq.)
Within an area identified as a geologic hazard in the Safety Element of the Local
General Plan.
DSA IR A-4
(rev 06-17-09)
Geologic Hazard
Report Requirements
Page 1 of 3
DSA IR A-4
(rev 06-17-09)
Geologic Hazard
Report Requirements
Page 2 of 3
2.4
Any project where the design ground motion loads are developed using earthquake
time history records, site response analysis, or site-specific ground motion hazard
analysis. This includes projects using any portion of ASCE 7, Chapter 16 or Chapter
21, or projects using ASCE 41, to develop seismic parameters.
2.5
2.6
Any project on existing sites if not exempted by Sections 3.1, 3.2 or 3.3 below.
2.7
On any other existing site when required by DSA, where a potential geologic hazard
has been previously identified.
3.
PROJECTS NOT REQUIRING GEOLOGIC HAZARD REPORTS: Except as
noted in paragraph 2.7, a geologic hazard report will not be necessary for projects on
existing sites in any of the situations described below:
3.1
non-structural alterations which do not cost more than 50% of the replacement
cost of the structure, and/or
alterations complying with Section 3403.2.3.2, where the alterations are not
initiated for the purpose of increasing the strength or stiffness of the seismicforce-resisting system.
3.2
If the project is one or more onestory, wood-frame and light-steel frame buildings
of Type II or V construction, 4,000 square feet or less in floor area, and not located
within Earthquake Fault or Seismic Hazard Zones as shown on the most recently
published maps from the CGS (see 2007 CBC, Section 1802A.6.1.1, Exception 1).
3.3
A new geologic hazard report is not required if the project is located on a site for
which adequate studies (refer to CGS Note 48 for guidance) have been already
made, and a reevaluation is made and the report is found to be currently
appropriate. This existing report for the site and the reevaluation must be submitted
to the CGS for approval for each project at the site.
4.
5.
REPORTING PROCEDURES: DSA prefers that a copy of a geologic hazard report
approved by the California Geological Survey (CGS) be submitted to DSA along with the
initial project application. If a project is submitted to DSA without a CGS approved geologic
hazard report DSA will start the plan review process pending receipt of the approved report.
DSA IR A-4
(rev 06-17-09)
Geologic Hazard
Report Requirements
Page 3 of 3
5.1
All geologic hazard reports must be approved by CGS before DSA will stamp-out the
plans and specifications for any project that requires a geologic hazards report.
5.2
School districts are responsible for submittal of reports to CGS and for the cost of
review by CGS.
5.3
CGS will begin to accept submittals directly from school districts by July 1, 2009.
DSA projects reviews and CGS reviews of geologic hazard reports for projects
submitted to DSA during July and August will proceed concurrently.
5.4
http://www.conservation.ca.gov/cgs/rghm/reviews/Pages/Default.aspx
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-5
Revised 06-02-08
Revised 02-01-08
Revised in its entirety 07-21-05
Issued 9-1-99
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this Interpretation of Regulations (IR) is to describe the DSA
Structural Safetys (DSA-SS) policy on the acceptance of structural products and to clarify
DSA policy on the acceptability and use of product evaluation reports issued by other
agencies and organizations, for projects submitted to DSA under the 2007 California
Building Code (CBC).
Background: Structural products were accepted to use on DSA projects either through
compliance with DSA Product Acceptance (PA) Reports or ICC Evaluation Service (ICC-ES)
Reports. Many products that had obtained DSA Acceptance Reports under the alternate
materials and methods provision in the 2001 CBC are now prescribed or referenced in the
2007 CBC.
The 2007 CBC took effect on January 1, 2008. There are major changes from the previous
2001 CBC. This IR describes the DSA-SS acceptance of structural products and third-party
evaluation reports, effective under the 2007 CBC.
1.
Acceptance of Structural Products: Structural products and materials, as
described in the Scope section of this IR, may be accepted for use on DSA projects if they
meet the following requirements:
1.1
1.2
In addition to valid listings, products that are prescribed in the CBC and its adopted
standards, including DSA Interpretation of Regulations (IR), Circulars or Bulletins,
shall comply with those prescribed requirements.
1.3
DSA has the final determination on the acceptability of a product, and the valid
listing (see Section 5 below).
Acceptance of Product
Evaluation Reports
Page 1 of 3
Acceptance of Product
Evaluation Reports
Page 2 of 3
2.
DSA PA Reports: Effective January 1, 2008, DSA PA reports will not be issued or
renewed to show conformance with the 2007 CBC.
2.1.
Existing PA Reports: Structural products used for projects submitted under the
2001 CBC may continue to use the applicable existing DSA PA reports for products
designed to conform to the 2001 CBC.
3.
VALID LISTINGS: DSA will accept evaluation reports that meet the eligibility
criteria listed below and are used in accordance with Section 4 of this IR. The intent is to
accept evaluation reports for products or materials that comply with the California Building
Code (CBC) and DSA requirements, demonstrate satisfactory performance, and are
manufactured under a quality assurance program.
For DSA to consider acceptance, evaluation reports issued by other agencies or
organizations must meet the following criteria:
3.1
The product or material must comply with the California Building Code (CBC).
Evaluation reports may not be acceptable if the product does not comply with
applicable DSA amendments (to the model code) contained in the CBC and/or
applicable DSA IR, Circulars or Bulletins.
3.2
The evaluation report must be current and valid. Reports that are more than three
years old are considered expired except as noted in Section 3.3 below.
3.3
The evaluation report must be issued by one of the following DSA recognized
agencies or organizations:
3.4
3.5
4.
International Code Council Evaluation Service. All reports that are currently
posted on the ICC ES website are considered current and valid, including reports
with prefix ESR and Legacy Reports.
Other product certification bodies that are certified to be in compliance with ISO
Guide 65, "General Requirements for Bodies Operating Product Certification
Programs".
Compliance with CBC adopted model code (e.g. 2006 IBC), DSA IR, Circulars,
Bulletins, referenced standards, published consensus acceptance criteria, and/or
industrial standards, e.g. ASTM specification.
USE OF REPORTS: Eligible evaluation reports, per Section 3 of this IR, may be
accepted for use on projects under DSA jurisdiction, if used in accordance with the
following:
4.1
Acceptance of Product
Evaluation Reports
Page 3 of 3
The design, application and installation of the product shall comply with the requirements of the CBC, IR, Circulars, Bulletins, and the applicable evaluation reports. The
minimum required Seismic Design Category is D per the 2007 CBC, Section 1613A.5.6.
4.2
For products or materials used to resist lateral forces, use 80% of the listed values in
the evaluation reports unless the listed values were established on the basis of cyclic
test results.
4.3
The applicable evaluation report and all the documents required by the evaluation
report shall be submitted to DSA with the project application package.
4.4
For certain types of products, the evaluation report may not be the sole basis for
acceptance. DSA regional offices will review, on a project specific basis, those
products or materials that require the following:
5.
CHANGES IN DSA ACCEPTANCE: DSA may reject, discontinue or impose
conditions on the acceptance of a product or report in the following situations:
When products are modified and become non-conforming with CBC, its adopted
standards, and / or evaluation reports,
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-6
Revised 11-16-09
Revised 09-18-07
Revised in its entirety 11-15-06
Issued 9-1-99
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The Code requires that all changes to the approved plans or specifications after
a contract for the construction has been awarded shall be made only by means of change
orders approved by the Division of the State Architect (DSA). This interpretation describes
a process for obtaining approval of changes by DSA.
Discussion: Section 4-338 (c) and (d), Part 1, Title 24, California Code of Regulations
(CCR), describes DSAs process for approval of change orders and preliminary change
orders. DSA has determined that to provide timely, efficient and consistent approval of
changes during construction, enforcing the strict letter of regulations may require flexibility.
An alternate field change document approval process is described in this IR. This process
focuses the designers and DSAs efforts on code compliance with the goal of timely review
and approval.
Page 1 of 8
DSA IR A-6
(rev 11-16-09)
Page 2 of 8
Field Change Document (FCD) A document defining changes to the Code regulated
construction requirements of the DSA approved plans and/or specifications issued after a
construction contract has been awarded. FCDs may include Architects Supplemental
Instructions (ASI), Instruction Bulletins (IB), Field Orders (FO), Construction Change
Directives (CCD), etc.
Drawing an illustration on paper larger than 8 1/2 x 14.
Interpretation a statement from the architect or engineer in general responsible charge
of the project that interprets (but does not change) the requirements of the DSA approved
plans and/or specifications.
Sketch an illustration on 8 1/2 x 11 or 8 1/2 x 14 paper.
1.
Scope. After a contract for construction has been awarded, DSA approval of
changes to approved documents shall be obtained in accordance with the following:
1.1
Changes That Require DSA Approval Prior to Construction. DSA approval shall
be obtained for changes to all Code-regulated construction and inspection/testing
functions prior to commencement of the affected work. Changes can be approved
through the field change document (FCD) approval process described in Section 3.1
below or the change order process described in Section 3.2. DSA-approved FCD, or
change order, documents shall be in the possession of the contractor and the
inspector prior to construction of the work shown thereon.
Code-regulated refers to work that is regulated by the provisions of Title 24 of the
California Code of Regulations applicable to the construction, including those
amendments to the Code adopted by DSA-SS (Structural Safety), DSA-AC (Access
Compliance), and the SFM (State Fire Marshal). For projects submitted under the
2001 CBC, refer to 2001 CBC, Part 2, Sections 101.17.11 (DSA/AC), 101.17.12
(DSA/SS), and 101.17.14 (SFM). [For projects submitted under the 2007 CBC, refer
to 2007 CBC, Part 2 Section 101.3.2 items 4, 10 (DSA/AC), 11 (DSA/SS) and 14
(SFM)].
Note that although DSA does not currently conduct a specific review of certain
aspects of construction (including mechanical, electrical, etc) these aspects are
considered to be Code regulated and must be submitted as part of an FCD or
change order.
DSA approval is also required for all change orders.
Changes That Do Not Require DSA Approval. DSA approval is not required for
FCDs if the scope of the change does not pertain to Code-regulated construction
(refer to Section 1.1 above). For example:
1.2
1.3
Interpretations and Clarifications.
Responses to request for information,
interpretations, clarifications, and other communications that do not change the
requirements of the DSA stamped approved documents may be issued by the architect or
engineer in general responsible charge. These documents do not require DSA approval.
2.
General Requirements. All change orders and field change documents must
conform to the following general requirements (see sample change order, which includes a
sample FCD, in the appendix):
2.1
The project name and the name of the facility must be indicated.
2.2
The DSA file and application numbers must be shown in the upper right hand corner.
DSA IR A-6
(rev 11-16-09)
Page 3 of 8
2.3
All FCDs and change orders shall be numbered in sequence in a logical and
consistent manner. The number must be shown in the upper left corner.
2.4
All changes must be described clearly and completely by the architect in general
responsible charge of the project and/or architects or engineers with delegated
responsibility for portions of the project as defined on Form DSA-1 Application for
Approval of Plans and Specifications.
2.5
Reference to the specific portions of the drawings and/or specifications that are being
changed must be included. All details and specification sections affected by the
change shall be coordinated. If a change to a detail is only applicable in some of the
locations for which the detail applies, those locations must be clearly described.
2.6
2.7
The number of pages in the FCD or change order, including the number of pages in
each attachment, shall be clearly indicated. All sketches and drawings attached to
describe the changes shall be clearly labeled and referenced.
2.8
When approved drawings are revised and reissued as part of an FCD or change order
all of the following requirements must be met:
2.8.1
Images of all DSA approval stamps must be removed from the drawing (or
crossed out) prior to making any changes.
2.8.2
Each change shall be highlighted on the drawing and identified (see example
change order attached in appendix).
2.8.3
2.8.4
All drawings shall be stamped and signed by the design professional in general
responsible charge. When preparation of a drawing has been delegated to
another design professional that individual shall also stamp and sign the drawing.
2.9
FCDs and change orders should include only clear instructions on specific changes to
details on the DSA approved drawings or sections of the DSA approved
specifications. When circumstances make it necessary to submit additional back up
information the following requirements shall be met:
2.9.1
2.9.2
Cost estimates, cost justifications, or other back-up documents that are not
necessary to define the changes to the DSA approved drawings or specifications
need not be submitted to DSA. If back-up information is submitted for any
reason, it must be separate from the FCD or change order.
2.9.3
2.10
2.11
The appropriate design professional (listed on application Form DSA-1) must sign the
FCD or change order (change orders must also be stamped).
DSA IR A-6
(rev 11-16-09)
Page 4 of 8
2.12
All engineers or architects for whom responsibility for portions of the work has been
delegated must sign the FCD or change order when their portion of the work may be
affected by the changes (change orders must also be stamped).
2.13
3.
Approval Process.
The design professional shall obtain DSA approval for
changes to the approved plans or specifications in accordance with Section 3.1 or 3.2. DSA
shall direct all communications (review comments and/or approved documents) to the
responsible design professional.
3.1
Field Change Document Approval (FCD) Process. This process can provide
responsive processing of documentation for changes that require DSA approval prior
to construction of the work shown thereon (refer to 1.1). FCDs do not require
documentation of school board approval.
Change documents can be transmitted via fax or other expedient means for review
by DSA (recommend faxable format of 8-1/2 x 11, with design professional's
phone/fax number noted). DSA can communicate review comments and approved
FCDs to the responsible design professional via fax or mail.
Information required to be provided with an FCD submittal is listed in Section 2
above.
3.2
Change Order (CO) Approval Process. DSA approved FCDs are not required to
be included in a formal change order. DSA stamped approved FCDs may be included
in formal change orders and are not subject to further technical review. If an
approved FCD is incorporated into a change order, the complete FCD bearing the
approval stamp of DSA shall be attached and referenced in the change order. All
documents included which do not bear a DSA approval stamp will be reviewed for
Code compliance.
The design professional shall submit two copies of each change order to DSA for
review and approval; one copy of the approved change order shall be retained by
DSA and one returned to the design professional. Back-up information and extra
copies of change orders will NOT be returned (exception: see 2.9.3 above).
General information required to be provided with the change order submittal is listed
in Section 2 above; additional information required for change orders includes:
Contract number when more than one contract is awarded for the project,
4.
Design Professionals' Duties. The design professionals have specific Codeprescribed duties with regard to changes to the approved plans and/or specifications. (See
Sections 3-341, Part 1, Title 24, CCR.)
4.1
4.2
Signing/Stamping. The design professional shall stamp and sign all documents
(note that all drawings must be stamped and signed; all sketches must be
signed).
DSA IR A-6
(rev 11-16-09)
Page 5 of 8
4.3
4.4
4.5
Cost Summary. The design professional shall report the total final construction cost
of the project on Form DSA-6A/E. The construction cost shall include the final
amount of all construction contracts, construction management agreements, and
estimated value of all construction work performed by volunteers or school district
employees.
5.
Record-keeping. The inspector shall maintain a file of approved FCDs and change
orders on the job at all times. The inspector is required to maintain complete
records of these documents. These documents shall be maintained in an organized
manner so that they are readily available.
5.2
5.3
Final Verified Report. The inspector's Final Verified Report (form DSA-6) shall
indicate the total number of change orders received and implemented.
APPENDIX
DSA IR A-6
(rev 11-16-09)
Change Order #: 2
Contract #: 1
Page 6 of 8
Project:
Perfectly Designed Elementary School
123 School Drive
Smallville, CA 91020
To:
Excellent Contractors
654 Concrete Road
City of Industry, CA 92010
The contract is changed as follows:
1.
2.
Refer to detail 17 on sheet A57. Add treated wood buck, 7/8" thick x width of
CMU wall, at each jamb of door 710. Secure to masonry with 1/4" diameter
expansion anchors with 1-1/4"embedment at 24" on center.
Requested by: Architect
Reason: To allow for proper installation of door.
Add
3.
$ 760.00
4.
DSA IR A-6
(rev 11-16-09)
Page 7 of 8
Credit $ <300.00>
$900,000.00
$
0.00
$900,000.00
$ <300.00>
$899,700.00
Architect:
Date:
Frank L. Wright, Architect
Really Smart Architects
(affix stamp here)
Date:
Structural Engineer:
Joe Excellent, President
Excellent Engineering, Inc.
(affix stamp here)
Date:
Owner:
Hal T. Computer, Director of Facilities
Smallville Unified School District
DSA IR A-6
(rev 11-16-09)
Page 8 of 8
Revise Detail E on sheet S2 as shown below. Change maximum non-shrink grout thickness from to 1.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
PROJECT INSPECTOR
CERTIFICATION AND APPROVAL
IR A-7
Revised 09-18-07
Revised 06-01-06
Revised 09-10-02
Issued 9-1-99
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This IR describes the requirements for the certification and approval of school
construction project inspectors. All project inspectors must complete this two-step process
of certification and approval by DSA before they are permitted to work on school
construction projects.
Section 1 of this IR explains the requirements for DSA Certification of project inspectors.
Section 2 specifies the requirements for DSA Approval of the project inspector. Duties of
Inspectors are described in DSA IR A-8. The acceptance and approval of assistant inspectors
is described in DSA IR A-12.
Project Inspector
Certification and Approval
Page 1 of 6
Project Inspector
Certification and Approval
Page 2 of 6
Buildings or additions of 2,000 square feet or greater that utilize materials other than
wood-frame shear walls (masonry/concrete shear walls, steel brace frames, concrete, or
steel moment-resisting frames) as the primary lateral-load resistive system.
Buildings or additions over 2,000 square feet in floor area that utilize wood-frame shear
walls as the primary lateral load-resistive system. Projects may be single or multi-level,
with no upper limit in floor area. The project may contain incidental masonry, concrete
and/or structural steel construction (e.g. gravity load carrying columns and beams).
Buildings may have isolated exceptions to the lateral load resistive system, such as a
steel brace frame at one location in the structure.
Buildings or additions of less than 2,000 square feet in floor area that have primary
lateral load-resistive systems utilizing concrete, masonry or steel construction. A singlestory masonry building with a regular configuration a floor area of less than 7,000
square feet, and a wood-frame roof structure may be considered to be a Class 2
structure. For a definition of regular configuration see 2001 CBC, Section 1629A.5.2 for
projects regulated by the 2001 CBC (or see ASCE 7, Section 12.3.2 for projects
regulated by the 2007 CBC).
Alteration, modernization, and reconstruction projects that exceed the limitations of the
Class 3 scope of work, and do not include substantial alterations to structural systems of
concrete, steel or masonry.
Non-building structures that exceed the limitations of the Class 3 scope of work.
Project Inspector
Certification and Approval
Page 3 of 6
Non-building structures, such as signs and poles less than 35' in height, bleachers with a
maximum of 5 rows of seats, walls less than 10' in height above grade, and single-story
canopies less than 200 square feet in horizontal projected area.
The DSA Project Inspector Examination Program is administered by the DSA Headquarters
office. For information regarding the examination schedule, locations, examination fees, or
to obtain an application, contact DSA Headquarters, by phone at 916/554-7019, or on-line
at www.dsa.dgs.ca.gov (click on Inspector Program).
Project Inspector
Certification and Approval
Page 4 of 6
field engineer assigned to the project by the DSA Regional Office. The design professional
and the DSA field engineer must review the inspectors qualifications for the project with
regard to DSA approval criteria (see DSA Approval of the Project Inspector on page 6 of this
IR). The use of assistant inspectors must also be considered at this time (see DSA IR A-12).
Types of Duties: Prior job positions and responsibilities are the primary
considerations of qualifying experience. The inspectors prior responsibilities for either
inspection or construction should include experience with the trades that will be utilized
on the project for which the inspector is applying. Job positions that may provide
qualifying experience include:
y
Other job positions are unlikely to provide sufficient experience for approval by DSA as a
project inspector.
Types of Projects: The types of projects that provide qualifying experience must be
relevant to the type of project for which the inspector is applying. Project aspects (both
Project Inspector
Certification and Approval
Page 5 of 6
for prior projects and the project for which the inspector is applying) that must be
considered include:
y
a. The inspector must be present on the job-site when there is construction activity.
The inspectors schedule must allocate sufficient time to perform all required duties
on the project for which the inspector is applying. The inspector must indicate on the
Form DSA-5 whether presence on the job-site will be full-time (40 hours per week or
more) or part-time (less than 40 hours per week). Large projects usually require a
full-time commitment from the inspector.
b. If the inspector has other work commitments concurrent with the project for which
the inspector is applying, each school project, each non-school project, and/or other
employment commitments must be described on the Form DSA-5. For each
concurrent project the following information must be provided:
y
The responsible design professionals, the school district, and DSA must conclude that
the inspectors schedule will allow for an adequate presence on the job-site. In the event
that the school district, the responsible design professional(s), or DSA conclude that the
inspectors schedule as described on the Form DSA-5 will not allow for sufficient
presence on the job-site, the inspector will be afforded an opportunity to provide
additional information for re-evaluation.
The inspector must obtain prior written approval from the school district, the responsible
design professional(s), and DSA for any changes to the time commitment or workload
from that indicated on the approved Form DSA-5.
The inspectors knowledge of his/her role and responsibilities, job duties, and limits
of authority.
Inspectors physical ability and stamina to inspect all construction and to maintain a
responsive presence on the job.
5.
Project Inspector
Certification and Approval
Page 6 of 6
The project inspector must be DSA approved for each individual project. The DSA field
engineers approval of the proposed inspector is based on the following criteria:
y
The proper relationship between the class of the inspectors certification and the
projects classification, as described in item number 1 on page 4.
The inspectors workload and time commitment to the project, as described in item
number 3 on page 5.
If the inspector meets the requirements for approval, the DSA field engineer will sign the
Form DSA-5, which indicates DSA approval. A copy of the signed Form DSA-5 will be
promptly returned to the inspector and the design professional in general responsible
charge. If DSA is unable to grant approval, the Form DSA-5 will be promptly returned to the
design professional in general responsible charge, with documentation of the reason(s) why
approval was not granted. The proposed inspector may be reconsidered for approval if these
documented reasons are satisfactorily addressed on the resubmitted Form DSA-5.
6.
The DSA field engineer completes an Inspectors Performance Rating for the project
inspector (Form DSA-180-5.1) and for the assistant inspector (Form DSA-180-5.1a) at the
final site visit (refer to IR A-8, Section 2). The performance rating is used by DSA as a basis
for approval of the project inspector and the assistant inspector on future projects.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-8
Revised 11-03-08
Revised 10-03-07
Revised 05-16-07
Revised 06-01-06
Revised 01-25-02
Issued 09-01-99
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
purview of DSA. This IR indicates an acceptable method for achieving compliance with applicable codes and regulations, although
other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Inspection of all portions of the construction for compliance with the requirements of
the DSA approved construction documents.
Submittal of verified reports (Form DSA-6). At the conclusion of the project any
outstanding deviations must be noted on the Form DSA-6.
For projects approved under the 2007 CBC the project inspector is responsible for
providing special inspection of aspects of the construction allocated to the project
inspector on the Tests and Inspections List (Form DSA-103). The project inspector
is also responsible for providing special inspection of aspects of construction
requiring special inspection by Title 24, Part 2, Sections 1707A.3 through 1707A.9.
Any changes to the special/project inspector responsibilities shown on the DSA
approved plans and specifications (including Form DSA-103) must be approved by
change order, or field change document (see IR A-6), prior to proceeding with the
related construction work.
DSA IR A-8
(rev 11-03-08)
Page 1 of 7
DSA IR A-8
(rev 11-03-08)
Page 2 of 7
The project inspector is prohibited from performing functions associated with actual
construction work such as:
The project inspector may perform duties for the school district that are not code-prescribed
as long as such duties do not interfere with inspection duties. It is the inspectors
responsibility to report all ancillary duties to DSA, the project architect and the structural
engineer. The inspector shall also report unforeseen time demands that are impacting, or
will impact, his or her ability to perform his code-prescribed duties.
DSA may approve a project inspector when in the opinion of DSA these ancillary duties
should not create a conflict of interest. DSA may withhold approval of a project inspector or
withdraw approval at any time if the appearance of a conflict arises.
Building Codes: Title 24, Part 1 (Administrative Code); Title 24, Part 2, Volumes 1
and 2 (Building Code); Title 24, Part 3 (Electrical Code); Title 24, Part 4 (Mechanical
Code); Title 24, Part 5 (Plumbing Code) and Title 24, Part 6 (Energy Code). The code
edition must be as referenced on the DSA approved plans and specifications. For
projects approved under the 2001 CBC, Volume 3 of Title 24, Part 2 is also required.
Applicable referenced standards: ASCE 7-05, ACI 318-05, ACI 530-05 & 530.1-05,
AISC 360 & 341, ANSI/NF&PA NDS-2005, various ASTM standards, etc.
DSA IR A-8
(rev 11-03-08)
Page 3 of 7
Labels, materials certificates, mill certificates, concrete batch tickets, etc. for
construction materials or assemblies as required by the DSA approved documents.
Test and Inspection List (Form DSA-103). Form DSA-103 may be incorporated into
drawings or specifications.
Semi-monthly reports.
Review requirements for each phase of the construction with the contractor prior to
commencing that phase of the work. Good communications will prevent construction
errors from occurring.
Title 24, Part 1, Section 4-343, specifies that the contractor must direct inquiries regarding
document interpretation (including Requests for Information or RFIs) to the design
professional in general responsible charge, through the inspector. This code provision
requires the contractor to involve the inspector in the interpretation and clarification of the
construction documents.
DSA IR A-8
(rev 11-03-08)
Page 4 of 7
The project inspector must have personal knowledge of the construction, obtained through
the project inspectors own physical inspection of the work in all stages of its progress.
When special inspectors or approved assistant inspectors are used on a project, the project
inspectors personal knowledge may include that knowledge obtained from these individuals.
The project inspector must keep a log of time spent on site.
4. Records of Inspections
The inspector must maintain detailed records of all inspections. The inspectors records
must provide a comprehensive and timely documentation of the inspected work, promptly
identifying all compliant and non-compliant construction. These records must be readily
accessible and maintained in an organized manner. The following is a list of the inspection
records that must be maintained at the job-site:
A systematic record of all materials and assemblies delivered to the project site.
Construction Procedure Records per Title 24, Part 1, Section 4-342(6), including but
not limited to concrete placement operations, welding operations, pile penetration
blow counts, and other records specified on the approved construction documents.
Log of project inspectors and assistant inspectors time spent on-site. DSA may
require verification from the inspector of time spent at the job-site during all phases
of the work.
Notifications to DSA as required by Title 24, Part 1, Section 4-342 (b) 5; including
start of work, minimum 48 hours prior to completion of foundation trenches,
minimum 48 hours prior to first concrete placement, and when work is suspended for
more than two weeks. Notifications shall be made by telephone or e-mail.
Inspectors Semi-Monthly Reports (see Title 24, Part 1, Section 4-337). The
project inspector must make semi-monthly reports (on the 1st and 15th of every
month) on the progress of construction. The semi-monthly report must be submitted
to the design professional in general responsible charge and the structural engineer;
a copy must be sent to DSA and the school district.
A semi-monthly report must be prepared in accordance with DSAs Guidelines for
Format of Project Inspector's Semi-Monthly Report for School Construction Projects .
The guideline is available on-line at www.dsa.dgs.ca.gov (click on Publications and
scroll down to Inspector Program Publications), or at DSA regional offices.
DSA IR A-8
(rev 11-03-08)
Page 5 of 7
Deviation Notices (see Title 24, Part 1, Section 4-342 (b) 7). When the inspector
identifies deviations from the DSA-approved plans and specifications, the inspector
must verbally notify the contractor. If the deviation is not immediately corrected, the
inspector is required to promptly issue a written notice of deviation to the contractor,
with a copy sent to the responsible design professional(s), and DSA. The status and
resolution of all deviations must be documented on semi-monthly reports.
Verified Reports (Form DSA-6) (refer to Title 24, Part 1, Section 4-336). The
project inspector shall submit verified reports directly to DSA (with copies to the
responsible design professional(s) and the school district) within seven days of any
of the following:
1)
Work on the project is suspended for a period of more than one month.
2)
3)
4)
5)
The verified reports shall clearly describe all non-compliant work including work done
in accordance with change orders that are pending DSA approval.
When DSA approval for special inspectors is required, the project inspector must
identify and report any special inspectors on the job-site that are not DSA-approved.
Verify that the materials testing laboratory is included on the List of DSA Accepted
Testing Laboratories on the DSA website and that all sampling and testing is
performed by the testing laboratory.
The project inspector must verify that the materials testing lab and special inspectors
have received sufficient advance notification to perform the required material
sampling or special inspection.
DSA IR A-8
(rev 11-03-08)
Page 6 of 7
The project inspector is responsible for verifying that all required material sampling
and special inspections have been performed. The project inspector is also
responsible to observe any special inspectors on-site presence and performance of
duties, the special inspectors documentation of complying and non-complying work,
and issuance of deviation notices.
The project inspector is responsible for reviewing all materials test and special
inspection reports. The project inspector must report the status and resolution of
deviations reported by any materials testing lab or special inspector on semi-monthly
reports.
The DSA Field Engineers Role During Construction - The Field Trip Note
The responsibilities of the DSA field engineer include observing the project inspectors
execution of code-required duties. During each visit to the job-site, the DSA field engineer
will document on the DSA Field Trip Note improper or incomplete execution of the
inspectors code-prescribed duties. The field engineer will also provide an acceptable process
to correct inadequate execution of the inspectors code-prescribed duties. Copies of the Field
Trip Note will be distributed to the inspector, the design professional in general responsible
charge, and the school district.
DSA IR A-8
(rev 11-03-08)
Page 7 of 7
The DSA field engineer must make a determination of satisfactory, needs improvement, or
unsatisfactory performance in each of the seven categories (six for assistant inspectors)
indicated on the rating form.
The rating in each category is based on the observations documented by the DSA field engineer
on the Field Trip Note(s) and/or on a review of the inspectors reports. Documented problems
with the inspectors performance that were satisfactorily addressed during the course of
construction can result in a rating of satisfactory.
Any documented improper or incomplete execution of code-prescribed duties that have not
been satisfactorily addressed will result in an unsatisfactory or needs improvement rating.
OVERALL RATING OF THE INSPECTOR
The DSA field engineer will also give the inspector an overall rating of satisfactory, needs improvement, or unsatisfactory performance on the rating form. The overall rating is based on
the ratings the inspector received in the seven categories (six for assistant inspectors). An
overall rating of satisfactory results from satisfactory ratings in each of the categories. An
unsatisfactory rating in one or more of the categories may be justification for an overall rating of
unsatisfactory.
The inspector can, upon request and by scheduled appointment, review the ratings with the
DSA supervisor or regional manager at the DSA regional office. Unsatisfactory overall ratings
require the review and signature of the DSA supervising engineer and DSA regional manager
prior to placement in the inspectors personal file.
DSAs Inspector File
The Inspectors Performance Rating is confidential and will be maintained in the inspectors personal and confidential file at the DSA regional office that provided construction oversight for the
project. Access to these files will only be permitted to DSA personnel and the individual
inspector.
An inspector may review this personal file by scheduling an appointment with the appropriate
DSA supervising engineer or regional manager. The inspector must present a photo ID. The
inspector may not make copies of the file contents, nor at any time will the file be allowed out of
the DSA regional office, unless subpoenaed by a court.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-9
Revised 04-27-10
Revised 04-21-05
Issued 9-1-99
Supersedes IR M-6 (9/99)
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This IR outlines the Division of the State Architect (DSA) policy regarding site
improvements for school building projects.
1.
Site Work Not Involving Structures or Their Utilities: For school site
improvement projects that involve only grading, landscaping, fill placement, paving, storm
drains or other work that does not support structures or involve their utilities, the school
district is not required to file an application for DSA Structural Safety approval, although it
has the option to do so if it chooses. DSA Access Compliance approval is required, however,
for all school projects, whether they are site improvements, new construction, or alterations
to existing construction.
In any case, in addition to the Education Code, the district is subject to compliance with
local, city or county ordinances as required by law, (e.g. local ordinances governing
drainage, waste, fire protection, the Health and Safety Code, the Government Code, etc.). It
is the school district's responsibility to identify and comply with all such applicable statutes
and regulations.
2.
Existing Site Work with Engineered Fill Involving New School
Buildings and Their Utilities:
For projects involving school buildings and their utilities erected on an existing site with
previously placed engineered fill, the architect shall show "existing fill" on his plans.
Adequate data concerning the existing fill is required. The site soil investigation, compacted
fill requirements, inspection and testing records of the original fill placement which has been
verified by a geotechnical engineer's affidavit shall be provided. If this documentation is not
available or adequate, an investigation of the existing fill shall be made by a geotechnical
engineer who shall prepare a report making recommendations regarding fill adequacy and
allowable soil bearing pressures for the footings of the proposed buildings. This report shall
be submitted to DSA with the plans and specifications for the project.
3.
Site Work Involving New School Buildings or Site Utilities: All site
improvement plans and specifications involving engineered fill designed to support
structures or involving retaining walls, underground structures, utility systems or other
items as required shall be submitted to DSA for approval prior to start of construction.
Options for submitting school building project plans and specifications for site improvement
are as follows:
DSA IR A-9
(rev 04-27-10)
Page 1 of 2
DSA IR A-9
(rev 04-27-10)
Page 2 of 2
Option A - Single Application. The entire project may be submitted for approval at
one time under a single application, or site improvements may be listed as phase I of
a multi-phase project submitted under a single application. The plan review fee for
either of the above shall be based on the estimated cost of construction of the entire
project. If the Site improvements are submitted as phase I of the project the
remainder of the project may be submitted under one or more subsequent phases
under the same application.
Option B - Multiple Applications. Plans and specifications for site improvement work
may be submitted under one application, and the school buildings for this site may
be submitted under another application. The estimated cost and plan check fees for
each application shall be based on the scope of work designated to each application.
This option is intended for special circumstances and requires pre-approval by DSA.
4.
Engineered Fill: In all cases the geotechnical engineer making the investigation of
the engineered fill and certifying to its adequacy for supporting school buildings is to be
employed by the school district. The geotechnical engineer is prohibited from having an
employment relationship with the contractor or developer for the existing site work during
the placement of the fill material.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-10
Revised 07-02-09
Revised 12-08-08
Revised 03-17-08
Revised 05-29-07
Issued 11-16-09
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, Community Colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this interpretation is to clarify when plans and specifications for
Resolution: Per California Education Code, Sections 17295 and 81133, all reconstruction
and alteration projects governed by the Field Act shall be submitted to the DSA.
1.
EXCEPTIONS:
1.1
DSA review and approval is not required for alteration projects to school buildings
governed by the Field Act with an estimated construction cost of $35,623.28 for
2009, or less.
1.2
DSA review and approval is not required for reconstruction or alteration projects to
school buildings governed by the Field Act with an estimated construction cost of
greater than $35,623.28 but not in excess of $142,493.12 for 2009, when all of the
following conditions are met:
1.2.1
1.2.2
DSA IR A-10
(rev 07-02-09)
Page 1 of 2
DSA IR A-10
(rev 07-02-09)
1.2.3
Page 2 of 2
2.
This interpretation does not preclude a design professional from choosing to submit
plans and specifications, with the appropriate fee to DSA for review, even when the project
is exempted from DSA plan review requirements as outlined herein.
3.
Projects not requiring DSA approval shall comply with all currently effective design,
construction, and inspection provisions of the California Code of Regulations, Title 24.
When authorizing construction of projects described in this interpretation, the
school district assumes responsibility to assure compliance with all code
provisions.
4.
5.
Construction cost thresholds cited in this interpretation are based on January, 1999
figures of $25,000 and $100,000 and are adjusted annually per the California Education
Code. Annual adjustments are calculated using the first January issue of Engineering NewsRecords U.S. 20 City Construction Cost Index.
6.
California Department of General Services Division of the State Architect Interpretation of Regulations Document
INCREMENTAL
SUBMITTALS
IR A-11
Revised 03-11-08
Issued 12-08-05
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1.2
The total number of increments and scope of each increment shall be defined using
the form DSA-1.INC - Definition of Scope of Increments - at the time of the initial
project submittal. This form is available from the DSA web site, forms page at
http://www.dsa.dgs.ca.gov/Forms/default.htm under DSAs Frequently Used
Forms, or from your DSA Regional Office.
1.3
1.4
The plan review fee for all increments shall accompany the initial submittal.
1.5
No more than six months may elapse between the approval of one increment and the
submittal of a subsequent increment. Any remaining unapproved portion of the
application will be void in accordance with Title 24, Part 1, Section 4-318 (c).
1.6
Additional increments can not be added to an application once review is under way.
1.7
1.8
The Architect or Engineer in General Responsible Charge must be the same person
for all increments. Separate assignments of Architect or Engineer in General Respon-
DSA IR A-11
(rev 03-11-08)
Incremental
Submittals
Page 1 of 4
DSA IR A-11
(rev 03-11-08)
Incremental
Submittals
Page 2 of 4
sible Charge may not be made for parts of a project when the project is an
incremental submittal.
2.
2.1
2.2
Completeness:
All materials for a complete submittal shall be included with each increment.
Contact the DSA Intake Architect or Supervisor with any questions prior to
submittal.
2.3
Title Sheet:
Identify which increment is being submitted.
The Title Sheet of each increment shall include a clear description of the scope of
work in each increment.
The final increment shall use a Title Sheet listing all sheets in the project; clearly
identify sheets used in each increment.
2.4
2.5
For Reference Only: Sheets or details previously reviewed and approved in one
increment and included in subsequent increments for reference, shall be identified
For Reference Only to avoid duplication of review. Identify increment number
where review and approval occurred.
2.6
2.7
3.
3.1
3.1.1
3.1.2
3.2
Procedures
3.2.1
3.2.2
Revisions, addenda, and deferred approvals shall clearly indicate the associated
increment.
DSA IR A-11
(rev 03-11-08)
Incremental
Submittals
Page 3 of 4
3.2.3
Each item in revisions and addenda shall clearly indicate the detail, sheet
number, and increment being modified. To simplify review, it is recommended
that modifications associated with one increment be grouped together when
possible.
3.2.4
4.
4.1
When no more than six months have elapsed between the approval of one increment
and the submittal of a subsequent increment, the subsequent increment shall be
designed to meet all the requirements of the edition of CBC that was in effect when
the project application was first filed with DSA.
4.2
When six months or more have elapsed, a new application and fees will be required
for the remaining unapproved increment(s), which shall be designed to meet the
requirements of the current edition of CBC.
5.
DSA IR A-11
(rev 03-11-08)
Incremental
Submittals
Page 4 of 4
Project 1:
The scope of work for Project 1 consists of the Construction of two classroom buildings
(simple wood-frame buildings), Addition to and Alteration to a multi-purpose building
(complex masonry buildings), and Relocation of four relocatable buildings.
Project 1 may be divided into increments as follow:
Scenario A
Increment 1 - Construction of: site development,
Increment 2 - Relocation of: four relocatable buildings,
Increment 3 - Construction of: two classroom buildings,
Increment 4 - Addition to: multi-purpose building, and
Alteration to: multi-purpose building.
- OR
Scenario B
Increment 1 - Construction of: site development and
Relocation of: four relocatable buildings,
Increment 2 - Construction of: two classroom buildings,
Increment 3 - Addition to: multi-purpose building, and
Alteration to: multi-purpose building
- OR
Scenario C
Increment 1 - Construction of: site development and
Relocation of: four relocatable buildings,
Increment 2 - Construction of: two classroom buildings and
Addition to: multi-purpose building, and
Alteration to: multi-purpose building
Project 2:
The scope of work for Project 2 consists of Construction of field buildings (a restroom
building, a press box and a concession building), Construction of outdoor bleachers and a
score board, and site work.
Project 2 may be divided into increments as follow:
Scenario A
Increment 1 - Construction of: restroom building, concession building, scoreboard
and site work,
Increment 2 - Construction of: bleachers, and
Increment 3 - Construction of: press box.
- OR
Scenario B
Increment 1 - Construction of: restroom building, scoreboard and site work,
Increment 2 - Construction of: concession building, and
Increment 3 - Construction of: bleachers, and press box.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-12
ASSISTANT INSPECTOR
APPROVAL
References: California Building Standards Administrative Code, (Title 24, Part 1)
Sections 4-211, 4-333, and 4-341
California Education Code, Sections 17309, 17311 and 81141
Revised 02-27-09
Revised 10-03-07
Issued 06-01-06
See IR A-7
Discipline: Structural
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12), Community Colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose:
IR A-7 explains the requirements for DSA certification for both assistant and project
inspectors. IR A-7 also explains the requirements for project approval of project inspectors.
IR A-12 specifies requirements for project approval of assistant inspectors.
Background: There are three types of inspectors who may perform code-required
inspections on school construction projects:
Project Inspector - is responsible for ensuring that all code-prescribed inspection and
administrative duties are completed, including supervision of assistant inspectors and
monitoring of special inspectors. The Class 1 project inspector may utilize one or more
assistant inspector(s) to assist in performing inspection and administrative duties on a
project.
1.
DSA IR A-12
(rev 02-27-09)
Assistant Inspector
Approval
Page 1 of 3
DSA IR A-12
(rev 02-27-09)
Assistant Inspector
Approval
Page 2 of 3
2.
2.1
2.2
2.3
The project inspector must provide continuous on-site supervision of all assistant
inspectors. The project inspector shall not assign the assistant inspector to inspect
work at a project site when the project inspector will not be present unless special
written DSA approval is obtained in advance.
2.4
Upon request, the project inspector must submit a written plan indicating the project
inspectors proposed presence at all concurrent projects. The plan must provide for
continuous on-site supervision of all assistant inspectors.
2.5
Both the project and assistant inspector must keep a log of time spent on-site, and
must indicate this information on each semi-monthly report.
2.6
2.7
3.
assistant
inspectors
3.2
3.2.1
3.2.2
3.2.3
Demonstrate that his or her current workload and time commitment to the
project are acceptable (refer to IR A-7, Section 2, item 3),
DSA IR A-12
(rev 02-27-09)
Assistant Inspector
Approval
Page 3 of 3
3.2.4 Have satisfactory DSA performance ratings on previous school construction projects
(refer to DSA IR A-8), and
3.2.5 Be employed directly by the school district.
4.
A project inspector is responsible for ensuring that all code-prescribed inspection and
administrative duties are completed per IR A-7 and IR A-8. The assistant inspector is
responsible for performing assigned inspections in a similar manner.
When an assistant inspector is utilized on a project the project inspector and assistant
inspector must both sign each semi-monthly report.
5.
The DSA field engineer observes the project inspectors and assistant inspectors
performance of code-prescribed duties during the course of construction, including the
project inspectors monitoring of the assistant inspectors performance (IR A-8, Section 1,
item 7).
The DSA field engineer completes an Inspectors Performance Rating for the project
inspector and for the assistant inspector (refer to IR A-8, Section 2). The performance
rating is used by DSA as a basis for approval of the project inspector and the assistant
inspector on future projects.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-13
Issued 04-05-07
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff to promote more uniform
statewide criteria for implementation of the Stop Work authority.
This IR is subject to revision at any time. Please check the DSA web site at http://www.dsa.dgs.ca.gov/Pubs/default.htm for
currently effective IR's (click on DSA Interpretations of Regulations Manual).
State Architect (DSA) may issue an Order to Comply or a Stop Work Order when
construction work is not being performed in conformance with existing law and/or project
plans and specifications and which failure could compromise the structural integrity of the
building creating a danger to public safety.
Examples of situations when the public safety may be endangered include but are not
limited to the following:
construction starts without first obtaining DSA approval of plans and specifications,
any other circumstances where DSA determines that the public safety could be
endangered.
1.
Implementation: DSA may issue an Order to Comply or a Stop Work Order when
work is proceeding that, in the sole opinion of DSA which is not subject to challenge, may
result in construction that could endanger the public safety. Generally, an Order to Comply
will be issued prior to a Stop Work Order
2.
Order to Comply: DSA may issue an Order to Comply (Order). The Order shall
describe the deviation(s) that need to be resolved and a deadline for response. A sample
Order is attached. The DSA Regional Manager and the Field Supervisor will review the Order
prior to issuance. The Order shall be signed by the State Architect or a designated
representative. The Order shall be sent to the owner of the project by regular and
registered mail. The order shall be effective at the time it is first deposited in the mail. The
owner of the project shall be responsible for enforcing the Order.
2.1
Resolution of Orders to Comply: When in the sole opinion of DSA the deviations
described in the Order to Comply have been satisfactorily corrected, the DSA Field
Engineer will acknowledge in his or her Field Trip Notes that the Order has been
satisfactorily addressed and a letter will be sent to the owner of the project
acknowledging that the issue has been resolved.
2.2
Stop Work Order: A Stop Work Order may be issued when construction work is not
being performed in conformance with existing law and or DSA approved plans and
specifications and could compromise the structural integrity of the building creating a
danger to public safety. A Stop Work Order may be issued without first issuing an
Page 1 of 5
Page 2 of 5
Order to Comply based on the circumstances and at DSAs sole discretion. The DSA
Regional Manager and the Field Supervisor will review the information provided and
determine whether or not a Stop Work Order should be issued. The Stop Work Order
will be signed by the State Architect or a designated representative and delivered to
the owner of the project by certified mail with return receipt requested. A sample
Stop Work Order is attached. Copies will be sent to the project contractor, inspector,
architect, and structural engineer. No further work will be permitted in the affected
areas until authorized by DSA in writing. The project owner shall be responsible for
stopping the construction work.
Once a Stop Work Order has been issued, no construction work, except that work
necessary to correct deviation(s) addressed in the Stop Work Order may be
performed on the project. When corrective work requires approval of change orders
or construction change directives by DSA such approvals shall be obtained prior to
performing corrective work.
Exception: The Stop Work Order may describe a specific area of the project
or a specific aspect of the work which shall be stopped; in this case work may
proceed in areas, or aspects, of the project that are not affected by the Stop
Work Order.
The Owner of the project shall be responsible for enforcing the stop work order or
order to comply and making sure that the work is corrected in accordance with
applicable laws, codes, plans and specifications, and any other applicable project
documents.
2.3
Resolution of Stop Work Order: The project inspector shall notify DSA when the
contractor has completed the corrective work. A DSA Field Engineer shall verify that
the required work has been completely and properly performed in accordance with
DSA approved documents. When the DSA Field Engineer has accepted the corrective
work in a Field Trip Note, the State Architect or a designated representative will
rescind the Stop Work Order by regular and registered mail and work may resume.
2.4
Enforcement: If work does not stop immediately upon issuance of a Stop Work
Order the matter will be referred to the Office of the Attorney General for
enforcement.
3.
Limitations: It is in the sole discretion of DSA to issue a stop work order or order
to comply however, DSA will not issue any such order invoking its stop work/order to
comply authority for incidental, or minor nonstructural additions, or nonstructural
alterations.
APPENDICES
Sample Order to Comply letter
Sample Stop Work Order letter
Sample Stop Work notice
SAMPLE
SAMPLE
Enclosure
Appl. # ____________
File # ___________
School District:
Date of Inspection:
Project: ________________________________________________
State Architect
No person shall remove, or obstruct the visibility of any DSA order posted unless authorized by DSA
DSA-351 (04-05-07)
IR A-14
Issued: 08-28-07
Discipline: All
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations clarifies the Division of the State Architect
(DSA) review and acceptance of walk-in freezers and cold storage boxes (WIF/CSB).
Background:
Policy:
1.
Requirements for Indoor Installation: The WIF/CSB units must be confined
on three sides by walls capable of resisting seismic forces from the WIF/CSB units as
prescribed by CBC Section 1632A (2007 CBC Section 1613A). Mechanical anchorage is not
required, and restraint may be provided by bearing on walls or floor curbs. On the fourth
side, with door, supplemental lateral bracing must be provided per Section 2.3.2 below.
Supplementary bracing shall not block or interfere with doorways or means of egress.
2.
Dimensional Limitation: WIF/CSB units are limited to 250 square foot of enclosed
areas and ten feet in height.
2.2
Snow Load Limitation: Snow load shall be limited to the lesser of 20 psf or the
manufacturers recommendation.
2.3
Page 1 of 2
Page 2 of 2
2.3.1
Fencing Option: Enclose the WIF/CSB unit by a fence with a clear space
between the fence and the unit equal to the height of the unit, or
2.3.2
2.4
2.5
DSA Review: DSA will check the foundation and anchorage capacities per
Section 2.4 above, and the supplemental lateral bracing per Section 2.3.2 above.
Provide plans, details, specifications, calculations, and any other information that
are necessary to complete the DSA reviews.
2.6
4.
Fire Life Safety Requirements: An automatic fire sprinkler system is required
for WIF/CSB units that are housed in or adjacent to a building protected or required to be
protected by an automatic fire sprinkler system. DSA will check WIF/CSB units installed
indoors.
4.1
When WIF/CSB are installed outdoors or adjacent to buildings, site plans showing all
approved fire lanes shall be submitted. DSA will check the site plan to ensure no fire
access lanes are obstructed by the WIF/CSB units.
5.
However, if pre-manufactured walk-in freezers or cold storage boxes are used by students
as a part of their education curriculum, or they are used by the general public, they are not
considered to be a part of an employee only work station and therefore must meet all
accessibility requirements of the California Building Code.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-15
Revised 12-17-09
Revised 10-15-07
Issued 08-13-03 as CR A-1
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose:
1.
See IR 17-4 for further information on the basics of testing and special inspection as well as
a clarification of specific procedures considered to be tests vs. special inspections.
2.
Exceptions: Inspection and testing of factory built relocatable buildings and
bleachers (grandstands) are exceptions to this interpretation:
2.1
2.2
Page 1 of 3
3.
Page 2 of 3
Definitions:
Assistant inspector - An individual approved by DSA to assist the project inspector on the
project site. See IR A-8 and IR A-12 for further information.
Project Inspector An individual approved by DSA to inspect all aspects of construction
for a project. The project inspector may utilize assistant or special inspectors for some
aspects of the construction.
Relocatable Building In-plant (RBIP) inspector An individual approved to inspect the
fabrication of modular buildings in the factory. For an application to become certified by
DSA as a Relocatable Building In-Plant Inspector by DSA see the DSA website at:
http://www.documents.dgs.ca.gov/dsa/other/RBIP_Examination_Application_2-24-04.pdf.
Special inspector An individual acceptable to DSA to provide inspection of a specific
aspect of construction (such as welding or masonry) either on or off the project site.
See IR 17-6 for further information on special inspection.
Testing The testing of structural materials or completed elements of a structure.
See IR 17-5 for further information on testing.
4.
Testing:
4.1
Material testing requirements will be listed on the Test and Inspection List (Form
DSA-103) and in the plans and/or specifications for each project. Materials must be
sampled, handled, transported, and tested by a testing facility accepted in DSAs
Laboratory Evaluation and Acceptance (LEA) program. When approved by the DSA
field engineer, an LEA accepted laboratory may subcontract testing of materials to a
facility that is not LEA accepted when all of the conditions of Section 4.1.1 through
4.1.4 are met.
4.1.1 An LEA accepted facility does not exist within 300 miles of both the material supplier
location and the material fabrication location.
4.1.2 The material tests to be performed are routine and the materials to be tested are
used in an ordinary manner. Unusual materials and/or applications may require
testing by an LEA accepted facility at the discretion of the DSA field engineer for the
project.
4.1.3 The facility to which services are subcontracted operates under the supervision of the
engineer in charge of the LEA accepted facility for the project. The LEA laboratory
engineer must evaluate the subcontract facilitys management, personnel,
equipment, operations, practices, etc. to verify that:
All personnel involved in the sampling, handling, and testing of material are fully
aware of all applicable codes, and standards (including special Title 24 code
requirements) for the sampling, testing, and reporting of materials tests required
for the project.
4.1.4 The LEA laboratory engineer shall include all tests performed by the subcontract
laboratory on his laboratory final verified report.
Page 3 of 3
5.
5.2
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
CHARTER SCHOOLS
ENFORCEMENT JURISDICTION
IR A-16
Issued 11-01-07
Supersedes DSA Policy # 94-19
Purpose: This Interpretation of Regulations (IR) clarifies the enforcement agency jurisdictional
authority for Charter School construction projects, such as new building and facility construction,
reconstruction, rehabilitation, alterations, and additions.
1.
2.
Non-State Funded Charter School facilities construction projects: If the
Charter School facility construction project does not use State funds, independent of land
ownership, the project must be submitted to either:
2.1
2.2
The local building enforcement agency with jurisdiction over the area in which the charter
school is located.
3.
DSA IR A-F
(iss 11-01-07)
Charter Schools
Enforcement Jurisdiction
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-17
Issued 02-01-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
School District Officials and Design Professionals, to promote more uniform statewide criteria for Voiding Applications during the
plan review phase of projects within the jurisdiction of DSA, which include State of California public elementary and secondary
schools (grades K-12), community colleges, and state-owned or state-leased essential services buildings.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose:
Projects are placed in our filing system for an undefined time, causing a backlog of
projects with unknown status.
Staff hours spent on obtaining full intimate project knowledge and understanding is
lost as time elapses.
The contract for DSA contract plan checkers, when used, expires in the elapsed time
causing contractual issues. This sometimes results is DSA staff assuming the
remaining work and always requires DSA staff time to resolve.
Original plan comments become potentially archaic as new codes, standards and
regulations become effective.
1.
The following criteria under which a project will be voided during the plan check phase are
herein clarified:
1.1
Prints from the corrected plans or corrected original plans must be filed for
backcheck within 6 months after the date of return of checked plans to the architect
or engineer.
1.1.1
1.1.2
1.2
2.
Re-submittal of Voided Projects: Any project application or approval that has
been voided by DSA can be re-submitted as a new project by filing a new application and
fee in accordance with Title 24, Part 1, Section 4-315 (b). Plans, specifications and design
shall comply with the requirements of the current California Building Standard Code.
DSA (SS) IR A-17(iss 02-01-08)
(errata 5-20-10)
Voidance of Applications
and Project Re-Submittal
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-18
Revised 04-27-10
Revised 07-01-09
Issued 02-01-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) clarifies situations where the use of a
statement of general conformance is acceptable in lieu of over-stamping on projects under
the jurisdiction of the Division of the State Architect (DSA).
Background: Business and Professions Code Sections 5536.1 and 6735 and Title 24, Part
1, Section 4-317(h), requires signature and seal (or stamp) of the architect or engineer in
general responsible charge to be shown on the basic construction documents that include
plans, specifications, calculations, reports, etc.
In certain situations, such as listed in Section 1.2 below, when the architect or engineer in
general responsible charge utilizes construction documents prepared, signed, and stamped
by other California Licensed professionals, DSA would accept the Statement of General
Conformance, shown in Appendix A, in lieu of the signature and seal (or stamp) from the
architect or engineer in general responsible charge (Title 24, Part 1, Section 4-317(g)).
When the following requirements are met, DSA will accept a Statement of
General Conformance (Appendix A) from the architect or engineer in general responsible
charge when he or she utilizes construction documents prepared, signed, and stamped by
other professionals, in lieu of his or her own signature and stamp on those construction
documents.
Policy:
1.
1.1
1.1.1
DSA will have the final determination if the Statement of General Conformance is
applicable or not.
1.1.2
DSA IR A-18
(rev 04-27-10)
Page 1 of 4
DSA IR A-18
(rev 04-27-10)
Page 2 of 4
1.1.3
1.1.4
1.2
1.2.1
Deferred approvals,
1.2.2
1.2.3
The Statement of General Conformance may be used for the basic construction
documents in lieu of stamps and signatures required per Title 24, Part 1, Section
4-317(h).
2.
3.
The signature and stamp of the original professional appears on the change and
the architect or engineer in general responsible charge provides a Statement of
General Conformance, or
4.
4.1
Statement of General Conformance shall be shown on the cover sheet, the index
sheet, or as directed by DSA.
4.2
APPENDICES:
Appendix A Example of Statement of General Conformance
Appendix B Example of Signature Block
of General
DSA IR A-18
(rev 04-27-10)
Page 3 of 4
APPENDIX A:
Example of Statement of General Conformance
DSA IR A-18
(rev 04-27-10)
Page 4 of 4
APPENDIX B:
Example of Signature Block
I find that:
Signature
Date
Signature
Date
Print Name
Print Name
License Number
Expiration Date
License Number
Expiration Date
IR A-19
Revised: 04-07-08
Issued: 02-01-08
Discipline: ALL
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose:
Background: Title 24, Part 1, requires the architect or engineer in responsible charge of
a project to assume responsibility for the safety of design of the project. The stamp and
signature of the architect or engineer on a plan, specification, or other document shall be
deemed evidence that full responsibility is assumed by the signatory for work shown
(Title 24, Part 1, Section 4-316 (e)).
Policy: The architect or the engineer in general responsible charge, and other
For plans and specifications, seals (stamps) and signatures may be applied manually or
electronically and may be in original or reproduced form.
For documents submitted electronically for approval through DSAs electronic plan review
program, Architects and Engineers must apply digital signatures with Public Key
Cryptography to the final construction documents (record set, see Section 2). Refer to DSA
Procedure PR 08-01 for more information.
1.
2.
Construction Documents: In accordance with Business and Professions Code,
Sections 5536.1 and 6735, the architect or the engineer in general responsible charge, and
other professionals delegated for preparation of portions of the project (Title 24, Part 1,
Section 4-317 (g)), shall provide, on their respective plans and specifications that are
permitted or to be released for construction (i.e., record set), the following:
DSA IR A-19
(rev 04-07-08)
Page 1 of 3
DSA IR A-19
(rev 04-07-08)
Page 2 of 3
2.1
Plans: Signature, seal or stamp, date of signing and sealing, license number and
expiration date shall be shown on each drawing sheet. Signature must be provided
before plans are approved by DSA.
2.2
Specifications:
Signature, seal or stamp, date of signing and sealing, license
number and expiration date shall be shown on the cover sheet or signature sheet as
the minimum. Signature must be provided before the specifications are approved by
DSA.
2.3
3.
Deferred Approvals:
A California licensed architect or registered engineer
stamps and signs the plans and specifications for the deferred approval item. The architect
or the engineer in general responsible charge of the design of the project shall submit the
plans and specifications for the deferred approval item, with the notation indicating that the
deferred approval documents have been found to be in general conformance with the design
of the building (Title 24, Part 1, Section 4-317 (g)). See DSA IR A-18 for more details on
the Statement of General Conformance.
The Statement of General Conformance shall not be construed as relieving the architect (in
general responsible control) or structural engineer in general responsible charge of his or
her rights, duties, and responsibilities under Sections 17302 and 81138 of the Education
Code and Sections 4-336, 4-341 and 4-344 of Title 24, Part 1. (Title 24, Part 1, Section
4-317 (b))
3.1 Overstamping: If the architect or structural engineer in general responsible charge
had exercised responsible charge (per Business and Professions Code, Section 6703) in the
preparation of the deferred approval documents, he or she may overstamp and sign those
documents.
4.
Pre-Check (PC) Documents: The requirements of Section 2 above shall apply.
See also Section 6.1 of DSA Procedure PR 07-01, Pre-Check (PC) Approval Procedure, for
additional requirements. For changes to an approved PC document, see Section 2 of IR A18, and Sections 7 and 8 of this IR.
5.
Civil Engineers: If the entire project consists of only site work and/or non-school
buildings (Title 24, Part 1, Section 4-314), a California registered civil engineer may
assume general responsible charge for the project.
5.2
Landscape Architect: If the entire project consists of only landscape work and/or
non-school buildings, a California registered landscape architect may assume general
responsible charge for the project.
6.
Assumption of Responsibility for Incomplete Documents: If construction
documents, deferred approval documents, PC documents, etc. bear the signature and stamp
of an architect or engineer who has left the project, deceased, or whose license or
registration has been revoked, cancelled, or retired before his/her design or construction
DSA IR A-19
(rev 04-07-08)
Page 3 of 3
was completed, another licensed architect or registered engineer shall assume responsibility
for the project or the portion of the project for which the original architect or engineer was
delegated responsibility, in accordance with Title 24, Part 1, Sections 4-316(c) and (d).
7.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-20
Revised 08-06-09
Issued 04-15-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) clarifies the Division of the State Architect
(DSA) review and approval of projects associated with uncertified school buildings.
Policy:
New work involving uncertified projects cannot be approved by DSA until the
issue of certification is resolved. DSA will not approve (stampout) plans and specifications
for alteration and/or addition projects on, or utilizing portions of, uncertified projects except
when the new project is solely for the purpose of upgrading fire-life safety (FLS) aspects of
the building/campus as indicated below.
1.
EXCEPTIONS:
1.1
Scopes: The scopes of the projects accepted for DSA approval under this policy
shall be limited to FLS alterations of the following types:
1.2
1.3
Implementation: DSA will review and approve the FLS only alteration projects on
uncertified buildings as described in Section 1.1 above. DSA written approval of the
alteration plans and specifications issued to the school district will specify:
Disclosure: The scopes of the projects and the uncertified buildings on the
alteration project must be clearly identified in the following manner:
DSA IR A-20
(rev 08-06-09)
The scope of the alteration project shall be clearly shown on the cover sheet or
index sheet of the plans,
Page 1 of 3
DSA IR A-20
(rev 08-06-09)
Page 2 of 3
The following disclosure statement shall also be shown on the cover sheet or
index sheet:
DSA approval of these plans shall not be construed as the
Certification of Compliance for the following building(s) as required
by the Field Act, Education Code Section 17280-17316 and Sections
81130-81147: and
Immediately after the disclosure statement, list all the uncertified buildings on
the alteration project.
2.0 Other Projects: DSA may begin review of other projects not identified in Section
1 above, associated with uncertified projects. However, DSA approval (stamp out) of the
plans and specifications shall be withheld until the issue of certification is resolved.
Appendix Clarifying Situations:
Many situations occur that may or may not involve uncertified buildings/projects to
the extent that a proposed new project may be affected. This appendix lists some of
those situations in an attempt to provide clarity, uniformity and consistency in the
application of this IR.
#1:
Q. The district submits a project for a fire alarm upgrade and/or fire alarm addition.
The project requires connecting the new fire alarm system/components into a fire
alarm panel that resides in an uncertified building.
A. See 1.2 Implementation above except:
The new project submittal must include the following two documents from NFPA
72 to be completed and submitted with the project.
1. Fire alarm system record of completion.
2. Fire alarm inspection and testing form.
#2:
Q. A school building is not certified and the district submits an application to DSA for
an alteration or addition to that building.
A. DSA will accept the new application and provide plan review but will not issue
project approval (stampout) until and unless the issue of certification is resolved.
#3:
Q. The district submits an application to DSA for a new building but the new building
depends on portions of an uncertified project to be minimum code compliant (e.g.
accessible restrooms located in uncertified buildings, path-of-travel part of an
uncertified project, parking part of an uncertified project, etc.).
A. DSA will accept the new application and provide plan review but will not issue final
approval (stamp out) until and unless the associated project certification is
resolved. (See also Project Certification Guide on DSA website for potential
alternatives.)
DSA IR A-20
(rev 08-06-09)
Page 3 of 3
#4:
Q. The district submits an application to DSA for a new project on a campus but the
entire campus (or portions of the campus) is not certified.
A. As long as the new project does not depend on uncertified construction to satisfy
minimum code requirement (accessible restrooms, path-of-travel, parking, etc.)
DSA will accept the new project as a viable, approvable project.
#5:
Q. The district submits an application to DSA for a new classroom building but
another ancillary building (gymnasium, administration building, shade structure,
library etc.) is not certified.
A. As long as the new project does not depend on uncertified construction to satisfy
minimum code requirement (accessible restrooms, path-of-travel, parking, etc.)
DSA will accept the new project as a viable, approvable project.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-21
Revised 08-25-09
Issued 04-15-09
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
design, install, and maintain fire alarm systems (F/A) for projects under the jurisdiction of
the Division of the State Architect (DSA), according to the requirements of the California
State Licensing Board (CSLB) and applicable referenced standards for all F/A installations in
public schools, community colleges, and state essential services buildings.
1.
1.1
All system design and installation must comply with 2002 NFPA 72 Section 4.3.2. An
Electrical Engineer or a C-10 licensed electrical contractor is authorized to design the
system within the parameters of their license.
1.2
2.
2.1
2.2
DSA IR A-21
(rev 08-25-09)
Page 1 of 3
DSA IR A-21
(iss 08-25-09)
Page 2 of 3
2.2.1
2.2.2
2.2.3
As per 2002 NFPA 72: Section 4.3.3, F/A system installation personnel shall be
supervised by persons who are qualified and experienced in the installation,
inspection, and testing of fire alarm systems. Examples of qualified personnel
shall include, but not be limited to, the following:
2.3
Electrical Engineer;
Factory trained and certified personnel, working under the supervision of a C10 licensed electrical contractor;
2.3.1
2.3.2
Battery and Voltage Drop calculations to match the new product data sheets; and
2.3.3
2.4
2.5
3.
3.1
DSA IR A-21
(iss 08-25-09)
Page 3 of 3
3.2
Programming of Fire Alarm Control Panels shall be done by factory authorized and
trained personnel.
3.3
4.
4.1
4.1.1
The Local Fire Authority may be invited, as a courtesy, to witness the final
acceptance test of the DSA approved system so the Local Fire Authority can
become familiar with the workings of the system and the systems configurations.
The Local Fire Authority is not obligated to witness the test nor authorized to
delay the testing until witnessing can be scheduled.
4.1.2
The Local Fire Authority may not require but may ask for or recommend changes
to the DSA approved system. A Change Order shall be generated and processed
through DSA. Initiation of any change shall not be performed without prior
approval of DSA.
4.2
Annual Testing: The fire alarm systems shall be tested in compliance with 2002
NFPA 72: Chapter 10, Table 10.4.3. In addition, the Local Authority is charged with
inspecting all schools within their jurisdiction at least annually. During the inspection
of the facility, a functional test of the fire alarm system and evacuation drill shall be
performed to ensure that the system performs as originally approved by DSA. The
testing can be done by qualified individuals trained by the installer, or by individuals
employed and qualified by the installing C-10 licensed electrical contractor or by
individuals employed by a qualified C-10 licensed electrical testing company.
Witnessing of the Test and Evacuation Drill shall be performed by the Local Fire
Authority.
4.3
4.3.1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-22
References:
California Building Code, Part 1, Section 4-314, Part 2, Section 1134B
Discipline: Structural, Fire-Life Safety, Access Compliance
Issued 08-15-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this Interpretation of Regulations (IR) is to clarify when plans
and specifications for small construction projects on existing public school sites are required
to be submitted to the Division of the State Architect (DSA) for review, approval and
construction oversight.
1.
Access Compliance Requirements: Some projects that are exempt from the
2.
Field Act (Education Code Sections 17280-17317, 17365-17374, and 81130-81149) are
required to be submitted to DSA for review and approval by the Access Compliance Section
of DSA. See Government Code Sections 4450-4461. Also see Appendix A of this IR for
projects that fall into this category.
Field Act but not requiring DSA approval shall comply with all currently effective design,
construction and inspection provisions of the California Code of Regulations, Title 24. When
authorizing construction of projects described in this interpretation, the school district
assumes responsibility to assure compliance with all code provisions. Architects and
engineers providing project design must be licensed as required by the rules governing the
licensing of architects and engineers. See Business and Profession Code Sections 6735 and
5535 through 5538.
All projects, whether governed by the Field Act or not, shall comply with all applicable
accessibility provisions of the California Code of Regulations, Title 24.
3.
Exempt Small Projects: See Appendix A for a list of small projects and the
review requirements for Structural Safety (SS), Fire-Life Safety (FLS) and/or Access
Compliance (AC). Items listed in the Appendix are exempt only when they constitute the
entire scope of a project.
4.
5.
Voluntary Submittal: This interpretation does not preclude a school district from
choosing to submit plans and specifications for exempt projects, with the appropriate fee to
DSA for review. Voluntary submittal of an exempt project will trigger full DSA plan review
for code conformance and construction oversight including inspections and materials
testing.
Page 1 of 3
Page 2 of 3
Project Description
1. Poles less than 35 feet tall (lighting poles,
flag poles, poles supporting open mesh
fences, etc.)
2. Poles less than 25 feet above the roof line
when attached to an existing school building
(antennas, flag poles, etc.)
3. Cell or antenna towers
4. Soil retaining walls less than 4 feet tall
without surcharge or a sloping backfill
5. Baseball dugouts less than 250 sq. ft. of
floor area with lightweight roof construction
and walls less than 4 feet tall resisting
(active, passive or at rest) soil pressure
with no sloping backfills or surcharge.
6. Ball walls or yard walls less than 6 feet
above grade
7. Free standing signs, scrolling message signs,
scoreboards, or solid clad fences less than 8
feet above grade
8. Bleachers and grandstands five rows of seats
or less
9. Ancillary accessory facilities to athletic fields
with light metal or wood frame construction
(one-story, not over 250 square feet, used
for equipment storage, toilets, snack bars,
ticket booths, etc.)
10. Playground equipment
11. Large playground equipment resembling
buildings and over 250 square feet
12. Open-mesh baseball backstops
13. Open-mesh fences
14. New or replacement of sidewalks
15. Landscaping
16. Replacement in kind of mechanical,
electrical, or plumbing units when the cost
does not exceed the thresholds in IR A-10
17. Cosmetic maintenance work such as
painting, re-carpeting, wallpapering,
reroofing, etc., as defined in Title 24, Part 1,
Section 4-314.
SS/FLS Review
Required?
Yes
No
Access Compliance
Review Required?
Yes
No
1
2
1,4
3
4
Page 3 of 3
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-23
Issued 11-03-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this Interpretation of Regulations (IR) is to clarify tasks that are
considered to be construction tasks subject to DSA fee calculation.
Background: Alternative project delivery systems have been developed in recent years
that assign certain construction related responsibilities to construction managers or other
entities. Some of these duties were traditionally performed by the construction contractor.
Such duties must be included in calculating construction costs which are used to determine
final fees due to DSA.
Note: Although certain portions of the Construction Management fees will be considered
construction related costs and utilized in determining DSA fees, please be aware that the
Office of Public School Construction (OPSC) does not consider these costs to be construction
related for purposes of having funds released in the School Facility Program with certain
exceptions. Please consult with the OPSC for further clarification of these Construction
Management exception areas.
1.
DSA Fees: Final DSA fees are based on the total final construction cost for the
project. The initial contract amount is reported to DSA on a Contract Information Form
(Form DSA-102). All changes to construction cost are tracked via change orders during the
course of construction to arrive at a final construction cost. Construction management costs
for the project are subject to DSA fees when such management fees constitute a portion of
the construction cost. See Section 3 below for clarification of services that are considered
to be part of the construction cost. Construction management fees paid for services that
are not related to construction are not subject to DSA fees except per Section 1.2 below.
1.1
1.2
DSA IR A-23
(iss 11-03-08)
Page 1 of 3
Page 2 of 3
Exceptions:
1. If non-construction costs are segregated by separate contract payment
items, by separately priced items of change orders, or by a certified copy of a
subcontractors bid, or by an entitys proposal in accordance with Title 24,
Part 1, Section 4-322 then the non-construction costs shall not be subject to
DSA fees.
2. DSA fees for entities (e.g.: Construction Managers, Program Managers, etc.)
may be prorated based on percentage of time spent on construction tasks.
1.3
The value of donated materials and/or materials provided by the school district must
be reported on Form DSA-102.
1.4
1.5
When a single contract covers work described in more than one DSA application the
cost relevant to each application shall be clearly broken out and a separate Form
DSA-102 shall be submitted for each application. Also, change order costs shall be
broken out for each application and clearly described on each change order.
2.
Definition of Construction: Any entity, including construction managers, that
performs construction tasks as defined in Section 3 below shall be subject to all the rules
and requirements applicable to construction contractors including but not limited to:
3.
activities
of
construction
workers,
Page 3 of 3
Providing temporary facilities including but not limited to site trailers, furnishings,
equipment, utilities, etc. for contractors, inspectors or other personnel;
Obtaining and/or paying for local permits and/or arranging for the delivery of
power, telephone, water and other temporary utilities required for construction;
Arranging for a fire watch during construction for the construction site and/or
for existing buildings while fire safety systems are non-functional for any reason
as a result of the construction;
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-24
Issued 11-03-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Publications/default.htm (click on DSA Interpretation of
Regulations Manual) at the time of plan submittal to DSA are considered applicable.
clarify the duties of the school district, designer and the construction contractor with
regard to the construction phase of the project, and
General: The school district may contract with construction managers or other entities for
assistance with monitoring the design and/or construction process. Construction phase
duties that must be performed by specific entities per Title 24, Part 1 are listed in this IR.
These duties may not be re-assigned to other entities. (Exception: Some of the duties of
the construction contractor may be performed by a construction manager however; DSA
might then consider the construction manager contract as a construction contract. See
Section 5.3 below.)
See IR A-23 for definitions of activities that are considered construction tasks.
1.
1.1
Design: The school board shall employ (or contract to) a qualified architect or
structural engineer to be in general responsible charge of the design of the project.
The designer shall not perform construction nor share any interest with any entity
performing construction.
Exceptions:
1. When the project involves no structural or architectural construction a
qualified engineer registered in that branch of engineering applicable to the work
may be in general responsible charge of the project; see Title 24, Part 1, Section
4-316.
2. The designer need not be independent of the builder when the design/build
requirements of Education Code Sections 17250.10 through 17250.50 are met.
1.2
Inspection: The school board shall provide for the cost of inspections by the project
inspector and, when required, all assistant and/or special inspectors. In general, the
project inspector and any assistant inspectors must be contracted directly to (or
Page 1 of 4
Page 2 of 4
directly employed by) the school board. The school board may contract to a third
party for the project or assistant inspectors employment only under the condition
that the inspectors employer shall not perform, nor offer to perform, any design or
construction related tasks (see IR A-23, Section 2). Special inspectors may only be
contracted directly to (or employed by) the school board or the testing laboratory.
1.3
Testing: The school board shall contract directly to a testing laboratory for the
performance of structural tests as defined by the DSA approved plans and
specifications and summarized on Form DSA-103. The testing laboratory must be
accepted in the DSA Laboratory Evaluation and Acceptance (LEA) program, see IR
17-5. Note that the school board may collect the cost of certain tests from the
contractor in accordance with Title 24, Part 1, Section 4-335(c).
1.4
Soils Investigations and Testing: The school board shall contract directly with a
California registered geotechnical engineer for the performance of soils and geologic
investigations (for design) when required. During construction the school board shall
contract directly with an LEA accepted testing laboratory which employs or contracts
with a registered geotechnical engineer for soils testing, see IR 17-7.
1.5
Notice of Completion: The school board shall submit a notice of completion to DSA
for each contract upon satisfactory completion of construction shown on the DSA
approved documents.
2.
Obtain DSA approval of drawings, specifications, and Form DSA-103 prior to the
issuance of any contracts for construction.
Review and evaluate the qualifications and experience of the testing laboratory and
all project, assistant and special inspectors prior to employment.
Advise the school district on the selection of the inspectors and testing laboratory for
the project.
Submit an Inspectors Qualification Record (Form DSA-5 and/or DSA-5A) for all
project, assistant, and (when required) special inspectors to DSA at least 10 days
prior to start of work.
Submit a Contract Information Form (Form DSA-102) for all construction contracts.
See IR A-23 for definitions of construction costs.
Provide a complete set of all DSA approved documents including the T&I List (Form
DSA-103), addenda, deferred approvals, change orders and field change
documents (see IR A-6) to the inspector and the testing laboratory.
2.2
During Construction:
Page 3 of 4
Verify that the DSA approved documents are being properly interpreted and
implemented by all parties and that construction is proceeding in accordance with
DSA approved documents.
Review shop drawings and submittals and respond in a timely manner; verify that
shop drawings and submittals conform to the requirements of the DSA approved
drawings.
Review and respond in a timely manner to all requests for information (RFIs) from
the contractors, inspectors, and testing laboratories. Verify that all RFIs from
contractors are passed through the project inspector in accordance with Title 24, Part
1, Section 4-343(b).
Evaluate non-conforming construction and/or materials and make decisions regarding acceptability and/or corrections required; notify DSA as to the disposition of
all non-conforming construction and/or materials.
Provide general direction to the project inspector and notify the school board and
DSA by letter if the project inspector is found unable or unwilling to perform his or
her duties.
2.3
Create and submit all addenda, deferred approvals, change orders, and FCDs to DSA
for approval.
Issue change orders or Field Change Documents (FCDs), in accordance with IR A-6,
as required to correct any errors or omissions in the DSA approved documents.
3.
3.1
3.2
Performance of Construction:
Provide quality control of all work including the work of all subcontractors.
Page 4 of 4
Immediately correct any construction that is not in accordance with DSA approved
documents. Note: the contractor may elect to request changes to the requirements
of the DSA approved documents from the architect rather than replace noncompliant work when it is in the best interest of the school district and the public
safety to do so. See Section 2.2.3 above for changes to DSA approved documents.
Notify the project inspector, special inspectors, and the testing laboratory of the start
of each and every aspect of the construction.
Provide access to the construction for all inspectors, testing laboratory personnel and
DSA representatives.
4.
5.
Facilitating communications;
5.2
Construction managers are not permitted to perform duties that are assigned by
Code to the school district, designers, testing laboratory or the inspectors (see paragraph 1,
2, and 4 above).
5.3
When construction managers contract to perform construction tasks (as defined in IR
A-23) the construction manager will be considered to be a construction contractor and will
be subject to all the duties and responsibilities of a construction contractor (see paragraph 3
above). Also, the cost of the construction management contract shall be considered to be
part of the total construction cost used to calculate the final DSA fee (see IR A-23).
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-25
References:
2007 CBSC Title 24 Part 1, Sections 4-209, 4-225 (c) and 4-316(e)
2002 NFPA 13 and 24
California Business and Professions Code, Sections 6737.1, 7026.12, 7057 & 7058
C.C.R., Title 16, Professional and Vocational Regulations, Section 832.16
Health & Safety Code 13195 & 13196.5
Discipline: Fire and Life Safety
Issued 05-26-09
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, Community Colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
design, install, and maintain automatic fire sprinkler systems (AFSS) for projects under the
jurisdiction of the Division of the State Architect (DSA), according to the requirements of
the Contractors State Licensing Board (CSLB) and applicable referenced standards.
1.
General Requirements: Any AFSS, both underground and overhead portions,
submitted to DSA for approval shall meet the following requirements.
1.1
Design Professional (DP): For the purpose of this IR, the architect or engineer in
general responsible charge [sometimes called the Architect Of Record (AOR) or the
Engineer Of Record (EOR)] shall be referred to as the design professional (DP).
The DP is at all times responsible for the design and construction oversight and must
coordinate the pipe sizes and designs with hydrant requirements and the anticipated
demand of the fire sprinkler system(s) that will be fed by the underground piping.
1.1.1
1.1.2
1.1.3
1.1.4
Design/Build Contractor:
For the purposes of this IR, a design/build
contractor is a contractor with a General A, C-16, C-34 or a C-36 contractors
DSA IR A-25
(iss 05-26-09)
Page 1 of 4
DSA IR A-25
(iss 05-26-09)
Page 2 of 4
1.3
Water Supply Data: Water supply data must be included with the initial plans and
specification submittal per current edition of the NFPA 13. Systems that require fire
pumps, water tanks, or other measures to provide required water flow and or
pressures must be pre-approved by DSA and submitted with the AFSS plans.
Water flow testing data must indicate the volume and pressure available for the
AFSS design. Testing data must be dated and may not be older than 6 months from
the date of submittal of documents to DSA. Submittal of test data to DSA shall be
wet signed by the Water Purveyor, or by the Local Fire Authority that conducted or
witnessed the test. If the AFSS is to be a deferred submittal, water supply data
must be included with the deferred submittal.
The original water supply
documentation may be duplicated and included with the deferred AFSS package if
the date of the water flow test is equal to or less than 6 months old at the time of
the deferred submittal. Submittals that exceed the 6 month time frame will require
additional tests and documentation. The time frame will be based upon the actual
date the deferred submittal was received by DSA.
1.4
Plans: The following information shall appear on all plans. (For a more detailed
guideline, and additional required information see Fire and Life-Safety Plan Review
Submittal Guidelines AFSS on the DSA Web Site.)
Note The term elevation in the following is used to mean the depth or height of
equipment or features noted on plans as a point above or below grade where
the underground piping supplies the AFSS riser or risers.
1.4.1
Test Hydrants: Test hydrants, static and residual, must be located and
identified, including the hydrant elevations.
1.4.2
Water Supply: Location and elevation of main feeds at point of connection with
public water supplies, water tanks, or other water supplies approved by DSA.
Hydraulic calculations must include all points of connection, devices, valves or
other equipment that affects the water flow and pressure.
1.4.3
Devices and Valves: The locations and identification (by type, model and
manufacturer) of all Backflow Preventers, Double Detector Check Valves, Gate
DSA IR A-25
(iss 05-26-09)
Page 3 of 4
Piping: Indicate all elevation changes, turns, and pipe size or type changes for
underground piping, and indicate the type of fittings (long elbow, Tee, etc.) used
in the underground piping plans.
Changes to the proposed piping plans, due to unknown site conditions or other
reasons, must be submitted to DSA via the DSA Change Order process (see IR A6). Additional or supporting documentation may be required before approval is
granted.
1.4.5
1.4.6
1.4.7
2.
Underground Portion:
2.1
2.2
DSA IR A-25
(iss 05-26-09)
Page 4 of 4
Preventers, Double Detector Check Valves, Gate Valves, Hydrants, Fire Pumps,
and/or other pressure reducing or increasing device within parameters of their
license. A C-36 may install the underground portion, from the property owners
side of the utility meter to the structure or fixed work, (outside of the building)
including Backflow Preventers, Double Detector Check Valves, Gate Valves,
Hydrants, Fire Pumps, and/or other pressure reducing or increasing devices of
the AFSS, with in the parameters of their license.
California registered civil engineers or registered mechanical engineers may cause
underground piping to be installed under their direction and supervision.
3.
Overhead Portion:
3.1
Who May Design?: The above ground portion of the system may be designed by a
Mechanical Engineer or Fire Protection Engineer, or a design/build C-16 licensed Fire
Protection Contractor, per Title 16, C.C.R., Section 832.16, and California Business
and Professions Code, Sections 7057 & 7058.
3.2
Who May Install?: All systems must comply with 2002 NFPA 13 Section 3.2.1.
and/or NFPA 24. Installation overhead portions of Automatic Fire Sprinkler Systems
shall be as follows:
If an above ground system is designed by a Mechanical Engineer or Fire Protection
Engineer, any C-16 licensed Fire Protection Contractor can install the system, per
Title 16, C.C.R., Section 832.16 and California Business and Professions Code,
Sections 7057 & 7058.
Note: Piping installers need not be certified if employed by and working under the
supervision of the contracted C-16 licensed Fire Protection Contractor.
4.
4.2
4.3
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-27
CARGO CONTAINERS
USED AS STORAGE
References:
2001, 2007 California Administrative Code (CAC), Title 24, Part 1,
Sections 4-314
Discipline: Structural, Fire-Life Safety, and Access
Issued 04-19-10
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this Interpretation of Regulations (IR) is to clarify the Division of
the State Architect (DSA) definition of school building as it applies to cargo containers used
as storage facilities.
Background: Many California school districts use cargo containers (also known as cargo
boxes, sea vans, or shipping containers) on school campuses to store materials and
emergency supplies.
A cargo container is an industrial, standardized, reusable portable vessel that was originally,
specifically or formally designed for use in the packing, shipping or transportation of goods
or commodities, and designed to be mounted on rail car, truck or ship.
Policy:
The Cargo containers used as storage units are not considered by DSA to be
school buildings. The definition of school building is found in Title 24, Part 1, Section 4314.
1.
1.2
1.3
It is not used to store hazardous material that would trigger Group H occupancy.
1.4
1.5
They are placed directly on even grade (not sloping more than 1:12) and at a
distance of five feet or more away from the top of any descending inclination having
slope greater than 1:12.
1.6
1.7
1.8
The container is not modified by the addition of doors or windows that would
compromise its structural integrity.
1.9
DSA IR A-27
(iss 04-19-10)
Cargo Containers
Used as Storage
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR A-28
Issued 04-27-10
SFM Information Bulletin, Fire Alarm Control Unit Replacement in Existing Buildings
Discipline: Fire-Life Safety
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) describes the Division of the State
Architect (DSA) requirements for the complete or partial change of a fire alarm (F/A)
system in an existing building due to obsolescence, catastrophic failure, voluntary
upgrading, or as part of the change order process.
Background: Typical fire alarm submittals consist of both the drawings and specifications
of the various devices intended for installation. At times the fire alarm submittal will include
a totally new system and at other times it will include only a portion of an existing system.
1.
PROCESS: All changes to a fire alarm system (excluding maintenance and some
repairs, as explained in Section 4) require DSA review. Upon completion of the changed,
(added, deleted, etc.) appliances, devices or system, that portion of the Fire Alarm system
in the scope of work shall be inspected and tested as required by NFPA 72. Upon successful
completion of the acceptance or reacceptance inspection and testing, an NFPA 72 Inspection
and Testing form shall be completed by the repairer/installer. A copy of the form, with
signatures, shall be given to the Architect or Engineer of Record, the DSA Project Inspector,
the Owner (School District) and the Local Fire Authority.
1.1
Total F/A System Exchange: Totally exchanging one system for another in
existing buildings requires meeting current code requirements and extending the
system to all areas within the existing structure(s). A full DSA project submittal
would be required.
1.2
2.
For example:
IR A-28
Iss (04-27-10)
Page 1 of 3
IR A-28
Iss (04-27-10)
Page 2 of 3
2.1
An ADA upgrade to a restroom will require the extension of the fire alarm system
into that restroom. Other portions of the building or campus F/A system would not
need to be included in the project.
2.2
2.3
Five of the six classrooms in a building are being modernized. A new power
extender panel is also being added. Only the areas affected by the scope of work
will be required to have an upgrade to the fire alarm system.
3.
Changes to Submitted and DSA Approved documents: Where construction plans and documents have been submitted and approved by DSA but the
accepted fire alarm bid package includes a different manufacturer and/or model for
the FACP, Power Extenders, appliances and devices, etc. then the following shall
apply:
3.1
Where the design has not changed (locations of appliances, routing of wire runs,
etc.) and the voltage draws of the substituted appliances and devices is the same or
less than those approved a change order shall be issued.
3.1.1
The Architect or Engineer of Record shall provide a letter from the fire alarm
design professional certifying that the design has not significantly changed and
the appliances and devices have equal or less voltage draws than those originally
submitted, and
3.1.2
Provide the new manufacturers product data sheets (cut sheets) and associated
State Fire Marshal listings for each appliance, device, etc.
3.2
Where substantial changes are made to the design or the voltage draws of the new
manufacturers equipment are higher than those originally approved, then a
revision or an addendum must be submitted to DSA for review and approval.
4.
4.1
Repair: Repair of an existing fire alarm system does not require submittal of plans,
specifications or other documents to DSA, except as noted below:
4.1.1
4.1.2
4.2.
5.
Resources: Several helpful documents have been provided on the DSA web site.
DSA Plan Submittal Requirements Fire Alarm and Detection Systems is available on
the DSA web site, FLS page.
IR A-28
Iss (04-27-10)
Page 3 of 3
DSA IR A-6: Change Order & Field Change Approval Process and IR A-18: Use of
Construction Documents Prepared by Other Professionals are available on the DSA
FLS page and in IR Manual.
Also see State Fire Marshal (SMF) Information Bulletin, Fire Alarm Control Unit
Replacement in Existing Buildings at
http://osfm.fire.ca.gov/informationbulletin/pdf/2008/IB_WUI-FAC_FINAL_20080910.pdf
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 3-1
STORAGE ROOM
OCCUPANCY SEPARATION
Reference: 2001 California Building Code (Title 24, Part2), Sections 302, 504.3, and Table 3-B.
Revised 09-18-07
Issued 02-20-07
Purpose: The purpose of this IR is to clarify the 2001 CBC requirements, and provide guidance for
storage room occupancy separations. (In the 2007 CBC this issue is addressed in Table 508.2.)
Background: The 2001 California Building Code is not specifically clear in excluding small areas
that do not pose a significant hazard from the need of an occupancy separation in a number of cases.
2001 CBC Section 302.4 requires occupancy separations Be provided between the various Groups
and Divisions as set forth in Table 3-B. Certain exceptions apply. The occupancy separations are
based on the real and potential hazards associated with each.
2001 CBC Section 504.3 addresses the Allowable Floor Area of Mixed Occupancies and does not
address the separation of occupancies, therefore the exceptions listed do not apply to occupancy
separations. This is a common misconception by design professionals and plan reviewers alike.
DSA recognizes that hazardous materials in quantities less than those listed in 2001 CBC, Table 3-D
are able to be stored in smaller spaces and not present a high risk to the building. The hazards
presented by materials in small storage rooms are significantly curtailed due to the reduced quantities
of materials physically able to be stored.
Interpretation: If a Storage Area (S-1 & S-2) is found within or adjoining the following
occupancies: E, A-1, A-2, or A2.1, and the Storage Area is 100 square feet or more in size,
then the storage area is required to have the occupancy separation required in 2001 CBC
Table 3-B. If the area is 99 square feet or less, then it will be considered an accessory
closet and the occupancy separation will not be required.
Storage Areas or closets designated for storage of materials in quantities in excess of those
listed in 2001 CBC, Table 3-D will be classified as the appropriate H Occupancy, and will
be required to have the appropriate Occupancy Separations regardless of size, per 2001
CBC, Table 3-B.
Mechanical and Electrical rooms are not required to have a one-hour occupancy separation
except as noted in 2001 CBC, Section 302.5.
Storage Room
DSA IR 3-1 (rev 09-18-07)
Occupancy Separation
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 9-1
Issued 10-15-07
Purpose: The purpose of this Interpretation of Regulations (IR) is to state the minimum
requirements of and provide guidance for applying NFPA 13 (Section 5-13.1.1 - 1999 Edition, and
Section 8.14.1.1 2002 Edition) as it relates to fire sprinklers coverage in concealed interstitial spaces
and as specified by State Fire Marshal (SFM) Code Interpretation 03-030.
1.
GENERAL:
1.1
NFPA 13 5.13.1.1(1999 Edition) All concealed spaces enclosed wholly or partly by exposed
combustible construction shall be protected by sprinklers (see Exceptions 1 through 12).
1.2
NFPA 13 8.14.1.1 (2002 Edition) All concealed spaces enclosed wholly or partly by
exposed combustible construction shall be protected by sprinklers except in non-combustible
concealed spaces where sprinklers are not required to be installed by NFPA 13, Sections
8.14.1.2.1 through 8.14.1.2.15.
2.
FIRE SPRINKLER REQUIREMENTS FOR INTERSTITIAL SPACES: Noncombustible materials for these spaces must meet the 25 flame spread, 50 smoke development
ratings. Data cables must meet CEC Section 800-49 and 800-50 as resistant to the spread of fire.
2.1
Fire Sprinklers Required: Unless specifically noted in the exceptions shown in the NFPA 13
1999 Edition or listed in the NFPA 13 2002 Edition, all areas not meeting the NFPA 13 criteria, shall
have fire sprinklers installed. Any amount of combustible materials or exposed combustible
construction will require the installation of fire sprinklers.
2.2
Sprinklers Used in Lieu of One-Hour Fire Resistive Construction: When automatic fire
sprinklers are used in lieu of one-hour fire resistive construction, the entire building, including
non-combustible interstitial spaces, must have sprinklers installed, to provide equivalent
protection. Sprinkler omissions allowed by NFPA 13 are not permitted (see SFM Code
Interpretation 03-030).
Building plans submitted prior to October 1, 2005 will not be required to have the interstitial
spaces sprinklered when fire sprinklers are used in lieu of one-hour fire-resistive construction.
2.3
Sprinklers not required: Interstitial spaces need not have the fire sprinklers (as noted in
NFPA 13) if all the following conditions are met:
All items within an interstitial space meet the definition of non-combustible, and
the space itself is of non-combustible construction, and
the fire sprinkler system is not used in lieu of one-hour fire resistive construction.
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 10-1
ILLUMINATION REQUIRED
FOR MEANS OF EGRESS
References: 2007 California Building Code Sections 1002,1006.1,
1006.3, and1024.6 and Exceptions
Discipline: Fire & Life Safety
Issued 06-22-09
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, Community Colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) clarifies code requirements, based on the
2007 California Building Code (CBC), for illumination of means of egress as it relates to exit
discharge to a public way or safe dispersal area.
General: The 2007 CBC, Section 1006.1 states, Illumination required. The means of
egress, including the exit discharge, shall be illuminated al all times the building space
served by the means of egress is occupied.
The 2007 CBC, Section 1002 defines EXIT DISCHARGE as That portion of a means of
egress system between the termination of an exit and a public way.
The 2007 CBC, Section 1024.6 states, Access to a public way. The exit discharge shall
provide a direct and unobstructed access to a public way.
Exception: Where access to a public way cannot be provided, a safe dispersal area
shall be provided
Interpretation:
1.
PUBLIC WAY: Public streets, alleys, parks, parking lots, and other similar public
areas are public ways.
The exit discharge capacity shall not be less than the required
discharge capacity of the exits being served. It must have a clear width and height of not
less than 10 feet.
2.
EGRESS ILLUMINATION: The entire exit discharge to the public way is required
to be illuminated at any time the building space being served is occupied.
3.
SAFE DISPERSAL AREAS: Where safe dispersal area or areas are provided, the
entire path to a safe dispersal area need not be illuminated. Illumination of a minimum of
20 feet shall be provided from the building or building complex or 20 feet beyond reaching
grade level when exiting from bleachers, grandstands or other stadium seating.
Emergency and egress illumination of the exit discharge to a safe dispersal area can be
accomplished by providing:
Page 1 of 2
Page 2 of 2
The illumination shall provide a minimum of not less than 1 foot-candle at the walking
surface.
4.
1006.3.
Emergency Power shall supply lighting of the exit discharge for a minimum of 90 minutes.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 11B-1
Revised 11-01-07
Issued 01-26-05
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA. This IR indicates an acceptable method for achieving compliance with applicable codes and regulations,
although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This interpretation clarifies acceptable design and installation requirements for
fire alarm systems installed in new buildings containing classrooms for projects under
Division of the State Architect (DSA) jurisdiction, which includes state-funded buildings and
facilities, State of California public elementary and secondary schools (grades K-12),
community colleges, and universities. (In the 2007 CBC this issue is addressed in Section
907.9.1.1.)
General: Unlike audible alarms, visual alarms are typically located within the space they
serve so the signal is visible to the occupants of the space. the Americans with Disabilities
Act Standards for Accessible Design, Section 4.1.3(14) indicates that when emergency
warning systems are provided, they shall include both audible and visual alarms. Since
classrooms in newly constructed buildings are required to be accessible by Section 4.1.1(1),
where audible alarm coverage is provided, the emergency warning system shall also provide
visual alarm coverage.
Design Requirements: Per California Government Code 4451(d), until such building
standards are published in the California Building Standards Code that meet or exceed the
requirements of the Federal Americans with Disabilities Act, specifically in this case the
Americans with Disabilities Act Standards for Accessible Design, Section 4.1.3(14), effective
March 1, 2005, DSA will accept construction documents for new construction (new
buildings) that indicate visual fire alarm coverage for all classrooms1 that are provided with
audible fire alarm coverage.
1
United States Architectural and Transportation Barriers Compliance Board: ADAAG Manual, A
guide to the Americans with Disabilities Act Accessibility Guidelines, July 1998, p. 98, Visual Alarms
(4.28.3); Technical Bulletin: Visual Alarms, August, 2003,
http://www.access-board.gov/adaag/about/bulletins/alarms.htm
or
http://www.access-board.gov/adaag/about/bulletins/pdf/alarms.pdf
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 11B-2
References: 2001 California Building Code: Sections 1117A.4.5 (prior to the 10/12/06
Supplement, effective 5/2/07), and 1127B.5 Items 3 & 5
California Government Code: Sections 4451(d) & (f)
Americans with Disabilities Act Standards for Accessible Design, Section 4.7.2
Discipline: Access Compliance
Revised 11-01-07
Issued 01-26-05
See IR 11B-3
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA. This IR indicates an acceptable method for achieving compliance with applicable codes and regulations,
although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This interpretation clarifies acceptable design and installation requirements for
curb ramps under Division of the State Architect (DSA) jurisdiction, which includes statefunded buildings and facilities, State of California public elementary and secondary schools
(grades K-12), community colleges, and universities. (In the 2007 CBC this issue has been
addressed by removing the requirement for a beveled lip at curb ramps.)
General: California Building Code (CBC) Section 1127B.5 Item 3 states: "Transitions from
ramps to walks, gutters, or streets shall be flush and free of abrupt changes, except that
curb ramps shall comply with Item 5." CBC Section 1127B.5 Item 5 states: "The lower end
of each curb ramp shall have a 1/2 inch (13 mm) lip beveled at 45 degrees as a detectable
way-finding edge for persons with visual impairment."
However, the Americans with Disabilities Act Standards for Accessible Design Section 4.7.2
does not allow a beveled lip at the lower end of a curb ramp and states: "Transitions from
ramps to walks, gutters, or streets shall be flush and free of abrupt changes."
Design Requirements: Per California Government Code 4451(d), until such building
standards are published in the California Building Standards Code that meet or exceed the
requirements of the federal Americans with Disabilities Act, and specifically in this case the
Americans with Disabilities Act Standards for Accessible Design Section 4.7.2, the DSA will
accept curb ramp designs which indicate that the lower end of each curb ramp is flush and
free of abrupt changes, without a beveled lip. All such curb ramp designs shall incorporate a
detectable warning surface (truncated domes) as indicated in other sections of the CBC, and
Access Compliance IR 11B-3.
Note: The October 12, 2006 Supplement to the 2001 CBC removed from Chapter 11A the
requirement for a beveled lip at curb ramps.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 11B-3
Revised 11-01-07
Issued 01-26-05
See IR 11B-2 and 11B-4
Design Requirements: Per California Government Code 4451(d), until such building
standards are published in the California Building Standards Code that meet or exceed the
requirements of the federal Americans with Disabilities Act, and specifically in this case the
Americans with Disabilities Act Standards for Accessible Design Section 4.7.7, the DSA will
accept curb ramp designs which indicate detectable warnings at curb ramps regardless of
slope.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
DETECTABLE WARNINGS
IR 11B-4
References:
2001 California Building Code: Sections 1117A.4.5, 1127B.5 Item 8, 1133B.8.3, and 1133B.8.5
2007 California Building Code: Sections 1112A.9, 1121B.3.1 Item 8(a), 1127B.5 Item 7,
and 1133B.8.5
California Government Code: Section 4451(d) & (f)
Americans with Disabilities Act Standards for Accessible Design, Section 4.7.2
Revised 11-01-07
Issued 01-26-05
See IR 11B-3
requirements for detectable warnings under Division of the State Architect (DSA)
jurisdiction, which includes state funded buildings and facilities, State of California public
elementary and secondary schools (grades K-12), community colleges, and universities.
General: The California Building Code indicates technical criteria for detectable warning
surfaces (truncated domes). The technical criteria include dome pattern, dome spacing and
dimensional placement.
The U.S. Access Board develops the minimum design standards for complying with the ADA,
and has also developed and considered detailed research studies regarding pedestrians and
the use of detectable warning surfaces. Under the Access Board, the Public Rights-of-Way
Access Advisory Committee was established in 1999 to develop additional ADAAG
provisions. The advisory committee reached agreement on recommended accessibility
standards for new and altered public rights-of-way covered by the ADA. The standards
proposed by the committee were presented in a report titled Building a True Community.
The draft guidelines issued by the Access Board, consistent with the advisory committees
recommendations, include revised technical criteria for detectable warnings.
The U.S. Department of Transportation (USDOT) is a designated agency responsible for
enforcing the standards and implementing regulations of the ADA Title II (State and Local
Government Services). The Federal Highway Administration (FHWA), under the USDOT, is
the enforcement authority for overseeing pedestrian discrimination issues under the Title II
implementing regulations. Both FHWA and the Access Board are encouraging the use of the
new technical criteria for detectable warnings over the original ADA design standard.
Acceptable Alternative Designs: The Division of the State Architect (DSA) recognizes
the federal research effort and that the new technical criteria provide substantially
equivalent or greater access and usability as modified and specifically indicated below.
Regarding the dome pattern and dome spacing for detectable warnings, the DSA will accept,
as an acceptable alternative design, detectable warning surfaces that comply with all of the
following:
Detectable Warnings
Page 1 of 2
Detectable Warnings
Page 2 of 2
1.
Pattern: Detectable warnings consisting of a surface with truncated domes that are
aligned in a square grid (in-line) pattern.
2.
Dome Spacing: Truncated domes aligned in a square grid (in-line) pattern shall have a
center-to-center spacing of 1.67 inches (42.4 mm) to 2.35 inches (59.7 mm).
In addition to the above criteria regarding detectable warning design, the DSA will
accept, as an acceptable alternative design, dimensional placement of detectable
warning surfaces at curb ramps that comply with the following criteria:
3.
Dimensional Placement at Curb Ramps: The detectable warning surface shall extend 36
inches (914.4 mm) minimum in the direction of travel for the full width of the curb
ramp. For curb ramps, also see IR 11B-2 and 11B-3.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 11B-6
References:
California Building Code, Section 1134B.2.1, Exception 4
Discipline: Access Compliance
Issued 02-04-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Discussion: Mechanical only means projects where all work is undertaken solely for the
purpose of heating, ventilation or air conditioning (HVAC). California Building Code (CBC)
Section 1134B.2 indicates that all existing buildings and facilities, when alterations,
structural repairs or additions are made to such buildings or facilities, shall comply with all
provisions of Division I, New Buildings.
However, the building code also states that for existing buildings, projects which consist
only of HVAC are not considered alteration projects for the purposes of accessibility for
persons with disabilities and are not subject to the accessibility provisions of the code.
DSA Access Compliance considers structural work that is required solely for the purpose of
performing the mechanical work to be incidental to the mechanical project which is exempt
work per CBC 1134B.2.1, Exception 4.
Exemption from DSA Access Compliance Review: Mechanical only projects are
exempt by accessibility code provisions and do not require DSA Access Compliance review
or approval. This includes mechanical only projects that contain incidental structural
upgrades required solely for the purpose of performing mechanical only work. It should be
noted that compliance with the building code is still required (i.e. the height of thermostats
shall be installed 48 above the finish floor to the operating handle).
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 11B-7
References:
2007 California Building Code, Sections 1129B.3 and 1129B.4,
Figure 11-B-18A, 11B-18B and 11B-18C
Discipline: Access Compliance
Revised 08-01-09
Issued 07-15-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings.. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this Interpretation of Regulations (IR) is to clarify requirements for accessible
parking.
Background: On October 10, 2007 the Governor of California approved Assembly Bill (A.B.) 1531
(2007). A.B. 1531 does the following:
Amends the requirements for signage and striping at accessible parking spaces,
Directs that the initial regulations to implement these provisions shall be adopted as emergency
regulations,
Provides that the adoption of these regulations shall be considered by the Department of General
Services (DGS) to be an emergency necessary for the immediate preservation of the public
peace, health and safety, or general welfare.
On May 21, 2008 the California Building Standards Commission approved amended regulations
proposed by DGS implementing A.B. 1531. The amended regulations became effective July 1, 2008 and
are contained in California Building Code Sections 1129B.3, 1129B.4, Figures 11B-18A, 11B-18B and
11B-18C.
The amended regulations can be found on the DSA Internet web site at:
http://www.documents.dgs.ca.gov/dsa/pubs/regulations_rev_08-01-09.pdf
Scope: The amended regulations apply to all new construction projects and alterations to existing
buildings and facilities covered by California Building Code, Chapter 11B. Construction documents
submitted to DSA for review and approval on or after July 1, 2008 must indicate compliance with the
amended regulations.
1.
Signage Requirements: The amended regulations indicate that the signage at accessible
parking spaces shall include Minimum Fine $250 below the International Symbol of Accessibility as
either an additional sign or additional language. This fine posting requirement is in addition to other
signage regulations contained in the California Building Code for accessible parking spaces.
2.
Striping Requirements: The revised regulations indicate that the accessible parking space
The border (perimeter) of the loading and unloading access aisle shall be painted blue.
The hatching within the loading and unloading access aisle shall be painted a suitable contrasting
color to the parking space at 3-0 maximum on center. Blue or white paint is preferred.
The amended regulations for the border and hatching at the loading and unloading access aisle are in
addition to other requirements indicated in the California Building Code for accessible parking spaces.
The requirement that the hatching at the loading and unloading access aisle be a suitable contrasting
color to the parking space is intended to ensure that the hatching is visually distinct from the background
to which it is applied, and thus can be more easily seen. As hatching is generally recognized as a noparking area, this difference in contrast assists drivers in providing a conspicuous visual deterrent to
parking in the loading and unloading access aisle.
3.
Acceptable Designs: Asphalt is often the parking surface material used at accessible parking
spaces. Asphalt is generally considered to be fairly dark in appearance. In order to provide a suitable
contrasting color at the hatched area of the loading and unloading access aisle, a light color hatching
must be used at locations where asphalt is the parking surface material. Although white paint is preferred
(and traditionally the color most often used), its use is not mandatory under the CBC.
In order to provide a suitable contrast at the hatching of the loading and unloading access aisle in
locations where light concrete is used as the parking surface material (such as at concrete parking
garages), a dark color hatching must be used. Although blue paint is preferred, its use is not mandatory
under the CBC.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 11B-8
Issued 11-19-09
Purpose: This Interpretation of Regulation clarifies DSAs position regarding the use of
construction tolerance guidelines related to accessibility provisions contained in the
California Building Code.
Background: Often, the subject of construction tolerance arises with regard to provisions
for accessibility as indicated in California Building Code Section 1101B.5. Requests have
been received for DSA to predetermine guidelines for what is considered an acceptable
construction tolerance for various architectural components.
1.
LEGAL ISSUES: According to the California Attorney Generals office, developing
guidelines for construction tolerances .unnecessarily encourages contractors and others
to deviate from the access regulations found in the California Building Code. 1
The California Attorney Generals office also indicated we are concerned that local building
officials and members of the general public, when they consult Construction Tolerance
Guidelines,.may assume that they have been adopted by a state agency and therefore,
have the force of state law, which they do not. Such reliance, in our view, may result in
violations of the California Building Code and, possibly, litigation against local building
officials and/or property owners. 1
Separately, a United States District Court case discussed the term conventional building
industry tolerances as follows:
What is an acceptable dimensional tolerance obviously will vary, depending in part upon
the purpose for the standard and the technological capacity to closely adhere to the target
dimensions. 2
2.
REGULATORY BUILT-IN TOLERANCES: California Building Code Section
1101B.5 indicates all dimensions are subject to conventional industry tolerances except
where the requirement is stated as a range with specific minimum and maximum end
points. Where a California Building Code requirement states a specified range, such as in
Section 1133B.4.2.1 where handrails must be installed between 34 inches and 38 inches
above the nosing, the regulation itself already provides an adequate tolerance and therefore
no further tolerance outside of the range at either limit is permitted. In such cases, the
technological capacity to achieve literal compliance with the dimensional requirements is
quite easy to accomplish.
DSA IR 11B-8
(iss 11-19-09)
Page 1 of 3
DSA IR 11B-8
(iss 11-19-09)
Page 2 of 3
3.
4.
5.
ESTABLISHING TOLERANCE GUIDELINES:
In conclusion, establishing
predetermined construction tolerances guidelines related to the requirements for
accessibility contained in the California Building Code is inappropriate.
DSA IR 11B-8
(iss 11-19-09)
Page 3 of 3
As previously stated, the California Attorney Generals office has indicated that construction
tolerance guidelines may wrongfully be viewed by some to have the effect of law 1 and
unnecessarily encourages contractors and others to deviate from the access regulations
contained in the California Building Code. 1
The use of predetermined construction tolerance guidelines allows a blanket acceptance of
departures from the building code requirements with no analysis as to the reason the use of
a tolerance is either justified or warranted. As a result, the guidelines are then arbitrarily
substituted for building code requirements, without taking into account the specific facts of
each circumstance.
It is preferred that construction tolerance acceptance be on a case-by-case basis, with the
degree of departure from the literal requirements coupled with the specific reason that the
requirement was unable to be achieved as the basis to be utilized for analysis. Many times
when questions arise regarding tolerances, it is often found after analysis that neither field
conditions nor manufacturing variables contributed to the deviation, but rather there was
simply a lack of proper planning or coordination. Inadequate planning and coordination are
not justifications for the use of construction tolerances.
6.
MORE INFORMATION:
Endnotes
1
Letter from the State of California Department of Justice to the Orange Empire Chapter of the International
Conference of Building Officials dated August 22, 2002.
Independent Living Resources v. Oregon Arena Corporation
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
ATTACHMENT OF CLAY OR
CONCRETE "S" ROOF TILE
Reference: California Building Code, Section 1507.7, Tables 15-D-1.1 & 15-D-2.1
IR 15-1
Issued 9-1-99
Revised 04-21-05
Supercedes IR M-7 (9/99)
This interpretation is intended for use by the plan review and field engineers of DSA to indicate an acceptable method for achieving
compliance with applicable codes and regulations. Its purpose is to promote more uniform statewide criteria for use in plan review
and supervision of construction of public schools and essential services projects. Other methods proposed by design professionals
to solve a particular problem will be considered by DSA and reviewed for code and regulation compliance.
Purpose: The purpose of this IR is to provide guidelines for the installation of "S" roof tiles.
Note that this IR is not applicable to roof tile with an interlocking channel.
General. Clay or concrete "S" roof tile attachments are acceptable as shown on the following
details. Refer to Section 1507.7A and Tables 15-D-1.1 and 15-D-2.1, of the CBC for additional
requirements.
The inspector of record is to provide continuous inspection of the attachment of the roof tile.
Application of the roof tile is not to be started until the attachment details have been reviewed
and approved by the Division of the State Architect (DSA) field engineer, if the details do not
conform to the approved drawings.
Attachment
Figure 1
IR 15-1 - Page 2 of 2
Figure 1
Fig. 1A
1 fastener to
sheathing
S roof tile
Height as required
to fully support cover
portion of tile
11/4" net
Fig. 1B
Fig. 1C
1 fastener to roof
sheathing
S roof tile
S roof tile
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 15-2
References:
2001 Title 24, Part 2, California Building Code (CBC) Sections 702A, 704A.1.2,
1507.1, and 1507.
2007 CBC, Sections 702A, 704A.1.2, 1507.3, and 1511.1
ASTM C1167-03 and C1492-03
Discipline: Structural
Revised 04-27-10
Issued 10-15-07
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1.
Purpose: The purpose of this Interpretation of Regulations (IR) is to clarify the
acceptance and test requirements for all tile roof covering materials and anchorage
systems, including mechanical and foam adhesive attachment systems. This IR also
specifies installation, testing and inspection requirements for these systems.
2.
Background:
Applicable requirements for roof tile materials and installation in the California Building Code
(CBC) include:
For newer materials and installation methods not included in the above CBC requirements,
the provisions of this IR apply.
3.
3.1
Qualification by Listing: Roof tile may be qualified and accepted if the roof tile has
a DSA recognized listing or evaluation report that indicates compliance with ICC AC180, Acceptance Criteria for Clay and Concrete Roof Tiles. See Section 8 of this IR
for DSA recognized listings or evaluation reports.
3.2
ASTM C1167-03 for clay tiles, or C1492-03 for concrete tiles for projects governed
by the 2007 CBC.
4.
DSA IR 15-2
(rev 04-27-10)
Page 1 of 3
DSA IR 15-2
(rev 04-27-10)
Page 2 of 3
Alternate Systems: Mechanical attachment systems that are not prescribed by the
CBC may be accepted if they have a DSA recognized listing or evaluation report for
the entire system or for each component of the system. See Section 8 of this IR for
DSA recognized listings or evaluation reports.
4.1
The listing or evaluation report shall indicate compliance with the following criteria:
4.2
5.
Roof System with Adhesive Attachment: Roof systems that utilize foam
adhesive for attachment may be accepted under the alternate materials and methods
provisions of Title 24, Part 1 (California Building Standards Administrative Code), Section 4304. Such systems shall have a DSA recognized listing or evaluation report that indicates
compliance with ICC ES AC-152, Acceptance Criteria for Adhesive Attachment of Concrete or
Clay Tiles. See Section 8 of this IR for DSA recognized listings or evaluation reports.
The listing or evaluation report shall indicate compliance with the following criteria:
Underlayments: ICC ES AC-48, Acceptance Criteria for Roof Underlayments for Use
in Severe Climate Conditions
6.
support the anticipated vertical and lateral loads of the tiles as required by the CBC. Only
qualified or certified installers and applicators may install roof tiles. Installation of roof tiles
shall meet all of the following requirements:
Tile Roofing Institutes Installation Manual for Moderate Climate Regions, which is
also approved by ICC-ES, and known as ESR-2015P,
6.1
The Standard Installation Guides for Concrete and Clay Roof Tile in Cold Weather
Applications, published by the National Tile Roofing Manufacturers Association, Inc.
(NTRMA)/ Western States Roofing Contractors Association (WSRCA);
ESR-2015P;
Manufacturers recommendations.
DSA IR 15-2
(rev 04-27-10)
Page 3 of 3
If clay tiles are used in the cold weather regions, the designer shall specify Grade 1
clay tiles per ASTM C1167-03.
Wildland Urban Interface Area: Where tile roofing is installed in areas designated
as a Wildland Urban Interface area as defined in the 2001 or 2007 CBC Section
702A, or where the site conditions warrant, roof covering shall be constructed to
prevent the intrusion of flames and embers in accordance with the 2001 or 2007
CBC Chapter 7A, Section 704A.1.
6.2
7.
Inspection and Testing: The project inspector shall verify that the tile roof
covering materials meet the requirements of Sections 3, 4 and 5 of this IR, and inspect the
installation of the tile roof covering systems. The project inspector shall also verify that all
installers and applicators are certified either by the manufacturer or the Roof Tile Institute,
as required in the applicable evaluation report.
Pull Test for Adhesive Systems: In addition to the above requirements, for
adhesive tile attachment systems a vertical upward pull force of 35 pounds shall be
applied to the nose edge of randomly chosen tiles for a duration of five seconds.
Test one tile per square of roofing area. If any tiles fail the pull test, test the four
adjacent tiles.
7.1
A simple method to perform the pull test is to slip an L-shaped hook under nose
edge of the tile and attach the hook to a fish scale.
The pull test must be performed or witnessed by the project inspector.
8.
9.
Other evaluation reports meeting the requirements and conditions of DSA IR-A5
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 16-1
Revised 04-15-08
Revised 09-10-02
Issued 01-07-02
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1.
Basic Requirements. All portions of relocatable school buildings are to conform
to all requirements of the building standards adopted for public schools in Title 24 except as
specifically described in this IR and shall be submitted to the Division of the State Architect
(DSA) for approval at each site. The State Fire Marshal regulations contained in Parts 2
through 9, Title 24 and Title 19, and the regulations for accessibility are to be followed
without modification. DSA Access Compliance Program approval is required for all new and
existing construction.
2.
Request for Waiver. The applicant shall initiate a request for waiver of the
durability requirements for permanent foundations at the time the application for plan
approval is filed. The applicant thereby acknowledges that a conditional certification is
acceptable. The request for waiver may be made on the application form or by letter from
the applicant or an agent of the applicant. A request for waiver from the building
manufacturer or leasing company will not be accepted. This written request shall be
submitted to DSA before the construction documents are stamped for identification. The
DSA letter will indicate conditional approval.
3.
Modified Requirements. The modified requirements may be applied only to
individual one-story relocatable buildings with 2,160 square feet or less of floor area.
Individual buildings may be placed adjacent to each other provided that any building will be
capable of being relocated without affecting the stability of adjacent buildings. The clear
separation shall not be less than four inches (drift/separation calculations are required for
two-story relocatables) and the joint may be covered with flashings or other materials that
do not prevent differential movement of the buildings. The detail of the covered joints shall
be shown on the drawings.
4.
Page 1 of 5
Page 2 of 5
4.2
Isolated piers may be constructed of stacked wood members nailed together with
hot-dipped zinc coated galvanized or equivalent corrosion resistant nails. Nailing
shall be sufficient to transfer the required lateral forces to grade level. The bottom
layer of wood shall be foundation grade redwood or preservative pressure-treated
sawn lumber.
4.3
Where the surface of the adjacent exterior grade is higher than the bottom of the
floor joists on any side of the building, all wood in the substructure and floor framing
(excluding the floor sheathing) shall be foundation grade redwood or preservative
pressure-treated sawn lumber with flashing, mow strip or paving, and drain in
accordance with Figure 1. Nails used in the foundation or floor framing, except for
floor sheathing attachment nails, shall be hot-dipped zinc coated galvanized or
equivalent corrosion resistant nails. The area of openings to provide under-floor
ventilation shall be that specified in Title 24, Volume 2, Section 2306A.7.
4.4
4.5
Metal frame jacks, specifically designed or justified by testing for the project, may be
used as isolated piers. Metal jacks shall be attached to the structure by mechanical
means. Overturning and bending forces due to vertical and lateral loads are to be
resisted in accordance with the applicable provisions of Part 2, Title 24, CCR.
4.6
The maximum bearing pressure for wood foundations bearing on soil or paving shall
not exceed 1000 psf, unless substantiating soil data for some greater value is
approved by DSA. The maximum allowable soil bearing pressure for concrete
foundations designed in accordance with 2007 CBC, Section 1805A shall not exceed
1500 psf, unless substantiating soil data for some greater value is approved by DSA.
4.7
The footings and foundation structure shall be capable of resisting all loads specified
in Part 2, Title 24, CCR. Unless the individual modules of the building are positively
fastened together at intervals not exceeding 10'-0" o.c. at the roof and floor level,
each module and its diaphragm shall be designed as a separate unit.
4.8
5.
6.1
Page 3 of 5
The minimum thickness of steel deck diaphragms and steel structural members
permitted is 20 gage. The minimum thickness of non-structural steel roof decking
and wall siding is 26 gage, protected with a durability coating. Steel members shall
be given a rust inhibitive coating.
7.
A bonded common grounding electrode shall be provided for each metal building,
exposed metal frame, ramp or stair and the electrical system installed at a readily
verifiable location.
7.2
8.
of
access
to
the
building
including
access
compliance
4. Location of all utilities serving the relocatable from the source to the point of
connection. Include a signed statement, on the drawings, from the appropriate
responsible engineer indicating verification of the location of the utilities shown as
existing and that their capacity is adequate for the additional load. If the source of
utilities is in or on an existing building, show the DSA application number under
which the building was approved.
5. Location of existing fire alarm pull stations and signal devices. Location of fire
apparatus access in accordance with Sections 3.05 and 3.16, Title 19, Public Safety,
CCR.
9.
Identification. The manufacturer or builder shall place two permanent metal
identification labels on each building module, one mechanically fastened and visible from
the exterior and the other mechanically fastened to the interior frame above the ceiling, at
the end of the module. The labels shall show the DSA application number under which the
building construction was authorized, the manufacturer or builder's name, the serial
number, the design live loads for the roof and floor framing, wind speed and exposure
category.
9.1
The location of the identification label shall be shown on the building plans. For
buildings that are manufactured in-plant, the plant inspector is to provide a verified
report with each building, which shall indicate the manufacturer's name and the
serial number for each building module and the DSA application number.
Page 4 of 5
details if necessary. Do not reuse A-325 bolts. Plans submitted shall include site plan,
complete floor plans, and details of all proposed work. Checking may be expedited if
complete plans of the existing building to be relocated are submitted with the application
package.
10.1
The certification by DSA of a relocatable building applies only to the location shown
on the approved site plans and certification is therefore void if the building is
relocated to another location. It is recommended that, when a building is moved, the
district shall apply for DSA certification to avoid the possibility of individual liability of
school board members. Relocation of an existing certified building within the same
district shall be considered to be an alteration for the purpose of completing the
application (Form DSA-1). A filing fee based only upon the value of the work shown
on the plans and specifications, including moving costs, will be charged if an
approved building is relocated.
10.2
When existing DSA-certified buildings are moved within the same school district or
from one district to another, the plans and specifications are to indicate the
application number of the previous certification for each building. If the building is
moved as one unit, without disconnecting the individual modules, complete
foundation and floor plans are required, but the plans of the superstructure need not
be submitted. The design professional in responsible charge shall verify by
appropriate means, subject to DSA approval, and submit a letter certifying that the
building conforms to the originally approved plans and specifications and has not
suffered structural deterioration or been structurally altered. A site plan and floor
plan for the relocatable building shall be provided to facilitate review of electrical,
mechanical, utility, fire and panic work as well as access compliance.
10.3
When relocation is proposed for existing buildings for which drawings were approved
but the construction was not certified, the plans and specifications must include the
DSA application number of the previous plan approval for each building and the
design professional in responsible charge shall examine, by appropriate means, and
certify that the building conforms to the originally approved plans and has not
structurally deteriorated. Any deviations from the originally approved plans and
specifications shall be indicated on the plans and specifications submitted under the
current application for approval. If the building is moved as one unit and
modifications or corrective work are not required, the plans of the superstructure
need not be submitted.
10.4
Existing buildings not previously certified by DSA are considered to be new buildings.
Complete plans, specifications, structural calculations for existing conditions and
necessary reconstruction work, and site data are required to be submitted. In
addition to the criteria of this IR, the design professional in responsible charge shall
examine and certify, subject to DSA approval, that the building conforms with the
plans being submitted for approval and so state in an accompanying letter. Any
special tests or inspections required to verify the work are to be performed under the
direction of the design professional in responsible charge.
11. Notice of Contract. In the event the contractor has been selected and a bid price
has been established prior to approval of the plans, the design professional in responsible
charge is to file the Contract Information (Form DSA-102) at the time the plans are
submitted for approval.
Attachment
Figure 1
Page 5 of 5
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
COMPUTER OR OFFICE
ACCESS FLOORS
IR 16-2
References:
2001 California Building Code, Sections 1632A and 1634A
Discipline: Structural
Revised 01-02-08
Issued 09-01-99
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
2.
Lateral Resistance.
2.1
2.2
Computer or Office
Access Floors
Page 1 of 2
2.3
Computer or Office
Access Floors
Page 2 of 2
2.3.1 When shot-in anchors or drilled-in anchors are used to attach the pedestal bases to
the supporting floor, testing of anchors is required. Test one of every ten shot-in
anchors and one of every two drilled-in concrete anchors at 160% of the ICBO
recommended allowable load. In case of test failures, see the 2001 CBC, Section
1923A.3.5, for procedure.
2.3.2 Use of adhesives to attach pedestal bases to concrete or wood floor systems will not
be accepted unless test reports on long term durability, high temperature and
strength are submitted to the Division of the State Architect (DSA) for review.
2.3.3 Mechanical connections in the floor system that are not subjected to analysis are to
be tested for twice the lateral load. Submit test procedure to DSA for approval before
testing.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 16-3
Revised 09-18-2007
Issued 09-01-1999
Discipline: Structural
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this IR is to provide guidelines for use of segmental retaining wall
systems. Requirements for segmental retaining walls are not completely addressed in the
California Building Code.
1. General. Gravity type retaining walls assembled of precast concrete or concrete masonry
units, referred to as Segmental Retaining Walls (SRW), may be approved for use on school
building projects as an alternative to conventional retaining systems. Approval of SRW systems
requires compliance with the conditions of this IR and approval of the Division of the State
Architect (DSA).
SRW systems consist of facing units anchored to a reinforced soil mass that provides gravity
load for resistance to overturning and lateral sliding. Geosynthetic grid materials (geogrid) are
used to anchor the facing units and to reinforce the soil mass. Only soil-reinforced SRW
systems will be acceptable for use on public school, state-owned or state-leased essential
services buildings or California Community College projects. The reinforced soil mass may
consist of cohesive or cohesionless soil subject to the recommendations of a geotechnical
report.
Retaining walls less than four feet above the top of the foundation and not supporting a
surcharge do not require review and approval by DSA as defined in Title 24, Part 1, Section 4314 under the definition of "school buildings." However, such walls should meet the
manufacturer's specifications and the applicable design and wall system requirements
described below.
2. Geotechnical Requirements. A California licensed geotechnical engineer, in accordance
with the 2001 CBC, Section 1804A (2007 CBC, Section 1802A), shall prepare a soil
investigation report for each project site. Recommendations for preparation of the reinforced soil
mass and slope stability above and below the retaining wall (if necessary) shall be addressed in
the report.
3. Design Requirements. Design of the SRW systems shall comply with the National Concrete
Masonry Association (NCMA) Design Manual for Segmental Retaining Walls, latest edition
(based on the Coulomb earth-pressure theory), or the AASHTO Highway Specifications, latest
edition, (based on the Rankine earth-pressure theory). Seismic analysis will be required for
walls greater than 10'-0" above the top of the foundation that support loads from roads, parking
areas, etc. or which retain soil adjacent to structures where failure can create a life safety
hazard. Structures shall not be supported by SRW systems. Seismic analysis shall be based on
Earth Retaining Systems
DSA (SS) IR 16-3 (rev. 09-18-07)
Page 1 of 3
Page 2 of 3
the Mononabe-Okabe theory and shall comply with the NCMA Segmental Retaining Wall
Seismic Design Procedure (latest edition), or AASHTO Highway Specifications. The design
shall include the effect of all surcharge loads, potential settlement and sloping soil conditions for
both gravity and seismic analyses.
Page 3 of 3
specifications. Surface drainage at the top and bottom of the wall shall be directed away from
the wall.
5.7 In retaining wall systems with corners, the geogrid layers shall be staggered at adjacent
walls to avoid overlap of grids and permit planer installation at each level.
6. Testing and Inspection.
6.1 An approved special inspector shall continuously inspect the construction of the wall.
6.2 The reinforced soil mass and granular backfill shall be placed and compacted under the
direction of a Geotechnical Engineer (or his representative) as required by the 2001 CBC,
Section 1804A.1 (2007 CBC, Section 1802A.1).
6.3 The concrete or concrete masonry mix design and strength evaluation for the precast units
shall be in compliance with the CBC, Chapter 19A and 21A. A letter of certification shall be
provided with the units indicating the manufacturer's name and address, name of product and
unit type. The certification shall include applicable laboratory compressive strength and
absorption test results.
6.4 Letters of certification shall be provided for the supplied geogrid indicating the supplier's
name and address, name of product and the product designation meeting the requirements of
the project's design. The letter of certification shall include the roll numbers and identification
procedures, sampling procedures and the results of the quality control tests which include
flexural rigidity, tensile strength and modulus and junction strength for each batch of resin and
each shift's production used.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 16-4
Revised 01-02-08
Issued 09-01-99
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this Interpretation of Regulations (IR) is to supplement the wind
forces set forth in the 2001 California Building Code (CBC), for the purposes of the design of
one story relocatable school buildings having a gross floor area of less than 2,160 square
feet in projects submitted to DSA under the 2001 CBC. For projects submitted under the
2007 CBC, see DSA IR 16-7.
1.
Exposure:
Importance Factor:
I = 1.0
2.
For the design of primary frames and systems per Section 1621A, Method 2 may be
used for all structural systems. The vertical pressures are assumed to act simultaneously
with the horizontal pressures. The following factors apply:
Cq [H] = 1.3 horizontally (on vertical projected area of structure)
Cq [V] = 0.7 upward (on the horizontal projected area of the structure)
Simultaneous vertical and horizontal application need not apply to:
1. Overall building stability.
2. At or below the foundation level of individual primary frames and systems for
structures with substandard foundations as described in IR 16-1.
3.
For the design of elements and components per Section 1622A, the design and wind
pressures used to design the elements and components of the structure may use the Cq
values set forth below in lieu of the values set forth in Table 16A-H, Section 2.
Roof Elements:
Cq = 1.2
Wall Elements:
Cq = 1.2
The requirements for local areas at discontinuities as set forth in Section 1622A, Item 2 are
not applicable except for discontinuities at roof overhangs, architectural projections, eaves,
canopies, cornices and similar structures. The coefficient for this discontinuity condition is:
Cq = 1.7 (overhang, et al.)
4.
The windows and doors must be designed as required per Section 1616A to ensure
that the building will perform as an enclosed structure.
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 16-5
Revised 06-02-08
Revised 04-21-05
Issued 9-1-99
Supersedes IR M-8 (9/99)
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1.
Definitions:
1.1
Reviewing stands, grandstands and bleachers more than five rows of seats above
grade are considered "school buildings" (2001 CBC, Section 4-314) and are subject
to DSA approval.
1.2
Bleachers which remain at a location for less than 90 days are excluded from DSA
approval.
1.3
Portable bleachers refer to seating facilities located outside of a building and not
attached to permanent foundations. The maximum height of any portable bleachers
may not exceed eleven rows, or nine feet above grade to the top seating board.
1.4
Folding and telescoping seating facilities are structures used for tiered seating whose
overall size and shape may be reduced without being dismantled for purposes of
moving or storing.
2.
Footings: Footings for outdoor seating facilities are required to comply with 2001
CBC, Section 1806A.10.
3.
Relocation: DSA approval is only for the specific location originally shown. Any
subsequent move to another location voids the approval and will require submittal of an
application for approval at the new site.
4.
4.1
Slender Columns: Columns having a slenderness ratio (l/r) from 200 to 300 may
be used with the following restrictions.
4.1.1
Maximum Allowable Axial Load: The maximum permitted axial load is 2,000
lbs.
4.1.2
Allowable Stresses: The column will be checked for combined axial plus
bending stress using the formula:
fa
Fa
fb
< 1.0
0.6Fy
Page 1 of 5
Page 2 of 5
Fa =
2E
(l/r)
35
l/r-125
5.
Tests on Steel: DSA will require steel tests in accordance with 2001 CBC, Section
2231A, subject to the following modifications:
5.1
Small Shapes and Bars: Shapes less than l square inch in cross section and bars
other than flats less than 1/2 " thickness or diameter will not require the tension
test, but will require a bend test.
5.2
Steel Tubing: Steel tubing used in bleachers is required to be made from new
billets. Each size of tubing used on any project will be tested and required to conform
to the following properties:
6.
Qualification of Welders and Inspection of Welding: Either of the
following methods, items 6.1 or 6.2, may be used to satisfy the requirements of 2001 CBC,
Section 2231A.
EXCEPTION: This provision need not apply to tack welds that were not later
incorporated into finished welds carrying calculated stress.
6.1
Verified Reports: With each bleacher, the manufacturer will send DSA a verified
report made by a qualified professional engineer, stating the following:
"Welds on this bleacher have been made by operators who have been
previously qualified by tests, as prescribed in the Qualification Section of the
Structural Welding Code of the American Welding Society, to perform the type
of work required. I have selected a person qualified to act as welding
inspector. I certify him to be experienced in inspection of arc welds on work
requiring unquestioned reliability, and that he has the ability to distinguish
between sound and unsound welding."
With each bleacher, the welding inspector will send DSA a verified report stating: "I
have checked the equipment and find it adequate and have checked the ability of the
welders and found them satisfactory. I have inspected all the welding and find it
proper and in conformity with the plans and specifications and 2001 CBC, Chapter
22A. I have used all necessary tests to assure myself of the adequacy of the
welding."
6.2
Page 3 of 5
7.
Lumber: Any one of the following three methods may be used to satisfy the
7.1
7.2
Method II: The bleacher manufacturer may send DSA a notarized certificate, signed
by the official of the bleacher manufacturing company, stating that the official has
personally inspected the lumber prior to processing or painting, and that it was grade
marked by an approved grading agency and is in accordance with the approved plans
and specifications. He shall list the grades indicated by the grade marks and note the
maximum slope of grain if it is specified to be more restrictive than the grading rules
requirement.
7.3
Method III: A qualified professional engineer may certify that the lumber used in
the bleachers conforms to the grades and other requirements called for in the
approved plans and specifications.
requirements.
8.
Concrete: The requirements governing the quality of concrete may be satisfied by
one of the following: (Also see 2001 CBC, Section 1905A.)
8.1
A report of strength tests of two identical cylinders taken for each days pour; one
tested at the age of seven days and the other at 28 days. The report should indicate
strengths equal to or exceeding the specified strength required for the project.
8.2
The above test report and affidavit are not required when the following provisions of
bleacher pier footings are complied with and not listed on the structural test and
inspection list.
8.2.1
9.
Other Materials: Certification and testing of materials other than the proceeding
should be in accordance with the appropriate sections of the CBC, and/or as determined by
DSA.
9.1
Page 4 of 5
General Affidavit Requirements: All verified reports and certificates will be filed in
duplicate. They must be notarized or the original signature of the person making the
report or certificate must be preceded by the statement:
"I certify (or declare) under penalty of perjury that I have read the above
report and know of the contents thereof, and that all of the above statements
are true."
10.
Load Tests: When load tests are made as a basis for approval of bleachers by
DSA, test loads will be applied in not less than four, approximately equal increments,
without shock to the structure and in a manner to avoid arching of the loading materials or
stiffening of the structure.
The load test procedure must by approved by DSA prior to testing. The strength of the
material in the test bleacher should not exceed the minimum specified strength by more
than 5 percent.
10.1
Test Load Factors: When load tests are made to check design or as a basis for
approval of bleachers, the test load should be not less than twice the design vertical
load combined with twice the design lateral load.
Attachment:
Figure 1
Page 5 of 5
Figure 1
Allowable stresses in minor bleacher struts and columns (200 l/r 200 300)
6000
Euler Curve
5000
4000
3350
(F.S. = 2.15)
2000
Column Curve
2
E
35
Fa=
l/r-125
(l/r)2
1000
0
180
635
(F.S. = 5.0)
200
220
240
260
280
300
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 16-6
COMPOSITE BASE
FOR HVAC UNITS
References: 2001 Title 24, Part 2, CBC Section 1632A
2001 Title 24, Part 1, Section 4-317(b)
Revised 10-15-07
Issued 05-07-07 as CR 16-1
Discipline: Structural
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Requirements for All HVAC Units: These requirements are applicable for all
1.1
1.2
The HVAC unit must be listed or certified by a qualified independent testing and
certification agency such as Underwriters Laboratories (UL), Inc., or Intertek ELT
Semko. The listing shall indicate that the composite base is suitable for exposure to
ultra violet light, for immersion in water, and for use in exterior climatic conditions
and operating temperatures.
Composite bases shall be rated for indoor air smoke and flame spread per UL94, Test
94-5V.
1.3
The curb or sleeper supporting the HVAC unit must be constructed to match or fit the
composite base as recommended or supplied by the manufacturer.
2.
HVAC Units Weighing Less than 400 Pounds:
In addition to the
requirements of Section 1 above, the HVAC unit must be anchored to resist wind or seismic
forces per the 2001 California Building Code (CBC) Chapter 16A, Divisions III and IV (for
projects submitted under the 2007 CBC, refer to ASCE 7-05, Chapters 6 and 13). However,
such anchorage need not be detailed in the construction documents per the 2001 Title 24,
Part 1, Section 4-317(b) (for projects submitted under the 2007 CBC, refer to ASCE 7-05,
Section 13.1.4). HVAC anchorage details shall be provided by the manufacturer or its
authorized representative to the project design professional and project inspector. An
acceptable anchorage detail is shown on Appendix A and Appendix B.
3.
Composite Base
for HVAC Units
Page 1 of 3
Composite Base
for HVAC Units
Page 2 of 3
3.2
A licensed design professional shall provide calculations to verify that wind or seismic
forces do not cause overturning of the HVAC unit.
3.3
3.4
If the HVAC unit with a composite base is mounted on a metal curb, the metal curb
must be rated for gravity and lateral loads and detailed on the construction
documents. If the metal curb has a valid OSHPD anchorage pre-approval, the OPA
number and anchorage detailing must be shown on the construction documents.
APPENDICES
Appendix A Photograph of unit showing Seismic Restraint Clips
Appendix B Drawing showing attachment method for composite base to metal roof curb
Appendix A
Composite Base
for HVAC Units
Page 3 of 3
Appendix B
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 16-7
References:
2007 California Building Code (CBC), Section 1609A.1.1
ASCE 7-05, Chapter 6
Discipline: Structural
Issued 12-18-07
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Policy: The following Alternate Wind Design Procedure is not mandatory, but will be
accepted by DSA as an alternate to Section 1609A.1 of the 2007 CBC for projects under the
jurisdiction of DSA.
1.
Alternate Wind Design Procedure: The following wind load provisions are
permitted by DSA as an alternative to Section 6.5 Method 2 Analytical Procedure of ASCE
7, as mandated in Section 1609A.1 of the 2007 (CBC).
2.
Limitations: Buildings or other structures whose design wind forces are allowed to
be determined in accordance with this IR shall meet the following requirements:
2.1
The building or other structure shall have no unusual geometric irregularity or spatial
form.
2.2
The building or other structure does not have response characteristics making it
subject to across wind loading, vortex shedding, instability due to galloping or
flutter; and does not have a site location for which channeling effects or buffeting in
the wake of upwind obstructions warrant special consideration.
2.3
A building or other structure greater than 100 feet (30480 mm) in height shall be
limited to a height-to-least-width ratio of 4 or less, and with a fundamental natural
period less than or equal to one second.
Page 1 of 8
Page 2 of 8
Commentary: The starting assumption of the procedure is that the structures are "rigid,"
which is defined as having a fundamental natural period of at least one Hz (period of
less than one second). Item 2.3 is intended to define that item. Structures less
than 100 ft can generally be considered rigid, at least for the approximate period in
ASCE Section 12.8.2.1 (these are similar period calculations as 2001 CBC Section
1630A.2.2). Thus the flexible structure requirements in ASCE 7 Chapter 6 can be
ignored.
3.
3.1
Symbols and notations: Symbols and notations are specific to this section in
conjunction with Symbols and notations in ASCE 7, Section 6.3.
B
3.2
Cnet
= Gust effect factor equal to 0.85 for rigid buildings as defined in ASCE 7,
Section 6.5.8.1
Kd
Pnet
qs
Design wind pressures: When using the Alternate Wind Design Procedure, the
Main-Wind-Force-Resisting System, (MWFRS) and Components and Cladding of
every building or structure shall be designed to resist the effects of wind pressures
on the building envelope. The net pressure on exterior building surfaces shall be
determined as follows:
Pnet = qs Kz Cnet [I Kzt]
(Equation 1)
Design wind forces for the MWFRS shall not be less than 10 lb/ft2 (0.48 kN/m2)
multiplied by the area of the building or structure projected on a plane normal to the
wind direction under consideration. See ASCE 7 Section 6.1.4 for criteria. Design
wind pressure for components and cladding shall not be less than 10 lb/ft2 (0.48
kN/m2) acting in either direction normal to the surface.
3.3
3.3.1
Page 3 of 8
designed with flexible diaphragms need only be designed for Load Case 1 and
Load Case 3 in Fig. 6-9.
2. Where the ratio BMWFRS/B exceeds 0.7, only Load Case 1 and Load Case 3 in
Fig. 6-9 need be considered, provided the design wind load is increased 20%
for the vertical elements of the MWFRS closest to the perimeter, for those
lateral lines which resist less than 50% of the total wind force at that story.
Commentary: Section 3.3.1 of the IR is different than the code change proposal by SEA.
The original ASCE 7 requirement to use the load cases in Figure 6-9 was put back
into the procedure. Exception 1 is directly from ASCE 7. The proposal by SEA to
simplify the torsion was included as Exception 2. However, since there is an increase
to some of the vertical elements in the MWFRS due to the torsion load case, the 20%
increase was included for the perimeter lines of resistance. When using Exception 2,
wall lines that resist more than 50% of the lateral load at that story will not see an
increase due to the torsional load cases.
3.3.2
3.3.3
Determination of net pressure coefficient Cnet: For the design of the main
wind force resisting system and for components and cladding, the net pressure
shall be as follows:
1. The net pressure coefficient, Cnet for walls and roofs shall be determined
from Table 2.
2. Where Cnet may have more than one value, the more severe wind load
combination shall be used for design.
3.4
3.4.1
Page 4 of 8
TABLE 1
WIND VELOCITY PRESSURE (qs) AT STANDARD HEIGHT OF 33 FEETa
Basic Wind Speed, V (mph)b
85
90
95
Pressure, qs (lb/ft2) c
18.5
20.7
23.1
100
110
120
130
140
150
25.6
31.0
36.9
43.3
50.2
57.6
a.
b.
c.
TABLE 2
NET PRESSURE COEFFICIENT, Cnet
STRUCTURE OR
PART THEREOF
1. Main Wind Force
Resisting System
2. Components and
cladding Walls b
CNET FACTOR a, f
DESCRIPTION
Enclosed
Partially enclosed
0.43
-0.51
-0.66
1.28
-0.85
0.11
-0.83
-0.97
1.28
-0.85
Roofs:
Wind perpendicular to ridge
Leeward roof or flat roof
-0.66
-0.97
-1.09
-0.28
-0.73
-0.05
-0.59
0.03
-0.47
0.06
-0.37
0.06
-0.27
0.14
-0.15
0.14
0.28
c
-1.41
-0.60
-1.05
-0.37
-0.90
-0.29
-0.79
-0.25
-0.68
-0.25
-0.58
-0.18
-0.47
-0.18
-0.03
c
-1.09
-1.41
Walls:
Windward wall
Leeward wall
Side wall
Parapet wall
Windward
Leeward
Affected zone d
Wall elements h 60 ft.
Wall elements h > 60 ft.
Parapet walls h 60 ft
Parapet walls h > 60 ft
10 sf
500 sf
20 sf
500 sf
1.00
0.75
0.92
0.66
2.53
2.87
-1.09
-0.83
-0.92
-0.75
-1.94
-1.68
1.00
0.75
0.92
0.66
3.38
3.64
-1.34
-0.83
-1.68
-1.00
-2.19
-2.45
3. Components and
cladding Roofs b
Affected zone d
Roof for h > 60 ft
Slope 2: 12 (or 10) 10 sf
500 sf
4. Chimneys, tanks
and solid towers b
b.
c.
d.
e.
f.
-1.34
-1.00
-2.11
-1.51
-2.87
-2.11
0.58
0.41
0.92
0.83
-
-1.00
-0.92
-1.45
-1.36
-1.00
-0.83
-
0.58
0.41
0.92
0.83
-
-1.68
-1.17
-1.87
-1.87
-1.17
-1.00
-1.70
-1.53
0.58
0.41
0.92
0.83
-
-2.53
-1.85
-3.15
-2.13
-1.17
-1.00
-1.70
-1.53
0.49
0.41
-1.26
-1.09
0.49
0.41
-1.51
-1.43
0.49
0.41
-2.62
-1.85
25
0.99
0.77
0.81
0.65
1.07
0.84
0.97
0.81
1.53
1.15
1.13
0.97
< 0.1
0.1 to 0.29
0.3 to 0.7
Flat
Round
1.45
0.87
1.30
0.94
1.16
1.08
0 to s
s to 2s
3s
1.45
2.24
3.10
1.45
1.45
1.88
1.45
1.45
1.45
a.
6. Solid Freestanding
Wall
Page 5 of 8
Linear interpolation between tabulated Cnet values and between tabulated slope or
effective wind areas is acceptable.
Overhang values are for both enclosed and partially enclosed buildings. For other than
overhangs, component and cladding values are for enclosed buildings. For partially
enclosed buildings, algebraically add or subtract 0.32 to increase values on table.
Use wall element values for slopes greater than 21:12 (60).
Refer to ASCE 7 Figure 6-11-A through Figure 6-17 for affected zone designations.
For roof slope > 2:12 (or 10), use coefficients tabulated for gable and hipped roof h
60 ft.
Open structures can conservatively use the values for enclosed structures except for a
MWFRS mono-slope windward roof, which must add +0.15 to the Case 2 Cnet factor.
Commentary: Many of the Figures in ASCE include multiple Cp pressure values that are not
included in Table 2. For example, in Figure 6-6, the wall pressure coefficient Cp
varies depending on the L/B ratio. The L/B ratio with a Cp value that results in the
largest Cnet value was used in Table 2. The same logic was used for other ratios not
included in Table 2, such as the h/L values for the MWFRS roof values. Also, the
reduction factor for the MWFRS roof values based on area were ignored.
Page 6 of 8
Page 7 of 8
Page 8 of 8
external negative pressures are increased with a positive internal pressure. Positive internal
pressures were used for Table 2.
Case 2 for the maximum horizontal wind shear force occurs when the maximum positive
windward pressure is combined with the maximum negative leeward pressure. However,
when combining windward and leeward loads, the same internal pressure is used. The
positive internal pressure is used in Table 2 to reduce the MWFRS windward pressure since
the leeward roof and leeward walls are both based on positive internal pressure.
Components and Cladding: For components and cladding, the authors used the internal
pressure (positive or negative) that would result in the greatest total pressure on the
element.
Determination of qi: In Section 6.5.12.2.1, q = qz for windward walls, q = qh for leeward
and side walls. The simplified formula uses qi based on the height used for the external
pressure, which results in qi= qz for windward walls and qi = qh for leeward and side walls.
The qi = qz for windward walls is conservative since it results in a higher windward pressure
by subtracting a smaller inward pressure. With qi = qh for leeward and side walls, this
matches the ASCE 7 language since windward and side walls are required to use qh.
Open Structures were not included in Table 2. Open structures have no internal pressure
so there is no simplification of combining external and internal pressures. Open structures
can conservatively use the enclosed structure values, except for the MWFRS windward
pressures on mono-slope roofs. The internal pressure cancels out when combining
windward and leeward pressures on walls and roofs for the MWFRS. An open structure with
only a mono-slope roof will not cancel out the internal pressure where there is no leeward
wall.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 16-8
Revised 04-03-09
Issued 08-15-08
Purpose: This Interpretation of Regulations (IR) describes the Division of the State
Architect (DSA) requirements for acceptance of solar photovoltaic and solar thermal
systems used in construction projects under the jurisdiction of DSA
Scope: This IR clarifies the requirements for structural support, and anchorage of panels
and balance-of-system (BOS) equipment. It also addresses the basic Fire-Life Safety and
some Electrical requirements of the California Building Code (CBC).
Photovoltaic roofing systems (such as tiles) that incorporate photovoltaic technology
physically integrated into the roof covering materials are outside the scope of this IR.
Background: Typical photovoltaic (PV) or solar thermal systems consist of solar panels
and BOS equipment. The BOS equipment includes foundations, support structures, DC-toAC inverters, electrical wiring, electrical protection, monitoring, and safety equipment.
Photovoltaic panels are anchored to building structures. The anchoring relies on various
attachment systems such as support frames (Section 3, below), ballast (Section 4, below),
or adhered systems (Section 5, below).
Solar thermal panels are typically anchored by support structures.
1.
DESIGN AND CONSTRUCTION OF SOLAR ENERGY SYSTEMS: DSA will not
review the design and construction of the panels and the BOS equipment. However, the
panels and BOS equipment must be designed and constructed to meet the requirements of
Title 24.
See Sections 7 and 8 below for the requirements of Access Compliance and Fire-Life Safety,
respectively.
2.
Page 1 of 6
Page 2 of 6
Manufacturers support frames will also be review by DSA. The buildings vertical and
lateral load resisting systems will also be evaluated for the additional loads from the solar
panels and BOS equipment.
2.1
3.
3.1
Requirements for Wind Design: The wind design requirements are given in CBC
Section 1609A. The design shall consider the effects of partially enclosed structure
configuration (if presented), and discontinuities at panel free edges and corners.
3.2
DSA will review support frames either supplied by manufacturers or designed by the
architects or structural engineers in general responsible charge (see Section 6 below),
foundations, primary structure, the connection details of panels to support frames and
connection details of support frames to primary structures or foundations. The design of
the support frames, foundations and connections must meet the following wind and seismic
requirements:
4.
BALLAST PANEL SYSTEMS: Ballast panels may only be installed on a flat roof
with minimal slope for drainage purposes. Panels in a ballast system are not attached to
the roof. They rely on their weights and aerodynamics to counter the wind uplift forces.
4.1
Requirements for Wind Design: The panels shall be designed and installed to
resist wind loads prescribed in CBC, Section 1609A. The minimum design wind force
shall be a net pressure of 10 lb/ft2 acting in either direction normal to the panels per
ASCE 7, Section 6.1.4.2.
Wind tunnel test reports for wind (uplift) are required to verify the design.
4.2
Requirements for Seismic Design: The panels must be seismically restrained from
falling off the roof or excessive movements on the roof. Individual panels need not
be restrained independently if the panels are connected with an interlocking
mechanism that is capable of holding the panels together in the horizontal and
vertical directions.
The overall panel array must be restrained. The restraint and panel interlocking
mechanism must be designed to resist sliding and pop-up resulting from lateral and
vertical seismic forces and displacements per CBC Section 1613A, and ASCE
Standard 7-05, Chapter 13. The restraint and panel interlocking mechanism may be
Page 3 of 6
4.2.2
BOS equipment shall be anchored per CBC Section 1613A, and ASCE Standard 705, Chapter 13.
4.3
Other Considerations: Ballast panel systems shall not cause excessive sagging of
the roof resulting in ponding. They shall also not block or impede drainage flows to
any overflow drains and scuppers.
5.
6.
SUBMITTAL REQUIREMENTS: All projects involving installation of photovoltaic
or solar thermal systems shall have a California licensed or registered architect or structural
engineer in general responsible charge per Title 24, Part 1, Section 4-316. Applications for
project review shall be submitted to the DSA Regional Offices, following the normal process
for project submittal. An overview of the project submittal process and requirements may
be found on the DSA web site. (See Appendix B for web links.)
In addition to the above requirements, the following items are also required for review:
6.1 General
6.1.1
6.1.2
The plans and specifications shall including anchorage or restraint details of the
panels, BOS equipment, support structures, and foundations. Also submit any
applicable anchorage calculations.
6.1.3
6.1.4
Calculations to verify that the primary structure will support the additional
vertical and lateral loads from the panels and BOS equipment. Also provide
calculations verifying that roof deflection will not cause ponding.
6.1.5
Roof Live Loads on Panels. It is not necessary to include roof live load (20
psf) in the area(s) covered by the panels when these area(s) are inaccessible, or
fenced off with posted signs prohibiting storage under the panels.
When applicable, include snow loads and loads from snow drift.
Wind tunnel test reports that address wind uplift per Section 4.1.2 above. Listings
or evaluation reports issued by ICC Evaluation Services, Dade County, or other
Page 4 of 6
Provide Panel Interlocking system verification using either a time-history nonlinear dynamic analysis or shake table testing in accordance with ICC ES
Acceptance Criteria AC-15-6, per Section 4.2 above.
7. ACCESS COMPLIANCE:
8. FIRE-LIFE SAFETY: The installation of solar or thermal systems will be reviewed for
code compliance by adherence to the State Fire Marshal Solar Photovoltaic Installation
Guideline in all respects including any additional amendments, supplements, or official
interpretations. Other proposed means of achieving compliance will be considered and
evaluated.
8.1 Fire-Life Safety Review: Photovoltaic and thermal stand alone systems that have
support structures of combustible materials shall be located per CBC requirements and
may not be located in Frontage areas used for adjacent building area increases.
Noncombustible support structures and BOS equipment may be located next to
adjacent buildings provided exiting is maintained and are not required to have
automatic fire sprinkler system coverage where the configuration of the system will
not allow heat, smoke or gasses to be trapped. Noncombustible stand alone systems
need not be included in the basic area calculations.
8.2 Requirements for Fire-Life Safety Design: When panels are supported on framing
systems and foundations, they shall be of non-combustible materials and shall be
designed so that heat, smoke and other gasses can not be trapped under the panels.
Framing systems may not be placed in designated fire access lanes. Combustible
framing systems may not be placed within the 2007 CBC Frontage Increase areas of
buildings constructed under the 2007 CBC, nor within the required side yard areas for
existing buildings constructed under previous codes, without prior approval of DSA
Fire-Life Safety.
9.
ments of the 2007 California Electrical Code (CEC). All systems shall be grounded in
accordance with the 2007 CEC, Article 250. Electrical cables and materials shall meet
the criteria for weather proof locations per the 2007 CEC, Article 310.
Solar
photovoltaic systems shall comply with the requirements of 2007 CEC, Article 690.
Appendix A shows an example of a PV system grounding.
Appendices:
Appendix A Example of PV System Grounding
Page 5 of 6
Scale: none
Page 6 of 6
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 16-9
PENDANT MOUNTED
LIGHT FIXTURES
References:
California Building Code, Part 2, Section 1614A1.12.
ASCE 7 Sections 13.6.1 and 13.2.3
Discipline: Structural
Issued 06-22-09
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, Community Colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose:
General: Pendant mounted light fixtures that are free to swing in the lateral direction
shall be detailed and installed so that they can swing at least 45 degrees from the vertical in
any direction without contacting an obstruction. Adjacent fixtures shall be separated by a
distance equal to at least one and one half times the length of the pendant.
Exception: When it can be demonstrated by rational analysis that fixtures will
swing less than 45 degrees in the maximum credible earthquake, fixture location and
spacing may be based on such analysis.
1. SAFETY CABLES: Fixtures that are supported by cables shall have cables (including
cable connections and supports) designed to support a load of at least 1.4 times the weight
of the fixture acting simultaneously in the vertical and horizontal direction and applied at
the point of lateral support.
Fixtures supported by hollow rods, or other support
mechanisms shall be provided with a safety cable attached directly to the fixture and
directly to competent supporting structure above. The safety cable, its connections, and
supports shall be designed to support a load of at least 1.4 times the weight of the fixture
acting simultaneously in the vertical and horizontal direction and applied at the point of
lateral support.
Exception:
Fixtures that have passed shaking table tests approved by the
enforcement agency shall be supported by devices identical to those used in the tests.
DSA IR 16-9
(iss 06-22-09)
Pendant Mounted
Light Fixtures
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 16-10
Issued 08-06-09
Discipline: Structural
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, Community Colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This IR clarifies the structural design requirements for bleachers with an overall
height of 20 feet or less from the top of foundation at the front to the uppermost seatboard.
Bleachers exceeding the height 20 shall be designed, constructed and inspected in
compliance with the requirements of the current California Building Code (CBC).
Do not use this IR for any other structures. This IR is applicable only to projects submitted
to DSA for review under the 2007 CBC. For projects submitted under the 2001 CBC, see IR
16-5.
1.
School Buildings: DSA reviews and approves the construction of school buildings.
Section 4-314, Part 1, Title 24, California Code of Regulation defines reviewing
stands, grandstands and bleachers more than five rows of seats above grade as
school buildings.
1.2
Portable Bleachers: Seating facilities located outside of a building and not attached
to permanent foundations. The maximum height of any portable bleachers may not
exceed eleven rows, or nine feet above grade to the top seating board.
1.3
1.4
Folding and Telescoping Seating Facilities: Structures used for tiered seating
whose overall size and shape may be reduced without being dismantled for purposes
of moving or storing.
All provisions in this IR pertaining to bleachers and
grandstands will also be applicable to this type of seating facilities.
1.5
DSA IR 16-10
(iss 08-06-09)
Page 1 of 8
DSA IR 16-10
(iss 08-06-09)
Page 2 of 8
A bleacher fabrication shop accredited for steel fabrication and welding in a manner
similarly to the above paragraph is also considered an approved bleacher fabrication
shop, provided the fabrication shop has a minimum of five years of documented
continuous experience in the fabrication of bleachers. Proof of experience may
include past certification, and a history of projects completed. Upon request by DSA,
the fabrication shop shall provide proof with a cover letter on the fabrication shops
stationary, signed and stamped by the manufacturers (California registered) civil or
structural engineer per Section 4.3 below.
2.
Footings: Footings for portable bleachers are required to comply with CBC, Section
1805A. Temporary portable bleachers as defined in Section 1.2 above maybe supported by
wood sills or steel plates directly bearing on the ground surface, provided the soil pressure
does not exceed 1200 pounds per square foot (psf).
3.
Relocation: DSA approval is only for the specific location originally shown. Any
subsequent move to another location voids the approval and will require submittal of an
application for approval at the new site.
4.
Sway Loads: The design of bleachers shall consider sway loads as live loads in
accordance with Footnote (d), Table 4-1, ASCE 7-05. See Appendix A for applicable
load combinations for bleacher design.
4.2
4.3
4.4
DSA IR 16-10
(iss 08-06-09)
Page 3 of 8
Exception: site adopted ancillary attachments such as ramps and walkways may
require a full review.
4.4.1
4.4.2
Span Limitation: The spans of the structural system must be the same or less
than shown on the previously DSA approved drawings and specifications.
4.4.3
Additional Limitations:
4.4.4
There have been no subsequent structural code changes that would adversely
affect the bleacher design.
The design loads are no greater than those indicated in the previously DSA
approved design.
Soil Condition Limitation: The soil conditions must provide equal or greater
capacity to support the structure than indicated in the previously DSA approved
design. If the soil conditions provide less capacity, DSA will review the affected
portions of the design. Once DSA determines that the site specific foundation
system complies with the code requirements, the design will be approved.
5.
5.1
5.1.1
5.2
Documentation:
At the completion of the fabrication, manufacturer shall
submit a Certificate of Compliance, form DSA-130, per CBC Section 1704A.2.2 to
the owner, project inspector, the engineer or architect in general responsible
charge, and DSA.
The certificate of compliance shall meet the following
requirements. See sample certificate of compliance in Appendix A.
The engineer shall state in the Certificate of Compliance that he/she has
personal knowledge of the fabrication, as defined in Title 24, Part 1, Section
4-336, and certify, under the penalty of perjury, that the materials used and
works performed are in accordance with DSA approved construction
documents.
DSA IR 16-10
(iss 08-06-09)
Page 4 of 8
5.2.1
5.2.2
5.2.3
6.0 Inspection in the Field: When the bleacher or grandstand is delivered to the job
site, the project inspector (PI) shall be responsible for, but not limited to, the following:
Ensure all the required documents per Sections 5.1 or 5.2 are submitted by the
manufacturer.
Review the manufacturers submitted documents for compliance with DSA
approved construction documents.
Inspect the bleacher or grandstand for defects and compliance with DSA
approved construction documents.
Inspect the field installation, including site work.
6.1
Special Inspection of Field Welding: If welding is required in the field, an AWScertified welding inspector (CWI), approved by DSA, shall inspect welding in
accordance with the CBC and IR 17-3. The field welding inspector shall provide daily
inspection reports (DSA-250). At the completion of the work, the field welding
inspector shall submit a verified report (DSA-292).
7.
Yearly Inspection: After the installation, the owner shall conduct annual
inspections as required by ICC/ANSI 300, Section 105.2.
The owner will also maintain
copies of all annual inspection reports and make them available on site for DSA review upon
request.
8.
Load Tests: For the 2007 CBC, load tests when approved by DSA may be used to
check bleacher design or as a basis for approval in lieu of engineering analysis.
The load test procedure must by approved by DSA prior to testing. Test loads will be applied
in not less than four, approximately equal increments, without shock to the structure and in
a manner to avoid arching of the loading materials or stiffening of the structure. The
strength of the material in the test bleacher should not exceed the minimum specified
strength by more than 5 percent.
8.1
Test Load Factors: When load tests are made to check design or as a basis for
approval of bleachers, the test load should not be less than twice the design vertical
load combined with twice the design lateral load.
DSA IR 16-10
(iss 08-06-09)
8.2
Page 5 of 8
Testing Beyond 2007 CBC: When the 2010 CBC becomes effective, load tests for
verification of primary structure of fixed bleachers shall not be permitted. They shall
be designed in accordance with the requirements of CBC and ICC 300, Section
303.1. Seatboards and footboards may not be considered as providing torsional
restraint for stringers or girders, nor distributing lateral forces by diaphragm action.
8.2.1
Folding Bleachers: Load tests for the verification of primary structure of folding
bleachers may be permitted on a case by case basis. Testing protocols and
procedures must be submitted for review and approval prior to testing.
8.2.2
Accessories: Load tests for minor accessories such as hand rails may be verified
by tests on a case by case basis. Testing protocols and procedures must be
submitted for review and approval prior to testing.
Exception: Testing shall not be permitted for structural verification of press
boxes.
9.
Attachments
DSA IR 16-10
(iss 08-06-09)
Page 6 of 8
Equations
1.4 (D + F)
1.2(D + F + T) + 1.6 (L + Lsway + H) + 0.5 (Lr or S or R)
1.2D + 1.6(Lr or S or R) + (f 1 (L + Lsway) or 0.8 W)
1.2D + 1.6 W + f 1L + 0.5(Lr or S or R )
1.2D + 1.0E + f 1L + f 2S
0.9D + 1.6W + 1.6 H
0.9D + 1.0E + 1.6H
Equation 16A-1
Equation 16A-2
Equation 16A-3
Equation 16 A-4
Equation 16A-5
Equation 16A-6
Equation 16A-7
Equations
D+F
D + H + F + L + Lsway + T
D + H + F + (Lr or S or R)
D + H + F+ 0.75 (L + Lsway + T) + 0.75 (Lr or S or R)
D + H + F + (W or 0.7 E)
D + H + F+ 0.75 (W or 0.7 E) + 0.75L + 0.75 (Lr or S or R)
0.6D + W + H
0.6D + 0.7 E + H
Equation 16A-8
Equation 16A-9
Equation 16A-10
Equation 16A-11
Equation 16A-12
Equation 16A-13
Equation 16A-14
Equation 16A-15
No
No
No
No
No
No
No
No
Equation 16A-16
Equation 16A-17
Equation 16A-18
Equation 16A-19
Equation 16A-20
Equation 16A-21
Yes except
3
Yes except
3
Yes except
3
Yes except
3
Yes except
3
Yes except
Increase?
No
No
No
No
No
No
No
Notes:
1.
Sway loads shall be considered as live loads per ASCE 7-05, Table 4-1, Footnote (d)
2.
For seismic analysis, bleachers shall be considered as all other self-supporting structures per
ASCE 7-05, Table 15.4-2 (the last non-building structural type in the table, R=1.25).
3.
ICC 300, Section 303.4 allows stresses permitted in the design standards of the various materials
to be increased by one-third due to sway or wind loads or by a combination of sway or wind loads
and vertical loads. The 2007 CBC allows stress increase only in Section 1605A.3.2 (ASD alternate
basic load combinations) and only where permitted by the material chapter or the referenced
standard. The steel chapter and the referenced standard AISC 360 does not permit stress
increase for steel design. Therefore, ICC 300, Section 303.4 is not adopted for materials such as
steel that does not permit stress increase.
FORM
DSA-130
Issued 08-09
DSA File #
Application #
Bleacher/Grandstand ID:
I certify (or declare) under the penalty of perjury that the following statements are
true: All boxes must be checked for the submittal to be considered complete.)
I have personal knowledge, as defined in Title 24, Part 1, Section 4-336, of the
fabrication of the bleacher/grandstand identified above.
The materials and works performed for the fabrication of the bleacher/grandstand
identified above are in accordance with DSA approved construction documents.
Attachments:
Proof of accreditation of the fabrication shop where the
identified above was fabricated
bleacher/grandstand
Signed:
Engineer
Print Name:
CA Reg./
License No.:
Engineer Stamp:
Form DSA-130
(iss. 08-06-09)
Page 1 of 1
FORM
DSA-131
Issued 08-09
Bleacher/Grandstand ID:
Part No.
Description
Application #
Material
ASTM Standard,
Grade, or Test
Report
Certified,
Stamped, or
Tested by
I certify (or declare) under penalty of perjury that the materials listed above have been used in the
construction of the referenced bleacher or grandstand.
Date:
Signed:
DSA Approved Special Inspector
Print Name:
Form DSA-131
(iss. 08-06-09)
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 17-1
Revised 10-15-07
Issued 10-20-05 as CR 17-1
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
This IR applies also to testing laboratories, technicians and special inspectors working on projects under DSA jurisdiction.
responsible for the sampling, handling, and testing of structural materials as specifically
required by Title 24, Part 1 (California Building Standards Administrative Code), Section 4335 and 2001 CBC, Title 24, Part 2, Chapters 14A, 16A through 23A (Chapters 14, 16A
through 19A, 20, 21A, 22A and 23 respectively in the 2007 CBC) and 33. This IR is not
applicable to tests required by other portions of the Code.
Section 4-335 of Part 1 requires that a testing facility acceptable to Division of the State
Architect (DSA) perform all tests. Testing facilities are evaluated and accepted as part of the
Laboratory Evaluation and Acceptance (LEA) program. Accepted facilities are listed at
http://www.applications.dgs.ca.gov/dsa/etrackerweb/approvedlabs.asp
Section 4-335(d) of Part 1 requires that all test reports state that materials were sampled
and tested in accordance with the requirements of the DSA approved project construction
documents. Reports must also state that materials meet the requirements of the DSA
approved documents.
1.
1.1
The project inspector, a representative of the architect, engineer, DSA or the testing
facility may select the locations for sampling. In no case shall the contractor,
supplier, or construction manager select locations for sampling.
1.2
Testing (including laboratory and field testing) may only be performed by qualified
representative of the LEA accepted testing facility identified on form DSA-102,
Contract Information Form.
1.3
1.3.1
Exception: For a minor scope of work, the project inspector may, if qualified and
other duties permit, be authorized in writing by the DSA Field Engineer to
sample, protect, handle, transport, and/or store test specimens. Copies of this
approval will be sent to the laboratory, project inspector, design professional and
the school district.
If the project inspector performs these tasks he or she shall specifically identify
the tasks performed on a verified report (form DSA-6).
The engineering manager of the LEA accepted facility must note Exception in
Section D of the Laboratory Verified Report (form DSA-291) and attach a list of
each type of material specimen for which sampling and handling were performed
by others.
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
NONDESTRUCTIVE TESTING
(N.D.T.) OF WELDS
IR 17-2
Revised 10-15-07
Issued 05-15-07 as CR 17-2
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
This IR applies also to testing laboratories, technicians and special inspectors working on projects under DSA jurisdiction.
1. Purpose:
2. Background: This IR does not apply to visual inspection during the welding operation.
NDT is considered a test, not an inspection. Title 24, Part 1 Section 4-335 requires that all
tests are to be conducted by a testing facility acceptable to Division of the State Architect
(DSA). Testing facilities are evaluated and accepted by DSA through the Laboratory
Evaluation and Acceptance (LEA) program. Nondestructive testing shall be performed only
by currently approved LEA facilities.
3. Requirements:
NDT Facilities:
3.1.1
Only currently approved LEA facilities may perform NDT. LEA facilities are listed
on the DSA web site, on the Testing Laboratories web page
(http://www.dsa.dgs.ca.gov/labs/default.htm).
3.1.2
The LEA facility may perform only those NDT test methods that are accepted
through the LEA program.
3.1.3
3.1.4
All NDT testing equipment must be kept calibrated and the use controlled by the
laboratory engineer.
3.2
3.2.1
Nondestructive Testing
(NDT) of Welds
Page 1 of 3
Nondestructive Testing
(NDT) of Welds
Page 2 of 3
Testing (ASNT). The NDT administrators Level III certification must be obtained
through the successful completion of an examination given by ASNT, or an ASNT
authorized examination center. The NDT administrators certification must be
current and verifiable on the ASNT website. The NDT administrator must be
certified in all NDT test methods for which the facility has been accepted, or is
seeking acceptance, through the LEA program. The NDT administrator may be
an employee of the facility or a contracted individual from an outside
organization. The NDT administrator is, at a minimum, responsible for:
a)
b)
Creating and maintaining qualification and certification records for all Level
I and II personnel, and
c)
Supervising and monitoring the NDT work of all Level I and II NDT
personnel.
3.2.2
The NDT program must meet the American Society of Testing and Materials
(ASTM) Standards E 54304 and E 121204.
3.2.3
The NDT program shall include a certification program which clearly outlines
qualifications and certification of nondestructive testing personnel.
The
certification program must meet the requirements of ANSI/ASNT CP-189-2001
and be approved by the NDT administrator (see Section 3.2.1 above) and the
laboratory engineer (see Section 3.1.3 above).
3.2.4
3.2.5
3.3
3.3.1
ASTM Standards
E-165-02, E1417-05
E-1444-05, E-709-01
E-164-03, E-587-00, E114-95, A-898-91
E-1032-01, E-94-04, E-1742-05
3.3.2
3.4
Nondestructive Testing
(NDT) of Welds
Page 3 of 3
3.4.1
The NDT Level II technician is required to issue a daily report that includes
records of equipment calibration and a systematic record of all welds tested and
accepted.
3.4.2
Test reports must state that materials were tested in accordance with and met
the requirements of the DSA approved documents. Reports must be submitted
as required by C.C.R. Title 24, Part 1, Section 4-335 (d). A sample report
template (DSA 210) is available on the DSA web site.
3.4.3
Reports shall be sent to the school district and copied to the architect, structural
engineer, project inspector, and DSA within 14 days of the date of the test.
Reports shall also be presented to the project inspector on a daily basis. Reports
indicating non-compliant materials shall be submitted immediately.
3.4.4
The California Registered civil engineer with engineering managerial responsibility for the LEA facility (Section 3.1.3 above) is responsible for signing and
submitting a Laboratory Verified Report (Form DSA-291) at the conclusion of the
testing program. The Laboratory Verified Report shall include all NDT testing.
4.0
professional and competent manner, report defective work, file all required reports in
a truthful and timely manner, or fulfill any other duties defined by the code may
have serious consequences for the NDT technician and/or the LEA facility. These
consequences include but are not limited to withdrawal of DSA approval, and/or
denial of any future DSA approval to work as a NDT technician on projects under
DSA jurisdiction.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
Structural Welding
Inspection
IR 17-3
Revised 04-07-08
Revised 01-02-08
Issued 05-15-07 as CR 17-3
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
This IR applies also to testing laboratories, technicians and special inspectors working on projects under DSA jurisdiction.
1.
Purpose: The purpose of this Interpretation of Regulations (IR) is to clarify the
minimum requirements and responsibilities for personnel conducting structural welding
inspections for projects submitted to DSA under the 2001 California Building Code (CBC). It
is applicable to shop and field welding activities.
2.
Background:
The 2001 California Building Code requires constant special
inspection of all welding operations except that continuous inspection is permitted for
certain weld types in accordance with the 2001 CBC, Section 1701A.5.
2.1
For welding, constant means constant presence of the welding inspector at point of
welding, and that he or she inspects each pass as it is being done prior to
subsequent weld layers. Constant inspection is applicable to the following types of
welds: Multi-pass fillet welds, partial penetration groove welds and complete
penetration groove welds.
2.2
For welding, continuous means the welding inspector must be in the vicinity of the
welding during all phases, and shall inspect in a timely manner, before subsequent
operations are performed. Continuous inspection is applicable to single pass fillet
welds, deck welding, shear studs, hand rails, etc.
3.
3.1
3.2
Have taken the AWS Open Code Book examination on ANSI/AWS D1.1, Structural
Welding Code Steel.
3.3
3.4
4.
Approval: A welding inspector shall be approved for each specific project prior to
performing any work in accordance with Section 4-333 (c) of Title 24, Part 1 and 2231A of
the 2001 CBC. To be approved for a project the welding inspector may be required to
demonstrate the following to the satisfaction of DSA:
4.1
4.2
4.3
5.
Inspection Duties:
5.1
Review and understand the applicable portions of the DSA approved plans,
specifications, field changes and other DSA approved documents. Approved shop
drawings, erection drawings, referenced codes and standards must also be reviewed
and understood. (Note that shop/erection drawings are NOT DSA approved documents and shall NOT be used as a basis for determining compliance).
5.2
Review manufacturers Material Test Report (MTR). Verify that all materials
properties (e.g. grade, type, size, thickness) are as specified by the DSA approved
documents, and that all materials are readily identifiable and traceable to an MTR.
Sample any unidentifiable material for testing. All testing of materials must be
performed by a laboratory accepted in the DSA Laboratory Evaluation and
Acceptance (LEA) Program.
5.3
For seam welds in hollow structural sections (HSS), conduct a thorough visual
examination of the seam weld area for visible discontinuities. Visual examination
should include, as a minimum, the exterior of the seam weld and the interior at each
end.
5.4
For structural plate, conduct a thorough visual examination of surfaces for visible
lamination discontinuities.
5.5
Verify that all applicable welder, welding operator, and tack welder qualifications are
available, current, and accurate.
5.6
Verify that a written Welding Procedure Specification (WPS) is available on site for
each type of weld, that the WPS is in compliance with all requirements, and that the
WPS has been approved as required by the construction documents.
5.7
Witness all Procedure Qualification Tests required for non-prequalified welds and
verify that Procedure Qualification Records (PQR) are compliant with all applicable
requirements.
5.8
Verify that all welding consumables comply with the DSA approved documents and
the approved WPS. Verify that all electrodes are properly stored.
5.9
Verify that the welding current and voltage are within the WPS parameters by using
a calibrated hand-held volt/amp meter. Readings should be taken as near the arc as
possible.
5.10
5.11
Conduct visual inspection of the work: Verify size, length, and location of all welds.
Verify that all welds conform to the requirements of the AWS code and the DSA
approved documents. Weld size and contour shall be measured with suitable
gauges.
5.12
Mark completed welds, parts, and joints that have been inspected and accepted with
a distinguishing mark, tag or dye stamp. The mark shall include: Testing laboratory
initials (if applicable), inspectors initials, inspection date and status.
5.13
6.
Reporting:
6.1
Provide daily inspection reports that clearly describe the inspection process. The
report shall document all inspection duties listed in Section 5. above. Reports shall
include a systematic list of accepted and rejected welds, parts, or joints. Reports
shall clearly document weld locations by grid line, elevation or other acceptable
means.
6.2
Reports shall reference the details on the DSA approved documents used as a basis
for inspection.
6.3
Inspection reports must state that the work was inspected in accordance with, and
met the requirements of, the DSA approved documents. Reports must be submitted
as required by Title 24, Part 1, Section 4-333 (c). A sample special inspection form
(DSA 250) is available on the DSA web site.
6.4
Reports shall be sent to the school district and copied to the architect, structural
engineer, project inspector and DSA within 14 days of the date of the inspection. For
field welding, reports shall also be presented to the project inspector on a daily
basis. Reports indicating non-compliance shall be submitted immediately.
6.5
At the conclusion of the work, the welding inspector is required to sign and submit a
verified report. The verified report shall be made on form (DSA 292) available on
the DSA website.
7.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 17-4
Issued 11-03-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Background: The California Building Code (CBC) requires special inspection and/or
testing of various construction work, materials, or completed components.
These
requirements were adopted from the model code applicable to construction nationwide
where a project inspector is generally not required. For this reason, some issues require
clarification in their application to projects under DSA jurisdiction. Issues that will be
addressed in this IR include:
Definition of the structural tests and special inspections required for a project and the
Statement of Structural Tests and Special Inspections (T&I List; Form DSA-103)
required by CBC Section 1704A.1.1.
The difference between a test and a special inspection.
Definitions:
LEA Approved Testing Laboratory A testing laboratory that has been accepted into the
DSA Laboratory Evaluation and Acceptance (LEA) Program. LEA approved laboratories are
listed on the DSA website at: https://www.apps.dgs.ca.gov/tracker/ApprovedLabs.aspx.
Project Inspector An individual employed by the school district and approved by DSA to
provide continuous, personal inspection of all aspects of construction for a project in
accordance with Section 4-333(b) and 4-342 of Title 24, Part 1.
Special Inspection A careful and thorough examination of a specific construction procedure (e.g. welding, masonry placement, etc.) for a project. Note that material identification and other related responsibilities are also generally a part of the special inspector's
duties. See Appendix A for a list of common special inspections.
Special Inspector A specially qualified individual employed by an LEA approved testing
laboratory or hired directly by the school district to perform special inspection.
Technician A qualified employee of a testing facility properly trained and supervised to
sample, handle, transport, and conduct tests on materials or on completed assemblies.
Test A procedure performed on a material or on a completed element of the structure to
determine strength, ductility, or other properties of the material or element. Tests must be
DSA (SS) IR17-4
(iss 11-03-08)
Page 1 of 3
Page 2 of 3
1.
1.1
Statement of Structural Tests and Special Inspections (T&I List; Form DSA103): After it is completed, Form DSA-103 may be referred to as the T&I List. Common
structural tests and special inspection requirements are included on the form and are
accessible by expanding the menus for the various construction categories (Soil, Concrete,
Masonry, Steel, and Wood) and subcategories. Mandatory tests and special inspections
within each category are already checked for convenience. Depending on the structural
elements included in the project, items in applicable categories must be checked by the
architect or structural engineer.
1.2
Changes to testing or special inspection requirements during construction:
All changes to the testing and inspection program that are made after a construction
contract has been awarded shall be accomplished by change order, or field change
document, (see IR A-6) and approved by DSA.
2.
Special Inspections:
Page 3 of 3
Appendix A
Sample List of Tests and Special Inspections
(This list is not all inclusive)
Tests:
Soil:
Fill material acceptance tests
Fill compaction
Pile load tests
Concrete:
Rebar
Air content
Slump
Temperature
Compression
Prestressing tendons and anchorage
Testing of post-installed anchors (wedge, sleeve,
epoxy, shot-pins, etc.)
Masonry:
Rebar
Units, mortar and grout
Prisms
Core-drilled samples
Veneer bond
Testing of post-installed anchors (wedge, sleeve,
epoxy, shot-pins, etc.)
Steel:
Tensile, (yield, ultimate, elongation)
HS bolt tests, (hardness, tension, wedge, chemical,
etc.)
Non-destructive examination of welds
Fireproofing thickness*
Fireproofing bond test
Fireproofing density
* Thickness testing of spray applied fireproofing may be
performed as a test or as part of the application
inspection.
Wood:
Special Inspections:
Soil:
Fill placement (includes verification of site preparation,
excavation depth, etc.)
Pile driving (count blows, verify pile depth, also
includes verifying pile materials, size and length prior
to driving)
Pier drilling (depth, diameter, location)
Concrete:
Verify mix
Batch plant inspection
Formwork
Rebar and embedded item placement
Concrete placement
Curing
Form removal
Application of prestressing force and grouting of
bonded tendons, (includes measuring prestressing
force applied and elongation of tendons)
Precast concrete fabrication
Shotcrete placement
Installation of post-installed anchors (wedge, sleeve,
epoxy, shot-pins, etc.)
Masonry:
Verify proportions of mortar and grout
Preparation of prisms for testing
Verify size, location and condition of all construction
supporting masonry, dowels, etc.
Placement of units, mortar, rebar, embedded items
and grout
Curing and weather protection
Installation of post-installed anchors (wedge, sleeve,
epoxy, shot-pins, etc.)
Steel:
Verify material size, grade, mill certificates and
markings
HS bolt installation and tightening (including
Skidmore-Wilhelm bolt tension verification testing)
Welding
Joist and truss fabrication
Shop fabrication
Spray applied fireproofing (substrate condition
application, thickness*)
Wood:
Glued-laminated member fabrication
Open-web truss fabrication
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 17-5
Issued 11-03-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this Interpretation of Regulations (IR) is to clarify structural test
requirements for projects under DSA jurisdiction.
See IR 17-4 for general information on the test and special inspection program, and
definitions of tests vs. special inspections.
Scope: This interpretation applies to structural tests that are required to be performed by
a DSA approved, independent testing laboratory in accordance with Code and/or project
specifications. See IR 17-4, Appendix A for a list of common tests required.
This interpretation does not apply to non-structural tests such as:
Also, this interpretation does not apply to testing of structural materials that is not
specifically required by the Code or the project plans or specifications such as:
Finally, this interpretation does not apply to testing of materials conducted by (or contracted
by) manufacturers, suppliers or contractors.
1.
1.1
Employment of the Testing Laboratory: The school district shall employ an LEA
approved laboratory to perform all tests indicated on the DSA approved documents
including the Statement of Structural Tests and Special Inspections (T&I List). The
testing laboratory must be employed directly by the school board and no other
agency or individual.
Page 1 of 3
Page 2 of 3
Sampling and testing: All sampling and testing shall be performed by technicians
employed by the testing laboratory except as specifically approved by DSA in
accordance with IR 17-1.
2.
DUTIES AND RESPONSIBILITIES: The civil engineer in charge of the
laboratory is responsible for supervising all testing activities and verifying that all of the
requirements of Section 2.1 through 2.3 of this IR are met. LEA laboratory must meet the
following requirements:
2.1
2.1.1
2.1.2
All equipment used shall be properly calibrated, certified, labeled, and maintained
as required by ASTM E329 and other appropriate referenced standards.
2.1.3
A quality control manual as required by ASTM E329 for all testing and special
inspections procedures shall be maintained.
2.1.4
2.1.5
2.2
2.2.1
2.2.2
All procedures shall be carried out in accordance with the quality control manual.
2.2.3
2.3
2.3.1
2.3.2
All tests that are performed shall be reported to all parties without exception.
2.3.3
The laboratory engineer shall review the DSA approved documents (including
plans, specifications, addenda, change orders, etc.) and verify that all tests
required by the DSA approved documents are performed.
2.3.4
The laboratory engineer shall prepare a laboratory verified report on Form DSA291 per Section 4, below. The laboratory verified report shall be submitted
within 14 days of the completion of the testing program.
3.
TEST REPORTS: All tests reports shall be submitted to the school district within
14 days of the date of the test. Copies of each report shall be submitted to the architect,
the structural engineer, the project inspector, and DSA by the testing laboratory within 14
days of the date of the test. Reports indicating deficiencies shall be submitted immediately.
Page 3 of 3
Reports shall include all information required by Title 24, Part 1, Section 4-335(d). Test
report templates for common structural tests are provided on the DSA website at
http://www.dsa.dgs.ca.gov/Labs/report_temp_forms.htm.
4.
All tests were carried out in accordance with DSA approved documents, referenced
Codes and Standards and the laboratory quality control manual,
Qualified personnel under the supervision of the laboratory engineer performed all
testing and related procedures, and
The results of all tests indicate that the materials tested met the requirements of the
DSA approved documents.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 17-6
Issued 11-03-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
See IR 17-4 for definition of terms and general information on the test and special
inspection program and definitions of tests vs. special inspections.
When specifically approved by DSA in writing, special inspectors may also be used for some
aspects of construction that are typically performed by the project inspector at the project
site (such as placement of concrete or installation of post-installed anchors).
An individual special inspector may only perform the type of special inspection that he or
she has been approved to perform by DSA. An individual may perform special inspection on
more than one aspect of the project only when specifically approved to do so, in writing, by
DSA. Special inspectors may not be utilized as assistant inspectors unless specifically
approved in writing by DSA. See IR A-12 for more information on assistant inspectors.
The project inspector is still responsible for the construction inspected by a special
inspector. The project inspector is required to monitor the activities of all special inspectors
in accordance with IR A-8.
1.
Exceptions:
1. The school district may contract directly with individual special inspectors rather
utilizing employees of the testing laboratory.
Page 1 of 5
2.
Page 2 of 5
2.
2.1.1
2.1.2
Review and understand all relevant Code requirements and referenced standards.
2.1.3
2.1.4
Review requirements with the contractor and resolve all questions and/or
differences of interpretation prior to start-up of each phase of the work.
2.1.5
Coordinate with the testing laboratory for any sampling and testing requirements.
2.1.6
2.1.7
Verify that existing conditions relevant to the work are in accordance with DSA
approved documents (e.g. for masonry work verify that surfaces of foundations
are level, clean and properly roughened, etc.).
2.1.8
Verify that tools, consumables, formwork, shoring and other items that may
affect working conditions or the quality of the work are in accordance with
relevant requirements.
2.1.9
2.1.10
Coordinate with the project inspector on the interface of the work inspected with
other aspects of the work.
2.2
Inspection:
2.2.1
Verify that all materials sampling and testing are performed as required.
2.2.2
2.2.3
Inspect the work at start-up until satisfied that all workers understand the
requirements and are adequately performing the work.
2.2.4
Inspect work when conditions change, a new phase of work starts, new workers,
equipment or procedures are implemented, or any other change to work or job
conditions takes place.
2.2.5
Inspect work during its progress from time to time (see Section 3 for frequency).
2.2.6
Inspect all work upon completion and/or prior to covering with other work.
Page 3 of 5
2.2.7
Personally verify that all work is in accordance with DSA approved documents.
2.2.8
2.3
Reporting:
2.3.1
Verbally report all deviations from DSA approved documents to the contractor
and the project inspector immediately.
2.3.2
Provide written daily reports (see Section 5 below for report requirements).
2.3.3
When deviations are not immediately corrected, report the deviations in writing
to the contractor, project inspector, DSA, project architect and structural
engineer.
2.3.4
If work that deviates from DSA approved documents is not reported in a timely
manner, it will be considered evidence of incompetence and/or negligence of the
inspector. When inspector incompetence or negligence is evident, DSA may
withdraw approval of the inspector for the project and/or withdraw certification of
the inspector to work on future projects under DSA jurisdiction.
2.3.5
2.3.6
Report the resolution of deviations to all parties in writing when deviations are
corrected.
2.3.7
Submit a Special Inspection Verified Report (DSA-292). See Section 6 below for
verified report requirements.
Exception: Project inspectors performing special inspections may include some
special inspections on their form DSA-6 rather than submitting Form DSA-292; see
Sections 5 and 6 below.
3.
The 2007 CBC, Title 24, Part 2, Section 1702A includes the following definitions:
Note: These definitions are only applicable to special inspectors. See Title 24, Part 1,
Section 4-342 and IR A-8 for the definition of continuous inspection for the project
inspector.
The definitions of periodic and continuous special inspection are identical except for two
things:
Periodic inspection may be performed by an inspector who is in the area where the
work has been performed while continuous inspection must be performed where
the work is being performed.
Page 4 of 5
Note: Work subject to periodic special inspection requires the presence of the special
inspector prior to start of work, from time to time during the work, and upon completion
of the work.
3.1
3.2
4.
Tables 1704A.3, 1704A.4, 1704A.5.1, 1704.A.5.3, and 1704A.7 (Title 24, Part 2) list tasks
that require special inspection. On projects under DSA jurisdiction some of the tasks may
be, or must be, performed by the project inspector rather than the special inspector. The
T&I List (form DSA-103) defines whether certain special inspection tasks shall be
performed by a special inspector or the project inspector. Exceptions are permitted with the
written approval of DSA (for example, the project inspector could be approved to inspect
some minor masonry work if he or she were appropriately certified and had the time
available to perform the masonry inspections in addition to all other duties).
The project inspector is responsible for providing continuous inspection of all aspects of
construction for which a special inspector is not provided, including, but not limited to, items
identified in the Code as requiring special inspection such as high-load wood diaphragms
and non-structural components.
When the project inspector performs special inspection he or she shall provide continuous
inspection of all work in accordance with Title 24, Part 1, Section 4-342(b)1 and IR A-8.
Note: The definition of continuous inspection for the project inspector is different from
the definition of continuous for special inspectors.
5.
Page 5 of 5
6.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 17-7
Issued 11-03-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this Interpretation of Regulations (IR) is to clarify structural test
requirements for soil and foundation aspects of projects under DSA jurisdiction. This IR does
not apply to the initial soil investigation or project design phase.
See IR 17-4 for general information on the test and special inspection program and
definitions of tests vs. special inspections.
General:
All construction phase laboratory and field soil testing shall be performed by
qualified technicians from a testing laboratory currently accepted in the DSA Laboratory
Evaluation and Acceptance (LEA) program. The tests shall be performed under the
supervision of a California registered geotechnical engineer (GE) employed by, or
subcontracted by the testing laboratory.
1.
1.1
1.2
Understanding and complying with Codes and reference standards relevant to the
tests performed including, but not limited to, Title 24 Code amendments applicable
to school construction.
1.3
Verifying that testing and reporting is performed in accordance with DSA approved
documents and all applicable requirements.
1.4
2.
PROGRESS REPORTS: Daily reports are required for testing activities that occur
at the project site. Daily reports shall be handed to the project inspector each day. Copies
of daily reports and reports of tests performed in the laboratory shall be sent to the project
inspector, architect, structural engineer, school district, and DSA within 14 days of the date
of the test.
3.
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 19-1
Discipline: Structural
Issued 9-1-99
References:
Revised (in its entirety) 03-06-06
2001 California Building Code, Sections 1912A.1 and 1923A.3.5
ICC ES Acceptance Criteria AC-01, AC-58, AC-193 including Annex 1, AC-106, AC-308, and AC-70
ACI 355.2 or ACI 318-02, Appendix D
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Publications/default.htm (click on DSA Interpretations of
Regulations Manual) at the time of plan submittal to DSA are considered applicable.
procedures and test values for post-installed anchors, including a new product line known as
screw anchors, in accordance with Section 1923A.3.5, 2001 CBC for projects under the
jurisdiction of the Division of the State Architect (DSA).
1.
LISTING REQUIREMENTS: Post-Installed anchors must be listed in a current
evaluation report issued by an evaluation agency recognized by DSA, which include the
following:
Post-Installed Anchors
in Concrete
Page 1 of 8
Post-Installed Anchors
in Concrete
Page 2 of 8
Commentary: ICC-ES Evaluation Reports are generally considered to be current if they are listed and
available from the ICC website http://www.icc-es.org/reports/index.cfm?search=search
2.
BASIS FOR DESIGN CAPACITIES: Design capacities for expansion-type and
epoxy (adhesive)-type anchors should reflect the tested capacity of the anchors including
the degree of scatter in the recorded peak loads and the load-displacement response, the
type and mechanical properties of the concrete or masonry in which the anchor is installed,
anchor edge distance and spacing, and whether the anchors are installed through metal
decking into concrete fill. In addition, the potential for concrete cracking in the vicinity of
the anchor during its service life and the effect of such cracking on the capacity of the
anchor to resist loads shall be considered. The effects of temperature variations on epoxy
(adhesive) type anchors shall also be taken into account where applicable.
The age, composition and mechanical properties of the materials in which the anchor will be
installed shall be evaluated. The relevant mechanical properties include unit weight,
compressive strength, and aggregate size and type. Evaluation of compressive strength on
the basis of cores taken at or near the anchor locations shall be permitted.
Exception: The design capacities for anchors tested in lightweight
concrete may be used for anchors installed in normal-weight concrete provided
the compressive strength of the normal-weight concrete equals or exceeds the
compressive strength of the lightweight concrete in which the anchor was
tested. Furthermore, design capacities for anchors tested in all-lightweight
concrete (unit weight 90-115 pcf) may be used for anchors installed in sandlightweight concrete (unit weight 105-120 pcf) provided that the compressive
strength of the sand-lightweight concrete equals or exceeds that of the alllightweight concrete in which the tests were conducted.
The compressive strength of the material in which the anchor will be installed shall meet or
exceed the compressive strength of the material in which the anchor was tested.
2.1
2.1.1
Commentary: The ICC-ES Reports generally allow the use of the 33-1/3% stress increase
for duration of loading if the anchor(s) have satisfied the seismic qualification testing
criteria. Section 1632A.1, 2001 CBC, precludes the use of the stress increase in
determining capacities of some anchorages.
For anchors installed in the underside of a beam/slab, the allowable tension load
design values should be based on the tabulated value for the anchors installed
without special inspection (special inspection is still required), unless allowable
load values for anchors installed in cracked concrete are provided in the ICC-ES
Report, or the anchors have been tested in accordance with ACI 355.2, latest
Post-Installed Anchors
in Concrete
Page 3 of 8
If anchors have not been tested in accordance with the requirements for seismic
qualification tests of AC01, Section 5.6, the allowable load values listed in the
ICC-ES Report may be used with the following modifications.
2.1.2.1
Allowable shear and tension design loads shall be limited to 80% of the
tabulated allowable values for anchors installed with special inspection.
2.1.2.2
Commentary: Previous Interpretations of Regulations have allowed the submittal of test data by
anchor manufacturers for review and acceptance by the DSA. Given the complexities of ICCES Acceptance Criteria, and the volume of data that can be submitted, it is no longer feasible
for the DSA to evaluate products without a current ICC-ES Report.
2.2
Commentary: Laboratory testing has shown that the tension performance of epoxy-type (adhesive)
anchors in cracked concrete can be significantly reduced. This is particularly true of small
diameter and shallow embedment anchors. In the absence of recognized testing criteria for
establishing the performance of epoxy-type (adhesive) anchors in cracked concrete, their use
shall be restricted.
Post-Installed Anchors
in Concrete
Page 4 of 8
elements (e.g. gunite), they may be installed in exterior locations with prior
approval of the DSA.
Commentary:
DSA has ongoing concerns regarding long-term durability of the adhesives when
exposed to numerous cycles of either high or low temperatures and the ability of the anchor to
resist loads when either the adhesive or a bolt is exposed to weather to transfer the heat/cold
to the adhesive.
If epoxy-type (adhesive) anchors are exposed to fire, all anchors in the affected area
shall be inspected and evaluated by a qualified person to ensure their load carrying
capability has not been compromised.
The design shear and tension capacities for epoxy-type anchors must be determined
in accordance with the following:
2.2.1
The allowable loads may be based on the values listed in an ICC ES Report that
complies with the requirements of AC58 for a specific anchor in the same
configuration as tested. Supporting data shall include the Seismic Qualification
test performed in accordance with the procedures of Section 5.3.7 of AC58.
Commentary:
As strength level capacities are developed to meet ACI 355.2, or ACI 318 Appendix
D provisions, those capacities should be based on the capacities either listed or
determined in accordance with the ICC ES Report.
2.2.2
Where epoxy-type (adhesive) anchors are used for structural applications, such
as dowels between new and existing concrete, the anchors shall be installed in a
manner such that the ultimate tensile capacity is controlled by the ultimate
strength of the steel element.
Exception: Epoxy-type (adhesive) anchors which cannot develop
the tensile capacity of the steel element may be used to transfer shear forces
only, provided that the loads on the anchor are amplified by factor of 4.0.
Alternatively, allowable shear capacity may be based on bolt shear capacities
obtained from Table 19A-D, 2001 CBC.
When epoxy-type (adhesive) anchors are used to resist tensile forces in
structural applications, the minimum depth of embedment shall be greater than
or equal to the development length, ld, determined in Section 1912A.1 for a castin-place reinforcing bar of the same diameter and grade when considering a
tensile splitting failure mode. Where tensile splitting need not be considered, the
depth of embedment may be determined in accordance with Appendix D of ACI
318-02 as amended by Section 3.3 of AC 308.
2.3
2.3.1
Screw Anchors. Screw anchors are not directly addressed by Section 1923A.3.5,
2001 CBC. The fastener is produced from hardened steel with threads, similar in
appearance to a lag bolt. Screw anchors may be used, provided the allowable shear
and tension loads are determined in accordance with the following:
The allowable values listed in an ICC ES Report, with special inspection, may be
used for allowable stress design, provided the report states that the anchors were
tested in accordance with AC106, latest revision, including the seismic
qualification tests of AC106 Section 4.6.
Post-Installed Anchors
in Concrete
Page 5 of 8
Commentary:
As strength level capacities are developed to meet ACI 355.2, or ACI 318 Appendix
D provisions, those capacities should be based on the capacities either listed or determined in
accordance with the ICC ES Report.
2.3.2
2.3.3
2.3.4
The use of screw anchors is not permitted in overhead applications or for discrete
hold down forces, such as shear walls.
Commentary: There is very little experience data on the performance of these anchors installed in
the tension zone of concrete members. Until cracked concrete testing methods are adopted
and incorporated into ICC Acceptance Criteria, similar to ACI 355.2, screw anchors cannot be
used overhead. In addition, the high Rockwell hardness of some screw anchors may make
them susceptible to hydrogen embrittlement.
Screw anchors may be very effective in sill bolting applications to reduce the possibility of
concrete splitting due to edge distance limitations, and a reduction or elimination of expansion
pressures associated with bolt installation.
2.4
2.4.1
3.
EMBEDMENT, SPACING, AND EDGE DISTANCE. All anchors shall meet the
minimum embedment, spacing, edge distance, and slab thickness criteria established by the
relevant ICC-ES Report.
3.1
Unless otherwise noted in the Report, the edge distance should be a minimum of ten
(10) bolt diameters from the free edge of the slab and center-to-center spacing
should be a minimum of twelve (12) bolt diameters. If the edge distance is less than
ten (10) diameters, and the load is directed toward the free edge, the allowable
shear load should be reduced per Section 1923A.3.3.
4.
UNDERSIDE OF BEAM/SLAB INSTALLATIONS. Except as noted in Section
2.1, all expansion type anchors installed in the underside of a beam/slab should use the
reduced allowable design load values determined in Sections 2.1.1 and 2.1.2.2 of this IR.
4.1
The allowable design loads in Sections 2.1.1 or 2.1.2.1 may be used for expansiontype anchors installed in the underside of a beam/slab, provided the installation
meets one of the following criteria:
Post-Installed Anchors
in Concrete
Page 6 of 8
4.1.1
The design engineer provides information that indicates the anchor installation
will occur in the negative moment (-M) region of the beam/slab, considering
unbalanced loading, or
4.1.2
Data is submitted to indicate that specific anchor is suitable for use in cracked
concrete (testing per ACI 355.2, Table 5.2, including Annex 1 of AC193), or
4.1.3
The anchor is installed in the high flute (rib) of the metal deck in a concrete on
metal deck assembly, or
4.1.4
The anchor is installed with sufficient embedment that the load transfer zone is
above the neutral axis of the beam/slab.
Exception: If the slab is intended to serve as a diaphragm for
transferring seismic forces to other lateral-load resisting elements, anchors to
be installed must be qualified per 4.1.2 above or the reduced allowable design
load values determined in Sections 2.1.1.1 and 2.1.2.1 must be used.
4.2
When installing expansion-type anchors through the low flutes of metal deck into
concrete, the anchors should be placed as close to the center of the flute width as
practicable. The deck shall be 20 ga. minimum thickness per CBC Section 2205A.4.1
and the flute width shall meet or exceed the value set forth in the ICC-ES Report for
the anchor. The minimum effective depth of embedment shall be as noted in the
ICC-ES Report for the anchor.
Commentary: Several deck manufacturers have a small rib that runs down the middle of the low
flute of deck. This rib is problematic as the drill bit will have a tendency to walk down the
rib. An offset in the hole is acceptable so long as the hole is as close as possible to the center
of the deck.
5.
TESTING AND INSPECTION REQUIREMENTS. Post-installed anchors shall
be tested in accordance with the provisions of Section 1923A.3.5, by an LEA accepted
testing facility, unless approval of an alternative individual is obtained in advance from the
DSA Field Engineer for the project.
If any anchor fails testing, test all anchors of the same type, not previously tested until
twenty (20) consecutive anchors pass, then resume the initial test frequency. If the
anchors are used for the support and bracing of non-structural components (pipe, duct or
conduit), the twenty (20) shall be only those anchors installed by the same trade. Refer to
Note 8 on the Test Values Table (attached) for acceptance/failure criteria.
Regardless of which test method is chosen by the consultant, test values and all appropriate
criteria shall be shown on the contract documents.
5.1
Expansion-type Anchors
5.1.1
Setting verification:
5.1.1.1
5.1.1.2
Post-Installed Anchors
in Concrete
Page 7 of 8
Commentary: Torque-controlled anchors (wedge anchors, sleeve anchors) should be limited in the
number of turns required to develop the specified installation torque. An excessive number of
turns could indicate a failure to set and also reduces the effective embedment of the anchor.
Most anchors should not require more than 2-3 turns (after the parts are snug) to set
properly. The degree of bolt projection conforming to proper set should be established for the
specific anchor being inspected. The tension performance of displacement-controlled anchors
(drop-ins) depends in large part on the degree to which the plug is driven into the anchor shell
during installation (i.e., the plug displacement).
5.1.2
Testing: An acceptable testing procedure is attached to this IR. The test load
may be applied by any method that will effectively measure the tension in the
anchor, such as direct pull with a hydraulic jack, calibrated spring loaded devices,
or a calibrated torque wrench. Displacement-controlled anchors such as drop-ins
shall not be tested using a torque wrench.
Required test loads may be determined by either of the following methods:
5.1.2.1
5.1.2.2
Tension or torque test values from the table and procedures attached to this
IR.
Anchors tested with a hydraulic jack should exhibit no discernable movement
during the tension test, e.g., as evidenced by loosening of the washer under
the nut.
Anchors tested with a calibrated torque wrench must attain the specified
torque within 1/2 turn of the nut.
Exceptions: Undercut anchors that are so designed to allow visual
confirmation of full set, need not be tension or torque tested.
If the manufacturers installation torque is less than the specified test torque,
use the manufacturers specified installation torque for testing the anchor.
5.2
5.3
Commentary: Screw-type anchors that are installed improperly (either over tightened or over-sized
holes) would typically exhibit excessive movement, or spinning in the hole at relatively low
torque values. Tension testing of these anchors is not necessary as the testing procedure
would require partial removal/withdrawal of the anchor to facilitate testing.
TEST VALUES
Hardrock or Lightweight Concrete
ANCHOR
Diameter
(in.)
1/4
5/16
3/8
1/2
5/8
3/4
1
WEDGE
Load
(lbs.)
800
1100
2000
2300
3700
5800
Torque
(Ft. lbs.)
10
25
50
80
150
250
SLEEVE
Load
(lbs.)
400
400
700
900
1100
1400
-
Torque
(Ft. lbs.)
4
5
10
20
45
90
-
SHELL
Load
(lbs.)
1000
1400
1800
2700
3700
5400
-
Torque
(Ft. lbs)
-
SCREW
Torque
(Ft. lbs.)
10
10
10
20
-
NOTES
1. Anchor diameter refers to the thread size for the WEDGE & SHELL categories, and to the anchor
outside diameter for the SLEEVE category.
2. Apply proof test loads to WEDGE & SLEEVE anchors without removing the nut if possible. If not,
remove nut and install a threaded coupler to the same tightness as the original nut using a torque
wrench to apply the test load.
3. For SLEEVE/SHELL internally threaded categories, verify that the anchor is not prevented from
withdrawing by a baseplate or other fixtures. If restraint is found, loosen and shim or remove
fixture(s) prior to testing.
4. Reaction loads from test fixtures may be applied close to the anchor being tested, provided the
anchor is not restrained from withdrawing by the fixture(s).
5. SHELL type anchors should be tested as follows:
a. Visually inspect 25% for full expansion as evidenced by the location of the expansion plug in
the anchor body. Plug location of a fully expanded anchor should be as recommended by
the manufacturer, or, in the absence of such recommendation, as determined on the job site
following the manufacturers installation instructions. At least 5% of the anchors shall be
proof loaded as indicated in the table above, but not less than three anchors per day for
each different person or crew installing anchors, or;
b. Test installed anchors per Section 1923A.3.5
6. Test equipment (including torque wrenches) is to be calibrated by an approved testing laboratory in
accordance with standard recognized procedures.
7. Alternate torque test procedures and test values for SHELL type anchors may be submitted to the
enforcement agency for review and approval on a case-by-case basis when test procedures are
submitted and approved by the enforcement agency.
8. The following criteria apply for the acceptance of installed anchors:
a. HYDRAULIC RAM METHOD: The anchor should have no observable movement at the
applicable test load. For wedge and sleeve type anchors, a practical way to determine
observable movement is that the washer under the nut becomes loose.
b. TORQUE WRENCH METHOD: The applicable test torque must be reached within the
following limits:
i. Wedge or Sleeve type: One-half (1/2) turn of the nut.
ii. One-quarter (1/4) turn of the nut for the 3/8 in. sleeve anchor only.
9. If the manufacturers recommended installation torque is less than the test torque noted in the table,
the manufacturers recommended installation torque should be used in lieu of the tabulated values.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 19-2
Issued 9-1-99
Supercedes IR 10-1 (7/96)
This interpretation is intended for use by the plan review and field engineers of DSA to indicate an acceptable method for achieving
compliance with applicable codes and regulations. Its purpose is to promote more uniform statewide criteria for use in plan review
and supervision of construction of public schools, community colleges and essential services buildings. Other methods proposed by
design professionals to solve a particular problem may be considered by DSA and reviewed for code and regulation compliance.
Purpose: This IR provides guidelines for the acceptance of glass fiber reinforced concrete
(GFRC) panels by the Division of the State Architect (DSA).
1. Definition. Glass fiber reinforced concrete is the term applied to products manufactured
using a cement/aggregate slurry reinforced throughout with alkali-resistant glass fibers. GFRC is
typically used in thin-walled architectural cladding panels with a minimum thickness of 1/2".
2. Product Description. Mix composition, degree of compaction, type of cement, and the
proportion, length and orientation of glass fibers may all be varied to produce a specific product.
Typically, a GFRC panel consists of 5% by weight (of total mix) alkali-resistant glass fiber
(absolute minimum of 4%) combined with a portland cement/sand slurry (cement/sand ratio not
less than 1:1 nor greater than 3:1). Panels are fabricated using a spray-up process. An alternate
method of fabrication uses a GFRC premix, which consists of 3% to 4% by weight (of total mix)
pre-chopped alkali-resistant glass fiber combined with a portland cement/sand slurry. Panels,
utilizing the GFRC premix, are fabricated by placing the slurry into molds in a manner similar to
precast concrete. Curing is provided with the use of a thermoplastic copolymer admixture, which
retains moisture in the mix until adequately cured, or by moist curing. Admixtures such as waterreducers, accelerators, retarders and air-entraining agents may be used.
GFRC manufactured in accordance with the recommendations of the PCI Recommended
Practice for Glass Fiber Reinforced Concrete Panels, 3rd Edition, has shown a history of good
performance in resistance to weather and water penetration. A weather-resistive coating,
however, is recommended over the GFRC panel, along with approved joint caulking
compounds, to create a complete weather-resistive barrier.
3. Plant Fabrication and Quality Control Requirements of Precast GFRC Panels. The
following requirements apply to all GFRC panels regardless of the fabrication process (spray-up
or premix).
3.1 A testing and inspection program shall be provided by the design professional in responsible
charge, shall be approved by DSA, and shall be referenced on the project Test and Inspection
List. The program for the specific project shall require the testing and inspection provisions of
the following sections.
3.2 GFRC panels shall be fabricated under the PCI Recommended Practice for Glass Fiber
Reinforced Concrete Panels, 3rd Edition. The manufacturer shall have an established quality
control program which meets the requirements of the PCI Manual for Quality Control for Plants
and Production of Glass Fiber Reinforced Concrete Products, including the testing and
inspection requirements of Part A, Division II, and utilizing the test procedures of Appendix F,
except as noted below. Verification shall be provided by 1) a DSA review of the manufacturers
quality control manual, or 2) certification under the PCI Plant Certification Program. (A copy of
the certificate shall be provided to DSA.)
IR 19-2 Page 2 of 3
3.2.1 The acceptance criteria for the Flex Anchor and Gravity Anchor Pull-off and Shear Tests,
Part A, Division II, Section 2.1.5, Production Testing - After Curing is that the minimum ultimate
strength at failure shall achieve three times the design load required by CBC,Section
1631A.2.4.2.5.
3.3 The manufacturing of the GFRC panels and the testing of the panels and connections shall
be continuously inspected by a DSA approved independent inspection agency. The approved
agency shall submit an affidavit at completion of fabrication stating that the panels and all
components have been fabricated in all material respects in accordance with the DSA approved
plans and specifications.
Exception: Continuous inspection is not required when plants are currently approved
under the PCI Plant Certification Program.
3.4 All panels shall be marked with the approved inspectors identification mark, and a list of
approved panels shall be provided to the project Inspector of Record (IOR) and DSA.
Exception: Panel identification by an approved inspector is not required when plants are
currently approved under the PCI Plant Certification Program.
3.5 The testing program of premix products may be modified as it applies to specific panels.
3.6 All test reports shall be sent to the architect, structural engineer, IOR and DSA within five (5)
working days of the completion of each test.
4. Specifications for GFRC Panels. Specifications should include the following:
1. GFRC panels shall be fabricated in accordance with the PCI Recommended Practice for
Glass Fiber Reinforced Concrete Panels, 3rd Edition, as modified below. The
manufacturer shall have an established quality control program that meets the
requirements of the PCI Manual for Quality Control for Plants and Production of Glass
Fiber Reinforced Concrete Products.
2. Requirements to provide corrosion protection for the stiffening frames, anchors,
connectors and inserts.
3. Mix design requirements for the GFRC backing material. The cement/sand ratio shall not
be less than 1:1 nor greater than 3:1
4. Requirement for glass fiber material. Only alkali resistant fiber may be used.
5. Bonding material for panel connectors.
6. Strength, strain and shrinkage requirements.
7. Requirement that the designs for in-service conditions be based on fully aged strength
and strain properties.
8. Admixtures to be used. Admixtures containing calcium chloride shall not be used.
9. Description of the required testing procedures and apparatus.
10. Requirement for reporting test results to Architect, Structural Engineer, IOR and DSA.
11. Requirement for continuous fabrication inspection by an approved independent
inspector, unless the plant is currently certified under the PCI Certification Program.
5. Drawings for GFRC Panels. Drawings for the GFRC panels should include the following:
IR 19-2 Page 3 of 3
1. Details for panel connectors; dimensions and thickness of bonding material; embedment
dimension of panel anchors connectors in bonding material; dimension for weld length of
anchor to steel stud framing.
2. Detail of enlarged or slotted hole to allow for erection tolerances and for sliding of panel,
when floor to floor lateral drift is considered, without the yielding of rods. Drawings shall
indicate the acceptable clearance between the connector rod and the sides of the hole,
as determined by the design professional, to allow for movement without rod yielding.
3. For rectangular support tubes, indicate orientation.
4. Clearly identify the boundary and interface between GFRC Panel and supporting
structural members on the design drawings.
6. Design for GFRC Panels by the Manufacturers Engineer.
6.1 Check panel to structure connectors for buckling.
6.2 Check all structural members (tubes, angles, etc.) and connections to members that support
GFRC panels and tie them to the structure.
6.3 Provide calculations for the design of the sub-frame to support the panels.
6.4 Provide calculations for the design of the GFRC panels for dead load, live load, wind load,
earthquake load, the effects of creep, shrinkage and other moisture induced elements, and the
effects of temperature change as applicable. Consider differences in the thermal and moisture
induced strain properties of the facing and the backing.
7. Design Considerations for Project Design Engineer.
Check structural members and their connections for the torsional, vertical and lateral loads
imposed by the GFRC panels.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 19-3
Issued 06-10-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This IR provides general requirements for acceptance and use of concrete mixes
containing a significant amount of fly ash or natural pozzolans as a substitute for Portland
cement, for projects under DSA jurisdiction. This IR describes the DSA requirements for the
use of fly ash, which also apply to the use of raw or calcined natural pozzolans.
Scope: This IR is applicable for all concrete mixes utilizing fly ash or natural pozzolans in
excess of 15% by weight, per 2007 California Building Code, Section 1903A.5.
This IR does not address issues related to constructability, curing, rate of strength gain,
admixture compatibility, or sampling and testing. The design professional in responsible
charge of the project shall clearly delineate all special requirements or procedures in the
construction documents. Individuals experienced in the use of concrete mix designs using
fly ash should be consulted, especially for mixes exposed to freeze / thaw or deicing
chemicals.
Background: Conventional or standard concrete mixes, as the term is used in this IR,
typically contain from 0 to 15% fly ash by weight. The percentage of fly ash is usually
expressed as the percent fly ash, by weight, of all the cementitious materials (cement and
fly ash) in the mix. Because Class F fly ash is a by-product of the combustion of coal, a
concrete mix containing significant amounts of fly ash is being recognized as a green
product. Compared to Portland cement, it offers these environmental benefits:
There are other benefits such as improved workability and durability, reduced permeability
and water demand, and lower heat of hydration. However, there are also some drawbacks
such as extended curing time, and slower early strength gain, which may impact testing and
handling of samples, and construction schedules (e.g: form and shoring removal). A special
strength testing specification may be necessary.
1.
Material:
1.1
Fly Ash: Fly ash and raw or calcined natural pozzolans shall meet the American
Society of Testing and Materials (ASTM) standard specification C 618-05 for Class N
or F (Class C fly ash is not permitted). Per ASTM C 618, sampling and testing of fly
ash shall be in accordance with ASTM C 311.
Page 1 of 3
Page 2 of 3
Fly ash shall be supplied by an experienced producer that complies with all
applicable standards (e.g. ASTM C 618, ASTM C 311).
Fly ash shall be from one source for the duration of the project unless additional
physical testing of the changed mix is preformed, per Section 2 below.
1.2
Other Material Components: All other materials used in the concrete mix shall
meet the requirements of Chapter 3 of ACI 318.
2.
2.1
General: For all mix designs, concrete proportions shall be selected by a registered
civil engineer with experience in concrete mix design, and shall be determined in
accordance with the provisions of ACI 318, Section 5.2. All mix designs shall be
identified by a mix design identification number. The civil engineer shall prepare and
submit a mix design report to the DSA approved (LEA) testing laboratory for review.
Mix design reports shall include all the data as required to verify conformance with
ACI 318, Section 5.2 and 5.3, and the following:
Cement certification
Admixture data
The report shall also bear the signature and seal of the registered engineer
responsible for proportioning in accordance with DSA Interpretation of Regulation IR
A-19, Section 1.1.
2.2
Mix Designs Utilizing 15% Or More Fly Ash: Proportioning shall be based on field
experience or trial mixtures, or both, per ACI 318, Section 5.3. Proportioning per ACI
318, Section 5.4 (without field experience or trial mixtures) is not permitted.
2.3
Mix Design Review and Approval Process: An engineer from a DSA approved
(LEA) testing laboratory shall review the mix design report and the design
professional in responsible charge of the project shall approve the mix design.
2.3.1
2.3.2
2.3.3
2.4
Page 3 of 3
Record Keeping: The LEA engineer and project inspector shall maintain a copy of
the approved mix design report, the approval letter from the engineer in general
responsible charge, and the documents submitted by the concrete supplier and make
them available to DSA upon request.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 21-1
Revised 09-18-07
Issued 09-01-1999
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
non-bearing wall, which is not part of the structural system of a building. In general,
construction is as required for non-bearing partitions except that minimum thickness
permitted is six inches. Wall reinforcement is as required for design loads with minimum of
#4 @ 24" o.c. vertical for running bond, or #4 @ 16" o.c. for stacked bond. Horizontal steel
is to be 0.001 times the nominal cross sectional area and may be spaced up to 4'-0" o.c.
maximum. Cells containing reinforcement shall be grouted. Though walls less than six
feet high are not required to be approved by the Division of the State Architect (DSA), if
shown on drawings, the design should consider the above requirements.
2. Grouting: If a 16" grout lift is called for, horizontal steel spacing should be 16" o.c. The
high lift grout method will be allowed for both brick and block walls when the design
indicates the use is feasible. Specifications should include the procedures outlined in DSA IR
21-2 and IR 21-3.
3. Thickness of Walls: In figuring stresses use the net dimensions of the block or brick
walls. It is not necessary to deduct for raked or tooled joints less than 1/2" in depth.
4. Wall Projection Beyond Foundation: The maximum allowable projection for a
brick wall is one-half brick for a block wall, the shell thickness minus 1/2". Design the wall
to be capable of carrying its load on the reduced area.
5. Concentrated Loads: Extra bars are necessary only when required by design. For
concentrated loads causing eccentric moments, use four times the wall thickness plus length
of bearing to compute bending stresses for interior supports. Use two times the wall
thickness plus length of bearing for support at ends of walls.
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 21-2
CONCRETE MASONRY
HIGH LIFT GROUTING METHOD
References:
2001 California Building Code (CBC), Title 24, Part 2,
Sections 2104A.6 and 2105A.7
2007 CBC, Section 2104A.6
Discipline: Structural
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
requirements and procedure for high lift concrete masonry grouting when the high lift
method is specified on the DSA approved plans and specifications.
1.
Description: The high lift grouting method as developed for use in reinforced
concrete block masonry is intended for use on wall construction where openings, block
pattern arrangements, reinforcing steel, or embedded structural steel details do not prevent
the free flow of grout or inhibit the use of mechanical vibration to properly consolidate, and
reconsolidate, the grout in all cells or horizontal grout spaces.
1.1
Procedure: The high lift method requires that all masonry units, reinforcing steel
and embedded items will be in place before grouting of the wall commences. The
work shall be so arranged that once grouting of a section of wall is started the
grouting shall proceed in lifts without stopping, except as noted below, until the full
height of the prepared section is poured. The waiting period between lifts shall be
limited to the time required to obtain an initial consolidation of grout. This also allows
for a reduction in hydrostatic pressure of the grout on the masonry unit and reduces
the possibility of "blow-outs."
1.2
Grout: The grout shall be a high-slump workable mix, preferably placed by pumping
to permit continuous pouring. The grout shall be worked into all voids. Mechanical
vibrators shall be used for consolidation and reconsolidation. Where job conditions
preclude such use, other methods may be employed if approved in advance by DSA.
Because of the high water/cement ratio used in this type of grout, it is essential that
the grout be reconsolidated after it has taken on a plastic consistency, but prior to
taking an initial set. The reconsolidation is intended to overcome settlement
shrinkage, separation from the reinforcing steel and to promote bonding to the
masonry unit shells.
1.3
Pour: For the purpose of this IR, a "pour" is considered as the entire height of grout
fill placed in one day and is composed of a number of successively placed grout lifts.
A "lift" is the layer of grout placed in a single continuous operation.
The maximum height of pour is limited by the practical considerations of segregation
of grout due to the height of free fall, the effect of dry grout deposits left on block
projections, congestion due to reinforcing steel and embedded items, and the ability
to effectively reconsolidate the grout. Unless specifically approved otherwise, the
maximum height of pour will be 12 feet for walls with a nominal thickness of less
DSA IR 21-2
(rev 12-17-09)
Concrete Masonry
High-Lift Grouting Method
Page 1 of 6
DSA IR 21-2
(rev 12-17-09)
Concrete Masonry
High-Lift Grouting Method
Page 2 of 6
than 12 inches, and 16 feet for walls with a nominal thickness of 12 inches or more.
For height of lift see Section 4.10.1 of this IR.
2.
Quality of Materials: All materials shall conform to 2007 CBC, Section 2103A
(Section 2102A in the 2001 CBC), with the following additional requirements:
2.1
Aggregate. Aggregate for grout shall conform to Section 2103A.12.3 of the 2007
CBC (Section 2103A.4.3 of the 2001 CBC) except when alternatives are specifically
approved by the architect or structural engineer and DSA.
2.2
Admixture. The grout shall contain an admixture of the type that reduces early
water loss to the masonry units and produces an expansive action in the plastic
grout sufficient to offset initial shrinkage and promote bonding of the grout to all
interior surfaces of the masonry units. Admixtures shall have an listing from ICC-ES
or other acceptable evaluation agency per IR A-5. The approval of the architect or
structural engineer and DSA is required for the use of any admixture.
3.
3.1
Mortar: Mortar shall comply with the requirements of 2007 CBC, Section 2103A.8
(Section 2103A.3 in the 2001 CBC), with the following additional requirements:
3.1.1
Place approximately half of the required water and sand into the mixer while it is
running.
3.1.2
Add cement, the remainder of the sand, and water in that order and mix for a
period of at least two minutes.
3.1.3
Add lime and continue mixing as long as needed to achieve a uniform mass.
3.1.4
Exception:
3.2
Grout: The grout mix shall comply with the requirements of 2007 CBC, Section
2103A.12 (Section 2103A.4 in the 2001 CBC).
Sufficient water may be added to make a workable mix that will flow into all voids of
the masonry without separation or segregation. The slump of the grout shall be 8 to
11 inches per ACI 530.1, Article 2.6 B.2 and ASTM C476, Section 4.2.2.
Grout mixes shall contain an approved admixture conforming to the requirements of
Section 2.2 above. Admixture shall be used in strict accordance with the
manufacturer's instructions and appropriate listing from ICC-ES or other acceptable
evaluation agency per IR A-5 .
3.3
Mixing of Grout: The mixing of grout shall conform to the requirements of ASTM
C476. The procedure used and timing for adding the admixture to the grout mix shall
conform with admixture manufacturers instructions.
3.4
Tests: Testing of mortar and grout shall conform to the requirements of 2007 CBC,
Section 2105A.5 (Section 2105A.3.4 in the 2001 CBC).
4.
Construction: The construction of high lift concrete block masonry work shall
conform to the requirements of CBC, Chapter 21A, with the following additional
requirements:
DSA IR 21-2
(rev 12-17-09)
Concrete Masonry
High-Lift Grouting Method
Page 3 of 6
4.1
Foundations: The contact surface of all foundations and floors that are to receive
masonry work shall be thoroughly cleaned and roughened in accordance with 2007
CBC, Section 1906A.4.1 (Section 1906A.4 in the 2001 CBC) before start of block
placement. Protect the roughened surface during construction to assure a good bond
between the grout fill and the concrete surface.
4.2
Cleanouts: Provide cleanout openings for all walls at the bottom of every cell for
each pour in accordance with 2007 CBC, Section 2104A.6.1.2.3 (Section
2104A.6.1.2.3 in the 2001 CBC). However, if the course at the bottom of the pour is
constructed entirely of inverted open-end bond beam units, cleanout openings need
only be provided in the reinforced cells.
The openings shall be made prior to the laying of masonry units and be of sufficient
size and location to allow thorough removal of all mortar droppings and debris.
After the laying of masonry units is completed, the cells cleaned, the reinforcing stell
positioned, and the inspection completed, close the cleanouts by inserting face shells
of masonry units or covering the openings with forms. Face shell plugs shall be
adequately braced to resist the hydrostatic pressure exerted by the grout in its fluid
phase.
4.3
4.4
4.5
Laying: Fill all head and bed joints solidly with mortar for a distance in from the face
of the unit not less than the thickness of the face shell. Take care in placing the
mortar to minimize its dropping into the block cells. Arrange open-end concrete
masonry units used in stacked bond so that closed ends are not abutting.
Consolidate mortar adequately by tooling to form a tight bond with the concrete
masonry unit, and to enhance the water resistance of the assemblage.
4.6
Wall Ties and Bracing: When stacked bond is used, or when adequate cross webs
between face shells are not provided, use ties of heavy gage wire embedded in the
horizontal mortar joints across continuous vertical joints or between face shells to
prevent "blow-outs" due to the hydrostatic pressure exerted by the grout in its fluid
phase. External ties or braces may also be used for this purpose.
During construction, adequately brace ungrouted walls to resist wind and other
forces.
4.7
Mortar Droppings and Overhangs: Mortar that projects into the grout space more
than shall be removed. Thoroughly remove mortar droppings
from the
foundation or bearing surface, cell walls and reinforcing steel. An acceptable method
DSA IR 21-2
(rev 12-17-09)
Concrete Masonry
High-Lift Grouting Method
Page 4 of 6
is to cover the exposed surface of the foundation with a minimum one inch thick
layer of dry sand, and then dislodge any hardened mortar from the cell walls and
reinforcement with a pole or rod. Remove the mortar debris and the sand cover
prior to clean up and grouting.
4.8
4.9
Grouting:
4.9.1
4.9.1.1
All cleanout closures, reinforcing steel, and embedded items shall be properly
secured in place.
4.9.1.2
For grout pours over twelve feet in height (only permitted for walls with a
nominal thickness of 12 inches or more) the minimum grout space
dimensions of all cells shall be three inches by four inches,
No cell shall contain vertical reinforcing steel exceeding six percent of the
cell area,
4.9.1.3
All equipment used for grouting shall be functional, appropriate and adequate
for the intended task.
4.9.1.4
4.9.2
To reduce the possibility of "blow-outs," do not pour grout until the mortar has
adequately cured. Grout the walls as soon as possible after mortar has cured to
reduce shrinkage and cracking of the vertical joints.
4.9.3
DSA IR 21-2
(rev 12-17-09)
Concrete Masonry
High-Lift Grouting Method
Page 5 of 6
engineer, and DSA, and shall keep records of the blow-out damage and any
repair procedures for review by the DSA field engineer.
4.10
Grouting Procedure:
4.10.1
Transport grout from the mixer to the point of deposit in the grout space as
rapidly as practical by means and methods which will prevent segregation of the
mix and minimize grout splatter on reinforcing steel and masonry unit surfaces
not being encased in the grout pour. Depending on weather conditions and
absorption rates of the masonry units, the lift heights and waiting periods may be
varied. For construction under weather conditions other than cold or hot
weather construction, as defined in 2007 CBC Sections 2104A.3 and 2104A.4
respectively, the individual lifts of grout shall be limited to four feet in height with
a waiting period between lifts of 30 to 60 minutes. No lift shall exceed four feet
in height without prior written DSA approval.
4.10.2
Place the first lift of grout to a uniform height within the pour section and
mechanically vibrate thoroughly to fill all voids. Vibration shall follow closely
behind grout placement and at the same pace as the grouting operation.
4.10.3
When the grout becomes plastic, but before initial set, pour the succeeding lift
and vibrate alternate cells twelve to eighteen inches into the preceding lift to
reconsolidate the preceding lift and close any plastic shrinkage cracks or
separations from the cell walls.
4.10.4
4.10.5
The waiting, pouring and reconsolidation steps shall be repeated to the top of the
pour. The top lift shall be reconsolidated after the required waiting period to fill
any space left by settlement shrinkage.
4.10.6
Provisions, such as drypacking, shall be made to provide solid bedding for nailers
at the tops of walls.
4.11
4.12
Curing: Attention shall be given to proper curing of the mortar and grout.
4.13
Cleaning Wall: Immediately after the wall has been fully grouted, water pressurized
through a jet nozzle shall be used to remove stains which have percolated through
the blocks and joints.
5.
5.1
DSA IR 21-2
(rev 12-17-09)
Concrete Masonry
High-Lift Grouting Method
Page 6 of 6
approved for that purpose by DSA. A qualified individual acceptable to the testing
laboratory shall make test samples and perform such field tests as are required.
The special masonry inspector shall check the materials, details of construction and
construction procedure. The inspector shall furnish a verified report on Form DSA292 certifying that of his or her own personal knowledge the work covered by the
report has, in every material respect, been performed in compliance with the DSA
approved construction documents.
5.2
Core Tests: Core samples of the completed masonry construction shall be taken in
accordance with 2007 CBC, Section 2105A.4 (Section 2105A.3.1 in the 2001 CBC).
All core samples shall be submitted to the testing laboratory for examination and
testing.
A representative of the testing laboratory shall inspect the coring of the masonry
walls and prepare a report of the coring operations. The report shall include the
following:
detailed description of the bond between the grout fill and the cell walls of the
masonry unit and
any difficulties encountered in the coring operation which might impair the
strength of the sample
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 21-3
Issued 9-1-99
Supercedes IR 24-5 (3/90)
This interpretation is intended for use by the plan review and field engineers of DSA to indicate an acceptable method for achieving
compliance with applicable codes and regulations. Its purpose is to promote more uniform statewide criteria for use in plan review
and supervision of construction of public schools, community colleges and essential services buildings. Other methods proposed by
design professionals to solve a particular problem may be considered by DSA and reviewed for code and regulation compliance.
Purpose: The purpose of this IR is to provide the requirements and procedure for high lift clay
brick masonry grouting when the use of this method is approved by the Division of the State
Architect (DSA).
1. Description. The high lift grouting method has been developed for use on wall construction
consisting of two wythes of brick masonry bonded to a grout core which contains the vertical
and horizontal reinforcing. The wythes are connected by wire ties laid in the mortar joints at a
spacing adequate to resist the hydrostatic pressure of the fluid grout during the pouring
operation.
Use of this method should be restricted to walls where openings, arrangement of piers, special
reinforcing details, or embedded items do not prevent the free flow of grout or inhibit the use of
mechanical vibration to properly consolidate the grout core. Horizontal reinforcing or embedded
items such as structural connections or electrical conduit should be positioned so as to allow
maximum accessibility to the grout space.
The procedure requires that all masonry units, reinforcing steel and embedded items are in
place before grouting of the wall commences. Arrange the work so that once the grouting of a
section of wall is started, the grouting proceeds in lifts without stopping except as noted below,
until the full height of the prepared section is poured. The waiting period between lifts is limited
to the time required to obtain an initial consolidation of grout due to settlement, shrinkage and
absorption of excess water by the masonry units. The waiting period reduces the hydrostatic
pressure of the grout on the masonry wythes and reduces the possibility of "blow-outs."
The grout is to be a workable mix, preferably placed by pumping, to permit continuous pouring
and is to be worked into all voids with mechanical vibrators. Because of the high water/cement
ratio used in this type of grout, it is essential that the grout be reconsolidated after it has taken
on a plastic consistency, but prior to taking an initial set. The reconsolidation is intended to
overcome settlement shrinkage, separations from the reinforcing steel and to promote bonding
to the masonry unit walls.
For the purpose of this IR, a "pour" is considered as the entire height of grout fill placed in one
day and is composed of a number of successively placed grout lifts. A "lift" is the layer of grout
placed in a single continuous operation.
The maximum height of pour is limited by the practical considerations of segregation of grout
due to the height of free fall, effect of dry grout deposits left on the bonding face of the masonry
units and reinforcing steel and the ability to effectively reconsolidate the grout. Unless
specifically approved otherwise, the maximum height of pour is sixteen feet for walls with a
single curtain of reinforcing steel (less than 12" thick) and twenty feet for walls with two curtains
of reinforcement (12" or more in thickness). The minimum grout space width is 3 " and the wall
shall be constructed so as to preserve an unobstructed vertical alignment of the grout space.
IR 21-3 Page 2 of 5
2. Quality of Materials. All materials are to conform to CBC, Section 2102A with the following
additional requirements:
1. Pea Gravel. Pea gravel for grout is to conform to ASTM C404 Aggregates for Grout,
except when other gradings are specifically approved by the architect or structural
engineer and DSA.
2. Coarse Aggregate. Coarse aggregate as for concrete, when permitted in grout fill, is to
conform to CBC, Section 1903A.3.
3. Admixture. The grout should contain an admixture of the type that reduces early water
loss to the masonry units and produces an expansive action in the plastic grout sufficient
to offset initial shrinkage and promote bonding of the grout to all interior surfaces of the
masonry units. Obtain the approval of the architect or structural engineer and DSA for
use of the admixture.
3. Mortar and Grout.
3.1 Mortar. Mortar is to comply with the requirements of CBC, Section 2103A with the following
additional requirements:
1. Place approximately half of the required water and sand into the mixer while running.
2. Add cement and the remainder of the sand and water into the mixer in that order and
mix for a period of at least two minutes.
3. Add lime and continue mixing as long as needed to secure a uniform mass.
4. The total mixing time may not be less than 10 minutes.
3.2 Grout. The grout mix is to comply with the requirements of CBC, Section 2103A.4.
Sufficient water may be added to make a workable mix that will flow into all voids in the masonry
tiers without separation or segregation. The slump of the grout should be varied depending on
the rate of absorption of the masonry units and temperature and humidity conditions. The range
should be from eight inches (8") for units with a low rate of absorption (30 to 40 grams per
minute) up to ten inches (10") for units with a high rate of absorption (80 to 90 grams per
minute).
Grout mixes are to contain an approved admixture conforming to the requirements of Item 2 (3.)
above. Use such admixture strictly in accordance with the manufacturers instructions.
Where the width of the grout space exceeds five inches, grout using a coarser aggregate may
be used if the mix is designed in accordance with CBC, Section 1905A. The maximum size
aggregate is not to exceed one inch. The water per sack of cement may be greater than is
shown in CBC, Table 19A-A-8 to allow for absorption by the masonry units and sufficient
workability to meet the requirements given above.
3.3 Mixing of Grout. The mixing of grout is to conform to the requirements for mixing of
concrete, CBC, Section 1905A.8. Whenever possible, batch, mix and deliver grout in
accordance with the requirements for transit-mixed concrete.
Time the admixture addition in strict accordance with the manufacturers instructions. The
procedure used for adding it to the grout mix should provide for good dispersion.
IR 21-3 Page 3 of 5
3.4 Tests. Testing of mortar and grout is to conform to the requirements of CBC, Sections
2105A.3, 2105A.4 and 2105A.5.
4. Construction. The construction of high lift clay brick masonry work is to conform the
requirements of CBC, Chapter 21, with the following additional requirements:
1. Wall Make-Up. Lay brick level in two wythes with a separation for grout space not less
than 3 ". The minimum wall thickness is governed otherwise by CBC, Table 21A-R.
2. Foundations. Clean thoroughly and roughen the contact surface of all foundations and
floors that are to receive masonry work in accordance with CBC, Section 2906A.4 before
start of laying. Protect the roughened surface during construction to assure a good bond
between the grout fill and the concrete surface.
3. Cleanouts. Provide cleanout openings for all walls at the bottom of each pour. These
openings are to be made by omitting alternate bricks on one wythe of the wall or by
forming openings of equivalent size and spacing in the foundation.
After the laying of the masonry units is completed, clean all foreign material from the
bottom of the grout space and position the reinforcing steel. Have all preparatory work
approved by the inspector, then close the cleanout holes. The holes may be plugged
with brick units set in mortar or covered with forms. The brick plugs are to have a twoday minimum curing time or are to be adequately braced to resist the pressure of the
fluid grout.
4. Control Barriers. Place vertical barriers or dams to control the extent of the pours
horizontally. Such barriers may be formed of brick across the grout space (in full vertical
and horizontal joints of mortar) full height of wall. Dams are to be located where
designated by the architect or structural engineer.
5. Reinforcement. Place all reinforcing steel accurately in strict accordance with the
approved plans and specifications. Both horizontal and vertical reinforcing are to be held
in position by wire tie or spacing devices near ends and at intervals not exceeding 192
diameters of the reinforcement. Place the horizontal reinforcing as the work progresses
and the vertical reinforcing may be dropped into position after the completion of the
laying if adequate positioning devices are provided to hold the threaded reinforcement.
6. Laying Brick. The brick is to be clean and all dust or dirt removed from the surfaces
before laying. At the time of laying, all brick is to be damp and have a residual absorption
between 5% and 10%. Take special care when using units with different absorption
characteristics in the same wall.
Lay the brick in mortar with full shoved bed and head joints. Take care in placing the
mortar to keep a minimum of droppings from falling into the grout space. As the work
progresses, both of the wythes should be kept approximately at the same height to
accommodate the wall ties. Place the ties in the mortar bed and vertically align all ties to
facilitate the vibrating of the grout pours.
7. Cleaning the Grout Space. Thoroughly clean all mortar droppings from the construction
joint at the foundation and from the reinforcing steel. Remove all mortar projections
which extend more than one-quarter inch (1/4") into the grout space.
Recommended methods to maintain a clean horizontal construction joint at the
foundation are to cover the exposed foundation surface with a one-to-two inch layer of
IR 21-3 Page 4 of 5
sand to receive the mortar debris and, (1) removing mortar from reinforcing steel and
mortar projecting into the grout space from the mortar joists by hosing out the grout
space at least twice a day (at mid-day and quitting time) with a high pressure stream of
water or, (2) dislodging the mortar droppings and projections with a pole or rod as the
work progresses. After the lay-up of the wall is completed, remove the sand cover and
mortar debris at the bottom of the grout space. The surface of the foundation should be
left with clean aggregate exposed in the concrete matrix.
8. Wall Bracing. After construction of the masonry walls and prior to grouting, the walls
should be adequately braced against lateral forces and other construction hazards until
permanent supports are in place.
9. Grout Pours. In the High Lift Grouting Method, intermediate horizontal construction joints
are not permitted. Plan the work for one continuous pour of grout to the top of the wall in
four foot layers or lifts in the same working day. Should a blow-out, a breakdown in
equipment, or any other emergency stop the grouting operation, an alternate procedure
may be used with the approval of the architect or structural engineer and DSA. The total
length of wall to be grouted in any one pour is limited to the number of sections between
vertical control barriers in which each lift can be placed within one hour of the preceding
lift. To prevent "blow-outs," no grout should be poured unless the mortar of the brick
work has been allowed to set a minimum of three days in hot weather or five days in
cold, damp weather. After all droppings and foreign material have been removed from
the grout space (see Item 4 (7.) above), close the cleanout holes (see Item 4 (3.) above).
All reinforcing, bolts and embedded connection items should be rigidly held in position
before grouting is started.
In order to control the rate of absorption of the brick units at the time of grouting, pre-wet
the interior surfaces of the brick wythes prior to the start of the grout pour. Soak the
bricks thoroughly with water the evening prior to the start of the grouting. In the case of
hot, dry weather conditions it may be necessary to provide additional moistening of the
grout contact surface of the brick the day of the pour.
10. Grouting Procedure. Handle the grout from the mixer to the point of deposit in the grout
space as rapidly as practical by pumping and placing methods which will prevent
segregation of the mix and cause a minimum of grout splatter on reinforcing and
masonry unit surfaces not being immediately encased in the grout lift. Discard the grout
not in place within 1 hours after water is first added to the batch.
Depending upon weather conditions and absorption rates of the masonry units, the lift
heights and waiting periods may be varied. Under normal weather conditions with typical
masonry units, the individual lifts of grout are limited to four feet (4') in height with a
waiting period between lifts of 30 to 60 minutes.
Place the first lift of grout to a uniform height within the pour section and vibrate
thoroughly to fill all voids. This first vibration should follow immediately behind the
pouring of the grout by not more than ten feet (10'). For vibration or consolidation, use an
approved mechanical vibrator.
After a waiting period sufficient to permit the grout to become plastic, but before it has
taken any set, the succeeding lift should be poured and vibrated twelve to eighteen
IR 21-3 Page 5 of 5
inches (12"18") into the preceding lift. This reconsolidates the preceding lift and closes
any plastic shrinkage cracks or separations from the masonry units.
If the placing of the succeeding lift is going to be delayed beyond the period of
workability of the preceding lift, each lift is to be reconsolidated by reworking with a
second vibrator as soon as the grout has taken its settlement shrinkage. Repeat the
waiting, pouring and reconsolidation steps until the top of the pour is reached.
Reconsolidate the top lift after the required waiting period so that any space left by
settlement shrinkage is filled with grout.
11. Curing. Attention should be given to proper curing of the mortar joints as well as the
grout concrete pour. The brick masonry work and top of the grout pour should be kept
damp to prevent too rapid drying during hot or drying weather, and drying winds.
12. Cleaning Wall. Soon after the grout work is completed, all exposed brick faces showing
grout spotting should be washed down thoroughly with a pressure stream of water
through a jet nozzle. Subsequent cleaning may be necessary as the curing is taking
place and before final acceptance, and as directed by the architect.
5. Inspection and Core Tests.
5.1 Inspection. All masonry work is required to be continuously inspected during laying and
grouting by an inspector specially approved for that purpose by DSA. The inspector makes test
samples and performs such tests as are required by Item 4 (5.) above.
The special masonry inspector checks the materials, details of construction and construction
procedure. He will furnish a verified report stating that of his own personal knowledge, the work
covered by the report has been performed and materials used and installed in accordance with
and in conformity to, the duly approved plans and specifications.
5.2 Core Tests. Take core tests of the completed masonry construction in accordance with
CBC, Section 2105A.3.1.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
MASONRY:
CONCRETE MASONRY UNIT STANDARDS
Reference: California Building Code Sections 2102A.5, U.B.C Std. 21-04
Discipline: Structural
IR 21-4
Revised 11-01-07
Issued 08-18-04 as CR 21-1
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1.
ASTM C 140-02a, Standard Test Methods for Sampling and Testing Concrete Masonry
Units
ASTM C 426-99, Standard Test Method for Linear Drying Shrinkage of Concrete
Masonry Units
2
BACKGROUND: Section 2102A.5.2 of the 2001 CBC, which was based on ASTM C
90-95, mandates the use of Grade N-1 concrete masonry units (Type I moisture controlled
units) for projects under DSA jurisdiction.
ASTM C 90 was revised in year 2000 to remove the Type I and Type II classifications. This
change has been continued in subsequent revisions of ASTM C 90, including the current
edition, ASTM C 90-02a.
3.
SUMMARY: When these current standards are applied on a project under DSA
jurisdiction, the design, sampling and testing of masonry units must comply with the
following requirements.
3.1
Plans and specifications shall reference the current standards, listed above, and the
project design shall conform to these standards and this DSA Circular.
Type I moisture-controlled units shall not be specified since they are no longer
recognized in the current edition, ASTM C 90-02a.
Page 1 of 2
3.2
Page 2 of 2
3.2.1
3.2.2
Mandatory Tests
3.2.3
Reporting
Test reports conforming to Section 10 of ASTM C 140 and Section 4-335 (d) of
Title 24, Part 1 shall be submitted to the project design professionals, the project
inspector, the owner, and DSA.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 22-1
Revised 01-02-08
Issued 09-01-99
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1. General. Designs of metal deck diaphragms with concrete weighing from 95 to 150
pounds per cubic foot, detailed in accordance with International Code Council Evaluation
Service (ICC ES) Evaluation Service Reports (ESR), will be accepted at 80% of the Report
values. For projects submitted to DSA under the 2007 CBC, 100% of the ESR value will be
accepted if the report values were based on test data, per ICC AC43 (2007 CBC, Section
2209A.2).
Where diaphragm shears exceed 80% of the ESR values, the structural concrete fill is to be
designed to resist the entire horizontal load, in accordance with 2007 CBC, Section 1901A
(Section 1911A in the 2001 CBC).
2. Shear Transfer. Transfer lateral loads to chords, reaction members and drags as
follows:
2.1
Diaphragms with Shears Not Greater than 80% of ESR Shear Value - Shear
may be transferred entirely by welding the metal deck to the steel framing in
accordance with the ESR, except use weld values given in Table J2.5 (AISC, 360-05).
The first sheet of steel decking adjacent and parallel to chords, reaction members
and drags (on one or both sides as applicable) is required to be a full width sheet.
This arrangement will reduce the shear in the concrete along the line of the first
seam and will provide maximum bond area of concrete to deck in the most highly
stressed regions.
2.2
Diaphragms Using Structural Concrete Fill to Resist the Entire Shear Transfer lateral loads directly from the concrete by means of dowels or welded shear
connectors to the building frame. Do not consider deck welding to be part of the
shear transfer connection.
Use allowable shear values for dowels equal to the values for bolts of the same
diameter as given in 2007 CBC, Section 1911A for Allowable Design Load (ASD) and
1912A for Load Resistance Factor Design (LRFD) (for projects submitted under the
2001 CBC, see Table 19A-D and Section 1923A). Note that allowable shear values for
welded connectors given in Section I1.3 of AISC 360-05 are for composite design
only, and allowable values for diaphragm shear transfer to drag members, reaction
Page 1of 2
Page 2 of 2
members and chords, etc., are not to exceed one-third of the available strength
(2007 CBC, Section 2204A.1.2).
3.
3.1
The minimum requirements for reinforcing steel in structural concrete fill on metal
deck may not be less than the minimum called for in CBC, Section 1907A.12.
3.2
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 22-2
Reference: 2001 Title 24, California Building Code, Sections 1923A, 2205A.11 and 2205A.12
Revised 11-01-07
2007 Title 24, California Building Code, Section 2204A.2.2
Revised 03-19-07
and AISC 360, Section J9
Issued 01-30-07 as CR 22-1
Title 8, Industrial Relations, Sections 1710 (f) (1) (A) and 1710 (b)
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1.
DESIGN REQUIREMENTS: Cut-thread or rolled-thread bolts of full diameter
body style shall meet the requirements of American Society of Mechanical Engineers
(ASME) standard ASME B18.2.1 or ASME B18.2.6 (Section 3 below). Full body style bolts
may be designed per Sections 1.1 or 1.2 below.
Rolled-thread bolts of reduced diameter body style shall meet the requirements of ASME
B18.2.1 (Section 4 below). Reduced body style bolts shall be designed per Section 1.1
below.
1.1
The construction documents shall indicate that the anchor bolts must meet the
requirements of ASTM F-1554. The anchor bolts shall be designed in accordance
with ACI 318, Appendix D.
1.2
When the anchor bolts are designed in accordance with 2001 CBC, Section 1923A.1
(Section 1911A.2 in the 2007 CBC), the body or shank diameters (from Table 3-1
below) shall be specified on the construction documents and utilized for the design.
The body or shank diameters herein specified shall supersede ASTM F-1554.
In addition, the minimum number of anchor bolts required for a column base plate is four
(4), per Title 8, Industrial Relations, Section 1710 (f) (1) (A). Steel posts weighing 300 lbs.
or less, as defined by Title 8, Section 1710 (b), are not subject to this requirement.
Base plate holes for anchor bolts may be oversized per 2001 CBC Section 2205A.11 (for
projects submitted under the 2007 CBC, refer to AISC 360, Section J9 and AISC Manual of
Steel Construction, Table 14-2).
2.
Anchor bolts are manufactured from bolt blanks, which is a headed smooth rod or bar
intended for subsequent threading. Blanks come in full body diameter and reduced body
diameter styles.
DSA (SS) IR 22-2
(rev 11-01-07)
Page 1 of 2
Page 2 of 2
2.1
Cut-Thread Bolts. The original blank is full diameter body style, and equal to the
major thread (outside) diameter. Threads are formed by cutting and removing metal
from the blank.
2.2
Full Diameter Body Style Rolled-Thread Bolts. The original blank is full diameter
body style, and the threaded length portion is reduced to the thread pitch diameter
during extrusion. Threads are formed by rotating dies that displace the metal.
2.3
Reduced Diameter Body Style Rolled-Thread Bolts. Similar to full diameter body
style rolled-thread bolts, except the blank diameter is reduced for the entire bolt
length.
2.4
Commercially, the terms cut-thread and rolled-thread may not indicate the
method of forming threads. The term cut-thread bolt may refer to either a cutthread bolt or a full diameter body style rolled-thread bolt. The term rolled-thread
bolt may refer to a reduced diameter body style rolled-thread bolt.
3.
FULL DIAMETER BODY STYLE BOLTS: Dimensional requirements for cutthread or rolled-thread bolts with full diameter body style are given in Table 3-1.
Table 3-1 Diameters of Full Diameter Body Style Bolts 1, 2
Nominal
Size (inches)
1/2
5/8
3/4
7/8
1
1-1/4
1-1/2
1-3/4
2
0.5000
0.6250
0.7500
0.8750
1.0000
1.2500
1.5000
1.7500
2.0000
0.515
0.642
0.768
0.895
1.022
1.277
1.531
1.785
2.039
0.482
0.605
0.729
0.852
0.976
1.223
1.470
1.716
1.964
Notes:
1) Adopted from ASME B18.2.1
and ASME B18.2.6.
2) For bolt diameters not indicated,
refer to ASME B18.2.1 and B18.2.6.
3) The body or shank of a bolt is
the smooth portion between the
head and the threads.
4.
REDUCED DIAMETER BODY STYLE BOLTS: Dimensional requirements for
rolled-thread bolts with reduced diameter body style are given in Table 4-1.
Table 4-1 Diameters of Reduced Diameter Body Style Bolts 1, 2
Body or Shank 3
Diameter (inches)
Nominal
Threads per
Inch
Size (inches)
(TPI) 4
Max.
Min.
13
11
10
9
8
7
6
5
4-1/2
0.482
0.605
0.729
0.852
0.976
1.223
1.470
1.716
1.964
0.444
0.559
0.677
0.795
0.910
1.148
1.381
1.608
1.843
1/2
5/8
3/4
7/8
1
1-1/4
1-1/2
1-3/4
2
0.5000
0.6250
0.7500
0.8750
1.0000
1.2500
1.5000
1.7500
2.0000
Notes:
1) Body diameters are based on
ASME B18.2.1, Table 2, Notes
7 & 13, and ASTM B1.1, UNRC
or 8 UNR series, Class 2A threads.
2) For bolt diameters not indicated,
refer to ASME B18.2.1, B18.2.6
and ASTM B1.1.
3) The body or shank of a bolt is the
smooth portion between the head
and the threads.
4) TPI means threads per inch (ASTM
B1.1, UNRC or 8 UNR series,
Class 2A threads).
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 22-3
Issued 07-15-08
Purpose: This Interpretation of Regulations (IR) clarifies the process and criteria under
which the Division of the State Architect will evaluate, accept for use and inspect the use of
open web steel joists (OWSJ) on projects under DSA jurisdiction.
Note: Frequently used terms are defined in the glossary, Section 9, of this IR.
1.
Approval Process: The approval of OWSJ for use on a specific project is a fourphase process.
There are specific requirements and responsibilities for the joist
manufacturers, and architect or structural engineer in general responsible charge (project
design professional) in each phase. The four phases and the key players involved are as
follows:
Review and Approval
Professional, and DSA
of
Construction
Documents:
Project
Design
3.
Page 1 of 6
3.1
Page 2 of 6
Structural framing plan including layout of OWSJ and all supporting elements
Loading diagrams for all OWSJ in accordance with CBC Section 2206A.2.1 and
any deflection requirement.
Specify the SJI joist designation for each joist. The designation shall comply
with CBC Section 2206A.2.
3.2
3.3
After the DSA plan review process is completed, the approved construction
documents will bear the DSA identification stamp with the initials of the plan
reviewer.
4.
Review and Approval of Joist documents. This phase occurs after the
project has been bid and the contract for the fabrication of the OWSJ has been awarded to a
qualified manufacturer as defined in Section 1 of this IR. The steps and requirements for
this phase are as follows:
4.1
4.1.1
4.2
Page 3 of 6
Joist profiles with member sizes and connection details, signed and stamped by
the manufacturers California registered professional engineer per CBC Section
2206.A.4, Design Approval.
This information may be included with the
calculation package.
4.3
4.4
Mechanical, electrical, and plumbing (MEP) plans that include locations and
sizes of roof top or floor units, ducts, pipes, conduits, etc.
Top elevations of support elements to insure proper seating of OWSJ, i.e. top of
steel girders, concrete or CMU pilasters or walls,
Submittal to DSA: When the project design professional approves the joist
documents, he/she shall provide a signed and stamped statement of general
conformance and submit it to DSA for approval in accordance with Title 24, Part 1,
Section 4-317(g). For additional information on the Statement of General
Conformance, see DSA IR A-18.
The project design professional shall submit two sets of joist documents to DSA.
One set will be used for marking up DSA review comments if there are any. The
other set will be used for DSA stamping.
4.5
DSA Review This step may involve a back-check review if the documents were not
approved. The project design professional shall coordinate with the manufacturer to
resolve DSA plan check comments (as noted on the mark-up set of joist documents)
and schedule a back-check appointment with DSA. Bring two sets of revised joist
documents to the back-check appointment.
DSA review of the calculations typically includes verification of input and output.
Each of the following conditions must be met:
Page 4 of 6
The joist designation K, LH, DLH, or Joist Girder (JG) listed in the SJI 42nd
Edition Catalog containing the Standard Specifications and the design loads are
not greater than those listed in the load tables of the SJI 42nd Edition Catalog.
4.6
DSA Approval: After DSA reviews the submitted joist documents and determines
that they are in conformance, DSA stamps the joist documents as approved. The
stamped set of joist plans will be scanned into the DSA database and then returned
to the project design professional who shall forward a copy to the manufacturer and
the fabrication special inspector. Additional copies of DSA stamped joist documents
may be made available to the project design professional by arrangement with the
DSA regional office.
5.
5.1
5.2
5.3
A fabrication special inspector must be approved by DSA for each project prior to
manufacturing. The fabrication special inspector provides inspection during OWSJ
manufacturing in accordance with Section 7 of this IR.
5.4
6.
Field Installation: During this phase, the OWSJ arrive at the construction site
and are ready to be installed. The steps and requirements for this phase are as follows:
6.1
Working from the DSA approved construction documents and DSA approved joist
documents (and joist revision documents as may be needed per Section 8 of this IR),
the project inspector shall verify joist size, fabrication special inspectors ID tag or
mark, and placement in the field.
6.2
Working from the DSA approved documents listed above the field welding special
inspector provides continuous inspection for field welding of attachments of the
OWSJ.
7.
Testing and Inspection: Testing and inspection shall comply with CBC Section
1704A.3 and shall be performed in accordance with Sections 4-333(c) and 4-335, Title 24,
Part 1, and DSA IR 17-3.
Page 5 of 6
7.1
Unidentified Steel. All steel shall be identified by the fabrication special inspector
per 2007 CBC Section 1704A.3.2.2. Unidentified steel shall be tested per 2007 CBC
Section 2212A.1.
7.2
Shop Fabrication. Inspection of shop fabrication shall comply with 2007 CBC
Section 1704A.3.2.2.
7.2.1
7.3
Marking: The special inspector shall place a distinguishing mark, and/or tag with
this distinguishing mark, on each inspected joist or joist girder. This mark or tag
shall remain on the joist or joist girder throughout the job site receiving and
erection process. At a minimum the distinguishing mark shall include the
special inspectors initials and date.
Welding: Inspection of shop and field welding shall comply with 2007 CBC Section
1704A.3.2.2 and DSA IRs 17-2 and 17-3. Additional requirements for welding
inspections are listed below:
7.3.1
The cost of inspection shall be paid by the owner (which is usually the school
district.)
7.3.2
Fabrication special inspectors and field welding special inspectors shall hold
current certification as an AWS CWI, in accordance with AWS QC1.
7.3.3
8.
Revisions During Manufacturing: This section is not applicable to the
approved alternate design substitutions described in Section 4.2 above. If revisions to the
approved joist document are necessary, the manufacturer shall obtain DSA approval of the
revisions prior to the manufacturing of the affected joists. The steps and requirements for
making revisions are as follows:
8.1
8.2
Manufacturer submits the joist revision documents to the project design professional
for approval. The joist revision documents shall include all the items listed in Section
4.1 of this IR for the affected joists.
8.3
When the project design professional approves joist revision documents, he/she shall
provide a signed and stamped statement of general conformance on these
documents and submit to DSA for approval.
8.4
DSA reviews the joist revision documents and the statement of general conformance.
DSA approves and stamps the joist revision documents.
8.5
The manufacturer starts the manufacturing of the joists with the approved joist
revision documents following the procedures in Section 5 of this IR.
9.
Glossary:
defined below:
For clarity and reference, some frequently used terms in this IR are
9.1
Page 6 of 6
9.2
Construction Documents
Project documents pertaining to the construction of the project and submitted to DSA
for review prior to construction. These documents may include drawings and specifications for site, architectural, structural, mechanical, electrical and energy features.
9.3
9.4
9.5
9.6
Joist Manufacturer
An OWSJ manufacturer who manufactures the members and components of OWSJ
and uses those members and components to fabricate on a continuing basis joists of
the K-, LH-, DLH-Series, and/or Joist Girders conforming to the Steel Joist Institutes
Standard Specifications and Load Tables of latest adoption.
9.7
9.8
9.9
Project Inspector
A DSA certified inspector who is in general responsible charge of inspection for the
project. He/she is employed by the school district and approved by DSA for the
project, Title 24, Part 1, Section 4-333(b)
9.10
Shop Order/Drawings
Fabrication plans and details develop by manufacturer to facilitate the fabrication of
OWSJ.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 23-1
PRE-FABRICATED WOOD
CONSTRUCTION CONNECTORS
References:
2001 Title 24, Part 2, California Building Code (CBC),
Sections 2304A.3, 2304A.4.2, 2316A.2, and 2318A.4
2007 CBC, Sections 2304.9.3, 2306, 2307, 1715A.1
DSA Interpretation of Regulations (IR) A-5
ICC ES AC-13
Discipline: Structural
Revised 11-01-07
Revised (in its entirety) 08-18-04
Issued 09-01-99
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) clarifies acceptable load capacities, design
and installation requirements for pre-fabricated wood construction connectors used on
projects under Division of the State Architect (DSA) jurisdiction, which includes State of
California public elementary and secondary schools (grades K-12), community colleges, and
state-owned or state-leased essential services buildings.
Scope: Pre-fabricated metal connectors are used to attach wood structural members to
other wood structural members, or to structural steel, masonry, or concrete members
(including foundations).
The application of Sections 1 through 6 of this IR is permitted for pre-fabricated concrete
anchorage devices, including cast-in-place bolts and post-installed expansion or epoxy
anchors used in conjunction with wood construction connectors. Post-installed anchor design
and testing must also comply with 2001 California Building Code (CBC), Section 1923A
(Section 1912A.1 in the 2007 CBC) and DSA IR 19-1.
Requirements for metal plate connectors for wood trusses are addressed in 2001 CBC
Section 2318A.7 (Section 2303.4.2 in the 2007 CBC) and DSA IR 23-4. Manufactured
lateral-load resisting systems as defined in 2001 CBC, Table 16A-N (for projects submitted
under the 2007 CBC, refer to ASCE-7, Table 12.2.-1) (e.g. shear walls, moment frames) are
not included within the scope of this IR. Specific DSA approval must be granted for these
systems in accordance with DSA Product Acceptance Program requirements.
1. LISTING REQUIREMENTS: Pre-fabricated connectors must be listed in a current and
valid evaluation report issued by an evaluation agency recognized by DSA, which include the
following:
International Code Council Evaluation Service (ICC-ES)
City of Los Angeles Research Report (RR)
DSA Product Acceptance Report (for projects submitted under the 2001 CBC only)
1.1
Effective January 1, 2004, Product Acceptance (PA) Reports will not be issued or
renewed by DSA for pre-fabricated wood construction connectors. Any Product Acceptance
reports previously issued by DSA for pre-fabricated wood connectors will expire upon
expiration of the 2001 edition CBC.
2. ACCEPTABLE LOAD CAPACITIES: In accordance with IR A-5, DSA allows 100% of
listed gravity load capacities and 80% of listed wind and seismic load capacities for
manufactured wood construction connectors. One hundred percent (100%) of the listed
wind and seismic load capacities will be allowed if listed load capacities are based upon
DSA IR 23-1 (rev 11-01-07)
(corrected 03-17-10)
Pre-Fabricated Wood
Construction Connectors
Page 1 of 2
Pre-Fabricated Wood
Construction Connectors
Page 2 of 2
DSA-approved cyclic testing. Listed load capacities based on load duration factors allowed
by 2001 CBC Section 2316A may be used. For projects submitted under the 2007 CBC,
listed load capacities based on values listed in NDS-05, Section 2.3, Adjustment of
Reference Design Values, may be used.
3. DESIGN REQUIREMENTS:
3.1
Load duration factors, or adjustment of reference design value, (e.g. 33% increase
for short-term loading) shall be determined in accordance with Amendment 6 in
2001 CBC, Section 2316A.2, (for 2007 CBC projects, NDS-05, Section 2.3) and the
evaluation report.
3.2
Wood member properties such as minimum specific gravity and maximum moisture
content, must comply with applicable provisions of the CBC and also all requirements
of the connector manufacturer and the evaluation report.
4.
INSTALLATION REQUIREMENTS:
4.1
All connectors, including holdowns shall be installed in accordance with the applicable
evaluation report and/or manufacturer's published information. Holdown connectors
specified to be installed with clearance between the connector and the sill plate (e.g.
one inch stand-off) may result in increased deflection of the holdown connection,
which shall be considered in the design.
4.2
Fasteners must comply with all requirements (e.g. nail gauge and length, corrosionresistant coatings) of the manufacturer and of the evaluation report. Fastener
protective coatings or corrosion-resistant materials shall be compatible with
preservative treatment chemicals in the wood, when in contact with them, and
comply with manufacturers recommendations.
4.3
Connectors shall not be field bent, except as specifically permitted by the evaluation
report and/or the manufacturer's instructions.
4.4
Connection details shall be designed to minimize the potential for splitting of wood
members. In the event of splitting, a DSA-approved repair procedure will be
required.
5.2
Each pre-fabricated connector must bear a stamp or adhered label showing the name
of the manufacturer, model number, and evaluation report number.
5.3
Minimum thickness of steel shall comply with Section 5.0 of ICC ES AC-13.
6.
Testing Requirements: For projects submitted under the 2007 CBC, testing shall
comply with 2007 CBC Section 1715A.1 and ICC ES AC 13.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
WOOD DIAPHRAGMS
IR 23-2
References:
2001 California Building Code, Sections 2315A
Revised 11-01-07
Issued 09-01-99
Discipline: Structural
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
requirements related to the design and construction of wood diaphragms for projects
submitted to DSA under the 2001 CBC.
1.
The blocking portion at each end is extended to 1/10 of the diaphragm length
(span) past where it is not required, or at least to one-half the diaphragm depth.
2.
Wood Diaphragms
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
CONCRETE CURBS IN
WOOD FRAMED BUILDINGS
IR 23-3
Revised 10-03-07
Issued 09-01-99
Discipline: Structural
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
to a six-inch high concrete curb at the exterior of buildings or at shower and toilet room
partitions.
1.
Curb At Exterior Walls: The curb may be omitted if the exterior ground surface
is paved for 18 and sloped away from the building, and the roof overhang length is equal
to, or greater than, the height of the exterior wall.
2.
Shower and Toilet Room Curbs: In lieu of the six-inch high curbs required at
shower rooms, or toilet rooms with more than two fixtures, the following stud wall and
partition protection, extending a minimum of six-inches up from the finish floor level, may
be submitted for approval:
1. Continuation of hot-mopped floor membrane.
2. Continuation of epoxy resin floor surfacing.
3. Copper Floor pan.
4. Other equivalent products which will prevent water seepage under the wall or
partition.
The requirements for exterior wall curbs remains as per the referenced requirements.
EXCEPTION: For toilet rooms of relocatable buildings, continuous vinyl flooring, with fully
sealed joints, is acceptable.
Concrete Curbs in
Wood Frame Buildings
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 23-4
Revised 11-01-07
Issued 09-01-99
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1. General: Design, fabrication and inspection of trusses are to comply with 2001
California Building Code (CBC), Section 2318A.7.
4. Analysis of Metal Plate Connectors: The allowable lateral load per tooth or per
square inch of plate is to be determined from Section 2318A.7.2.
In lieu of this requirement, the allowable load per tooth or per square inch may be assumed
to be equal to 80% of the value recommended by ICBO research report for "loads at 46
degrees to 90 degrees with respect to the length of the plate."
DSA (SS) 23-4
(rev 11-01-07)
Page 1 of 6
Page 2 of 6
EXCEPTION: 80% of the "0 degrees to 45 degrees" value may be used when
orientation of the plates is shown on the drawings and calculations show that
resultant loads are at 0 to 45 degrees with respect to the length of the plate.
No increase for load duration or metal side plates is permitted. Effective area of plate
is determined as per Section 2318A.7.1.
Member ends at all joints are to be shaped for full bearing, but because of possible
shrinkage, all forces, including compression, are assumed to be transferred through steel
plates (end bearing of compression members is neglected).
Forces in members are assumed to act along member center lines.
The plates are assumed to be rigid.
Effect of uniformly distributed loads on top and bottom chords may be neglected in plate
analysis.
Evaluation of stresses in plate prongs in all joints shall consider both direct load, and
moment due to eccentric loading of the plate. (For illustration see Figure 1 on page 6 of this
IR).
Stresses in steel at critical net sections of the plate are to be checked.
1. One load test is to be made for every 50 trusses (or fractional part thereof) of every
type of truss. The method of making load tests is subject to the approval of DSA.
Load tests are to be made either by application of a symmetrically distributed load
upon two identical trusses braced as required by the approved plans, or by use of
concentrated loads supplied by means of calibrated testing apparatus upon the two
trusses braced or laterally supported as required by the approved plans. The loads
are to be arranged so that they do not cause arching, composite action or load
redistribution. The test trusses are to be supported as called for on the approved
building plans. Truss test results are to be submitted to, and accepted by, DSA
before trusses are erected.
2. Each tested truss should be clearly and permanently marked for identification.
3. At the option of the manufacturer, a preload not exceeding 50% of the design total
load (D.L. & L.L), may be applied and removed before testing begins.
4. All loads are to be applied simultaneously to both trusses.
5. Deflections are to be measured at bottom edge of bottom chord at mid span and at
1/4 points.
6. All tests are to be performed by an independent testing laboratory acceptable to
DSA. A copy of each test result is to be submitted to DSA.
Page 3 of 6
9. Creep criteria:
Page 4 of 6
12. Computation of Shear Stress in Light Metal Plates: The forces in the top
chord, vertical, and diagonal member are H, V, and R, respectively. All forces are assumed
to act at their member neutral axes.
The stresses in the plates are calculated on the basis of an equivalent shear stress per
square inch of plate. The active areas of plate are those portions of the plate at a minimum
of inch away from the edge of plate, or end of a member (See Figure 1 on page 6).
12.1 Analysis Procedure: The procedure given below will use the horizontal force in the
top chord active area as an example. The procedure will be the same for the other active
areas.
1. Determine stress component at point 1 due to direct translation forces:
f hd1 =
H
2 Ah
Page 5 of 6
Mh = eh x H, The moment of the member force about the centroid of the considered
active area, OR:
Mh = (eh x H) + (ev x V) + (er x R): The sum of the moments of all the member forces
about the centroid of the considered active area
f hr1 =
Mhxr1
2 Jh This stress will be a vector perpendicular to the position vector r1
3. Compute the maximum magnitude and the angle of the resultant stress:
f h1 = f hd1
+ f hr1
IR 23-4 - Page 6 of 6
Figure 1
ev
H
1
Ah
1/2" CLR
Typical
r1
Ar
er
Av
eh
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
BOLTS USED IN
WOOD CONSTRUCTION
IR 23-5
References:
2001 California Building Code, Section 2318A.2
2007 California Building Code, Sections 2306, 2307 and NDS-05, Chapter 11
Discipline: Structural
Revised 10-15-07
Issued 10-01-2002 as CR 23-1
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1. General: Cut-thread or rolled-thread bolts with full diameter bodies meeting the
requirements of ASME B18.2.1 or ASME B18.2.6 are permitted for use on projects approved
by DSA. See Table 1 below for dimensional requirements of cut-thread or rolled-thread
bolts with full diameter bodies. Rolled-thread bolts with reduced diameter bodies per ASME
B18.2.1 are not permitted.
2. Background: Dimensional requirements for bolts are given in ASME B18.2.1, Square
and Hex Bolts and Screws, and ASME B18.2.6, Fasteners for Use in Structural
Applications. Bolt threads are formed either by cutting or rolling.
2.1
Cut-Thread Bolts. The original blank must be full size, and equal to the major
thread (outside) diameter. Threads are formed by cutting and removing metal from
the blank. A bolt blank is a headed rod or bar intended for a subsequent threading
operation.
2.2
Full Diameter Body Rolled-Thread Bolts. The blank diameter is full size and the
threaded length portion is reduced to the thread pitch diameter during extrusion.
Threads are formed by rotating dies that displace the metal.
2.3
2.4
Commercially, the terms cut-thread and rolled-thread may not indicate the
method of forming threads. The term cut-thread bolt may refer to either a cutthread bolt or a full diameter body rolled-thread bolt. The term rolled-thread bolt
may refer to a reduced diameter body rolled- thread bolt.
3. Application: Cut-thread or rolled-thread bolts with full diameter bodies are permitted.
For each nominal bolt size utilized on a project, the minimum shank or body diameter shall
be specified and ASME B18.2.1 or ASME B18.2.6 shall be referenced on the drawings or
specifications.
Bolts Used in
Wood Construction
Page 1 of 2
Bolts Used in
Wood Construction
Page 2 of 2
Body or Shank
Diameter (inches)
Max.
Min.
0.515
0.482
0.642
0.605
0.768
0.729
0.895
0.852
1.022
0.976
Notes:
1) Adopted from ASME B18.2.1 and ASME B18.2.6.
2) For bolt diameters not indicated, refer to ASME B18.2.1 and B18.2.6.
3) The body or shank of a bolt is the smooth portion between the head and the threads.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 23-6
Revised 08-25-09
Revised 11-01-07
Revised 12-15-04
Issued 11-05-2004 as CR 23-2
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) provides clarification on the panel marking
requirements for plywood and oriented strand board (OSB) panels used on DSA projects,
which includes State of California public elementary and secondary schools (Grades K-12),
community colleges, and state-owned or state-leased essential services buildings.
Policy: Plywood and OSB panels meeting the requirements of this IR shall be considered
to have met the marking requirements of the 2007 CBC, Section 2303.1.4.
Note: For projects submitted under the provisions of 2001 CBC, see AC 23-2 for additional
requirements on OSB.
2.2
2.3
The scope of accreditation shall include the inspection of plywood panels for
compliance with PS 1 (plywood) or PS 2 (OSB) requirements.
Next Page
Appendix A: List of Qualified Testing and Inspection Agencies
DSA IR 23-6
(rev 08-25-09)
Page 1 of 2
DSA IR 23-6
(rev 08-25-09)
Page 2 of 2
Inspection Agency
IAS Accreditation
Contact Information
Number
Scope1
AA-649
Plywood
AA-688
AA-657
Plywood
AA-663
OSB
AA-660
Plywood
TECO
2902 Terra Court
Sun Prairie, WI 53590
AA-654
AA-607
OSB
Plywood
OSB
OSB
Plywood
OSB
Plywood
Plywood - PS 1-95 (or current version); OSB - PS 2-92 (or current version).
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 23-7
References:
Revised 11-01-07
2001 California Building Code (CBC), Section 2315A, Tables 23A-II-H & 23A-II-I-1.
Issued 03-14-2005 as CR 23-3
2003 International Building Code (IBC), Section 2305, Tables 2306.3.1 & 2306.4.1.
American Forest & Paper Association 2001 Edition National Design Specification (NDS),
Supplement - Special Design Provisions for Wind and Seismic.
American Plywood Association (APA) Report T98-22; APA Form No. TT-045.
Discipline: Structural
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Background: The California Building Code (Tables 23A-II-H & 23A-II-I-1 in the
2001 CBC) prescribes minimum penetration of 1-1/2 inch for 8d nails and 1-5/8 inch for 10d
nails into framing and blocking members for nails that attach wood structural panels.
Current standards (Tables 2306.3.1 & 2306.4.1 in the 2003 IBC) indicate minor revision of
these penetration requirements, and prescribe minimum penetration of 1-3/8 inch for 8d
nails and 1-1/2 inch for 10d nails. Recommended shear values and other requirements for
wood structural panel diaphragm design and construction contained in these current
standards remain unchanged from those contained in the 2001 edition CBC.
The 2001 CBC requirement of 1-5/8 inch minimum penetration for 10d nails precludes the
use of 1-1/2 inch net thickness framing members for wood structural panel diaphragm
attachment. DSA acceptance of 2003 IBC provisions permits the use of 1-1/2 inch net
thickness framing members for wood structural panel diaphragm attachment.
2.
Application: The minimum nail penetration of 1-3/8 inch for 8d nails and
1-1/2 inch for 10d nails prescribed in Tables 2306.3.1 & 2306.4.1 of the 2003 IBC may be
used in lieu of the minimum nail penetration specified in Tables 23A-II-H and 23A-II-I-1 of
the 2001 CBC.
This is applicable only to 8d or 10d nails that attach wood structural panel diaphragms to
framing and blocking members. 8d or 10d nails used in any other connections (e.g.
interconnection of framing members, timber connectors) shall comply with the requirements
of 2001 CBC, Section 2318A.
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 23-8
References:
2007 California Building Code (CBC), Title 24, Part 2,
Sections 2303.4 and 1704A.3,
ICC ES AC306
Discipline: Structural
Issued 12-17-09
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) clarifies the criteria and process under
which the Division of the State Architect (DSA) will evaluate, accept for use, and establish
requirements for inspection of manufactured wood trusses on projects under DSA
jurisdiction.
Note: Frequently used terms are defined in the glossary, Section 8, of this IR.
2.
Acceptance Criteria: Wood-Chord-Metal-Web trusses shall meet the requirements of ICC Evaluation Service (ICC-ES) Acceptance Criteria AC306.
Truss manufacturers shall maintain a quality control and assurance program with
periodic audits by an approved inspection agency as required by AC306 and the
evaluation report.
For design purposes, trusses that utilize bearing clips that result in eccentricity
between the truss support point and the panel point (i.e. a no-notch clip) to transfer
loads to the supporting structure may only use 80% of the listed values on the
evaluation report.
specific project is a four-phase process. There are specific requirements and responsibilities
for the truss manufacturer, and architect or structural engineer in general responsible
charge (project design professional) in each phase. The four phases and the key players
involved are as follows:
DSA IR 23-8
(iss 12-17-09)
Page 1 of 5
DSA IR 23-8
(iss 12-17-09)
Page 2 of 5
3.
Structural framing plan including layout of wood trusses, depths, and all
supporting elements
Loading diagrams for all wood trusses in accordance with CBC Section
2303.4.3 Item 1-1.2.
3.2
3.3
After the DSA plan review process is completed, the approved construction
documents will bear the DSA identification stamp with the initials of the plan
reviewers.
4.
Review and Approval of Truss Submittal Package. This phase may occur
after the project has been bid and the contract for the fabrication of the wood trusses has
been awarded to a qualified manufacturer as defined in Section 1 of this IR. The steps and
requirements for this phase are as follows:
DSA IR 23-8
(iss 12-17-09)
4.1
4.1.1
4.2
4.2.1
Page 3 of 5
4.3
The manufacturer submits the truss submittal package to the project design
professional for review and approval. This step may take multiple exchanges
between the project design professional and the manufacturer to finalize the
submittal package for submittal to DSA.
4.4
When the project design professional approves the submittal package, he/she shall
provide a signed and stamped Statement of General Conformance and submit a set
to DSA for approval in accordance with Title 24, Part 1, Section 4-317(g). For
additional information on the Statement of General Conformance, see DSA IR A-18.
4.5
If DSA reviews the submittal package and determines that they are in conformance,
DSA stamps the truss design drawings as approved. The stamped set of the truss
design drawings and the remainder of the submittal package will be scanned into the
DSA database and then returned to the project design professional who shall forward
a copy to the manufacturer. Additional copies of DSA stamped truss design drawings
may be available to the project design professional by arrangement with the DSA
regional office.
This step may involve a back-check review if the submittal package was not
approved. The project design professional shall coordinate with the manufacturer to
resolve DSA plan check comments (as noted on the mark-up set of submittal
package) and schedule a back-check appointment with DSA. Bring a set of corrected
submittal package and the original DSA marked-up set to the back-check
appointment.
5.
Manufacture and Special Inspection of Wood Trusses: The manufacture
of wood trusses shall not occur prior to DSA approval of the truss submittal package
(Section 4 above).
5.1
from
the
DSA
approved
construction
Changes to the approved construction documents and truss design drawings must be
reviewed and approved prior to truss fabrication in accordance with Section 7 of this
IR.
DSA IR 23-8
(iss 12-17-09)
Page 4 of 5
5.2
Manufacturer notifies the project design professional, who will notify the project
inspector, and fabrication special inspector of the fabrication schedule. Fabrication
may not start without the presence of fabrication special inspector.
5.3
5.3.1
5.3.2
Responsibilities:
Verified Report: The fabrication special inspector shall furnish a verified report
to the project design professional, and DSA in accordance with CBC Section
1704A.6.2.
6.
Field Installation: During this phase, the wood trusses are installed at the
construction site. The steps and requirements for this phase are as follows:
6.1
Working from the DSA approved construction documents and DSA approved truss
submittal package and any DSA approved field change documents, the project
inspector shall verify truss size, fabrication special inspectors stamp, placement in
the field and all truss installation details including bridging, bracing, connections,
etc..
7.
8.
Glossary:
8.1
Construction Documents
DSA truss submittal package are necessary, the fabricator and the project design
professional, working together, shall prepared and submit a change order or Field Change
Document to DSA for review in accordance with DSA IR A-6. DSA approval of all changes is
required prior to the implementation of the changes.
For clarity and reference, some frequently used terms in this IR are
defined below:
Project documents pertaining to the construction of the project and submitted to DSA
for review prior to construction. These documents may include drawings and
DSA IR 23-8
(iss 12-17-09)
Page 5 of 5
specifications for site, architectural, structural, mechanical, electrical, fire and life
safety, accessibility and energy features.
8.2
8.3
8.4
8.5
Project Inspector
A DSA certified inspector responsible for inspection for the project. He/she is
employed by the school district and approved by DSA for the project, Title 24, Part 1,
Section 4-333(b)
8.6
8.7
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 23-9
PREFABRICATED
WOOD I-JOIST
References:
2007 California Building Code, Section 2303.1.2
ICC ES AC-014
National Design Specification for Wood Construction (NDS-2005)
Discipline: Structural
Revised 08-25-09
Revised 07-15-08
Issued 03-14-05 as AC 23-1
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Background:
1.
1.1
1.2
The evaluation report shall indicate compliance with all the following building codes
and standards:
2006 IBC
ASTM D5055-04
ICC-ES AC-14
1.3
2.
DESIGN REQUIREMENTS:
2.1
Joists shall only be used for dry conditions of use and must be protected from
weather exposure during construction.
2.2
Joists shall be designed in accordance with AF&PA NDS-2005, Chapter 7 and the
appropriate evaluation report.
2.3
Lateral and rotational supports shall be provided at all bearing locations per AF&F
NDS 2005 Section 7.3.5. Lateral and rotational support may be provided by joist
hangers complying with ICC AC13, Section 3.3.
DSA IR 23-9
(rev 08-25-09)
Prefabricated
Wood I-Joist
Page 1 of 2
DSA IR 23-9
(rev 08-25-09)
Prefabricated
Wood I-Joist
Page 2 of 2
2.4
2.5
Design flexure, shear and bearing shall be determined through ASTM D5055-04
procedures, and as listed in the evaluation report.
2.6
2.6.1
2.7
3.
Solid sawn lumber flange connections at bearing locations (e.g. wall top plates).
3.2
Tie strap or other connector hardware (end distance and spacing of nails).
3.3
Web stiffeners material and size (comply with the manufacturers requirements).
3.4
I-joist chord, or web filler, that is a part of a wall anchorage system (attachment
must meet the requirements of ASCE 7-05 Section 12.11.2).
3.5
I-Joist flange receiving diaphragm sheathing nails (the minimum thickness and width
of the flange shall meet applicable CBC code requirements, i.e. edge distance,
minimum nail penetration per CBC Tables 2306.3.1, 2306.3.2, and 2306.4.1).
3.6
4.
4.2
ICC-ES AC14, Appendix A, Quality Assurance Guidelines for Prefabricated Wood Ijoists, promulgated by the Wood I-joists Manufacturers Association, or ICC-ES
approved equivalent such as APA QA Policy for Performance Rated I-Joists.
4.3
ICC-ES AC 14 Appendix B.
4.4
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
STRUCTURAL (CERTIFIED)
GLUED LUMBER
IR 23-10
References:
2007 California Building Code, Section 2303.1.1
Dept. of Commerce PS 20-99
ALSC Glue Lumber Policy
Discipline: Structural
Issued 08-15-08
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
1.
ACCEPTANCE CRITERIA: Structural glued lumber shall be designated Certified
Glued Lumber (CGL) and grade stamped by an inspection agency accredited by the
American Lumber Standard Committee (ALSC) to supervise glued lumber manufacturing.
DSA (SS) IR 23-10
(iss 08-15-08)
Structural (Certified)
Glued Lumber
Page 1 of 2
Structural (Certified)
Glued Lumber
Page 2 of 2
1.1
Grading: CGL shall be graded in conformance to ALSC Glued Lumber Policy (GLP)
and Voluntary Product Standard PS 20-99 or current edition.
1.2
1.3
1.4
2.
CONDITIONS OF USE:
2.1
CGL shall only be used for dry conditions of use and must be protected from weather
exposure during construction.
2.2
CGL shall be assigned the same design values as solid sawn lumber or timber of the
same species and visual grade.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 23-11
Revised 12-17-09
Revised 4-17-06
Issued10-06-04 as AC 23-2
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this Interpretation of Regulations (IR) is to clarify the criteria
under which the Division of the State Architect (DSA) will accept the use of oriented strand
board (OSB) as wood structural panels on projects under DSA jurisdiction.
1.
CONDITIONS OF USE: Wood structural panels may include OSB panels. The
use and installation of OSB panels shall comply with the requirements for wood structural
panels in the 2001 CBC, and this document.
2.
MATERIALS: OSB panels shall comply with UBC Standard 23-3. Certification and
panel marking shall comply with PS 2-92, Section 7. Each panel shall bear markings
identifying the qualified testing and inspection agency (as defined in Section 3), grade,
nominal thickness, span rating, exposure durability classification and the standard to which
it is certified.
3.
3.2
3.3
DSA IR 23-11
(rev 12-17-09)
Page 1 of 3
DSA IR 23-11
(rev 12-17-09)
Page 2 of 3
4.
DESIGN:
4.1
Sheathing. OSB structural floor sheathing and roof sheathing shall meet the design
requirements of CBC Section 2312A.1 and 2312A.2 respectively.
4.2
4.3
Deflection. When calculating shear wall and diaphragm deflections, the equations
for plywood may be used. The modulus of elasticity (E) may be determined from
APA Panel Design Specification D510 or may be provided directly by the
manufacturer. The nail slip coefficients may be considered the same as for plywood.
For OSB panels under constant load equal to or greater than 50% of their allowable
design strength, creep must be considered. Use a creep adjustment factor of 1/6 on
panel stiffness (EI) to calculate deflection for panels used in moist conditions (such
as raised floors) that produce panel moisture content (MC) of 16% or higher. For
dry service conditions that produce panel moisture content of less than 16%, use a
creep adjustment factor of 1/2, which is the same for plywood. See APA Panel
Design Specification D510, Section 4.5.1, Creep.
5.
5.1
When panels are used in areas subject to high relative humidity or where
condensation can develop (such as roofs with attic space, mansards, raised floor
crawl space, etc.), ventilation shall be provided in conformance with Section
1505.3, Part 2, Title 24, CCR, with ample vents located to eliminate dead-air
pockets.
5.2
Panels shall be protected from moisture during transit and storage. Wetted OSB
panels shall be dried to 16% moisture content or less prior to being installed.
5.3
If installed panels are wetted, they shall be dried to 16% moisture content or less
prior to being covered. Alternatively, provide adequate ventilation on the back side
to allow drying. All nails pushed up due to material swelling shall be re-driven.
Additional nails shall be installed if material swelling causes the nail heads to
penetrate into the surface by more than 1/16 inch after drying. If the additional
nails result in nail spacing closer than the allowable, then framing or blocking must
be added to receive the new nails and provide appropriate shear transfer.
5.4
5.5
Edge checks are defined as wood flakes that have become separated from the panel
leaving voids in the panel edges. Panels with edge checks greater than 1/4 inch in
depth or 2 inches in length at any one location shall render the panel unacceptable
for use. The maximum cumulative length of edge checks in a standard 4-ft. by 8-ft.
panel shall not exceed 8 inches. Panel edge nailing shall be adjusted to avoid nailing
into edge checks.
5.6
Field cut edges of panels shall be protected from the weather, or sealed using an
exterior acrylic latex paint.
DSA IR 23-11
(rev 12-17-09)
Page 3 of 3
IAS
Accreditation
Number
Inspection Agency
Contact Information
AA-649
AA-654
TECO
5650 Terra Court
Sun Prairie, WI 53590
AA-660
AA-663
AA-688
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 24-1
Revised 03-17-10
Revised in its entirety 01-02-08
Revised 11-01-07
Revised 04-21-05
Issued 09-01-99 as IR M-1
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) clarifies DSA requirements for glass panel
railings to be accepted for use in the construction of projects under Division of the State
Architect (DSA) jurisdiction. DSA will require the use of either a design or a test option, as
explained in this IR.
1.
General: Glass panel railing refers to a railing assembly, consisting of glass panels
cantilevered from a base and capped with a continuous rail at the top. The system shall be
designed so that the top rail remains in place in the event of failure of an individual glass
panel. Glazing in railing panels shall be an approved safety glazing material that conforms
to 2007 California Building Code (CBC) Sections 2406.1.1 and 2407.1 (Section 2406.6 in the
2001 CBC). Minimum nominal thickness shall be 1/4. Fully tempered glass and laminated
glass shall comply with Category II of Consumer Product Safety Commission (CPSC)
standard 16 CFR Part 1201.
Glass panel railings shall not be used in locations where they may be subject to vehicle
impact, in accordance with 2007 CBC Section 2407.1.3 (Section 2406.4 in the 2001 CBC).
2.
Design Option: The components and assembly of the glass panel railings are to
be designed for a factor of safety of four (4) times the design load.
2.1
Projects submitted to DSA under the 2001 CBC: The required vertical design
load for glass panel railings is 100 lbs. per lineal foot. Horizontal load is as tabulated
in Table 16A-B of the 2001 CBC and are applied horizontally at right angles to the
top rail.
2.2
Projects submitted to DSA under the 2007 CBC: The required vertical and
horizontal design loads for glass panel railings are prescribed in 2007 CBC, Section
1607A.7.1 for uniform load and Section 1607A.7.1.1 for concentrated load.
3.
Test Option: In lieu of the Design Option in Section 2 above, glass panel railings
may be accepted by test. Tests may be conducted in the field or in the laboratory on exact
duplicate mock ups as evidence of acceptability of each railing configuration or design.
All tests are to be performed by a DSA approved testing laboratory. Tests are to be
observed and results recorded in a report signed by a California registered civil or structural
engineer (per 2007 CBC, Section 2403.2).
DSA IR 24-1
(rev 03-17-10)
DSA IR 24-01
(rev 03-17-10)
3.1
Test Protocol: An acceptable test for the entire completed glass railing assembly
shall meet the following minimum criteria:
3.1.1
Test for two (2) times the horizontal design load(s) in Section 2 above, applied at
right angles to the top rail.
3.1.2
Test the deflection of the top rail at one (1) times horizontal design load applied
at right angles to the top rail for maximum allowable of h/120, where h is the
distance from the floor level to the top of the rail.
3.1.3
Top rail shall recover to the original position upon release of the test loadings.
3.1.4
At least one test shall be performed for each railing configuration or design.
3.1.5
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 25-1
Revised 09-18-07
Revised 04-21-05
Issued 09-01-1999 as IR M-2
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this IR is to provides allowable loads for mild steel wire.
1. Description. "Galvanized soft annealed mild steel wire," as defined in ASTM A641
(Class 1 Coating) is the wire referred to in this IR.
2. Basis of Design Strength. Based on tests which the Division of the State Architect
(DSA) has received to-date for this type of wire, an ultimate stress of 60,000 psi will be
used for #10 gage and #12 gage wire.
3. Design Value. Basic stress will be the ultimate stress divided by 2.5, or 24,000 psi.
Testing is not required when these values are used.
4. Diameter of Wire. #10 wire is 0.135 inches in diameter and a #12 wire is 0.106
inches in diameter as shown by the U.S. Steel Wire Gage.
5. Allowable Load.
Wire Size
#10 wire
#12 wire
Basic Load
343 lbs.
209 lbs.
6. Fabrication. When using twists on wire to develop the maximum allowable load, use a
minimum of 4 twists within 1". Three twists may be used to develop not more than one
half the above values.
7. Limitations.
7.1
These values are for tension only. Tearing of thin metal by wire must be considered.
If the specification requires a special wire, a higher allowable base load may be used,
subject to DSA approval.
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 25-2
Issued 9-1-99
Revised 04-21-05
Revised 07-21-05
Supercedes IR M-3
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Publications/default.htm (click on DSA Interpretations of
Regulations Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this IR is to provide guidelines for the installation of metal
suspension systems for lay-in ceilings.
1.
CEILING NOTES: The following notes will be acceptable in plans and specifications
1.1
#12 gage (min.) hanger wires may be used for up to and including 4 ft. by 4 ft. grid
spacing and shall be attached to main runners.
1.2
Provide #12 gage hanger wires at the ends of all main and cross runners within eight
(8) inches of the support or within one-fourth (1/4) of the length of the end tee,
whichever is least, for the perimeter of the ceiling area. End connections for runners
which are designed and detailed to resist the applied vertical and horizontal forces
may be used in lieu of the #12 gage hanger wires, subject to Division of the State
Architect (DSA) review and approval.
1.3
1.4
Ceiling grid members may be attached to not more than two (2) adjacent walls.
Ceiling grid members shall be at least 1/2 inch clear of other walls. If walls run
diagonally to ceiling grid system runners, one end of main and cross runners should
be free, and a minimum of 1/2 inch clear of wall.
1.5
At the perimeter of the ceiling area where main or cross runners are not connected
to the adjacent wall, provide interconnection between the runners at the free end to
prevent lateral spreading. A metal strut or a #16 gage wire with a positive
mechanical connection to the runner may be used. Where the perpendicular distance
from the wall to the first parallel runner is 12 inches or less, this interlock is not
required.
for ceiling systems whose total weight, including air conditioning/heating grills and light
fixtures, does not exceed two (2) psf. Heavier systems, and those supporting lateral loads
from partitions, will require special design details. Also, see IR 25-3 for heavier systems.
Page 1 of 12
1.6
Page 2 of 12
Provide bracing assemblies consisting of a compression strut and four (4) #12 gage
splayed bracing wires oriented 90 degrees from each other (see Figure 1) at the
following spacing:
1. For school buildings, place bracing assemblies at a spacing not more than 12 ft. by
12 ft. on center.
2. For Essential Services Buildings, place bracing assemblies not more than 8 ft. by 12
ft. on center.
3. Provide bracing assemblies at locations not more than one half (1/2) the spacings
given above, from each perimeter wall and at the edge of vertical ceiling offsets.
The slope of these wires shall not exceed 45 degrees from the plane of the ceiling
and shall be taut. Splices in bracing wires are not to be permitted without special
DSA approval.
4. Suspended acoustical ceiling systems with a ceiling area of 144 square feet or less,
and fire rated suspended acoustical ceiling systems with a ceiling area of 96 square
feet or less, surrounded by walls which connect directly to the structure above, do
not require bracing assemblies when attached to two adjacent walls.
1.7
Fasten hanger wires with not less than three (3) tight turns. Fasten bracing wires
with four (4) tight turns. Make all tight turns within a distance of 1-1/2 inches.
Hanger or bracing wire anchors to the structure should be installed in such a manner
that the direction of the anchor aligns as closely as possible with the direction of the
wire.
Note: Wire turns made by machine where both strands have been deformed
or bent in wrapping can waive the 1-1/2 inch requirement, but the number of
turns should be maintained, and be as tight as possible.
1.8
Separate all ceiling hanger and bracing wires at least six (6) inches from all unbraced
ducts, pipes, conduit, etc.
1.9
When drilled-in concrete anchors or shot-in anchors are used in reinforced concrete
for hanger wires, 1 out of 10 must be field tested for 200 lbs. in tension. When
drilled-in concrete anchors are used for bracing wires, 1 out of 2 must be field tested
for 440 lbs. in tension. Shot-in anchors in concrete are not permitted for bracing
wires. If any shot-in or drilled-in anchor fails, see CBC, Section 1923A.3.5.
Note: Drilled-in or shot-in anchors require special DSA approval prior to use in
prestressed concrete.
1.10
Attach all light fixtures and ceiling mounted air terminals, to the ceiling grid runners
to resist a horizontal force equal to the weight of the fixtures. Screws or approved
fasteners are required.
1.11
Flush or recessed light fixtures and air terminals, weighing less than 56 lbs., may be
supported directly on the runners of a heavy duty grid system but, in addition, they
must have a minimum of two (2) #12 gage slack safety wires attached to the fixture
at diagonal corners and anchored to the structure above. All 4 ft. x 4 ft. light fixtures
must have slack safety wires at each corner.
All flush or recessed light fixtures and air terminals weighing 56 lbs. or more must be
independently supported by not less than four (4) taut #12 gage wires, each
attached to the fixture and to the structure above regardless of the type of ceiling
grid system used.
Page 3 of 12
The four (4) taut #12 gage wires, including their attachment to the structure above,
must be capable of supporting four (4) times the weight of the unit.
1.12
All fixtures and air terminals supported on intermediate duty grid systems must be
independently supported by not less than four (4) taut #12 gage wires each attached
to the fixture or terminal, and to the structure above.
1.13
Support surface mounted light fixtures by at least two positive devices which
surround the ceiling runner and which are each supported from the structure above
by a #12 gage wire. Spring clips or clamps that connect only to the runner are not
acceptable.
Provide additional supports when light fixtures are 8 ft. or longer.
1.14
Support pendant mounted light fixtures directly from the structure above with
hanger wires or cables passing through each pendant hanger and capable of
supporting four (4) times the weight of the fixture. A bracing assembly, per Figure 1,
is required where the pendant hanger penetrates the ceiling. Special details are
required to attach the pendant hanger to the bracing assembly to transmit horizontal
forces.
1.15
(1)
duty.
(2) (3)
(3)
2.
2.1
Provide Underwriter Laboratory (U.L.) design number or State Fire Marshal (SFM)
listing number. The components and installation details must conform in every
respect with the U.L. or SFM approval for the design number specified. Custom
designs which combine components from different approved designs but have not
been tested as a complete assembly are not acceptable.
2.2
For schools and Essential Services Buildings, bracing assemblies are required for
each 96 square feet. The first bracing assembly is required not more than four (4)
feet from each wall. A minimum of one bracing assembly is required between any
two adjacent expansion cut-outs on runners being braced.
2.3
Pop rivets, screws, or other attachments are not acceptable unless specifically
detailed on the drawings and approved by U.L. and SFM.
Page 4 of 12
3.
ADDITIONAL REQUIREMENTS FOR METAL PANELS: Metal panels and
panels weighing more than 1/2 psf, other than acoustical tile, are to be positively attached
to the ceiling suspension runners.
4.
framing, special details will be required for the vertical hanger wire and lateral bracing wire
support connections to the framing.
5.
5.1
The gage and spacing of the wires must comply with the current applicable codes.
5.2
All existing ceiling hanger wires must be tested to 200 lbs. in tension.
5.3
All existing splayed bracing wires must be field tested to 440 lbs. in tension.
5.4
6.
DSA
Product Acceptance (PA)
Report #_
PA-008
PA-022
PA-026
PA-030
PA-041
PA-078
Note: Alternate manufacturers and systems may be submitted for review and
acceptance by the Division of the State Architect.
Figure 1
SUSPENDED CEILING BRACING ASSEMBLY
Bracing assemblies are required at spacing indicated in section 1.6 on page 2 of IR 25-2
Compression struts:
Steel section with l/r ratio of 200 maximum. Attach to main runners within 2" of cross runner
with 2-#12 self-drilling self-tapping (SDST) screws and to structure with 2-#12 x 2" screws at
wood or 3/16" diameter anchor at concrete/steel. Compression strut shall not replace hanger
wire.
Note:
See figures 3,4,5,6 for
connections of bracing
& hanger wire to the
structure above
Compression strut
45 degrees
max typ.
Main runner
Cross runner
45 degrees
max typ.
Figure 2
ACCEPTABLE HANGER WIRE CONNECTION TO GRID
1/2"
Hanger
wire
8" max.
or note (1)
below
Main or cross
runner
Acoustic panel
Pop rivet-see
section 1.4, IR 25-2
Wall angle
Wall connection-anchor
to structural element
Main runner
Cross runner
Detail (B)
Acoustic panel
Figure 3A
ACCEPTABLE DETAILS - WIRE CONNECTIONS TO WOOD FRAMING
Three 11/2" x 9 ga. staples or 3-stronghold J nails
at each wire loop
3" max.
1" min.
Bracing wire
Hanger wire
Bracing
wire
Joist or rafter
2 X blkg. w/2-16d
common nails at
ea. end
Bracing wire
2"
min.
Hanger wire
Saddle tie, per detail (F)
Hanger
wire
Hanger wire
saddle tie per detail (F)
Brace wire saddle tie per detail (F)
Note:
Saddle tie has
double loop at
support
Hanger wires-3 tight
turns and bracing
wires 4 tight turns
Figure 3B
ACCEPTABLE DETAILS - WIRE CONNECTION AT WOOD FRAMING
Plywood floor/roof
sheathing
Wood I-joist
*Alternate:
Figure 4
ACCEPTABLE DETAILS - WIRE CONNECTION TO CAST-IN-PLACE CONCRETE
Shot-in anchor
3/4" (minimum)
penetration - test
Structural concrete
5/16 inch (minimum) drill-in
expansion anchor - test
Structural concrete
5/8" max
Steel strap
1" wide x 12 ga.
(minimum)
45
max
Splayed brace
wire see sections
1.6, 1.7 of IR 25-2
Structural concrete
Structural concrete
45
max
Figure 5
ACCEPTABLE DETAILS - WIRE CONNECTIONS TO STEEL FRAMING
Web member
Bottom
chord
Insulation over
steel deck
Bracing
wire
Splayed
bracing wire
20 ga. min.
deck
Vertical hanger
wire
Insulation over
steel deck
2-#8 x 1/2"
self-tapping
screws
Steel strap 3" wide
x 4" long x 12 ga.
(minimum)
20 ga. min.
deck
#3 x 12"
rebar
Hanger wire-tie
to #3 rebar with
three wraps around
rebar and one wrap
around wire
Figure 6
ACCEPTABLE DETAILS - WIRE CONNECTIONS TO STEEL FRAMING
#3 rebar x length required
to cover min. of 4 high
corrugations
Non-structural
concrete fill
Wire pigtail
see figure 4
detail (C)
Structural
concrete fill
Steel
deck
Steel deck
See Fig 5 (D)
for alternative
support detail
Hanger wire
Structural
concrete fill
Structural
concrete fill
Steel deck
See Fig. 4
detail (B)
Bracing
wire
Steel deck
See Fig. 4
detail (A)
Hanger wire
Figure 7
ACCEPTABLE LOCATION OF SLIP JOINTS IN ESB EXITWAYS
Typical hanger wire, see
sections 1.1, 1.2 and 1.7 of IR 25-2
4'-0" o.c.
8" max
see Fig. 2
8" max
see Fig. 2
4'-0"
or less
4' o.c.
4'-0" o.c.
Typical splice
Pop rivet
Pop rivet
Continuous runners
(splice all joints)
Splice must be
thru conn. - snap
conn. unacceptable
Typical hanger
1/2" CLR
Pop rivet
Ledger angle
Runner splice
Wall slip
B
Refer to T-24
Part 2, Sec.
2501A.5
Connected wall
Connected wall
Plan view
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 25-3
Issued 9-1-99
Revised 6-11-03
Revised 4-21-05
Revised 7-21-05
Supercedes IR M-4(9/99)
This Interpretation of Regulation (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Publications/default.htm (click on DSA Interpretations of
Regulations Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: The purpose of this IR is to provide additional guidelines for the design and
construction of gypsum wall board suspended ceiling systems.
1.
2.
DESIGN: For lateral load, refer to CBC, Section 1632A. The weight of the
3.
DETAILS OF CONSTRUCTION.
3.1
General: Gypboard ceilings should not support building components other than air
conditioning/heating grills or light fixtures. All such components shall be supported
either directly from main runners, or by supplemental framing which is supported by
main runners. No vertical loads other than gypsum board dead load shall be applied
to cross-furring.
3.2
suspended ceiling shall not be less than four (4) pounds per square foot for design
purposes.
3.2.1
There are many possible variations of hanger and main runner sizes and spacings
listed in CBC, Table No. 25A-A, and all of the combinations are acceptable.
However, the main runners that are most frequently used are 1-1/2 inch cold
rolled channels, 0.475 lbs/ft. This is acceptable provided the following
requirements are met:
Page 1 of Page 1 of 3
Page 2 of Page 2 of 3
To use a main runner spacing of 4'-0" o.c. with a hanger spacing of 4'-0" o.c., main
runners must be 1-1/2 inch hot rolled channels weighing 1.12 lbs/ft. Also, #8 gage
galvanized hanger wires would be required.
3.2.2
1. Hangers should be saddle-tied around main runners to develop the full strength of
the hangers.
2. Cross-furring should be saddle-tied to the main runners with one strand of #16
gage, or two strands of #18 gage tie wire.
3. Main runners should be spliced by lapping and interlocking flanges 12 inches
minimum and tying near each end with double loops of #16 gage wire.
4. Cross-furring should be spliced by lapping and interlocking the pieces eight (8)
inches minimum and tying near each end with double loops of #16 gage wire
3.2.3
Fasten hanger wires with not less than three (3) tight turns. Fasten bracing wires
with four (4) tight turns. Make all tight turns within a distance of 1-1/2 inches.
Hanger or bracing wire anchors to the structure should be installed in such a
manner that the direction of the anchor aligns as closely as possible with the
direction of the wire.
Note: Wire turns made by machine where both strands have been deformed or bent
in wrapping can waive the 1-1/2 inch requirement, but the number of turns should
be maintained, and be as tight as possible.
Separate all ceiling hanger and bracing wires at least six (6) inches from all
unbraced ducts, pipes, conduit, etc.
When drilled-in concrete anchors or shot-in anchors are used in reinforced
concrete for hanger wires, 1 out of 10 must be field tested for 200 lbs. in tension.
When drilled-in concrete anchors are used for bracing wires, 1 out of 2 must be
field tested for 440 lbs in tension. Shot-in anchors in concrete are not permitted
for bracing wires. If any shot-in or drilled-in anchor fails, see Section 1923A.3.5,
Title 24.
Note: Drilled-in or shot-in anchors require special DSA approval when used in
prestressed concrete.
Provide trapeze or other supplementary support members at obstructions to
typical hanger spacing. Provide additional hangers, struts or braces as required at
all ceiling breaks, soffits or discontinuous areas. Hanger wires that are more than
1 in 6 out of plumb are to have counter-sloping wires.
4.
4.1
All recessed or drop-in light fixtures, as well as ceiling mounted mechanical air
terminals and services, shall be supported directly by main runners or by
supplemental framing which is supported by main runners and positively attached
with screws or other approved connectors.
4.2
Surface mounted fixtures shall be attached to a main runner with a positive clamping
device made of material with a minimum of 14 gage. Rotational spring clamps do not
comply.
5.
Page 3 of Page 3 of 3
LATERAL SYSTEM:
5.1
Wire Brace System. Provide bracing assemblies, per Figure 1 of IR 25-2, as
determined by calculations, with the following limitations:
1. For school buildings, place bracing assemblies at a spacing not more than 12 ft. by
12 ft. on center.
2. For Essential Services Buildings, place bracing assemblies not more than 8 ft. by 12
ft. on center.
3. Provide bracing assemblies at not more than six (6) feet from each perimeter wall
and at the edge of vertical ceiling offsets.
The slope of bracing wires shall not exceed 45 degrees from the plane of the ceiling
and shall be taut. Splices in bracing wires are not to be permitted without special
DSA approval.
4. Ceiling grid members may be attached to not more than two (2) adjacent walls.
Ceiling grid members shall be at least 1/2 inch free of other walls. If walls run
diagonally to ceiling grid system runners, one end of main and cross runners should
be free, and a minimum of 1/2 inch clear of wall.
5. Suspended ceiling systems with an area of 144 square feet or less, and fire rated
ceiling systems with an area of 96 square feet or less, surrounded by walls which
connect directly to the structure above, do not require bracing assemblies when
attached to at least two adjacent walls.
5.2
5.2.1
1:1 maximum
5.2.2
5.2.3
Details are required providing for lateral load transfer from the gypsum board to
shear walls, or other lateral load resisting elements, on all four sides of the
diaphragm.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
SELF-FURRING
LATH
IR 25-4
Revised 01-02-08
Issued 09-30-05 as CR 25-1
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose:
1.
General: Lath for plaster shall be furred out a minimum of 1/4 inch when installed
over a solid surface such as plywood. The use of self-furring lath is subject to a satisfactory
jobsite demonstration of the lath installation for each project, with approval by the project
architect and enforcement agency.
2.
Background: Many types of self-furring lath have depressions in the lath that
successfully offset the lath 1/4 inch from plywood or other rigid backing, and therefore meet
the 1/4 inch offset requirement of ASTM C933-04 Section 5.1.2 (or Table 25A-B of the 2001
CBC). Furring nails are not required. The lath is not offset from the backing at the location
where nails or staples hold the lath to the backing/stud.
3.
Self-Furring Lath
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR 25-5
Issued 06-22-09
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, Community Colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose:
1.
General Requirements: The following requirements apply to ceiling systems
whose total weight, including ceiling mounted air terminals, services and light fixtures, does
not exceed four (4) psf. Heavier systems, and those supporting lateral loads from partitions,
will require special design details.
1.1
#12 gage wire shall be 0.106 inches in diameter conforming to ASTM A641.
gage wire shall be soft annealed, galvanized steel wire with a class 1 coating.
#12
1.2
#12 gage hanger wires may be used for up to and including 4 ft. by 4 ft. grid
spacing and shall be attached to main runners.
1.3
Provide #12 gage hanger wires at the ends of all main and cross runners within eight
(8) inches of the support or within one-fourth (1/4) of the length of the end tee,
whichever is least, for the perimeter of the ceiling area. See Figure 2. Perimeter
wires are not required when the length of the end tee is eight (8) inches or less.
1.4
1.5
Ceiling grid members shall be attached to two (2) adjacent walls per ASCE 7-05,
Section 13.5.6.2(b). Ceiling grid members shall be at least 3/4 inch clear of other
walls. If walls run diagonally to ceiling grid system runners, one end of main and
cross runners should be free, and a minimum of 3/4 inch clear of wall.
1.6
The width of the perimeter supporting closure angle shall be not less than 2 inches.
1.7
At the perimeter of the ceiling area where main or cross runners are not connected
to the adjacent wall, provide interconnection between the runners at the free end to
prevent lateral spreading. A metal strut or a #16 gage wire with a positive
mechanical connection to the runner may be used. Where the perpendicular distance
from the wall to the first parallel runner is 12 inches or less, this interlock is not
required.
1.8
DSA IR 25-5
(iss 06-22-09)
Page 1 of 13
DSA IR 25-5
(iss 06-22-09)
Page 2 of 13
1.9
1.10
The maximum slenderness ratio (kL/R) of the compression strut is 200 or less.
1.11
The slope of bracing wires shall not exceed 45 degrees from the plane of the ceiling
and wires shall be taut. Splices in wires are not permitted without special DSA
approval.
1.12
Compression struts shall not be more than 1 (horizontal) in 6 (vertical) out of plumb.
1.13
Suspended acoustical ceiling systems with a ceiling area of 144 square feet or less,
and fire rated suspended acoustical ceiling systems with a ceiling area of 96 square
feet or less, surrounded by walls which connect directly to the structure above or
walls independently braced above ceiling to structure above, do not require bracing
assemblies when attached to two adjacent walls.
1.14
For ceiling areas exceeding 2500 square feet a seismic separation joint shall be
provided in accordance with Figure 7 Detail A to divide the ceiling into areas not
exceeding 2500 square feet. Alternatively, structural analysis shall be performed to
demonstrate compliance with ASCE 7-05, Section 13.5.6.2.2(d).
1.15
Penetrations through the ceiling for sprinkler heads and other similar devices that
are not integrally tied to the ceiling system in the lateral direction shall have a two
(2) inch oversized ring, sleeve or adapter through the ceiling tile to allow free
movement of one (1) inch in all horizontal directions. Alternatively, swing joints may
be provided per ASCE 7-05, Section 13.5.6.2.2(e).
1.16
Fasten #12 hanger wires with not less than three (3) tight turns. Fasten #10 or #12
bracing wires with four (4) tight turns. Make all tight turns within a distance of 1-1/2
inches. Hanger or bracing wire anchors to the structure should be installed in such a
manner that the direction of the anchor aligns as closely as possible with the
direction of the wire.
Note: Wire turns made by machine where both strands have been deformed or bent
in wrapping can waive the 1-1/2 inch requirement, but the number of turns should
be maintained, and be as tight as possible.
1.17
Separate all ceiling hanger and bracing wires at least six (6) inches from all unbraced
ducts, pipes, conduit, etc.
1.18
When drilled-in concrete anchors or shot-in anchors are used in reinforced concrete
for hanger wires, 1 out of 10 wire/anchor assemblies must be field tested for 200
lbs. in tension. When drilled-in concrete anchors are used for bracing wires, 1 out of
2 wire/anchor assemblies must be field tested for 440 lbs. in tension in the direction
of the wire. Shot-in anchors in concrete are not permitted for bracing wires.
Note: Drilled-in or shot-in anchors require special DSA approval prior to use in
prestressed concrete.
DSA IR 25-5
(iss 06-22-09)
Page 3 of 13
1.19
Attach all light fixtures and ceiling mounted air terminals, to the ceiling grid runners
to resist a horizontal force equal to the weight of the fixtures. Screws or approved
fasteners are required.
1.20
Flush or recessed light fixtures, weighing less than 56 lbs. and mechanical terminals
and services, weighing less than 20 lbs., may be supported directly on the runners of
a heavy duty grid system but, in addition, they must have a minimum of two (2)
#12 gage slack safety wires attached to the fixture at diagonal corners and anchored
to the structure above. All 4 ft. x 4 ft. light fixtures must have slack safety wires at
each corner.
All flush or recessed light fixtures weighing 56 lbs. or more and mechanical terminals
and services, weighing 20 lbs. or more, must be independently supported by not less
than four (4) taut #12 gage wires, each attached to the fixture and to the structure
above.
The four (4) taut #12 gage wires, including their attachment to the structure above,
must be capable of supporting four (4) times the weight of the unit.
1.21
Support surface mounted light fixtures by at least two positive devices which
surround the ceiling runner and which are each supported from the structure above
by a #12 gage wire. Spring clips or clamps that connect only to the runner are not
acceptable.
Provide additional supports when light fixtures are 8 ft. or longer. Maximum spacing
between supports shall not exceed 8 feet.
1.22
Support pendant mounted light fixtures directly from the structure above with
hanger wires or cables passing through each pendant hanger and capable of
supporting two (2) times the weight of the fixture. A bracing assembly, per Figure 1,
is required where the pendant hanger penetrates the ceiling. Special details are
required to attach the pendant hanger to the bracing assembly to transmit horizontal
force. If the pendant mounted light fixture is directly and independently braced
below the ceiling, i.e. aircraft cables to walls, then brace assembly is not required
above the ceiling. See IR 16-9 for additional requirement for pendent mounted
fixtures.
1.23
The ceiling grid system must be rated as heavy duty as defined by ASTM C635. A
list of acceptable grid systems must be shown on the drawings. The grid systems
specified must be acceptable in accordance with IR A-5. The following information
must be included on the drawings for each acceptable grid system specified:
Classification of ceiling grid is heavy duty.
(1) (2)
(2)
2.
ADDITIONAL REQUIREMENTS:
2.1
DSA IR 25-5
(iss 06-22-09)
Page 4 of 13
for the design number specified. Details shall clearly depict all components, including
insulation materials, of the design so that the assembly can be constructed and
inspected accordingly. Custom designs which combine components from different
approved designs but have not been tested as a complete assembly are not
acceptable.
Pop rivets, screws, or other attachments are not acceptable unless specifically
detailed on the drawings and approved by U.L. and SFM recognized laboratories.
2.2
2.3
2.4
3.
3.1
The gage and spacing of the wires must comply with the current applicable codes.
3.2
All existing ceiling hanger wire/anchor assemblies must be tested to 200 lbs.
3.3
All existing bracing wire/anchor assemblies must be field tested to 440 lbs.
3.4
2.
All new wires, after being spliced to the existing wires, must be field tested per
Items 3.2 and 3.3 above.
3.
All field tests must be performed in the presence of the project inspector.
4.
5.
DSA ACCEPTANCE: DSA no longer issues Acceptance Reports for products.
Ceiling grid systems or components, with valid evaluation reports issued by
qualified evaluation agencies in accordance with DSA IR A-5, are accepted by DSA,
provided the system or component meets the requirements of CBC Section
1614A.1.12 and ASCE 7-05, Section 13.5.6. Where qualified evaluation report is
utilized, the installation shall comply with all the requirements specified in the
evaluation report, i.e. connections, member sizes, perimeter details, special clips to
wall angles, etc.
DSA IR 25-5
(iss 06-22-09)
Page 5 of 13
Figure 1
Compression struts shall not replace hanger wires. Maximum KL/R ratio of 200 or less. The
sizes of compression struts must be shown on construction documents by the engineer or
architect. Attach compression struts to main runners within 2" of cross runner. Details of
attachment at both ends must be designed and shown on construction documents by
the engineer or architect. The attachment at the top shall be capable of supporting four
times the weight of the strut.
DSA IR 25-5
(iss 06-22-09)
Page 6 of 13
Figure 2
CEILING HANGER DETAILS
DSA IR 25-5
(iss 06-22-09)
Page 7 of 13
Figure 3A
ACCEPTABLE DETAILS - WIRE CONNECTIONS TO WOOD FRAMING
DSA IR 25-5
(iss 06-22-09)
Page 8 of 13
Figure 3B
ACCEPTABLE DETAILS - WIRE CONNECTION AT WOOD FRAMING
DSA IR 25-5
(iss 06-22-09)
Page 9 of 13
Figure 3C
ACCEPTABLE DETAILS - WIRE CONNECTION AT WOOD FRAMING
DSA IR 25-5
(iss 06-22-09)
Page 10 of 13
Figure 4
ACCEPTABLE DETAILS - WIRE CONNECTION TO CAST-IN-PLACE CONCRETE
Shot-in anchors not allowed for bracing wires
DSA IR 25-5
(iss 06-22-09)
Page 11 of 13
Figure 5
ACCEPTABLE DETAILS - WIRE CONNECTIONS TO STEEL FRAMING
DSA IR 25-5
(iss 06-22-09)
Page 12 of 13
Figure 6
ACCEPTABLE DETAILS - WIRE CONNECTIONS TO STEEL DECK
DSA IR 25-5
(iss 06-22-09)
Figure 7
ACCEPTABLE LOCATION OF SLIP JOINTS IN EXITWAYS
Page 13 of 13
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
TITLE 24 ELEVATORS:
BUILDING MATERIALS AND SYSTEMS
References:
2001California Building Code (CBC): Table 6-A and Section 3003.5
2004 California Electrical Code (CEC): Section 800.51
2007 CBC: Sections 707.14 and 3002
2007 CEC: Section 179
Discipline: Structural
IR 30-1
Corrected 09-10-09
Issued 08-25-09
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, community colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose:
1.1
1.2
Electrical Wiring: Electrical wiring shall meet or exceed the minimum requirements
of the applicable 2007 California Electrical Code for fire resistive construction, with
penetration protection per 2007 California Building Code Section 712.4.2.1.
1.3
Automatic Fire Sprinkler Systems: Buildings with required automatic fire sprinkler
systems will have a side-wall type of sprinkler installed a maximum of two feet
above the bottom of the hoist way, but in no case shall the sprinkler be installed so
as to be an obstruction to the elevator car at its lowest point of travel.
An automatic fire sprinkler is not required at the top of an elevator hoist way
constructed of non-combustible materials.
1.4
Fire Alarm Requirements: Smoke or Heat Detection is not required at the top of
the elevator hoistway if there is no automatic fire sprinkler located at the top of the
hoistway.
1.5
Elevator/Stairway Configuration: Elevators with cabs sized to accommodate
ambulance gurneys are not required for two story buildings if the configuration of the
stairways is such that the use of an ambulance gurney is feasible and approved by the Local
Fire Authority and DSA.
(See DSA Policy 09-05 for Elevator Cab Size deviation
procedures).
DSA IR 30-1
(iss 08-25-09)
Title 24 Elevators:
Building Materials and Systems
Page 1 of 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
GROUNDING OF
RELOCATABLE BUILDINGS
IR E-1
Revised 10-03-07
Revised 04-21-05
Issued 09-01-99 as IR M-5
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretations of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
3.
DSA IR E-1
(rev 10-03-07)
Grounding of
Relocatable Buildings
Page 1 of 2
DSA IR E-1
(rev 10-03-07)
Grounding of
Relocatable Buildings
Page 2 of 2
Figure 1
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
GROUND FAULT
CIRCUIT-INTERRUPTER
IR E-2
References:
2004 California Electrical Code (CEC), Sections, 210.8(B), 406.3 (G), 406.4 (E), and 406.8
2007 CEC Sections 210.8 (B), 406.4 (E) and 406.8.
2007California Building Code (CBC) Section 1117B.6.5.2
Revised 10-03-07
Issued 02-20-2007
General: The California Electrical Code (CEC) Section 210.8 Ground-Fault CircuitInterrupter Protection (GFCI) for Personnel requires that personnel be protected from
electrical shock via the Ground-Fault Circuit-Interrupter device. In keeping with the intent
of this section, GFCI protection shall be required in all Public School construction (K-12 and
Community Colleges) in locations as required by recognized standards, regardless of type of
occupancy and as noted below.
1.
Interpretation:
1.1
Classrooms
Teacher Work Rooms
Auto, Metal or Print Shops
Science Labs
Teacher Lounges
Janitors Closets
Ground-Fault
Interrupter-Circuit
Page 1 of 2
Ground Fault
Interrupter-Circuit
Page 2 of 2
Laundry areas
Home Economics classrooms
Infant care areas/classrooms
Any area where similar hazards exist
Mounting:
Receptacle mounting height requirements shall be similar to that stated in CEC
Section 210.52 (C) 5 for all countertops in California public schools. Receptacles
shall be located above, but not more than 20 inches (500 mm) above, the
countertop.
Exception: Receptacle outlets rendered not readily accessible by
appliance garages, or
See 2004 CEC, Section 406.3 (G) (Section 1117B.6.5.2 in the 2007 CBC) for
determining the general requirements for electrical receptacles in the above
locations.
1.2.2
1.2.3
2.
2.1
Modifications:
Receptacles and receptacle face plates shall not be altered in any manner that
would void the UL Listing. Use of broken, altered or modified receptacles, face
plates or other materials associated with the receptacles is strictly prohibited.
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR E-3
Issued 04-27-10
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA which includes State of California public elementary and secondary schools (grade K-12, Community Colleges
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) clarifies code requirements, based on the
2007 California Electric Code and 2003 NFPA 20 Section 5.20 as to what will be acceptable
as a reliable power supply to an electric fire pump.
General: The 2007 California Electric Code, Article 695, Section 695.3, states, Power
Source(s) for Electric Motor-Driven Fire Pumps shall have a reliable source of power.
Interpretation:
1. Reliable Power Supply:
DSA IR E-3
(iss 04-27-10)
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
NONWATER- SUPPLIED
URINAL FIXTURES
IR P-1
References:
Revised in its entirety 06-02-08
2001 California Plumbing Code (Title 24, Part 5), Sections 301.2, 401.1, 406.2
Issued 01-05-04 as AC M-1
2007 California Plumbing Code (Title 24, Part 5), Sections 301.2, 401.1, 405.2
California Building Standards Administrative Code (Title 24, Part 1), Section 4-304
Health & Safety Code Section 17921.4
American Society of Mechanical Engineers (ASME) A112.19.19-2006 Vitreous China Nonwater Urinals
Discipline: Plumbing
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects, including
State of California public elementary and secondary schools (grades K-12), community colleges, and state-owned buildings. This IR
indicates an acceptable method for achieving compliance with applicable codes and regulations, although other methods proposed
by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Application:
1.1
Public Schools: The design professional in general responsible charge (i.e. project
architect) of the design of the school construction project shall consult with the
school district regarding installation and maintenance requirements for the proposed
nonwater-supplied urinal fixtures. The nonwater-supplied urinal fixtures, installation,
and maintenance must comply with the requirements noted in Sections 2, 3, and 4
below.
1.2
2.
Fixture Requirements:
2.1
2.2
DSA IR P-1
(rev 06-02-08)
Nonwater-Supplied
Urinal Fixtures
Page 1 of 2
DSA IR P-1
(rev 06-02-08)
Nonwater-Supplied
Urinal Fixtures
Page 2 of 2
may be referenced in the project construction plans and/or specifications to fulfill this
requirement.
2.3
2.4
Trap Seal: Nonwater-supplied urinal fixtures must provide a trap seal that complies
with the California Plumbing Code. This trap must permit the uninhibited flow of
waste through the urinal to the sanitary drainage system. This trap must be installed
and maintained in accordance with the urinal fixture manufacturers instructions.
Fixture Installation : A water supply rough-in to the urinal fixture location shall
be provided. Water distribution and fixture supply piping sized to accommodate a water-fed
urinal shall be installed to an in-wall location immediately adjacent to the urinal fixture.
4
California Department of General Services . Division of the State Architect . Interpretation of Regulations Document
IR N-1
Revised 04-15-08
Issued 09-15-03 as a DSA Bulletin
This Interpretation of Regulations (IR) is intended for use by the Division of the State Architect (DSA) staff, and as a resource for
design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects within the
jurisdiction of DSA, which include State of California public elementary and secondary schools (grades K-12), community colleges,
and state-owned or state-leased essential services buildings. This IR indicates an acceptable method for achieving compliance with
applicable codes and regulations, although other methods proposed by design professionals may be considered by DSA.
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective
IRs. Only IRs listed in the document at http://www.dsa.dgs.ca.gov/Pubs/default.htm (click on DSA Interpretation of Regulations
Manual) at the time of plan submittal to DSA are considered applicable.
Purpose: This Interpretation of Regulations (IR) clarifies requirements for the energy
compliance review of Pre-Check (PC) designs submitted to the Division of the State
Architect (DSA) for approval. This IR completely supersedes and replaces previously issued
DSA Bulletin "PRE-CHECK (PC) DESIGNS - ENERGY COMPLIANCE REVIEW," revised
September 15, 2003.
BACKGROUND: All public school facility construction within the State of California,
including relocatable classrooms, must comply with all Parts of Title 24 (California Building
Standards Code), including the energy efficiency standards contained in Part 6, Title 24,
California Energy Code. The provisions of Part 6, Title 24 apply to the building envelope,
space-conditioning systems, water-heating systems, and lighting systems of buildings.
1.
Any PC Design application submitted to DSA for approval of compliance with Title 24,
current edition, and containing buildings with space-conditioning systems, water-heating
systems, and/or lighting systems is subject to energy compliance review.
Any project application that utilizes a PC design will be reviewed at the time of submittal to
DSA to determine whether or not the PC design is approved for the climate zone in which
the project is located.
If the PC design is not approved for the project's climate zone, the project applicant and the
PC owner will be notified by DSA that approval of the PC design for the climate zone in
which the project is located is required prior to approval of the project application.
Review and approval of the PC design for the project's climate zone will be processed as a
revision. The approved revision to the PC design must be incorporated into the project
application.
2.
2.1
For any PC design subject to energy compliance review, the PC application submitted
to DSA must include documentation identified in Section 3.2 below.
2.2
Energy compliance documentation must be approved for each climate zone in which
a project utilizing the PC is anticipated to be located, as determined by the PC owner.
The climate zones for which the PC has been designed shall be noted on the PC plan
cover sheet (see Section 2.3).
DSA IR N-1
(iss 04-15-08)
Page 1 of 3
DSA IR N-1
(iss 04-15-08)
Page 2 of 3
Any building design that complies with the worst-case orientation (see Section 2.3)
in climate zones 14, 15 and 16 may be approved, from an energy standpoint, for
placement in any climate zone. Climate zones 14, 15 and 16 represent the most
severe types of weather (both heating and cooling) in California. Complying with
code in climate zones 14, 15 and 16 does not require or prevent modeling the PC in
other climate zones. Modeling and complying with code in other climate zones may
allow for flexibility in the choice of insulation, fenestration and heating and cooling
system equipment. Information regarding the design variations for all climate zones
or groups of climate zones for which the PC complies must be provided in a table on
the PC plan cover page/sheet as applicable. When modeling for particular climate
zones use the reference cities listed in the 2005 Building Energy Efficiency
Standards, Joint Appendix II on page II-3.
2.3
For each climate zone considered, energy efficiency analysis must demonstrate
compliance for the highest energy use (i.e. worst-case) orientation for each building
within the PC Design. This worst-case orientation may be determined by performing
rotations about the compass in 30 degree increments starting at 0 degrees for each
building.
2.4
2.5
When a unique PC design contains multiple sizes, the smallest and the largest
potential size should be modeled at 30 compass intervals in each Climate Zone for
which the PC seeks approval (per 2.3 above). The electronically-generated computer
file(s) that produced the worst case energy use results for each climate zone for each
unique PC design configuration that is modeled should be provided to DSA. In
addition, a spreadsheet or table showing the data (standard and proposed design
kBTU/ft2/yr) results from all the 30 degree simulations per climate zone in which
each unique PC design configuration was modeled must be provided to DSA.
3.2
DSA IR N-1
(iss 04-15-08)
Page 3 of 3
orientation(s) were modeled and the worst-case orientation using the compliance
method submitted, and which occupancy or occupancies are to be approved.
3.3
Mixed occupancies within designs should be modeled for lighting as designed, except
where the PC Owner wants approval of other occupancies with differing lighting
power densities. In the latter case, one computer model could be used for approval
but the base case model must contain the lowest proposed lighting power density
and the proposed case model must contain the highest lighting power density.
3.4
3.5
During the review phase, the DSAENPR may contact the Design Professional to
request additional information or to address questions regarding the PC's energy
compliance.
3.6
3.7
A plan sheet entitled Title 24 Part 6 should be included in the plans. This sheet
should contain copies of the approved and signed PERF forms (parts 1 and 2) and
also the Mandatory Measures sheets for lighting, mechanical and envelope that
reflect the computer-generated or hand-written output from the approved energy
Title 24 compliance documentation for each unique design.
3.8
Fees: Costs incurred by DSA to review and approve energy compliance shall be
recovered from the PC Owner or Manufacturer. Energy review costs will be included
in the DSA plan review invoice issued upon completion of the PC design back-check.
Any questions regarding this Bulletin may be directed to the DSAENPR lead person at 916327-0535.