VOLUME THREE
Social and Economical Development Pillar
Energy, Transportation, Water Resource Management
Information and Communications Technology
Urban Development, and Mining Sector Strategies
uYuYY]
F F 5S
5 4 7 P3 5 ]Z3 7Y4 J 3 4 fF u
7 5
3 2 7 3 5 ]Z3 4 J 3 4 3Y
Verily, never will Allah change the condition of people unless they
change it themselves (Holy Quran, 013,011)
1.
The Afghanistan National Development Strategy (ANDS) serves as Afghanistans Poverty Reduction
Strategy Paper (PRSP) and uses the pillars, principles and benchmarks of the Afghanistan Compact as
a foundation. The pillars and goals of the ANDS are:
Security: Achieve nationwide stabilization, strengthen law enforcement, and improve personal
security for every Afghan.
2.
Governance, Rule of Law and Human Rights: Strengthen democratic processes and institutions,
human rights, the rule of law, delivery of public services and government accountability.
3.
Economic and Social Development: Reduce poverty, ensure sustainable development through a
SULYDWHVHFWRUOHGPDUNHWHFRQRP\LPSURYHKXPDQGHYHORSPHQWLQGLFDWRUVDQGPDNHVLJQLFDQW
progress towards the Millennium Development Goals (MDGs).
A further vital and cross-cutting area of work is eliminating the narcotics industry, which remains a
formidable threat to the people and state of Afghanistan, the region and beyond.
II
Map of Afghanistan
Foreword
For the preparation of Afghanistan National Development Strategy
IV
Hamid Karzai
President of the Islamic Republic of Afghanistan
VI
Sarwar Danish
Minister of Justice
Haneef Atmar
Minister of Education
VII
Acknowledgments
For the preparation of the Afghanistan National Development Strategy
VIII
Adib Farhadi,
Director, Afghanistan National Development Strategy, and
Joint Coordination and Monitoring Board Secretariat
See complete list of contributors in next page
IX
The Energy Sector Strategy was developed as a result of the commitment and efforts of members of key
Afghan ministries, United Nations, donors, NGOs, civil society and the private sector.
The invaluable contribution of H.E. Mohammad Ismail Khan, Minister of Energy & Water, H.E. Dip. Eng.
M. Ibrahim Adel, Minister of Mines, H.E. Mohammad Ehsan Zia, Minister of Rural Rehabilitation and
Development, has been invaluable in the development of this sector strategy.
Finally, we would like to thank everyone who assisted the ANDS Secretariat in working to develop the
(QHUJ\6HFWRU6WUDWHJ\:HORRNIRUZDUGWRWKHUPFRPPLWPHQWRIDOORXUVWDNHKROGHUVWKURXJKRXWWKH
implementation of this strategy.
Certainly, contributions to the Energy Sector will remain key to the success of this strategy in particular,
and of the ANDS in general.
Special thanks also go to the following for their valued help and support:
H.E. Eng. Mir M. Sediq Ashan, Energy Deputy Minister, Ministry of Energy and Water; H.E. Eng. Abdul
Qudos Hamidi, Deputy Minister, Ministry of Mines; Eng. Zia Gul Saljuki, Planning Director, Ministry of
Energy and Water; Eng. Ghulam Rabani, Director General, DABM; Eng. Mohammad Hashim, Technical/
PIU, Ministry of Energy and Water; Eng. Mohammad Sarwar, Ministry of Energy and Water; Eng.
Abdul Waheed Qayum, Deputy Planning Director, DABM; Mary Louise, Advisor to DABM; Arsalan
Ghalieh, Advisor to Ministry of Rural Rehabilitation and Development; Salem Shah Ibrahimi, Assistant to
Minister, Ministry of Rural Rehabilitation and Development; Eng. Khuzhman Ulomi, Head of Policy and
Coordination Department; Ministry of Mines; Dip Eng. Chaman Shah Ahmadi, Advisor to ministry on Oil
and Gas, Ministry of Mines; Eng. Mohmmad Farid Fazaly, Deputy for Oil and Gas Department, Ministry of
Mines; Eng. Abdull Khaliq, Director of Coal for North, Ministry of Mines; Eng Aziz Areb, Head of Mining
Department, Ministry of Mines; Eng. Wais Ahmad, NSP Chief Coordinator, Ministry of Rural Rehabilitation
DQG'HYHORSPHQW5R\D+XVVHQL2IFHU$1'60LQLVWU\RI5XUDO5HKDELOLWDWLRQDQG'HYHORSPHQW$PLQ
6KDHH&RRUGLQDWRU$1'60LQLVWU\RI5XUDO5HKDELOLWDWLRQDQG'HYHORSPHQW'LDQD1DZD]L2IFHU
(ANDS), Ministry of Rural Rehabilitation and Development; Russell Profozich, Former Advisor to ANDS;
Matthew W. Addison, Former Advisor to ANDS; Aziz Darwish, Executive Secretary to Minister, Ministry
RI0LQHV+D]$I]DO\3URMHFW([HFXWLYH2IFHU0LQLVWU\RI0LQHVDQG5DKDWXOODK1DHHP$1'6
The Transport Sector Strategy was developed as a result of the commitment and efforts of members of key
Afghan ministries, United Nations, donors, NGOs, civil society and the private sector.
The invaluable contribution of H.E. Dr. Sohrab Ali Saffary, Minister of Public Works, H.E. Hamidullah Qaderi,
Minister of Transport and Civil Aviation, H.E. Mohammad Ehsan Zia, Minister of Rural Rehabilitation
and Development and H.E. Eng. Mohammad Yousuf Pashtun, Minister of Urban Development, has been
invaluable in the development of this sector strategy.
Finally, we would like to thank everyone who assisted the ANDS Secretariat in working to develop the
7UDQVSRUW6HFWRU6WUDWHJ\:HORRNIRUZDUGWRWKHUPFRPPLWPHQWRIDOORXUVWDNHKROGHUVWKURXJKRXWWKH
implementation of this strategy.
Certainly, contributions to the Transport Sector will remain key to the success of this strategy in particular,
XI
Special thanks also go to the following for their valued help and support:
H.E. Eng. Shojaudin Ziaie, Chair of Water Technical Secretariat and Water Deputy Minister, Ministry of
Energy and Water; H.E. Eng. Pir Mohammad Azizi, Deputy Minister, Ministry of Agriculture, Irrigation
and Livestock; H.E. Dip. Eng. Mohammad Akram Ghiasi, Deputy Minister, Ministry of Mines; H.E. Dr.
Qiamudin Djalalzada, Deputy Minister, Ministry of Urban Development; H.E. Eng. Dad Mohammad
Baheer, Technical Deputy Director, National Environmental Protection Agency; Eng. Sultan Mahmood,
General Director of Hydrology and Water Management Department, Ministry of Energy and Water; Hans
Husselman, Advisor to Ministry of Energy and Water; Paul Collins, Advisor, IRD; Eng. Sayed Sharif
Shobair, Advisor to Ministry of Energy and Water; Mohammad Qasim Naimi, Advisor to Ministry of Energy
and Water; Ghulam Hassan, National Environmental Protection Agency; Eng. Mohammad Naim Tokhi,
Ministry of Mines; Mohammad Qasim Salehi, Ministry of Urban Development; Abdul Hashim Hikmat,
Ministry of Economy; Eng. Abdul Waheed Hamidi, Planning Director; Ministry of Rural Rehabilitation
and Development; Eng. Fahimullah Ziaee, Ministry of Rural Rehabilitation and Development; Eng.
Waheedullah Majeed, WatSan Director, Ministry of Public Health; Jamal Nasir, Coordinator, Ministry of
8UEDQ'HYHORSPHQW(QJ0$OL$NEDUL0LQLVWU\RI3XEOLF+HDOWK5R\D+XVVHQL$PLQ6KDHHDQG'LDQD
Nawazi, Ministry of Rural Rehabilitation and Development and Rahatullah Naeem (ANDS).
The Information and Communication Technology (ICT) Sector Strategy was developed as a result of the
commitment and efforts of members of key Afghan ministries, United Nations, donors, NGOs, civil society
and the private sector.
The invaluable contribution of H.E. Eng. Amirzai Sangin, Minister of Communication and Information
Technology; has been invaluable in the development of this sector strategy.
Finally, we would like to thank everyone who assisted the ANDS Secretariat in working to develop the
,&7 6HFWRU 6WUDWHJ\ :H ORRN IRUZDUG WR WKH UP FRPPLWPHQW RI DOO RXU VWDNHKROGHUV WKURXJKRXW WKH
implementation of this strategy.
Certainly, contributions to the ICT Sector will remain key to the success of this strategy in particular, and
of the ANDS in general.
Special thanks also go to the following for their valued help and support:
H.E. Baryalai Hassam, Deputy Minister, Ministry of Communication and Information Technology ;
Ajmal Ayan, Planning Director and International Relations, Ministry of Communication and Information
Technology; Muhammad Aimal Marjan, Director General ICT, Ministry of Communication and
Information Technology Oliver Dziggel, Legal Regulatory Advisor, Telecom Regulatory Board, Ministry
of Communication and Information Technology; Bhupa Nanda, Advisor to Ministry of Communication
and Information Technology and Rahatullah Naeem (ANDS).
The Urban Development Sector Strategy was developed as a result of the commitment and efforts of
members of key Afghan ministries, United Nations, donors, NGOs, civil society and the private sector.
The invaluable contribution of H.E. Eng. Mohammad Yousuf Pashtun, Minister of Urban Development, H.E.
Jelani Popal, Director General of Independent Directorate of Local Governance and H.E. Ruhullah Aman,
Former Mayor of Kabul Municipality, has been invaluable in the development of this sector strategy.
Finally, we would like to thank everyone who assisted the ANDS Secretariat in working to develop the
8UEDQ 'HYHORSPHQW 6HFWRU 6WUDWHJ\ :H ORRN IRUZDUG WR WKH UP FRPPLWPHQW RI DOO RXU VWDNHKROGHUV
throughout the implementation of this strategy.
XII
Certainly, contributions to the Urban Sector will remain key to the success of this strategy in particular, and
of the ANDS in general.
Special thanks also go to the following for their valued help and support:
H.E. Dr. Qiamudin Djalalzada, Deputy Minister, Ministry of Urban Development; H.E. Barna Karimi,
Deputy Dirctor for Policy, Independent Directorate of Local Governance; H.E. Dr. Hassan Abdullahi,
Former Deputy Mayor (Technical), Kabul Municipality; Jamal Nasir, Coordinator, Ministry of Urban
'HYHORSPHQW(QJ$EGXO+DVLE/DWL)RUPHU'LUHFWRU*HQHUDORI$GPLQDQG)LQDQFH0LQLVWU\RI8UEDQ
Development; Eng. Said Osman, Planning Director, Ministry of Urban Development; Richard Geier, Urban
Development Advisor, UN-Habitat; Pushpa Pathak, Former Advisor to Kabul Municipality; Fernando
Da Cruz, Jolyon Leslie, Program Manager, Urban Development Group, UNDP; Jolyon Leslie, Director,
AKTC; Eng. Abdul Khaliq Nemat,Urban and Regional Planning Advisor and Strategic Regional Planning
Manager, Ministry of Urban Development; Eng. Ibrahim, Director General of Admin and Finance, Ministry
of Urban Development; Eng. Waheedullah Azizi, Advisor to Kabul Municipality; Eng. Mahmoud Saikal,
Advisor to ANDS, Mohammad Qurban Haqqjo, Independent Directorate of Local Governance; Ahmad
Shah Hemat, Assistant Project Manager, Ministry of Urban Development and Rahatullah Naeem (ANDS).
The Mines and Natural Resources Sector Strategy was developed as a result of the commitment and
efforts of members of key Afghan ministries, donors, civil society and the private sector.
The invaluable contribution of H.E. Dip. Eng. M. Ibrahim Adel, Minister of Mines, has been invaluable in
the development of this sector strategy.
Finally, we would like to thank everyone who assisted the ANDS Secretariat in working to develop the
0LQHV6HFWRU6WUDWHJ\:HORRNIRUZDUGWRWKHUPFRPPLWPHQWRIDOORXUVWDNHKROGHUVWKURXJKRXWWKH
implementation of this strategy.
Certainly, contributions to the Mines Sector will remain key to the success of this strategy in particular, and
of the ANDS in general.
Special thanks also go to the following for their valued help and support:
H.E. Dip. Eng. Abdul Qudos Hamidi, Deputy Minister, Ministry of Mines; H.E. Dip. Eng Mohammad
Akram Ghiasi, Deputy Minister of Mines, Ministry of Mines; Eng. Khuzhman Ulomi, Head of Policy and
Coordination Department, Ministry of Mines; Dip Eng. Chaman Shah Ahmadi, Advisor for Oil and Gas,
Ministry of Mines; Eng. Mohmmad Farid Fazaly, Deputy Director, Oil and Gas Department, Ministry of
Mines; Eng. Abdull Khaliq, Director, North Coal, Ministry of Mines; Eng Aziz Areb, Director of Mining,
Ministry of Mines; Dip Eng Abdul Wakil, Advisor to Ministry of Mines; Dip. Eng. Masoom, Deputy
Director, Cadastre Department, Ministry of Mines; Dip Eng Sadeq, Advisor for Policy and Coordination
Department, Ministry of Mines; Mr.Aziz Darwish, Executive Secretary to Minister, Ministry of Mines; Mr.
+D]$I]DO\3URMHFW([HFXWLYH2IFHU'U0HKUDQ0+H\GDUL)RUPHU$GYLVRUWR$1'6DQG5DKDWXOODK
Naeem (ANDS).
XIII
Table of Contents
XV
XVI
XVIII
AC
ACRC
ACSA
ADB
ADC
ADF
AFG/ Afs
AGS
AHA
AIP
AIRD
AISA
AMU
ANDS
ARDS
AREU
ARN
ARTF
ASAP
ASYCUDA
ATRA
AUWSSC
BCM
BGR
BOT
BPD
BTFB
BTU
CAA
CAP
CAR
CAREC
CASA
CAWSS
CCN
CDC
CDCs
CDMA
CDP
CENTCOM
&(2
CFL
CG
CIDA
CMBS
CN
&62
CUM
DABM
DCN
DfID
DM
EC
ECOTA
EIA
EIRP
ETP
ETS
EU
UNFAO
Afghanistan Compact
Afghan Center for Regional Cooperation
Afghan Computer Science Association
Asian Development Bank
Area Development Councils
Afghan Development Forum
Afghani (Currency)
Afghan Geological Survey
Afghan Highway Administration
Aeronautical Information Publication
Afghanistan Institute of Rural Development
Afghanistan Investment Support Agency
Aviation Maintenance Unit
Afghanistan National Development Strategy
Afghan Reconstruction & Development Service
Afghanistan Research and Evaluation Unit
Afghan Road Network
Afghan Reconstruction Trust Fund
As soon as possible
Automated System for Customs Data
Afghanistan Telecommunication Regulation Authority
Afghanistan Urban Water Supply and Sewerage Corporation
Billion cubic meters
Bundesanstalt fuer Geowissenschaften und Rohstoffen
Build-Operate-Transfer
Barrels per Day
Border Transit Facilitation Bureaus
British Thermal Units
Civil Aviation Authority
City Action Plans
Central Asian Republics
Central Asian Regional Economic Cooperation
Central and South Asia
Central Authority for Water Supply and Sewerage
Copper Cable Network
Community Development Council
Community Development Councils
Code Division Multiple Access
City Development Plans
U.S. Department of Defence Central Command (covers Afghanistan)
&KLHI([HFXWLYH2IFHU
Compact Fluorescent Lights
Transport Sector Consultative Group
Canadian International Development Agency
Community-Based Monitoring Systems
Counter Narcotics
&HQWUDO6WDWLVWLFV2IFH
cubic meter
Da Afghanistan Breshna Moassessa (the Afghan electric utility)
District Communication Network
Department for International Development
Deputy Minister
European Commission
Economic Cooperation Organization Trade Agreement
Environmental Impact Assessment
Emergency Irrigation Rehabilitation Program
Evapotranspiration
Eastern Transmission System
European Union
United Nations Food and Agricultural Organization
XIX
FDI
FS
FSO
FY
G2B
G2G
GCN
GDP
GDP
GEF
GIPI
GIS
GOA
GPRS
GPS
GSI
GSM
GTZ
GWH
GWP
H/H
Ha
HDM 4
HPP
I-ANDS
IARCSC
IATA
ICAO
ICE
ICT
ICTTC
IDLG
IDPs
IMF
IN
IPP
IROA
IRRIP
ISP
IWRM
IXP
JCMB
JICA
KfW
KIA
Km
KM
kW
kWH
LFSP
LOE
LOS
Lpcd
M&E
MAIL
MCIT
MCN
MDG
MEW
MFA
XX
MHP
MIS
MIS
MoA
MoC
MOCI
MoE
MOF
MoF
MOFA
MOI
MOJ
MoM
MoPH
MORR
MOT
MOTCA
MoU
MoUD / MUD
MoWA
MPW
MRRD
MUD
MW
MW
0:+
NA
NATO
NDC
NEEP
NEPA
NEPS
NGO
NGOs
NHCA
NRAP
NRAP
NRRDC
NRVA
NSP
NSS
NTS
NURC
O&M
O&M
OFC
PABX
PAR
PCU
PDP
PIA/MVK
PKI
PMMR
PPA
PPP
PRC
PRR
PRT
PSA
PV
Micro-Hydro Plant
Management Information System
Management Information System
Ministry of Agriculture
Ministry of Commerce
Ministry of Commerce and Industries
Ministry of Economy
Ministry of Finance
Ministry of Finance
Ministry of Foreign Affairs
Ministry of the Interior
Ministry of Justice
Ministry of Mines
Ministry of Public Health
Ministry of Refugees and Returnees
Ministry of Transport
Ministry of Transport and Civil Aviation
Memorandum of Understanding
Ministry of Urban Development
Ministry of Women Affairs
Ministry of Public Works
Ministry of Rural Rehabilitation and Development
Ministry of Urban Development
Mega-What (measure of energy capacity)
Megawatt
0HJD:DWW+RXUVPHDVXUHRIHQHUJ\RZ
Needs Assessment
North Atlantic Treaty Organization
National Data Center
National Emergency Employment Programme
National Environmental Protection Agency
North-East Power System
Non-Governmental Organization
Non-Government Organizations
National Hydrology Committee for Afghanistan
National Reconstruction Program
National Rural Access Program
New & Renewable Energy Research and Development Center
National Risk and Vulnerability Assessment
National Solidarity Programme
National Surveillance System
Northern Transmission System
National Utility Regulatory Commission
Operation and Management
Operation & Maintenance
Optical Fiber Cable
Private Automatic Branch Exchange
Public Administration Reform
Project Coordination Unit
Provincial Development Program
Personal injury accidents per million vehicle kilometers
Public Key Infrastructure
Performance Based Management & Maintenance of Roads
Power Purchase Agreement
Public-Private Partnership
Peoples Republic of China
Priority Reform and Restructure
Provincial Reconstruction Team
Production Sharing Agreement
Photovoltaic
XXI
RAMU
RBA
RBC
RBM
RED
RFP
RH
RIMU
RLED
RMU
ROR
SAARC
SAFTA
SBA
SBC
SCO
SCWAM
SDP
SEPS
SHS
SIA
SIDA
SIDA
SIDA
6,0
SOE
Sq km
SSDG
SSO
SWOT
TA
TAP
TAT
TCF
TSC
UAE
UNDP
81(6&2
UNHCR
81236
USA
USAF
USAID
USGS
USS
UWSS
UWSS
VCN
WB
WLL
WRD
WRM
WRPU
WSS
WTO
WTS
WUA
XXII
XXV
Ministry/Agency
Name of Minister
HE M. Ismail Khan
Ministry of Mines
Signature
Date of Submission
February 2008
XXVII
XXVIII
EXECUTIVE
SUMMARY
ENERGY SECTOR STRATEGY
Afghanistans energy sector and its economy are
at a crossroads. Energy, abundantly and cost
effectively supplied, can be a very important input
in the sustainable development of Afghanistan.
However, energy is no panacea. In fact, if it is
supplied imprudently, instead being a vehicle
for growth, it will pull down the Governments
development efforts and be a drag on economic
growth. Capital investment in energy is rising
rapidly attesting to the efforts to the Islamic
Republic of Afghanistan (IROA) and the donor
community. At the same time though, the
HIFLHQF\ RI HQHUJ\ RSHUDWLRQV LV QRW LQFUHDVLQJ
If left unchecked, much of the investment that is
being made will be wasted.
To illustrate this gravity of the problem, the cost of
losses has been estimated. Because of the state of
the infrastructure and the familiar short comings
of Government owned and operated energy
provision, losses are enormous. Losses in 2005
amounted US$ 128.5 million.
Figure 1.
$ 300,000
Thousands of US Dollars
$250,000
$200,000
Subdies
Comercial
Lsses
$150,000
Technical
Losses
$100,000
$50,000
$0
2005
2005
can use best use and pay for it (and that may well
be business), in the quantities and quality that
they need, at a price that covers cost (for all but
the poorest members of society), and to do so in
the most cost effective manner. At the same time
though, it must begin to take steps that will provide
a solid footing for the transition of the sector from
Government provision to Private Sector provision.
This strategy acknowledges that there are many
steps that need to be taken on the road to fully
involving the private sector. It will begin with
changes in policy and laws and involvement of
the private sector in rural energy provision and
in outsourcing at DABM. It is a gradual process
that will be enhanced by a deliberate process of
reform.
The availability of secure energy supplies within
$IJKDQLVWDQ ZDV VLJQLFDQWO\ GLVUXSWHG E\ WKH
FRQLFWV RI WKH SDVW WZR GHFDGHV 3RVWFRQLFW
efforts by the Islamic Republic of Afghanistan
(IROA) and international donors to date have
focused on expanding the availability of energy
resources throughout the country. Particular
emphasis has been on expanding and rehabilitating
the electricity sector in the major economic hubs
of the country and providing basic service in rural
areas. Efforts also have been taken to improve
the supply of natural gas, increase availability of
hydro-electric generation, rehabilitate and expand
electricity and natural gas transmission and
distribution systems, develop renewable energy
resources in rural and remote areas, increase lowcost power imports and improve the capability of
energy sector institutions.
Since 2001, Afghanistan energy efforts have
focused on bailing out the boat or keeping the
lights on and providing heat in the winter. At
some point, one must also focus on stopping the
RZRIZDWHUEHIRUHWKH\EHFRPHH[KDXVWHG7KH
short term focused activities alone can continue
only so long before the long term growth path
of the country is adversely impacted. Having
achieved moderate success in these areas, the time
is ripe to review current activities and programs
INTRODUCTION
Figure 1.
Figure 2.
350
300
250
200
150
100
50
0
0
5000
10000
15000
20000
25000
30000
Energy development
goals
Expand access to
improved energy
services
Improve reliability
of energy supply
7\ac`SSQOZ
cuctainability
associated with
energy supply and
use
Improve energy
sector goernance
and regulation
Reduce health and
environmental
costs associated
with energy supply
and use
Poverty alleviation
outcomes
Income
Capability
Security
Empowerment
Since 2002, Government has worked
with donors to assess sector needs and has
developed a power sector master plan (200304), gas sector master plan (2004-05), and
renewable energy plan (2006). These require
continued updating but have provided
foundation information.
Donors have contributed to rehabilitation
of the power grid, millions $USD funding for
diesel fuel and support of more than 1700
small renewable energy projects.
Since 2006, some commercialization of
operations in power.
2.
Sector Governance and Institutional
Reform
Establishment of the Inter-Ministerial
Commission for Energy (ICE) in 2006 to
coordinate government policy in energy,
leverage donor resources and integrate sector
planning.
Establishment of Cadastre , monitoring/
evaluation and environment maintenance
departments to better implement/organize
gas/petroleum and minerals agreements and
environment preservation.
Cabinet approval of Minerals Law,;
under review by Parliament according to
plans envisaged; Mineral Regulations is in the
process of drafting and review.
Cabinet approval of Hydrocarbon Law,
Hydrocarbon Regulations draft has been
under review by MoJ.
Gas Law is in the process of drafting
3.
Promotion of regional energy linkages
Afghanistan signed as a member of the
Central Asia South Asia (CASA) 1000MW
project November 2007.
Power purchase agreements (PPA) in the
process for regular power imports from Iran,
Sector Governance.
Funding/Capital Investment.
Sub-National
Integration.
Consultations
and
PDPs
10
CHAPTER 1
11
Figure 1.
1980
1990
2000
2001
2002
2003
2004
2005
Production
0.073
0.119
0.014
0.007
0.010
0.009
0.009
0.008
Consumption
0.027
0.109
0.024
0.017
0.020
0.018
0.018
0.019
-0.046
-0.010
0.010
0.010
0.010
0.008
0.009
0.011
Imports
Source: US EIA
including
traditional
energy
which
is
XQVXVWDLQDEO\ KDUYHVWHG 0XFK RI WKH GHFLW LQ
supply can be blamed on the lack of investment,
cannibalization and carnage that has accompanied
Afghanistans civil crises since 1978. As civil
VWULIH VWUDLQV QDQFLDO UHVRXUFHV QHZ LQYHVWPHQW
is abandoned, routine maintenance is postponed;
spares are taken from one plant for another; skilled
human resources that are needed to maintain
the capital stock leave; and soon parts are stolen
and sold for other uses. Sad and unpreventable
as this is, a large share of the gap can be blamed
on faulty resource allocation policies. Subsidies,
as they are so often carried out, create a vicious
downward cycle. For example, the electric utility
often does not collect enough to pay for operating
cost let alone capital costs. This is because (1)
thirty percent of the energy it supplies is lost, (2)
Table 2.
US $ Thousands
232,461
929,843
$ 27,895
Commercial Losses
Subsidies
371,937
$ 44,632
$ 56,000
$128,528
12
1.
Electricity
Electricity drives modern economies and per
capita consumption of electricity in Afghanistan is
one of the lowest in the world. After a long period
of decline, generating capacity is beginning to
grow again. Hydro plants account the largest
share of capacity with imports in second place
and growing. The most promising long-term
resource for power generation in Afghanistan
is hydropower, which accounts for over 50% of
grid-connected installed capacity1. Following
hydropower, thermal generation, primarily diesel
generation, supplies power mainly to urban areas.
Utilization of indigenous fossil fuels (natural gas
1 In the 1980 Master Plan it was estimated that Afghanistan
has the potential of developing about 23,000 MW of additional
hydro generating capacity, with 18,000 MW located on the
Panj and Amu Rivers that form the border with Tajikistan and
Uzbekistan. The remaining 5,000 MW potential is primarily in
two areas, about 1,800 MW on the Kokcha River and 3,200 MW
in the Kabul River basin.
13
1990
2000
2001
2002
2003
2004
2005
0.94
1.10
0.47
0.39
0.69
0.81
0.76
0.75
0.00
0.00
0.10
0.20
0.15
0.10
0.10
0.10
0.88
1.02
0.53
0.56
0.79
0.86
0.81
0.80
0.426
0.494
0.405
0.265
0.264
0.323
0.323
0.320
14
Table 4.
shows the cost of generating power from various sources on the Afghanistan power system.
7KHFRVWRIJHQHUDWLRQGLIIHUVVLJQLFDQWO\DQGGLVSODFLQJGLHVHOJHQHUDWLRQ
S/N
1
Type
Hydro
2
3
2.29
Thermal (NW Kabul)
27.115
Imported
8.
2.62
Natural Gas
Coal
29.53
5.19
6.473
2.8 to 3.5
1MW=4.5 ton of coal, cost of one ton of coal is priced
Afs.2200.
Source: DABM. The estimated cost of power from natural gas is based on Sheberghan power plant; no estimate
RIFRVWRIFRDOUHGFDSDFLW\LVDYDLODEOHDWWKLVWLPH
Figure 1.
Cost of Supply
15
2.
Petroleum
Natural Gas
1DWXUDOJDVLWQRW\HWDVLJQLFDQWHQHUJ\ resource,
DOWKRXJK LW KDV WKH SRWHQWLDO WR EH D VLJQLFDQW
1990
2000
2001
2002
2003
2004
2005
Production
60
104
Consumption
67
Reserves
NA
NA
3,530
3,530
3,530
3,530
3,530
3,530
Source: US EIA.
4.
16
Crude Oil
7.
Coal4
17
18
Coal
1980
1990
2000
2001
2002
2003
2004
2005
Production
0.131
0.116
0.089
0.092
0.096
0.099
0.103
0.099
Consumption
0.131
0.116
0.089
0.092
0.096
0.099
0.103
0.099
8.
Table 7.
Wind
Resource
Utility Scale
Wind
Class
Wind Potential
Wind
Speed
m/s
Total
Capacity
Installed
(MW)
Good
6.8-7.3
75,970
Excellent
7.3-7.7
33,160
Excellent
7.7-8.5
33,100
Excellent
> 8.5
15,800
Total
158,100
19
20
DEMAND
10.
SUPPLY
21
22
12.
23
24
25
26
27
28
29
30
CHAPTER 2
ENERGY SECTOR STRATEGY
ENERGY STRATEGIC VISION
An Energy sector that provides citizens of
Afghanistan and drivers of growth in the economy
with long-term reliable, affordable energy access
based on market-based private sector investment
and public sector oversight.
Overall Energy Sector Goals
Restructured sector governance and costrecoverable operations
Rehabilitation and expansion of the public
power grid
The attraction of private investment in the
energy sector
Improved rural energy access
Development of indigenous resources for
power and energy use
There is a time in Afghanistans future when
energy will be abundant, blackouts will be a thing
of the past, and most of its energy needs will be
provided directly by the private sector. Private
investors will develop power plants, operate
and own distribution systems and develop in
situ resources, just as they have begun to do in
many countries. But that is the distant future.
For now, Afghanistan must work hard to increase
HQHUJ\ SURGXFWLRQ GRLQJ VR HIFLHQWO\ DQG LQ D
cost effective manner. It can do this by building
QHZFDSDFLW\DQGE\LPSURYLQJWKHHIFLHQF\RI
existing infrastructure, building capacity in its
workforce, and reorganizing its energy operations
to make them more transparent, increase operating
HIFLHQF\ DQG SUHSDUH WKHP IRU HYHQWXDO HQWU\
into the private sector. At the same time though,
it must begin laying the ground-work for the
eventual large-scale participation of the private
sector.
Above all, this means that development of the
electricity sector and the fuels that feed it are
31
32
$VLGHIURPWKHQDQFLDOLPSOLFDWLRQRIFRQWLQXHG
losses, there are other sound reasons for focusing
on this area. Adding a megawatt of power
through repair and renovation is usually quicker
and certainly cheaper than building new capacity.
Progress is being made on building new capacity
but repair and renovation is slower than it should
be. For example, it is only now, in September
2007, that DABM has begun a limited campaign to
identify losses. Training is urgently required in all
areas from general accounting to advanced power
system controls. he second prong must be to
VLJQLFDQWO\LPSURYHVHFWRUJRYHUQDQFHDQGEHJLQ
involving the private sector in various aspects of
energy until the legal, commercial and security
climate is conducive to transfer most aspects of
the energy sector to the private sector3. The single
most important governance measure will be the
establishment of a multi-sector regulator under the
Ministry of Economy. Arguments are frequently
made that the private sector wont participate
or that it should not participate until and unless
VLJQLFDQW UHIRUP DQG LPSURYHPHQWV KDYH EHHQ
made. The reality is different. Afghanistan can
begin now by introducing management contracts
for some aspects, outsourcing others and in the
case of peripheral operations such as construction,
they can be spun off. Small as these measures
may be, they will invigorate the sector by tapping
private sector resources and management. They
will allow Government entities to focus on core
activities and build a successful track record
in private sector involvement. At the same
time though, every effort must be made to lay
the foundation of enabling laws, policies and
regulations that unleash the full potential of
private sector investment and operation of large
scale energy facilities.
33
34
3
Liquid Fuels. There is no plan to divest
or assess the Liquid Fuels Enterprise under the
Ministry of Commerce and Industries. Operating
some 1600 gas pump stations and 1300 fuel trucks
should provide considerable opportunity for
private investment, improved quality of product
and competitive pricing.
Renewable Energy. There is not a coordinated
approach in place to support the development
of renewable energy sources. A number of small
renewable projects are underway, many are
DIOLDWHV RI ODUJHU SURJUDPV LH DOWHUQDWLYH
livelihood programs in poppy growing regions.
Use of solar water heating and lighting, water
pumping and micro-hydro can be expanded and
privately operated. In rural locations, communities
have gathered resources to construct small hydro
and limited solar facilities that support minimal
but important light and small power supply. More
emphasis required.
NEEDS ASSESSMENT
Several needs assessments have been carried out.
7KH\ IDOO LQWR WZR EURDG FDWHJRULHV 7KH UVW
category projects demand and supply or given an
assumption about economic growth, investigates
how demand and supply will respond. The
second category is prescriptive in nature that is
it is based upon some policy variables and sets
targets about how the sector should respond. For
example, it sets a rate of household connections as
a target and then uses Government policies and
control of the sector to move towards that target.
Each of these is useful but one major drawback is
that ALL have been at the sub-sector level. These
studies have primarily focused on individual
energy sub-sectors such as power or oil and gas,
LQVRPHVSHFLFLQVWDQFHVLOOXPLQDWLQJLPSRUWDQW
aspects of the strategic development of the energy
sector in the overall context of Afghanistans
development agenda. At the same time, the
sub-sector-based approach, while necessary to
adequately address the technical complexities of
the energy sector, has not captured the inter-related
nature of energy sector developmental issues and,
consequently, the trade-offs that may be entailed
in the strategic decision-making process.5 This
is a consequence of the fragmenting of energy
ELECTRICITY
5
2005
35
Year
Number of Customers
Residential Nonresidential
Customer
Additions
Capital Cost ($
mm)
Peak MW Supply
2006
365,221
38,868
2007
485,058
51,621
132,591
132.5
429
2008
644,216
68,560
176,096
176.1
570
2009
855,598
91,056
233,878
233.9
757
2010
1,136,339
120,933
310,618
310.7
1,006
853,182
853.2
Total
323
Notes: 33% annual growth in customers; $1,000 cost per customer connection;800 watts peak demand
per customer.
The estimated cost of increasing customer access
to electric power to meet Afghanistan Compact
goals is $853 million for the period 2006 to 2010. In
addition, the cost of expanding generating supplies
(domestic and imported) is approximately $400
million. Therefore, on this basis the funding
needed to meet Afghanistan Compact goals
would be about $1.2 billion for the period 200620101, excluding the costs of developing the energy
supplies when indigenous resources are used.
Meeting these goals in relation to existing budget
constraints necessitates developing an overall
Energy Sector Strategy that will identify leastcost options to meeting sector requirements in the
ORQJHUWHUP PD[LPL]H WKH EHQHWV RI ,52$ DQG
donor initiatives; and increase participation and
investment by the private sector. Information on
Afghanistans energy situation is constrained by
a serious lack of good quality data. This hampers
efforts to develop and implement a clear sector
strategy. For example, ANDS goals are clear in the
benchmarks that are to be met by 2010, including
the percentage of urban and rural households
1 Ministry Strategy (With Focus on Prioritization); Ministry of
Energy and Water, September 30, 2006.
36
Table 9 on the next page: East Electricity Demand for Afg 2010-2020
Required Generation (MW) (including losses)
Year 2010
Year 2015
Year 2020
Kabul System
671.6
1,066.9
1,206.8
272.2
405.0
473.4
Subtotal
943.8
1,472.0
1,760.2
Aybak
16.1
25.4
30.0
Khulm
20.0
31.8
37.6
Doshi
6.5
8.8
10.4
Charikar
10.5
20.9
34.1
Subtotal
60.1
94.9
112.1
1,003.9
1,566.9
1,872.3
Planned SEPS
160.4
251.3
296.3
Girishk
11.5
18.4
22.3
Qalat
77.9
123.7
146.5
Subtotal
249.8
393.4
465.1
Jahalabad
86.2
103.1
121.8
Ghazni
44.9
71.4
84.5
Gardez
32.2
51.2
60.6
Heart
102.1
150.0
164.9
Subtotal
265.4
375.7
431.8
1,519.1
2,436.0
2,769.2
Source: Needs Assessment Infrastructure Report: Energy and Transport Sector; USAID, 2007
37
38
5HGXFLQJGHPDQGWKURXJKHQGXVHHIFLHQF\
such as CFLs.
Metering
of
transmission.
existing
cross
Expanding
transmission
neighboring countries.
border
capacity
to
5HKDELOLWDWLQJWKH6KHEHUJKDQJDVHOGVDQG
construction of its solar power plant.
Develop New Hydro capacity.
And investment in oil, natural gas and
coal infrastructure based on tenders using
performance contracts and a permitting
system.
(Greater detail on these and other priority
programs are presented in detail in the sub-sector
strategy areas.)
2.
Energy Sector Governance is the single
most important issue for the long run health
of the sector. The enabling frameworks and
implementing rules and regulations need to
be established along best practice guidelines.
Activities include:
3.
Develop
and
adopt
a
modern,
comprehensive energy law and then separate laws
for electricity, oil and natural gas. Concurrently
develop the implementing rules and regulations.
4.
Adopt in policy and embody in law, the
principle of private sector provision of energy.
The overarching energy law should explicitly
address the role of the private sector which role is
further developed in sub-sector law.
5.
Establish a Multi-Sector Regulator
for electricity, coal, Petroleum and Petroleum
Products and Water.
6.
Develop an Energy Policy that establish
guidelines for energy production and consumption
WKDWLVFURVVVHFWRULQQDWXUHHJHQHUJ\HIFLHQF\
cost recovery, environmental issues. The National
Energy Policy should provide guidance on the
role of energy in the Nations economy and set
guidelines for how energy will be used.
7.
Establish procedures to ensure effective
coordination among the different sector
Government entities and sharing of data by these
institutions.
8.
Ensure that Government energy entities
are effective by implementing capacity building
programs and reorganizing these entities as and
when their roles change.1
9.
Improve the production and delivery
of rural energy by clarifying the roles of MEW
and MRRD and evaluating options for project
development and ownership, technical support
and pilot projects based on international
best practices and attraction of private sector
participation.
10.
Enhance policy and planning and the
effectiveness of donor support by strengthening
Inter-agency cooperation and adopting tools that
will allow integrated planning and analysis.
11.
Develop and deploy tools to evaluate and
prioritize options such as a least-cost plan.
12.
15.
Accelerate private sector provision while
an effective supporting framework is being put
into place by such measures as:
1 As the private sector takes on increasingly more aspects
of energy, Governments role will change to one of planning,
policy and regulation.
16.
Making an unequivocal commitment
to involving the private sector including an
aggressive time-table for action.
17.
Recognizing that in the long run diesel
power is too expensive but, in short run, it may
serve as a stop gap measure. Explore a limited
WHUP ,33 IRU GLHVHO VD\ YH \HDUV 7KLV PHHWV
the immediate objective of getting power while
developing some expertise in negotiation and
power contractual instruments. It also has the
advantage of restricting diesel power to a limited
time period, time in which lower cost power can
come on line.
18.
Issuing tenders for private investment in
IPPs based on a ceiling bulk power tariff (avoided
cost) or some other method that might promote
more competition in cost, and a one-stop shop
window at the MEW.
19.
Using
regulation
by
contract,
management performance contracts and light
handed regulation concepts2;
20.
Issuing
tenders
for
coal
sector
development based on a permitting system.
21.
Expediting the commercialization of
Stated owned Enterprises such as DABM; and,
22.
Outsourcing activities now that can
LPPHGLDWHO\ EHQHW IURP SULYDWH VHFWRU
involvement such as meter reading and billing
39
Objectives
1
Reform of Sector Governance. This
strategy supports the consolidation of energy
planning and policy-making functions through
the Inter-ministerial Commission for Energy (ICE)
as well as improved line ministry staff capacity to
plan and budget. The law of hydrocarbons was
referred to the Parliament for probe into and
approval while its regulations are still underway
in MoJ that upon its enforcement, appropriate
ground will be prepared for participation of
private sector in this section.
2
Institutional Reforms, A new market
paradigm is being supported for Afghan energy;
VLJQLFDQWLQVWLWXWLRQDOFKDQJHVDQGUHOHYDQWVWDII
capacity is required.
Inter-Ministerial Commission for Energy
(ICE). Support of the government sponsored
institution brings together the seven energyrelevant ministries, donors and private sector
to review priority energy development
DVSHFWV2IFHVIRU,&(DUHHVWDEOLVKHG
40
DESIRED OUTCOMES
4
An effective enabling environment for
private sector investment.
1
Restructured energy sector governance/
commercialized
operations.
Improved
governance can mobilize investment, mitigate
corrupt practices and improve technical quality
of energy supply. This strategy supports the
shifting of government as energy producer to
energy regulator with viable legal and regulatory
frameworks that include the development of
market-based power purchase and production
sharing agreements. Market-based enterprise
operations will support loss reduction, improved
billing and collection, market procurements and
HIFLHQW HQHUJ\ SUDFWLFHV WKDW UHVXOW LQ PRUH
energy supply and cost savings.
Access
to
Rural
energy
Reduced Poverty:
41
Table 10.
Industry Sector
Intermediate-Term (5 to 10 years)
Cross-Sector Issues
Sector Governance
Sector Governance
Sector Governance
6LJQLFDQWLQYROYHPHQWRIWKH
private sector
Improve GOA/
Donor/
Sector Governance
Capacity Building
Least-Cost Expansion
Plan
Needs Assessment
and Data Base
NGO coordination
Sector Governance
Monitoring &
Evaluation Plan
Electricity Sector
Corporate
Governance
Technical Losses
27.5%
20%
Collections
Private Sector
Investment
DAMB
Commercialization
Tariff Reform
Power Imports
Installed Capacity
850 MW (2011)
1,019 MW (2013)
42
Industry Sector
New Connections
730,000
Dehsabz
Intermediate-Term (5 to 10 years)
&RPSOHWHDVVHVVPHQWRIHOGVDQGLVVXH
PSA; rehabilitate infrastructure; issue
tender for IPP; consider bundling with gas
processing & fertilizer plant
Indigenous Fuels
Development
Complete feasibility
VWXG\IRURLOUHQHU\
&RPSOHWHIHDVLELOLW\VWXG\IRURLOUHQHU\DV
part of least cost energy sector plan
'HYHORSUHQHU\LIFRVWHIIHFWLYH
Complete Tariff
Reform
Regulatory Reform
Modify
Hydrocarbons Law
Private Sector
Investment
Petroleum Imports
Approval of minerals
law by the parliament
Coal Sector
Develop Rural
Energy Policy
Renewable Energy
Renewable Energy
Rural Energy
Updated as necessary
43
Industry Sector
Intermediate-Term (5 to 10 years)
Assess rural
renewable energy
technologies
Pilot Projects
44
45
B.
Government needs to make an unequivocal commitment
to involving the private sector including an aggressive
timetable for action. Amend the law to restructure
WKHHQHUJ\VHFWRUZLWKDVWULFWWLPHWDEOHVSHFLFDOO\
mentioning (a) sector restructuring, and (b) private
provision of energy.1
46
47
C.
48
E.
49
50
51
52
CHAPTER 3
ENERGY SUB-SECTOR
STRATEGIES
ELECTRIC POWER
The goal of the IROA s strategy for the power
sector is to provide supplies of reliable, affordable
HOHFWULF SRZHU VXIFLHQW WR VXSSRUW D JURZWK
rate in GDP of 9% per year and reduce poverty
by 3% per year. If these targets are met, by 2013
these achievements would result in over 90% of
residents in the three
(seeFigure.8)
Priority objectives of the Government in electricity
include:
53
Tariff reform.
MEASURES
TO
INCREASE
GENERATION AND DELIVERY
'HYHORSPHQWRIDJDVUHGJHQHUDWLRQSODQW
at (100MW)
POWER
following1:
1
This list is intended to indicate IROA and donor
activities undertaken to expand availability of electric power.
The status of these activities often is unclear as to whether they
have been completed, are being implemented or have been
delayed.
54
55
56
57
costs
Obligation to provide
distribution company
service
by
the
PROJECTS
To ensure that ongoing activities to expand
electricity supply mesh effectively with the IROAs
longer-term objectives for the electricity sector and
produce cost-effective results, it is recommended
that the following activities be undertaken as part
of an overall Afghanistan Energy Sector Strategy:
1.
58
6LJQLFDQWWUDLQLQJZLOOEHUHTXLUHGWR
Design/implement/manage
transparent
DQG HIFLHQW SURFXUHPHQW SROLF\ V\VWHPV
and procedures, with internal audit
SURFHGXUHV DQG SUH DZDUG FHUWLFDWLRQ E\
external auditor
Capacity
Building
or
training
in
FRQWUDFW PDQDJHPHQW IRU VSHFLF KLJK
value equipment such as generation plants,
dispatching, substations and transformers
5 '$%0KDVDSSUR[LPDWHO\HPSOR\HHVWKHQHZV'$%6
will probably have something like 2,000 to perhaps 2,500 employees.
The residual staff will remain with DABM for some time, and/or
remain on the Ministrys complement. These people need a Social
Safety Net package, to allow them to retire, (if they are old enough)
or be retrained with other marketable skills if they are of a suitable
age. It is imperative to address this now so that it does not become
an obstacle to full commercialized business practices and provides a
model for other SOEs.
59
Capacity Building-for
Transformation
Corporate
Culture
Development
1.
2.
ESCO Services
3.
60
5.
6.
7.
8.
Personnel Development
career development
9.
and
corporate
and
Project
management
concepts
for
VSHFLF SUREOHP VROYLQJ DQG VKRUW WHUP
transformative projects, inter-departmental
projects, and corporate issues
Commercial Policy
implementation6
4.
Capacity Building-Information
Information Systems
Technology,
Capacity
Building-/Training
in
Management Systems & Procedures7
Facilities security
Security
implementation
of
such
Metering/billing/collection/audit policies,
etc.
Collection strategies
7 DABM has contractual obligations to provide sophisticated security at major installations being commission or
turned over by contractors in Feb 2008, but has no capacity to
comply.
61
PETROLEUM SECTOR
The indigenous fossil fuels in Afghanistan are
62
NATURAL GAS
Commercially, the most important energy
resource in Afghanistan economically includes
natural gas following water power and coal. . The
natural gas reserves need to be evaluated and
estimates of proven and recoverable resources
FRQUPHG DQG HOGV GHYHORSHG PDQ\ H[LVWLQJ
JDVHOGVDQGZHOOVQHHGWREHUHKDELOLWDWHGDQG
infrastructure rebuilt and expanded. Currently
ministry of mines attempts to develop petroleum/
gas sector in accordance with law of hydrocarbons
and related rules/regulations in the country
through the full participation of private sector so
that Afghanistan get access instantly to energy
of natural gas and oil that are seriously required
for rehabilitation and growth of economics in the
country. The volume of investment and incomes
depend on gradual development of gas/oil sector.
A. Reserve Estimates
Based on the existing reports, 120 cubic meters
of gas reserves and approximately 14,5 million
63
Afghan Gas
64
Draft a gas sector law to address downstream (delivery, pricing and sale) issues.
65
66
Petroleum Products
67
(VWDEOLVKLQJDQHIFLHQWSROLF\DQGUHJXODWRU\
framework, including support for private
investment in oil exploration, production,
import and marketing.
68
Increasing
Government
revenues
by
gradually phasing out government subsidies
and improving revenue collection.
Recommendations:
The IROA has made broad policy commitments
and engaged in technical assistance and capacity
building efforts supported by donor funding to
restructure and develop the oil sector. However,
these activities have not been incorporated into
a comprehensive strategic plan for the energy
sector. As part of the Energy Sector Strategy, the
IROA and donors need to undertake the following
activities with regard to the oil sector:
1.
Review Options for Attracting Private
Sector Participation and investment, including
management contracts for research and
development of oil reserves; development of a
VPDOO RLO UHQHU\ DQG GLVWULEXWLRQ RI FUXGH RLO
products; and development and implementation
RI WKH UVW RLO SURGXFWLRQ VKDULQJ DJUHHPHQW ,W
could also take the form of privatizing service
stations.
2.
Modify the Hydrocarbons Law of 2005 to
clarify ownership and development of resources;
to provide for exploration and development by
the private sector, including stetting production
VKDULQJ DJUHHPHQWV HVWDEOLVK VFDO WD[ KHDOWK
and safety policies and standards; and establish
an independent regulatory authority.
3.
Petroleum Imports. The IROA needs
to improve control of imports and collection of
duties; test products at retail outlets and storage
depots to improve quality; and should consider
increasing domestic storage facilities.
The government should improve and control
revenues collection, monitor quality of oil
materials in the areas of importation, storage and
PDUNHW DQG QDOO\ WR SD\ DWWHQWLRQ WR VXSSO\LQJ
oil through domestic establishments.
C.
Coal
FUXGHLQHIFLHQWPHFKDQL]HGPLQLQJPHWKRGVRU
by artesian methods. Current production from
all operations is estimated to be about 110,000
short tons.
The existing industrial sized coal mines are
marginal (if not out of operation) due to antiquated
machinery and lack of maintenance and new
investment. However, there is considerable small
scale production. At present, the small scale mining
sector, including coal is wholly unregulated and
RFFXSLHV ODUJH QXPEHUV RI SHUVRQV LQ GLIFXOW
security, health, and environmental conditions.
Moreover, coal demand and prices in urban
centers have risen due to domestic energy
needs during the winter months and also due to
LQFUHDVLQJLQGXVWULDOGHPDQGWRUHFRQVWUXFWLRQ
bricks.
Development of coal and other mineral resources
requires investments in excess of private sector..
Therefore the IROAs economic policy is to
establish an enabling environment conducive to
attracting and retaining investment by private
sector both local and international groups.
However, privatization and/or leasing of existing
state owned mining enterprises to private groups
is, at present, held up by the lack of adequate
mining legislation and the need for a clear policy
on sector development. Enabling legislation and
a proper mineral concession system is needed to
establish clear lines of authority and responsibility
for the Government and for private developers in
the area of investments.
If appropriate measures are taken to distinguish
regulatory from operational functions within the
ministry departments responsible for coal; put
existing operations on a commercial basis so that
they may attract private investment; and establish
market prices for coal, it is estimated that the value
of annual coal production could increase from the
current US$ 10 million to US$ 40 million.
14
Securing Afghanistans Future: Accomplishments
and the Strategic Path Forward; Mining Sector, Technical
Annex, January 2004.
69
70
Establishment
of
an
internationally
competitive taxation regime.
([SODLQLQJWKHFRXQWU\VFRDOHOGVWRDWWUDFW
investors of minerals law aimed at lightening
their minds in Afghanistan.
71
72
73
17 )RUH[DPSOHHVWLPDWHIRU3KRWRYROWDLFHOHFWULFLW\DVSHU055'
(Mostafa Torkan, May 24, 2007) is $12,000/kW, as compared to:
(i) Micro-hydropower at $1,200/kW and Diesel generated power at
$500/kW.
74
RURAL ELECTRIFICATION IN
BANGLADESH19
3URYLGHVWKH*()QDQFHGJUDQW
19
While the market characteristics of Bangladesh
DUH VLJQLFDQWO\ GLIIHUHQW WKDQ $IJKDQLVWDQ WKH H[DPSOH
highlights how innovative mechanisms can be effectively
used.
75
program-eligible
76
1.
Increase collaboration between MEW
and MRRD and Delineate Responsibility for
Rural Energy Development. As noted under the
Electricity Sector section, responsibility for all
rural-remote energy efforts should be consolidated
within one institution, RLED, with membership by
all stakeholders to help coordinate rural-remote
energy programs and projects. It appears that the
MRRD is the proper entity to head up this effort.
5XUDO HQHUJ\ LV GHQHG DV RII JULG DSSOLFDWLRQV
such as SHS, micro-hydro, and diesels in areas
of less than 2,500 persons. It could also include
the use of wind power for both electrical and
mechanical energy, for example. It would not
include any grid connected applications. It also
LQFOXGHV UXUDO HOHFWULFDWLRQ 6LQFH WKHUH LV QR
XQLYHUVDOGHQLWLRQRIUXUDOWKHGHQLWLRQIRUWKLV
purpose is something needs to work out. REDA
would also be responsible for developing a ruralremote energy master plan.
2.
In collaboration with NURC, develop
Rural Energy Policy to include Light Handed
Regulation DV DQ RIFLDO SROLF\ RI WKH ,52$
and implemented by the MRRD to promote
development of stand-alone rural energy systems
by cooperatives or the private sector. Policy and
regulation must set guidelines for cost-recovery.
In essence all project need to be able to recover
operation and maintenance costs and set aside a
sinking fund for capital replacement. The rural
energy policy and master plan will investigate
appropriate fuels for cooking.
3.
Develop a Methodology for Assessing
Rural and Renewable Energy Resources and
Technologies, including hydro (large scale, mini
and micro), diesel, solar, wind, biomass; and
77
78
CHAPTER 4
CROSS-CUTTING ISSUES
To achieve its goals, in addition to providing for
affordable and sustainable energy development
the Energy Sector Strategy will incorporate
mechanisms to support cross-cutting issues
that impact all energy sector initiatives. These
include the environment, counter narcotics, anticorruption, gender and regional cooperationin
addition to capacity building.
ENVIRONMENT
Energy, even renewable energy, has an
environmental impact. This strategy directly
addresses environmental impacts by:
Focusing on policies and projects that
LPSURYH WKH RSHUDWLQJ HIFLHQF\ RI HQHUJ\
production. It strives to get the most energy
delivered for the minimum environmental
impact. For example, reducing technical
losses or cogeneration.
Focusing on policies and projects that
LPSURYHHQGXVHHIFLHQF\7KHVHDUHDUHDV
that seek to reduce the amount of energy
needed for any given activity. A CFL
program is one such measure.
Shifting investment and production to
cleaner sources of energy, for example, wind
power.
Through the promotion of combining energy
supply with income generating activities, as
incomes increase, there is less pressure on
natural assets. And, Through focusing on
ANTI-CORRUPTION
The energy strategy directly tackles corruption
in several ways. One of the most important
measures for reducing corruption is limiting
WKH UROH RU LQXHQFH RI *RYHUQPHQW ,Q HQHUJ\
we are promoting increased private sector
participation; we are reducing the role of
79
REGION COOPERATION
The most important areas furthering regional
cooperation include expansion of energy trade
by upgrading electricity transmission ties with
Central Asian countries and exploring options for
transport of electricity and natural gas through
Afghanistan for regional supply. The NEPS
represents one of the largest sector investments
and the cornerstone of success in NEPS is
expanded energy trade. Technical standards
and commercial instruments will be developed.
Physical investments are being made to improve
trade. CASA 1000 is looking at using Afghanistan
as an energy transit corridor. Regional cooperation
will be enhanced by projects such as NEPS and
efforts to increase cost-effective electricity imports
from neighboring countries.
0RUHHIFLHQWVWRYHVGULQNLQJZDWHUSXPSLQJDQG
agro-processing can reduce womens workloads,
improve their health, and expand income-earning
potential.
The energy sector has the potential to provide a
wide pool of jobs as it is developed; for example,
in the construction and repair of thermal plants,
LQ FRDO PLQHV DQG LQ RLO HOGV /DERU LQWHQVLYH
construction methods should be considered. For
skilled technical jobs, the energy sector can initiate
training and apprenticeship schemes to provide
on the job experience for new trade and technical
graduates and engineers. Foreign personnel can
contribute to such schemes as mentors and can
also be tapped to advice on competency based
occupational analyses, new curricula for training
colleges and universities. Planning for major
energy development projects should involve an
employment audit which indicates numbers of
temporary and permanent jobs expected; plans
for training and replacement of foreign workers.
COUNTER NARCOTICS
The strategy does not directly address this issue
but it is clear that increased economic growth
supported by an expanded energy sector
particularly in rural and remote areas will help
counter the cultivation of poppies and illicit drug
trade. In many programs that have targeted
poppy areas, success has been made when
alternative livelihoods are found. A cornerstone
of this strategy is the linking of energy supply to
income generating activities.
80
2.
International Community. While an ICE
working group on donor coordination will be
effective, it is essential that the donors themselves
improve the way in which they are engaged with
the Afghan energy sector. At present there are 25
donors engaged in the sector; in addition there
are 15 different US agencies. Afghan counterpart
resources are limited and stretched; donors need
to respect these limits.
RISK ASSESSMENT
1.
Sector Governance, Firmly entrenched
practices of how Government implements sector
operations have resulted in perceived and actual
risk for viable private sector investment. A lack of
legal and regulatory basis from which investors
ordinarily operate, no technical standards and a
disperse array of institutions responsible for sector
development create serious risk for transparent
procurement, contract certainty, predictability of
WKHPDUNHWDQGRYHUDOOLQYHVWRUFRQGHQFH
2.
Security outside sector control, Whether
sometimes perceived or often real, security aspects
of infrastructure development in Afghanistan
remain at the fore of investor concerns.
3.
Hardware and technical capacity
Virtually none of the equipment, supplies or
spare parts required to operate the energy sector
are produced or even available in the country.
When they are on the local market they are often
of seriously technically inferior quality and at
very high cost. Some of the larger equipment (i.e.,
diesel generators, drilling rigs) can take up to one
year to procure or to lease. Much of the modern
technology that is being installed to upgrade the
power sector has never been part of the system
and no staff capacity exists to operate same;
capacity building that includes health and safety
awareness is essential.
81
82
CHAPTER 5
MONITORING AND
EVALUATION
Monitoring and Evaluation Reporting System:
A.1 Overall Reporting, Because of the diversity
and breadth of energy sector operations, it
is impossible to have one reporting system;
GLIIHUHQW WHFKQLFDO QDQFLDO DQG RSHUDWLRQDO
reporting is required. Still, there are common
reporting requirements and approaches that will
be followed.
6HFWRU6SHFLF5HSRUWLQJWKURXJK5HJXODWRU\
Bodies. It is expected that the cadastre and
inspectorate functions for hydrocarbons and
mining will be operational by end August
2008. More momentum for power regulation
is required but will also provide reporting
requirements and monitoring standards
presently absent from the sector. Liquid
IXHOV ZLOO DOVR EHQHW IURP VRPH H[WHUQDO
regulation.
83
BIBLIOGRAPHY
Afghanistan
Energy
Sector:
Corruption
Assessment; by Mary Louise Vitelli; Asian
Development
Bank
Afghanistan
Country
Partnership Strategy and Program (CPSP), June
2007.
Afghanistan: Energy Strategy; Preliminary
Findings and Recommendations; The World
Bank, February 2005.
Afghanistan Fact Sheet; Energy Information
Administration; United States Department of
Energy, June 2004.
Afghanistan National Development Strategy
Policy
Overview;
Islamic
Republic
of
Afghanistan, undated.
Afghanistans Uncertain Transition from Turmoil
to Normalcy; by Barnett R. Rubin; The Center for
Preventive Action; Council on Foreign Relations;
CSR NO. 12, March 12, 2006.
A Survey of the
Foundation, 2006.
Afghan
People,
Asia
84
85
86
An enabling
environment for
private sector
investment in
energy sector
created
SECTOR : ENERGY
Outcomes
Institution Building/
AC Cross Cutting
Issues
Development /
Gender Cross Cutting
Issues
Institution Building
/ Env. Cross Cutting
Issues
Institution Building
/ Env. Cross Cutting
Issues
MEW, MoM
1387-1388 (2008-2009)
MEW
MEW, MoM
MRRD, MEW, AISA
MoF
MoCI, MoM
MoM
MEW, MoFA
1386-1388 (2007-2009)
1387-1389 (2008-2010)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1389 (2008-2010)
1387-1388 (2008-2009)
1387-1389 (2008-2010)
Development
Development
Development
Development
Development
Development
Institution Building
/ RC Cross Cutting
Issues
Institution Building/
AC Cross Cutting
Issues
Continue
MEW, MoM
MoM, MEW
MEW, MoWA
Continue
1388-1389 (2009-2010)
MEW
1387-1388 (2008-2009)
1388-1389 (2009-2010)
MoM, MEW,MoF
Responsible Agency
Development
1387-1388 (2008-2009)
Time frame
Category
Development
PILLAR : INFRASTRUCTURE
87
Expanded public
power grid
SECTOR : ENERGY
Outcomes
Policy Actions or Activities
1387-1389 (2008-2010)
1387-1388 (2008-2009)
1388-1389 (2009-2010)
Commenced, ongoing
through 1388 (2009)
Development
Development
Development
Development
Development
Development
Development
Development
Development
Development
Development
Development
Development
Development
Development
Development
Development/ CN
Cross Cutting Issues
3URPRWLRQRIHQHUJ\HIFLHQF\
Kabul distribution procurement
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1389 (2008-2010)
Continue
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1389 (2008-2010)
1387-1389 (2008-2010)
1387-1388 (2008-2009)
Development
Development
Continue
1388-1390 (2009-2011)
Legislation
Development
1388-1391 (2009-2012)
Time frame
Development
Category
PILLAR : INFRASTRUCTURE
MEW
MEW
MEW
MEW, MoM, MoCI,
MoF, MRRD, MoEc
DABM/S, MEW,
MoF
MEW DABM
MEW, MoF,
DABM/S
MEW, MoF
DABM/S
MEW
MEW
MEW
Energy Sector
Ministries and
Institutions
MEW, MRRD
Responsible Agency
88
Restructured
Energy Sector
Governance and
Commercialized
operations
Promotion of
Private sector
Increased Access
to Rural Energy
Services
SECTOR : ENERGY
Outcomes
Legislation
Legislation
Legislation
Institution Building
Institution Building
Institution Building
Legislation
Legislation
Legislation
Legislation
Legislation
Development
Development
Development
Development
Development
Development
Category
Development
PILLAR : INFRASTRUCTURE
1387-1389 (2008-2010)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1389 (2008-2010)
1388-1390 (2009-2011)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
Continue
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
Continue
Continue
Time frame
MEW, MoF
MoJ, MEW
MoE MEW
Energy Sector
Ministries and
Institutions
Energy Sector
Ministries and
Institutions
MEW
Energy Sector
Ministries and
Institutions
MoM
DABM/S
MRRD, MEW
MEW, MRRD,
MoWA
MoM, MEW, MoF
MEW, MRRD
MEW, MRRD
MRRD
MEW, MRRD
MEW, MRRD
MEW
Responsible Agency
89
SECTOR : ENERGY
Outcomes
Institution Building
Institution Building
Institution Building
Institution Building
Institution Building
Institution Building
Category
Institution Building
PILLAR : INFRASTRUCTURE
1387-1388 (2008-2009)
1388-1389 (2009-2010)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
Exist
1387-1388 (2008-2009)
1388-1389 (2009-2010)
Time frame
MoM,MEW,MRRD
MRRD, MEW
MRRD
Energy Sector
Ministries and
Institutions
MEW
MoM, MoF
MRRD, MEW
Responsible Agency
90
SECTOR: ENERGY
Expected Outcomes
PILLAR: INFRASTRUCTURE
TBD
60%
60%
65% (2011)
25% (2011)
90% (2011)
TBD
A strategy for the
development and use of
renewable energies will be
developed by March 2008
TBD
Energy sector governance
restructuring and
commercialized operations
by 2010
75% of the costs will be
recovered from users by
March 2011
30%
10%
35%
TBD
6%
RIKRXVHKROGVHOHFWULHGLQXUEDQDUHDV
RIKRXVHKROGVHOHFWULHGLQUXUDODUHDV
% of non-residential consumers provided electricity.
Index on the progress of expanding public power grid.
Index on the progress of increasing access to rural energy
Targets
TBD
Baseline
Indicator
91
AFG
Budget
Ref
AFG/
0316701
AFG/
0317801
AFG/
0455501
AFG/
0473301
AFG/
0473705
AFG/
0501701
AFG/
0524401
S/N
Program/Project Title
1382
1385
1384
1384
1382
1382
1383
Start
1389
1390
End
Project
Duration
6.410
49.000
0.460
41.900
2.260
1.450
2.500
1387
16.20
45.00
2.40
25.00
1388
45.00
50.00
1389
100
1390
100
1391
6.410
65.200
0.460
131.900
4.660
1.450
277.500
Total
Requirement
(US$ Million)
6.410
49.000
0.460
29.000
2.260
1.450
1.180
Total
Funding
(US$
Million)
0.000
16.200
0.000
102.900
2.400
0.000
276.320
Gap
(US$
Million)
ADB,
AFG
ADB,
AFG
ARTF
WB
WB
AFG
AFG
Major
Donor
Core
Core
Core
Core
Core
Core
Core
Core/
External
MEW
MEW
MEW
MEW
MEW
MEW
MEW
Responsible
Agency
92
AFG/
0603801
AFG/
0604601
AFG/
0665701
AFG/
0728901
AFG/
0729001
AFG/
0729101
AFG/
0729501
10
11
12
13
14
15
AFG
Budget
Ref
AFG/
0524404
S/N
Program/Project Title
1386
1386
1386
1386
1385
1383
1384
1386
Start
End
Project
Duration
1.000
3.000
1.390
3.500
15.000
0.090
36.500
26.000
1387
4.21
30.00
15.00
20.00
1388
25.00
1389
1390
1391
1.000
3.000
1.390
7.710
70.000
0.090
51.500
46.000
Total
Requirement
(US$ Million)
0.000
0.000
0.000
3.500
15.000
0.090
36.500
26.000
Total
Funding
(US$
Million)
1.000
3.000
1.390
4.210
55.000
0.000
15.000
20.000
Gap
(US$
Million)
ADB
ADB
Core
Core
Core
Core
Core
Core
Core
ADB,
ISDB
AFG
Core
Core/
External
ARTF
Major
Donor
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
Responsible
Agency
93
AFG/
0813501
AFG/
0752501
AFG/
0752602
AFG/
0752901
22
23
24
25
AFG/
0806701
19
AFG/
0807501
AFG/
0806601
18
21
AFG/
0806401
17
AFG/
0806801
AFG/
0781401
16
20
AFG
Budget
Ref
S/N
Power distribution
networks of Major
Urban Centers
including Kabul
Design and
Construction of Small
and medium Power
Plants in Provinces
(Bamyan, Ghor,
Badakhshan and
Kunar)
Feasibility Study of
Olambagh Power
Plant in Orozgan
Province at Capacity
of 90 MW
Construction of
Combine Cycle
Construction of
Substation in Kholm
and Extension
of Distribution
Networks in Kholm
,Pulikhomri ,Aybak,
Doshi, Jabilsarag,
Gulbahar and
Charikar
Design of Irrigation
and Power Dam of
Lower Kokcha
Feasibility Study of
Sorobi 2 Power Plant
in Capacity of 180
MW
Sheberghan Gas
Power Plant
National Load
Control Center NEPS
REFS PASA support
to infrastructure:Core
Cost
Program/Project Title
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
Start
1388
1390
End
Project
Duration
18.00
50.00
75.00
0.500
3.000
60.000
5.000
0.500
8.790
25.000
1387
0.00
0.00
75.00
2.50
2.00
18.00
10.00
2.00
23.00
50.00
1388
0.00
0.00
0.00
23.00
100.00
1389
100.00
1390
35.00
1391
18.000
50.000
150.000
3.000
5.000
78.000
15.000
2.500
54.790
310.000
Total
Requirement
(US$ Million)
18.000
50.000
149.170
0.000
0.000
15.000
0.000
0.000
8.790
5.000
Total
Funding
(US$
Million)
0.000
0.000
0.830
3.000
5.000
63.000
15.000
2.500
46.000
305.000
Gap
(US$
Million)
USAID
USAID
USAID
ARTF
ADB
AFG
Major
Donor
External
External
External
Core
Core
Core
Core
Core
Core
Core
Core/
External
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
Responsible
Agency
94
AFG/
0827501
AFG/
0827601
28
29
40
39
38
37
36
35
32
33
34
31
Total:
AFG/
0816901
27
30
AFG/
0780301
AFG
Budget
Ref
26
S/N
Construction 220
kV Double Circuit
Transmission Line
from Pul-e-Khumri
to Kabul and Baghlan
and construction of
Sub-Stations ( Pule-eKhumri, Charikar and
Kabul)
Reconstruction and
completion of Salma
Dam Power Project
(42 MW ) in Heart
province
100 MW Kabul
Genesets
Operation and
Maintenance of
Power Facilities
Rehabilitation and
construction of small
and medium sized
hydro power plants
(Nationwide)
Power Transmission
line and distribtution
networks
Turkministan
Sorobi 2 Power Plant
Kajaki Power Plant
Kalagosh Power Plant
North East Power
Supply
South Power System
(Logar, Paktia,
Paktika, Khost)
Ulambagh Hydro
Power Project
(Uruzgan)
Baghdara (Panjsher)
Power Plant
Renewable Energy
Fuel Subsidies for
Diesel Generators
Program/Project Title
1387
1387
1387
1387
1392
1392
1393
1393
1389
1390
1387
1387
1394
1393
1391
1389
1392
1390
End
1387
1387
1387
1385
1383
1387
1387
1387
1386
Start
Project
Duration
676.68
50.00
39.00
2.00
65.00
36.00
48.43
1387
863.67
40.00
25.00
25.00
15.00
50.00
70.00
10.00
100.00
15.00
70.00
75.00
0.00
0.00
25.00
3.36
1388
912.36
50.00
25.00
75.00
25.00
50.00
90.00
35.00
125.00
25.00
31.00
100.00
0.00
0.00
35.00
3.36
1389
845.00
50.00
25.00
100.00
40.00
40.00
50.00
125.00
50.00
125.00
40.00
1390
795.00
50.00
25.00
125.00
75.00
100.00
125.00
60.00
100.00
1391
1392+
50.00
50.00
4,142.71
240.000
100.000
325.000
155.000
100.000
200.000
195.000
525.000
150.000
140.000
400.000
2.000
65.000
136.000
55.145
Total
Requirement
(US$ Million)
574.96
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.000
65.000
36.000
55.145
Total
Funding
(US$
Million)
3,567.75
240.000
100.000
325.000
155.000
100.000
200.000
195.000
525.000
150.000
140.000
400.000
0.000
0.000
100.000
0.000
Gap
(US$
Million)
USAID
USAID
IND
IND
Major
Donor
External
External
External
External
Core/
External
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
Responsible
Agency
95
Badakhshan
Badakhshan
Badakhshan
Badakhshan
Badakhshan
Badakhshan
Daikundi
Daikundi
Daikundi
Faryab
7
9
10
11
12
13
14
15
16
28
29
27
18
19
20
21
22
23
24
25
26
17
th
Badghis
Badghis
Kapisa
Jawozjan
Pajshir
Nangarhar
Nangarhar
Kabul
Kabul
Samangan
Samangan
Samangan
Jawozjan
Bamyan
Bamyan
Bamyan
Bghlan
Balkh
Project Location
Project Name
No.
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
Responsible
agency
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
Project
Duration
(year)
Start
End
96
Provide the Energy (Electricity) to the District Shawali Kot for 140000 people About 500 k. watt.
Dynamo generated power source from Nahre Shahe to the centre (150 kw).
&RQVWUXFWLRQRIDK\GURSRZHUGDPLQ.KDN$IJKDQ 7DPREHQHFLDULHV
3URYLVLRQRI(OHFWULFLW\IRU7DUHQNRW&LW\.Z%HQHFLDULHV$OO7DUHQ.RW
Provision and Distribution of Electricity in centre of Chahar Cheno Khas Urozgan Gizab and
FKRUD'LVWULFWNZ%HQHFLDULHV
Construction of dam at the districts level (20 dams).
Establishment of small hydropower dame in Taiwira, Lalsarjangal and Tolic districts about 20
dams.
hydropower dame in Taiwira, Lalsarjangal and Tolic districts about 20 dams.
&RQVWUXFWLRQRIK\GURGDPLQSURYLQFLDOFHQWUHEHQHFLDULHV
(VWDEOLVKPHQWRIHOHFWULFLW\QHWZRUNLQ)DUDKFLW\%HQHFLDULHV
&UHDWLRQRI.DPDONKDQGDPRQWKHKLOPDQG5LYHULQ&KDUEXMDNGLVWULFWNP%HQHFLDULHV
200000.
Construction of electricity production projects in centre of Bargumtal.
Construction of small hydpr-power dams. Centre of Noorgram district.
Construction of a hydropower dam in Armoor district, Kamdish.
Construction of a hydropower dam in Paroon, Nooristan district.
Construction of a hydropower dam in Wama district .
Construction of head power in Spena Barkha district, Want Waigal and Mandol district . Is this
the same as hydro power?
Construction of hydropower headworks in Barginatal (2mw).
3URYLVLRQRIHOHFWULFLW\WR%XVW$UHDRI/DVKNDUJDKEHQHFLDULHV3HRSOH
5HFRQVWUXFWLRQRI.DMDNL'DP%HQHFLDULHV$OO3URYLQFH)URP:DWHUDQGHOHFWULFLW\
&RQVWUXFWLRQRIK\GURGDPLQ.DPNDL0D]JKRU%HQHFLDULHV
&RQVWUXFWLRQRIGDPLQ]DPEDUFHQWUHRI.KRVW%HQHFLDULHV
5HKDELOLWDWLRQRI.DFKNLGDPLQ6KDPDONKHOEDNGLVWULFW%HQHFLDULHV
&RQVWUXFWLRQRIK\GURSRZHULQ'UDQJ6DKDN=XUPDWGLVWULFWNZEHQHFLDULHV
Creation of a hydropower dam in Tera district, Gardiz city. (production 500 kw).
Rehabilitation of electricity network in district # 18.
Establishment of 10 megawatt hydropower dam, in Kasham Qura Mangorchi.(8000
EHQHFLDULHV
30
31
32
33
59
58
48
49
50
51
52
53
55
56
57
47
42
43
44
45
46
40
37
38
39
36
35
34
Project Name
No.
Khost
Badakhshan
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
Noristan
Noristan
Hilmand
Hilmand
Khost
Khost
Khost
Paktia
Paktia
Kabul Urbon
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
MEW
Noristan
Noristan
Noristan
Noristan
Noristan
Nimroz
Ghor
Ghor
Farah
Ghor
MEW
MEW
Urozgan
Ghor
MEW
MEW
MEW
MEW
Kandahar
Laghman
Zabul
Urozgan
Project Location
Responsible
agency
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
Project
Duration
(year)
Start
End
99
100
Ministry/Agency
Name of Minister/Director
Signature
101
102
EXECUTIVE
SUMMARY
103
$VFDOO\VXVWDLQDEOHV\VWHPIRUURDGPDLQWHQDQFH
by March 2008;
104
105
106
107
108
other
domestic
airports will be
109
110
112
INTRODUCTION
IMPORTANCE
OF
THE
TRANSPORT
SECTOR FOR OVERALL AFGHANISTAN
DEVELOPMENT AND POVERTY REDUCIOTN
Afghanistans mountainous terrain, its landlocked
status and prime location in the heart of Central
Asia present challenges to and opportunities
113
114
anti-smuggling
and tracking
115
116
CHAPTER 1
CONTEXT
ANALYSIS OF THE CURRENT STATE OF THE
TRANSPORT SECTOR
Poverty reduction, sustainable economic growth
as well as political and social development
critically depends on the reconstruction and
rehabilitation of roads, as well as the facilitation
of transport services -- the inexpensive movement
of freight and passengers. Investments made in
the road sector can lead to employment creation,
income generation, regional development,
poverty reduction, and increased security. A well
built and maintained road network will serve
to strengthen regional ties and help establish
Afghanistan as the regional trade hub between
the Central Asian Republics and Pakistan, Iran,
the PRC, and India. Road construction can lead
to increased investment in the economy, due to
savings in travel time and costs. Maintaining and
LPSURYLQJ URDGV E\ SULYDWH FRQVWUXFWLRQ UPV
will lift the private sector in the country. The
rehabilitation of roads will also lead to an increase
in: agricultural production, government revenue,
and trade. Womens welfare will be promoted
though increased availability and access to social
services including health and education facilities.
But a road network is a facilitating mechanism; for
transport sector improvements to be a spearhead
for development and poverty reduction, they
must be coordinated with improved security,
agricultural development, improved water
management, counter narcotics programs, and
devolution of authority to local government units.
Poverty in Afghanistan is deep and widespread.
Nearly 40 percent of the rural population does not
consume enough food to avoid malnourishment.
117
118
Length (km)
Regional Highway
3,242
National Highway
4,884
Provincial Roads*
34,462
Urban/City Roads*
3750
Subtotal
46,338
87,830
Total
134,168
MAINTENANCE
AND
CONTROLS
AND
OTHER
119
120
121
122
Map 2:
123
124
Rural
Rehabilitation
and
125
126
with
international
standards,
promoting
HIFLHQW FRVWHIIHFWLYH DQG RUGHUO\ JURZWK RI DLU
transport. Because the MOF does not turn over
the appropriate air-service fees collected by the
air sector to airport service maintenance, the GOA
may be in violation of agreements with IATA and
ICAO.
On the ground transport side, the MOTCAs
Department of Private Sector inspects and issues
commercial transit permits and collects fees
from all domestic and international commercial
vehicles for each trip they make.
Ministry of Interior
The Ministry of Interior is responsible for
commercial and private-use vehicle and driver
licensing and safety inspections. Currently, the
MOI is structured so that its departments carry
out functions shared with other Ministries, as well
as departmental duplication within the Ministry
itself. MOI is naturally focused on putting down
the insurgency and ensuring peace and stability.
However, this primary mission is being carried
out to the detriment of provincial and municipal
transport systems, road safety, vehicle inspections,
and driver licensing. None of these functions are
mentioned in its new Strategy.
The MOI is responsible for the supervision of the
governance of the Provinces and Municipalities,
except for Kabul Municipality, at the present.
While the Municipalities are responsible for urban
transport planning and service delivery, they
must coordinate with the Provincial Governors,
the MOI and the MoUD. This creates overlapping
UHVSRQVLELOLWLHVDQGKDVPDGHLWPRUHGLIFXOWWR
HIFLHQWO\FRQGXFWXUEDQWUDQVSRUWSODQQLQJDQG
service delivery. The same problem exists for
smaller urban areas, because they are responsible
to the Provincial Governors, the MOI and the
MoUD.
Very recently, a new Independent
Directorate for Local Governance, reporting to the
President, has been established to relieve MOI of
supervising the civil affairs in the Municipalities
and the Provinces. It is too early to tell if this will
127
128
remain
unclear. While municipalities a
relatively independent level of government can
collect revenues, formulate budgets and hire staff,
they face many administrative and institutional
challenges. For example, revenue generation
capacity is poor, planning and budgeting is not
linked to needs, expenditure controls are weak, the
organisational structures do not relate to strategy,
and their staffs capacities need strengthening and
their skills need updating.
Municipal revenue generation capacity is weak:
the last property valuation in Kabul was in
1978 and the highest property tax is currently
equivalent to US$4 per year. Improved municipal
revenue generation through updated land titling,
property valuation and collection of the property
tax will be critical for funding an operation and
maintenance (O&M) budget compatible with the
increased stock of urban infrastructure.
Yet, the urban transport sector is important because
the urban sector accounts for about 50 percent of
the gross national product. Afghanistans cities
devote about 15% of their annual expenditures to
their transport systems. Successful urban transport
systems and transit infrastructure will increase
HFRQRPLFHIFLHQF\DQGDFFHVVWRDPHQLWLHVDQG
make urban growth possible without undue
adverse effects on the environment.
MOI is responsible for overseeing municipalities,
although this is in transition. One of its branches
issues regulations for local governments.
Governors and mayors, except that of Kabul who
has a Minister status, fall under this branch; higherlevel municipal staffs are appointed by MOI. MOI
FRQWUROVWUDIFPDQDJHPHQW02,DOVRGHDOVZLWK
registration of births and deaths, regulatory issues
and statistical matters. Municipalities report to
MOI, yet they are somewhat autonomous, and
MOI provides little managerial support, advice
or capacity development. Other ministries
UHVSRQVLEOHIRUWKHGHOLYHU\RIVHUYLFHVVSHFLFDOO\
health and education also do not provide
support to municipalities. The new Independent
Directorate of Local Governance (IDLG) will
129
Services
Transit Permit and Penalties for
failing to obtain such permit
Ministry of Commerce
Ministry of Interior
Road Pass
Transshipment Note Book
Loading & Unloading Fee
Vehicle Registration
(Passenger)
Driver Licensing
Ministry of Finance
Notebook for
Commercial vehicles
Ministry of Foreign
Affairs
Fees
4.2 Afs/km for asphalt roads
Customs
Road Tolls
Ministry of Public
Works
130
131
Figure 1:
WEAKNESSES
AND
SHORTCOMINGS
AFFECTING THE TRANSPORT SECTOR
Lack of capacity throughout all levels
Poor transportation infrastructure
Lack of transparency
to
reorganize
in
Complexity of procurement
development projects
process
Inability/unwillingness
effectively
QDQFLDOPDQDJHPHQW
various
for
133
Map 5:
Figure 6:
134
Figure 7:
135
Legislation/Decree
Bonn Agreement, 5th December 2001
(1380)
Decree No. 134, Gazette 803 of
1381(2002)
Decree No. 484 of 1360 (1983)
amended in 1990, 91, & 94)
Decree No. 711 , 13 Hoot 1368 (1990)
Decree No. 798 of 1380 (2001)
Decree No. 794 of 1380 (2001)
Description
States that all existing laws shall prevail until changed.
Decree on Domestic and Foreign Investment: allows foreign
investments in all sectors of the economy
5RDG7UDIF/DZFRQWUROVDQGUHJXODWHVURDGWUDIFURXWHSHUPLW
licensing of vehicles and drivers, vehicle insurance, accidents,
DVVLJQPHQWRIGXWLHVRIWKHWUDIFGHSDUWPHQWDQGSHQDOW\SURYLVLRQV
Transit Duties and Loading Regulations: controls and duties on goods
in transit from other countries
Construction Works Law: regulates the manner in which all
construction works shall be carried out by the Ministry of Public Works
Law of Municipalities: establishes the powers and duties of
PXQLFLSDOLWLHVLQFOXGLQJKRZWKH\UHJXODWHWUDIFDQGYHKLFOHVDIHW\RQ
municipal roads
Provides provisions and procedures for outsourcing government
services to the private sector and centralizes government procurement
under ARDS
136
137
138
CHAPTER 2
POLICY FRAMEWORK
OVERALL STRATEGY FOR THE
TRANSPORT SECTOR
STRATEGIC VISION AND GOALS
1. Strategic Vision:
A safe, integrated transportation network that
ensures connectivity and that enables the lowcost and reliable movement of people and goods
within Afghanistan as well as to and from foreign
destinations. This will give impetus to economic
growth and employment generation and help
integrate Afghanistan into the global economy.
GOALS:
Afghanistan Constitution:
Chapter 1, Article 6, states that The State is
obliged to create a prosperous and progressive
society based onbalanced development in all
areas of the country. This requires a broad-based
and well-planned development of the transport
sector.
7KHVSHFLFJRDOVIRUWKHVHFWRUVHWE\WKLV6WUDWHJ\
RYHU WKH QH[W YH \HDUV LQ OLQH ZLWK WKH $IJKDQ
Compact are:
Fully upgraded and maintained ring road and
roads to neighbouring countries by March 2009;
$VFDOO\VXVWDLQDEOHV\VWHPIRUURDGPDLQWHQDQFH
by March 2008;
139
140
141
142
AND
2. Priority Policies:
Continue to implement and improve current
programs and develop new programs to
UHDFKWKHJRDORIDVDIHHIFLHQWDQGHIIHFWLYH
Afghanistan Road Network (ARN) including
Regional Highways, National Highways,
Provincial Roads, as well as rural roads, as
a crucial part of the transportation system
for the Afghan people. The policy is to have
a road transportation system where access
within and beyond the community and to the
region is available and as low-cost as possible;
a transportation system where accidents,
GHOD\V DQG FRQJHVWLRQ DUH VLJQLFDQWO\
reduced; a transportation system where
freight moves easily and at the lowest possible
costs across towns, districts, provinces and
international borders; a system that promotes
integrated regional development in the
nations rural areas; a system where roads
minimally impact the environment, including
air quality; a system where pedestrians,
bicyclists and other forms of non-motorized
transport are accommodated; a system that
promotes gender equity, a system where
competition between transport serviced
providers is ensured; a system that facilitates
the GOAs counternarcotics efforts; and a
system where transportation services are
restored immediately after disasters and
emergencies. An overriding principle for this
policy is to continue delivering services to the
people, and not let the reform process disrupt
current programs that are developing the
sector.
Enable the principal airports of Afghanistan
and the civil aviation oversight function
to conform to the requirements of the
International Civil Aviation Organization
(ICAO) and IATA in order to attract world
class airlines to serve Afghanistan; to create
the necessary infrastructure and capable
domestic and international air transport
activity; and to promote a freely competitive
aviation environment for international and
domestic service.
Establish a new independent Civil Aviation
Authority, to improve the quality and quantity
of civil aviation available in the country,
143
144
STRATEGIC OBJECTIVES:
Short Term
Improve coordination between transport
sector governance institutions as soon as
possible;
Develop and put in place an axle-load limit
violation fees and an enforcement system by end2008;
Prioritize all transport projects based on their
estimated internal rate of return and impact on
counterinsurgency, poverty reduction, and
gender equity by end-2008;
Improve the capacity and make the Civil Aviation
Authority under MoTCA by 2009, and transition
control of Afghan airspace to the Afghan Civil
Aviation Authority;
Finance Civil Aviation infrastructure maintenance
and improvements from national budget by 2009;
Improve lines of authority and responsibility
for governance of the sector by creating a
Transport Sector Inter Ministerial Working
Group by mid-2008;
)DFLOLWDWHWKHLQWHUQDWLRQDORZRIOLFLWIUHLJKW
and services by lowering road user fees by
75% to promote trade and growth, and by
negotiations through SAARC and other
international organizations by end-2009;
Give more autonomy to local communities
and the Provincial Governments to determine
how and when rural roads are improved, as
well as provincial roads by end 2009;
Medium Term
Provide public transport
including Kabul by 2010;
for
34
provinces
145
roads
in
146
DESIRED OTUCOMES
RESULTS:
AND
EXPECTED
Outcomes:
Road Transport
Improved
connectivity
throughout
Afghanistan.
Lower road user costs.
Business environment for private sector
development improved as well as job creation
and poverty reduction.
Less journey time lost due to congestion.
Lower accidents/ fatality rate per PIA/MVK
( personal injury accidents per million vehicle
kilometers)
Civil Aviation
Increased
domestic
and
international
SDVVHQJHUVDQGIUHLJKWWUDIF
All stakeholders are well informed about the
viability of air transport systems.
Improved governance of civil aviation sector.
Overall Transport Sector
Improved air quality. For details refer to
Annex I (Action Plan)
Expected Results
Completion of 3,242 km of regional highway
system by March 2009
$ VFDOO\ VXVWDLQDEOH URDG PDLQWHQDQFH
system by March 2008
Forty percent of all villages to be connected by
all-weather roads to the national road system by
the end of 2010 (ANDS Target, to be exceeded if
practicable)
Seventy percent of all roads in municipalities (i.e.,
cities) are improved to a good standard by the end
of 2010
Fifty-Six percent of all villages to be connected by
all-weather roads to the national road system by
the end of 2013
Gender analysis
programs
policies/
*HQGHUWUDLQLQJRINH\RIFLDOV
Establishment/capacity
building
of
gender working groups or similar
mechanisms
major
of
6HWXSDVFDOO\VXVWDLQDEOHURDGPDLQWHQDQFH
system using the private sector for as much
of the work as is practicable by March 2008 to
HIIHFWLYHO\DQGHIFLHQWO\PDLQWDLQNP
of roads
147
148
149
1.
150
Training
Transport Training Institute
(VWDEOLVKDQDQFLDOO\VXVWDLQDEOH7UDQVSRUWDWLRQ
Training Institute, housed either at Kabul
University or Kabul Polytechnic. This institute
will be an applied training center at all levels of
sophistication, from training senior management
and planners to construction workers. The institute
would be an independent entity, located at one
of the university campuses in Kabul mentioned
above. People needing training from outside
Kabul will need to travel to the Institute for their
training, initially. In the long run, the Institute
could establish other campuses at other cities in
the country. The Institute will have a number of
Departments with specialized training available
for people working in each aspect of the sector.
The institute will receive requests for training,
DQGWKHQSUHSDUHPRGXOHVWRWWKHUHTXHVWDQG
price tuition so as to cover costs. Tuition and
funding will be initially covered by donors, but
will move to being paid by Afghan institutions
and individuals. Enrollment in these modules
would be open to public and private sector
students. All information about who receives
training, promotions, and scholarships, should be
disaggregated by gender. The capacity building
and training programs should also be designed
with full consideration of the gender roles in
$IJKDQ VRFLHW\ DQG VKRXOG LQFOXGH VSHFLF
151
Tendering,
Contracting
and
Contract
Administration since the basis for contracting
out
infrastructure
maintenance
and
rehabilitation to the private sector is to take
DGYDQWDJH RI SULYDWH VHFWRU HIFLHQFLHV DQG
management approaches, this is a required
function. However, contracting and contract
administration require specialized expertise
and transparency. They require skills in tender
document preparation, tender instructions
preparation, advertising of tenders, due
GLOLJHQFH DQG SUHTXDOLFDWLRQ DQG VKRUW
listing of contractors, distribution of tender
documents and instructions, receiving and
processing bids, bid opening, bid evaluation
and awarding contracts. Managing contracts
for independent construction supervising
engineers also is a critical function. Strong
capacity for project management, supervision
and inspection of works, material testing
and quality assurance, sanctioning of nonperformance,
timely
disbursement
of
payments to contractors, accounting and
auditing in a transparent manner and project
evaluation and contract close-out are required.
For roads, establishment and Management
of a Road Fund (long term, perhaps by
year four of the program, International best
practices indicate that road infrastructure
maintenance should be paid for by road users.
This often requires setting up an independent
Road Fund, supported by a Road Board,
and Road Agency, funded through road
user tariffs (i.e., fuel tax and international
transit fees). The Road Fund and its Board
are responsible for collecting the revenue
from the MOF, depositing the revenue into a
separate account and managing the fund. The
tariff-setting process involves projection of
funds requirements for routine maintenance,
and investment requirements for periodic
maintenance, rehabilitation and upgrading
as well as any new development. It also
requires determining the costs and revenues
IURP HQIRUFLQJ WUDIF ODZV DQG UHJXODWLRQV
152
153
154
3.
2.
3.
4.
5.
6.
2.
155
7.
PROGRAMS
156
2YHUWKHQH[WYH\HDUVDWRWDORINPRIURDGV
will be rehabilitated and reconstructed with the
estimated cost of $3.6 billion; but there is only $2.3
billion currently available and $1.3 billion is still
UHTXLUHG 2YHU WKH QH[W YH \HDUV DURXQG
Km of National and Regional Highways will be
maintained at a total estimated cost of $1.5 billion.
For Regional Highways the breakdown is 3,455.7
km for a total estimated cost of $1.25 billion.
1.
157
158
159
160
161
162
KM/Y/C
Type
A
B
C
D
E
F
Total
150
30
20
10
6
4
1
3
3
12
29
44
91
KM/ 5y
750
450
300
600
870
880
3,750
KM/Y/C
No of
Centers
KM/ 5y
150
750
30
450
20
300
10
12
600
Total Cost
$172.5 million
$103 million
$69 million
$90 million
$130.5 million
$132 million
US $ 697 million
Type
Average cost /
Km
US $ 230,000
US $ 230,000
US $ 230,000
US $ 150,000
US $ 150,000
US $ 150,000
Name of Cities
No of terminals
Kabul
Kandahar, Mazar
Heerat
Jallalabad, Kunduz
Khost
Chariakar, Pulikhomri, Samanagan,
Faizaabad, Shibarghan, Maiamana,
Zaaranj, Lashkarga, Grishk,
2 in each city
2 in each city
Ghazni,Gardiz, Spinboldak
Metherlam, Asadabad, Sarobi,
Poli Alam, Orgown, Sharana
Maidan Shar, Bamian, Jabal, Saraj, Baghlan,
Talogan,
E
29
870
163
Type
KM/Y/C
No of
Centers
KM/ 5y
Name of Cities
No of terminals
44
880
91
3,750
Kabul Municipality
I.
(i)
(ii)
164
Main objectives:
Estimate the cost of meeting the ANDS/
AC targets;
Identify priority projects that will help in
meeting these targets and the immediate
120
III.
5.
6.
7.
8.
9.
2.
3.
4.
10. Institutionalizing
greater
involvement
of, and consultation with, the people and
communities in municipal decision-making
and management regarding transport.
Long Term Strategy Measures (5-10 years):
1.
2.
3.
Establish
an
effective
inter-agency
coordination mechanism for coordination of
all development programs and projects in the
city.
165
4.
166
Jalalabad Airport
167
168
Kandahar Airport
Herat Airport
169
170
UHVWDWLRQFRQWUROWRZHUDQGWHFKQLFDOEXLOGLQJV
utilities, domestic accommodation;
roads and parking; maintenance facilities; PAPIs;
and an automatic weather station. The ADB has
provided $20M for reconstruction but this has
proved to be only enough for 4 airports (Maymana,
Qal-e-Naw, Feyzabad and Chagcharan). The ADB
has earmarked a further $16M for the regeneration
RIDQRWKHUWKUHHGRPHVWLFDLUHOGVZLWKWKHIXQGV
available in the 1388 budget. We recommend that
two of them should be Bost and Tarin Kowt as
the Scope of Works are complete. However, there
are a number of political and infrastructure issues
that need to be sorted out at Bamyan and so this
project should wait until 1389. In the meantime,
technical assessments and Scope of Works should
be carried out at Farah and Zaranj and then
considered for funding in 1389 (security issues
SHUPLWWLQJ 7KH VHYHQ GRPHVWLF DLUHOGV DUH DW
the following stages of development:
Bamyan: Emergency repair work is required.
MoTCA said this would start next spring. In the
meantime $20,000 had been sent for repairs to the
drainage system but much more needs to be done
($2-4 million). Long-term regeneration is on hold
because of an inter-governmental departmental
GLVSXWHRYHUWKHDLUHOGVIXWXUH Nevertheless an
ADB Scope of Work, design and cost estimate is
complete and, therefore, all the pieces are in place
to go to tender as soon as an agreement about the
future of the airport is determined. Currently,
1= WKH 81 DQG RWKHU DJHQFLHV XVH WKH DLUHOG
DQG 027&$ LQWHQGV WR DVN WKHP WR QDQFLDOO\
support the repairs. CJEng have been tasked to
FRPH XS ZLWK D SODQ WR VWDELOLVH WKH DLUHOG $
security fence is also required as children and
animals often cross the runway.
Feyzabad: An ADB Scope of Work, design and
cost estimate for regeneration is complete and a
request for proposals from contractors has been
issued. However, the one bid was considered to
be excessive. The ADB was consulted and it was
agreed to go ahead with the work (ISAF estimate
Euro 3M) and this should begin in the near future.
171
172
173
174
175
Map 8:
--
3.
4.
5.
6.
7.
176
8.
9.
11.
10.
12.
13.
14.
15.
16.
17.
177
178
CHAPTER 3
Provincial
Road
Agricultural potential;
Mining and industrial development
potential;
([SHFWHG JURZWK LQ WUDIF DQG ,PSURYH
local connectivity to health and other social
services.
By end 2009, road projects will be prioritized
based on their estimated internal rate of return,
impact on counterinsurgency, followed by
impact on poverty reduction, gender equity,
and other social factors.
Meanwhile, in addition to the above criteria,
the major criterion for road sector development
and maintenance is how the proposed projects
can assist national economic growth, poverty
reduction, gender equity, and enable security
improvements nationwide. Also, for some of
the prioritized roads the only criterion is their
industrial development potential. These kinds
of roads can be called industrial roads.
Perhaps one of the major challenges affecting
the prioritization of road sector development
projects is that donors, who are among the
major stakeholders, sometimes come up with
their own priorities based on their perspective
of Afghanistans needs. This can severely
affect the proposed prioritization based on the
aforementioned criteria. Better coordination
with donors following this Strategys roadmap
will minimize the problem.
179
Rural Roads
5XUDO URDGV KRZHYHU GHQHG DUH JHQHUDOO\
recognized as being the responsibility of MRRD.
MRRDs strategy to develop rural roads is based
on maximizing connectivity between people in
rural areas and social services centers, centers to
allow people to have a voice in local politics, and
market centers. According to MRRD, priority
should be placed on ensuring connectivity to the
ODUJHVW YLOODJHV UVW DV D PHDQV RI PD[LPLVLQJ
returns per unit of investment.1 Indeed, recent
research shows that such an approach will also
encourage the development of transport hubs and
services.2
However although efforts have been made to
rationalize the decision-making process for
investments in the rural roads sector, in practice
the selection of targeted rural roads has been
VWURQJO\LQXHQFHGE\H[WHUQDODFWRUV
Furthermore, current confusion regarding
MRRDs role is compounded by the ANDS
framework, which is comprised of three pillars for
development, which are divided into six sectors.
Regional and National Highways for which MPW
is the lead agency, fall under the framework of
Sector three (3) on infrastructure and natural
resources, whereas Secondary and lower classes
of roads are included in Sector six (6): Agriculture
and Rural Development, with joint MPW/MRRD
implementation. The dissection of the Road Sector
into two different ANDS sectors has contributed
to poor coordination in planning between the subsectors within the overall Roads Sector.
To rank and prioritize rural roads projects, as with
all roads projects, the most important factors are
the estimated internal rate of return, impact on
counterinsurgency, followed by impact on poverty
reduction and other social factors. However, with
rural roads connectivity, counterinsurgency,
gender equity, and poverty reduction should
count for more weight than is given to the internal
rate of return for major roads. In the meantime
HDFKUHFRPPHQGHGURDGVKRXOGEHMXVWLHGZLWK
1
This rationale assumes that market and road
network hierarchy development principles are respected
2
International Forum for Rural Transport and
Development 2006
180
181
182
Civil Aviation
As a goal for 2010, civil aviation projects also
QHHG WR EH MXVWLHG DQG SULRULWL]HG PXFK WKH
same as roads projects. The most important
factors are the estimated internal rate of return,
impact on counterinsurgency, followed by
impact on poverty reduction and other social
factors. In the meantime each recommended
of the
183
184
Railways
Railway links in Afghanistan are critical to
Afghanistans infrastructure and economic
development because bulk commodities (such as
fuel) are brought to Afghanistans border by rail,
then transhipped to truck for movement within
the country. Transport costs of bulk commodities
over long distances are typically cheaper by rail
than road.
However, by end 2009, it is a priority to build or
strengthen intermodal loading and unloading
stations at all railheads to lower the costs of
loading and unloading freight being moved
between international rail shipments and truck
7UDIF5HJXODWLRQVDQG6DIHW\
As the number of people and distance driven
increases on the highways each year, without
VLJQLFDQW LPSURYHPHQWV LQ KLJKZD\ VDIHW\
the number of fatalities and injuries will also
increase. Ensuring that it is safe to travel on the
highways is a guiding principle throughout all of
our programs and activities. The Transport sector
agencies will continually improve road safety.
Objectives: Reduce the number of road-related
fatalities and injuries:
Strategies
Road safety is a high priority, with more than 431
Afghans killed and more than 588 injured in motor
vehicle crashes on rehabilitated roads each year,
and these estimates likely seriously understate
the number of injuries and fatalities. The transport
sector needs to focus safety programs on high
risk areas through technical assistance, research,
training, data analysis and public information
as well as through compliance, education and
enforcement of national motor carrier safety
requirements. Further, the transport sector needs
to provide resources for infrastructure and system
improvements to enhance safety such as highway
crossings. Improving highway safety also reduces
the economic costs of transportation. To meet its
Goals to continually improve highway safety,
even as travel increases, the transport sectors key
strategies in road safety include the following:
185
Licensing,
Permitting,
and
Vehicle
Inspections: Now under the purview of MOI,
this function must be made more effective, serve to
protect the public from unsafe drivers and vehicles,
and also serve as a transparent source of revenue.
186
188
CHAPTER 4
189
190
Risk Assessment
The risks to the goals and outcomes of the Strategy
are high. The risks most easily controlled are those
of donor coordination and the coordination and
reforms required by the central government.
Moving to an integrated management approach
for the sector from Kabul and then devolving
authority to the provincial and municipal
governments is a high risk venture, but absolutely
necessary if the Strategy is to succeed.
To improve the transport sector, closer
collaboration between all actors in the sector is
required due to a deteriorating security situation.
The Afghan Military, ISAF, and the US Military
must be brought into the planning and execution
of transport projects more closely than before. This
means delays in separating military from civilian
management of air facilities and implementing
road improvement projects.
191
BIBLIOGRAPHY
ADB. (April 2003). Rebuilding Afghanistans
Agriculture Sector. South Asia Department.
Asian Development Bank. Manila, Philippines.
ADB. (March 2004). Securing Afghanistans
Future: Accomplishments and the Strategic Path
Forward; Transport Sector Building Connections.
South Asia Department. Asian Development
Bank. Manila, Philippines.
Aid Coordination Working Group. (January
2007). Provencial Budgeting, Financing Model
and Aid Coordination Working Group. Ministry
of Finance. Islamic Government of Afghanistan.
Kabul.
Aviation Consultants International. (December
2006). Phased Transition to a Directorate of Civil
Aviation & a Civil Aviation (Regulatory) Authority
& Integrated Corporate Human Resource
Strategic Development: Capacity Strengthening
of the Aviation Sector of Afghanistan. TA No.
4594-AFG, Asian Development Bank. Manila,
Philippines.
Buddenberg, Doris and William Byrd. (November
2006). Afghanistans Drug Industry:
Structure, Functioning, Dynamics, and Implications
for Counter-Narcotics Policy. The World Bank.
7KH8QLWHG1DWLRQV2IFHRQ'UXJVDQG&ULPH
&ROOLHU 3DXO DQG $QNH +RHIHU 2FWREHU
$LG 3ROLF\ DQG *URZWK LQ 3RVW&RQLFW
Societies: Policy Research Working Paper 2902.
The Development Research Group.
The World Bank. Washington D.C. USA.
Council of Ministers. (2002). Law on Foreign
and Domestic Private Investment.
Decree
No.
134, Gazette No. 803. Kabul, Afghanistan.
<http://www.export.gov/Afghanistan/bus_
FOLPDWH"DQYODZKWPO!
192
193
194
Improved connectivity
through out
Afghanistan and to the
foreign destinations
within the region.
ROAD TRANSPORT
Expected Outcomes
SECTOR : TRANSPORT
PILLAR : INFRASTRUCTURE
1388-1392 (2009-2013)
Development
Legislation
Development
Development/ Gender
Cross Cutting Issues
Development
Development
Institution Building
1388-1392 (2009-2013)
1388-1392 (2009-2013)
1388-1392 (2009-2013)
1387-1389 (2008-2010)
1388-1389 (2009-2010)
1388-1390 (2009-2011)
1389-1392 (2010-2013)
1388-1392 (2009-2013)
Development
Development
1388-1392 (2009-2013)
Time frame
Development/ RC Cross
Cutting Issues
Category
MUD,
Provinical
Municipalities,
MPW, MRRD
MoTCA. MPW,
KM, MoUD,
Provincial
Municipalities
Transport
sector line
ministries and
institutions
MPW, MoTCA,
MoF, MoFA,
MoCI
MoTCA
MPW, MoF
MPW, MRRD,
MoTCA
MRRD,
MPW, MoUD,
Municipalities
MRRD, MPW
MPW
Responsible
Agencies
195
Increased domestic
and international
passengers and freight
WUDIF
CIVIL AVIATION
Expected Outcomes
SECTOR : TRANSPORT
PILLAR : INFRASTRUCTURE
Institution Building
Institution Building/ AC
Cross Cutting Issues
Institution Building
Legislation
Development
Development
Development
Category
1388-1389 (2009-2010)
1389-1392 (2010-2013)
Continue
1387-1390 (2008-2011)
1387-1390 (2008-2011
1387-1390 (2008-2011)
1387-1390 (2008-2011
1387-1390 (2008-2011)
Time frame
MPW, MRRD,
KM, MoUD,
IDLG
MPW, MoTCA,
MRRD, MoUD,
MoF, IDLG,
MoI, KM
MoTCA
MoTCA, MoF
MoTCA
MoTCA
MoTCA
MoTCA
Responsible
Agencies
196
Expected Outcomes
SECTOR : TRANSPORT
PILLAR : INFRASTRUCTURE
Institution Building
Institution Building
Institution Building
Institution Building
Institution Building
Institution Building
Institution Building
Institution Building
Institution Building
Category
1387-1389 (2008-2010)
1388-1390 (2009-2011))
1388-1389 (2009-2010)
1389-1392 (2010-2013)
1388-1389 (2009-2010)
1389-1390 (2010-2011)
1388-1389 (2009-2010)
1387-1389 (2008-2010)
1387-1388 (2008-2009)
1387-1388 (2008-2009)
Time frame
Transport
sector line
ministries and
institutions
GoA and
Transport
sector line
ministries and
institutions
Transport
sector line
ministries and
institutions
Transport
sector line
ministries and
institutions
Transport
sector line
ministries and
institutions
MRRD, IDLG
MoI, IDLG
MPW, MoTCA,
MRRD, MoUD,
MoF, IDLG,
MoI, KM
MPW, MoTCA,
MRRD, KM,
MoI, IDLG,
MoF, MoUD
MoI
Responsible
Agencies
197
Business environment
for private sector
development
improved to create jobs
and reduce poverty.
Expected Outcomes
SECTOR : TRANSPORT
PILLAR : INFRASTRUCTURE
Institution Building
Legislation
Develop and put in place an axle-load limit violation fees and an Legislation
enforcement system
Pass any required legislation and enabling regulations so that
Legislation
private sector insurance, auditing, and bonding industries can
GHYHORSDQGIRUHLJQLQVXUDQFHUPVFDQRSHUDWHLQ$IJKDQLVWDQ
protecting rights of the companies and the public, with penalties
for violations.
Legislation
Legislation
Institution Building
Category
1387-1390 (2008-2011)
1387-1388 (2008-2009)
1389-1392 (2010-2013)
1387-1389 (2008-2010)
1389-1392 (2010-2013)
1389-1392 (2010-2013)
1388-1392 (2009-2013)
Time frame
2IFHRIWKH
President,
the National
Assembly,
MoCI, MoJ and
MoF
2IFHRIWKH
President,
the National
Assembly,
MoTCA, MPW,
MoI, MoF,
MRRD, IDLG
and MoUD
2IFHRIWKH
President,
the National
Assembly,
MoCI, MoJ and
MoF
MPW, MoF,
MRRD, MoUD,
,'/*2IFH
of President,
National
Assembly, MoJ
MPW, MoF
Transport
sector line
ministries and
institutions
Transport
sector line
ministries and
institutions
Responsible
Agencies
198
Improved connectivity
through out Afghanistan
and to the foreign
destinations within the
region.
SECTOR: TRANSPORT
Expected Outcomes
ROAD TRANSPORT
Baseline
Indicators
National
Assembly,
MoTCA
National
Assembly,
MoTCA. MCN,
MoI, MoJ
Responsible
Agencies
40 % of all villages to be
connected by all-weather
roads to the national road
system by the end of 2010.
Targets
1388-1389 (2009-2010)
Legislation and
Development/ CN Cross
Cutting Issues
1388-1389 (2009-2010)
Legislation/ RC Cross
Cutting Issues
Time frame
Category
PILLAR: INFRASTRUCTURE
Expected Outcomes
SECTOR : TRANSPORT
PILLAR : INFRASTRUCTURE
199
CIVIL AVIATION
Increased domestic and
international passengers
DQGIUHLJKWWUDIFE\DLU
50% Qalainaw
30% Maimana
0% Faizabad
0% Chaghcharan
0% Zaranj
0% Lashkar Gah
0% Tarin Kowt
0
50% (KDH)
0% (JBD)
10% (MZR)
40% Kabul
0% Heart
TBD
TBD
2 (End 2010)
Environmental protection
from air pollution by End of
2009
Targets
$VFDOO\VXVWDLQDEOHURDG
maintenance system by End
2008.
Improved sidewalks and
shoulders by 2010
Lower road user fees by 75%
by end 2008.
Less journey time by end 2012
Baseline
40%
Indicators
,QGH[RQWKHSURJUHVVRISXWWLQJDVFDOO\
sustainable road maintenance system in place by
End 2008 and its coverage
Improved sidewalks and shoulders (km) (along
with improved and connected drainage system)
Index on the rationalization of road user costs.
SECTOR: TRANSPORT
Expected Outcomes
PILLAR: INFRASTRUCTURE
200
Targets
TBD
TBD
TBD
10 (2013)
Baseline
The feasibility studies for the 10 domestic
airports have been done.
For have Airport services cost
comparable with international standards
,ICAO personnel is developing a tariff
plan for various component of airport
services on the basis of the Airport
master Planning study report of 2004.
5%
Indicators
# of domestic airports constructed/rehabilitated
Improved governance of
civil aviation sector.
SECTOR: TRANSPORT
Expected Outcomes
PILLAR: INFRASTRUCTURE
201
3.00
3.000
3.25
1.500
0.500
2.10
2.100
1.75
5.86
2.93
1392+
2.930
1391
1.50
1390
1.500
1389
2.00
1388
Total
Requirement
(US$ Million)
2.000
1387
0.000
0.000
0.000
0.000
0.000
1.500
2.000
Total Funding
(US$ Million)
3.000
0.500
3.250
2.100
5.860
0.000
0.000
Gap (US$
Million)
JPN
AFG
Major
Donors
Core
Core
Core
Core
Core
Core
Core
Core
External
K a b u l
Municipality
K a b u l
Municipality
K a b u l
Municipality
K a b u l
Municipality
K a b u l
Municipality
K a b u l
Municipality
K a b u l
Municipality
Responsible
Agency
202
18.00
29.60
14.60
43.65
18.000
15.000
34.690
158.34
2.50
2.500
20.00
14.00
20.00
50.00
4.40
6.000
1392+
27.90
14.00
6.000
1391
27.900
32.00
18.000
1390
0.45
2.20
2.200
1389
Total
Requirement
(US$ Million)
0.450
1388
1387
31.000
15.000
18.000
2.500
10.000
27.900
0.450
6.000
18.000
0.000
Total Funding
(US$ Million)
127.339
14.600
0.000
0.000
10.000
0.000
0.000
14.000
32.000
4.400
Gap (US$
Million)
Core
Core
ARTF,
WB
Core
Core
ITA
AFG
ADB
Core
Core
ADB,
AFG
ISDB
Core
Core
Core
Core
Core
External
ADB
ISDB
ADB,
AFG
Major
Donors
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MPW
K a b u l
Municipality
Responsible
Agency
41.20
72.00
1392+
38.00
107.70
57.50
132.00
Total
Requirement
(US$ Million)
5.00
3.75
15.00
1.250
5.000
102.00
5.50
5.500
14.80
29.00
9.000
6.00
51.50
15.000
1391
8.800
36.00
21.500
1390
1.62
102.00
30.000
1389
1.620
1388
1387
0.000
0.000
5.500
8.800
1.620
9.000
15.000
21.500
30.000
Total Funding
(US$ Million)
102.000
5.000
0.000
6.000
0.000
29.000
92.700
36.000
102.000
Gap (US$
Million)
AFG
AFG
AFG
SADF
ADB
ADB
ADB
Major
Donors
Core
Core
Core
Core
Core
Core
Core
Core
Core
Core
External
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MPW
Responsible
Agency
204
60.00
Total
Requirement
(US$ Million)
16.00
3.00
10.00
15.00
11.25
3.000
5.000
5.000
0.500
10.00
11.75
30.00
25.00
12.00
12.000
10.00
8.20
8.200
10.00
0.80
0.800
50.00
1392+
200.00
50.00
1391
2.000
30.00
1390
1.00
25.00
5.000
1389
1.000
1388
1387
0.500
0.000
0.000
3.000
12.000
0.000
0.000
0.000
0.000
0.000
Total Funding
(US$ Million)
11.250
30.000
25.000
13.000
0.000
8.200
0.800
200.000
1.000
60.000
Gap (US$
Million)
AFG
Core
ADB.
AFG
Core
Core
Core
Core
Core
Core
Core
Core
Core
Core
External
AFG
AFG,
WB
Major
Donors
MoTCA
MoTCA
MoTCA
MoTCA
MoTCA
MoTCA
MPW
MPW
MPW
MPW
Responsible
Agency
205
0.00
0.00
0.03
0.00
0.00
3.50
0.03
0.04
54.80
10.00
0.00
0.00
5.94
50.00
0.00
0.00
2.87
0.31
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
50.00
10.00
54.80
0.08
0.03
3.50
5.94
0.31
2.87
12.00
6.00
4.000
2.50
2.00
Total
Requirement
(US$ Million)
1.500
1392+
12.00
3.00
1391
4.00
1390
5.000
1389
1.00
1388
1.000
1387
50.000
10.000
54.800
0.080
0.030
3.500
5.937
0.310
2.870
0.000
0.000
0.000
0.000
Total Funding
(US$ Million)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
12.000
6.000
12.000
1.000
Gap (US$
Million)
USAID
USAID
IND
EC
JPN
JPN
EC
EC
SIDA
Major
Donors
External
External
External
External
External
External
External
External
External
Core
Core
Core
Core
Core
External
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MoTCA
MoTCA
MoTCA
MoTCA
Responsible
Agency
206
10.00
0.00
50.00
100.0
100.0
1392+
10.00
279.00
151.00
83.63
Total
Requirement
(US$ Million)
25.00
200.0
200.00
1,000.00
900.00
300.0
200.00
300.0
265.00
265.00
300.0
150.00
150.00
100.00
400.00
60.00
400.0
100.0
60.00
50.0
50.0
50.00
25.00
50.00
25.00
150.00
0.00
279.00
50.00
1391
25.00
57.00
44.00
0.00
1390
80.00
0.00
83.63
1389
80.00
1388
1387
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.000
279.000
33.800
83.634
Total Funding
(US$ Million)
1,000.000
900.000
265.000
150.000
60.000
100.000
400.000
150.000
80.000
0.000
0.000
117.200
0.000
Gap (US$
Million)
JPN
External
External
Core
ARTF,
EC,
UKDFID,
WB
USAID
External
Core
External
USAID
Major
Donors
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MPW
MoTCA
MRRD
MRRD
MPW
Responsible
Agency
Total:
1387
3.0
1.50
1,049.70
6.0
4.00
1,603.16
20.0
5.00
1,129.00
4.0
8.0
25.0
8.0
495.0
5.0
10.0
138.5
6.5
12.0
10.0
15.0
15.0
5,385.43
20.00
40.00
50.00
30.00
50.00
50.00
7.00
7.0
10.0
15.0
15.0
3.00
7.0
15.0
3.00
50.0
Total
Requirement
(US$ Million)
150.00
50.0
1392+
25.0
1391
25.00
1390
30.00
1389
30.00
1388
773.231
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Total Funding
(US$ Million)
4,612.20
20.000
40.000
50.000
30.000
50.000
50.000
150.000
30.000
Gap (US$
Million)
Major
Donors
Core
External
MoTCA
MoTCA
MoTCA
MoTCA
MoTCA
MoTCA
MoTCA
MoTCA
Responsible
Agency
208
23
24
25
26
27
28
29
30
22
12
13
14
15
16
17
18
19
20
21
11
10
&RQVWUXFWLRQRI7HUWLDU\URDGVIURP7DQJL0XUFKLQ%XUNDWR+D]DU4DTLQ.PDQGZLOOEHEHQHFLDO
for 30000 families.
Construction of a bridge for vehicles in Pajman, Barfac district (25 metres).
5RDGFRQVWUXFWLRQIURP%DJKODQ4DGHHPFLW\WR$ETXOL*DUGDENPEHQHFLDULHVFRPSOHWHG
MPW)
5RDGFRQVWUXFWLRQIURP1DKULQGLVWULFWWR%XUNDGLVWULFWNPEHQHFLDULHV2QJRLQJ03:
&RQVWUXFWLRQRI*RUJDQURDGNPEHQHFLDULHV
Road construction in Mullah Ghulaman &dasht-e- Essa Khan, in the centre of the province.
Road asphalting from Centre of Bamyan until Dokani, for Mili Buses.In centre of the province
Road construction from Shato Pass until Qonaq, Panjab & Waras districts.
Repair and gravel of road from Dandan Shikan pass to Hajar in Kahmard district (90Km).
Construction, repair and gravelling of road from daga to Treich in Yakawlang district (100 km).
Cosntruction of Airport in Shibartoo. 6km
Construction of Concrete bridge in centre of Panjab district. 30m
Construction of Faiz Abad Arghenchkhwa districts road (50km)
Construction of Ring Road from Share Bozorg to Darwaz (270km) (circular road of Shar-e-BozorgEshkashim-Shighnan-Maimee-Darwaz ha in total reaches to 400km among which 100km are rocks which
will be consulted with Ministry accordingly)
Construction of bridge at Faizabad on the Kohistan road.
Road construction in Fakhor Gezab, Bery and Sartagab districts (55 km).
Road construction in Qara Gharnij upat Zard Gulan Kijran district (26 km).
Construction of secondary road from Nili to Qonaq passes (137 km).
Construction of Mirgulam and Askan bridge (50m)
Construction of Darai Khodi bridge (50m)
Road construction from Pishok up to Ghor province. (80) Km.
Construction of bridge on Kijran river in Kijran district Zargulan village. (55m)
1
2
3
4
5
6
Project Name
No.
Badakhshan
Daikundi
Daikundi
Daikundi
Daikundi
Daikundi
Daikundi
Daikundi
Badakhshan
Bghlan
Bghlan
Bamyan
Bamyan
Bamyan
Bamyan
Bamyan
Bamyan
Bamyan
Badakhshan
Bghlan
Bghlan
Bghlan
Balkh
Balkh
Balkh
Balkh
Balkh
Balkh
Balkh
Balkh
Project
Location
MPW/MRRD
MRRD
MRRD
MRRD
MPW/MRRD
MPW/MRRD
MPW
MPW/MRRD
MPW/MRRD
MPW
MPW/MRRD
MPW
MPW
MRRD
MRRD
MRRD
MoTCA
MRRD
MRRD
MPW
MRRD
MRRD
MRRD
MPW
MPW
MPW/IDLG
MPW
MPW
MoUD/ MoTCA/
IDLG
MoUD/ MoTCA/
IDLG
Responsible
agency
1388
1387
1387
1387
1387
1387
1391
1388
1387
1387
1387
1388
1388
1388
1387
1388
1388
1388
1388
1387
1388
1387
1387
1387
1387
1387
1387
1387
1387
1387
Project Duration
(year)
Start
End
209
31
32
33
34
62
63
61
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
38
36
37
35
Project Name
No.
Hirat
Hirat
Ghazni
Parwan
Parwan
Parwan
Parwan
Parwan
Parwan
Parwan
Parwan
Parwan
Parwan
Panjshir
Panjshir
Panjshir
Panjshir
Panjshir
Panjshir
Panjshir
Ghazni
Ghazni
Ghazni
Ghazni
Ghazni
Jawozjan
Faryab
Jawozjan
Faryab
Daikundi
Daikundi
Daikundi
Daikundi
Project
Location
MPW
MPW
MRRD
MRRD/MPW
MRRD
MRRD
MRRD
MRRD
MRRD
MRRD
MPW/MRRD
MRRD
MRRD
MRRD
MRRD
MPW/MRRD
MRRD
MRRD
MRRD
MRRD
MPW/MRRD
MRRD
MRRD
MPW/MRRD
MPW/MRRD
MPW
MoRR
MRRD
MoRR
MPW
MPW
MPW/MRRD
MPW
Responsible
agency
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1388
1387
1387
1387
1387
1387
1387
1387
1390
1388
1388
1387
Project Duration
(year)
Start
End
210
91
92
93
94
95
96
97
98
99
90
87
88
89
86
85
84
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
No.
Project Name
Kabul
Kabul
kundoz
kundoz
kundoz
kundoz
kundoz
kundoz
kundoz
Kabul
Paktika
Kabul
Kabul
Paktika
MRRD
MPW/MRRD
MRRD
MRRD
MRRD
MPW
MPW/MRRD
MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MRRD
MRRD
Paktika
Paktika
MPW/MRRD
MRRD
MPW/MRRD
MRRD
MRRD
MRRD
MRRD
MPW
MPW
MPW/MRRD
MRRD
MRRD
MRRD
MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MRRD
MPW/MRRD
Responsible
agency
Hirat
Hirat
Hirat
Takhar
Takhar
Takhar
Takhar
Takhar
Wardak
Wardak
Wardak
Wardak
Wardak
Wardak
Nangarhar
Nangarhar
Nangarhar
Nangarhar
Nangarhar
Paktika
Project
Location
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1388
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
Project Duration
(year)
Start
End
211
*UDYHOOLQJRI&KDDU'DUDURDGWR/DOD0DLGDQLQFOXGLQJWKHFXOYHUWVNPEHQHFLDULHV
Gravelling and repair of the road from centre of the province till Khuram and Roi do Aab, 120 km.
Asphalt of the road in 15km
Construction and asphalt of road in 117 km.
Asphalt of the roads in the centre of the province in 30km.
Construction of rural roads in provincial centre and other districts (10 km for each district, total 70 km).
Asphalting of Deh Baba Ali up to Durnama centre of province (15 Km)
Construction and Rehabilitation of rural roads as per 10km per district in 6 districts and center
Construction of road in town and connection to the main read in Tagab Nijrab and Kohband.
Repairing and gravelling of roads and construction of bridges in Ghormach (30
Repairing and gravelling of roads and construction of bridges and culverts in Maqar (30 km, 70,000
EHQHFLDULHV
Repairing and gravelling of roads and construction of bridges and culverts in Qadis (about 30 km and
120,000
Asphalting of road in Morghab and Maqar. (15 km).
Asphalting of road from Badghis to Maqar Qalai now. (15 km).
Construction of road Qadis Jawand (15 km)
100
101
102
103
104
105
106
107
108
109
115
116
117
118
131
130
129
125
126
127
128
124
120
121
122
123
119
112
113
114
111
110
Project Name
No.
Logar
Kandahar
Kandahar
Sari pul
Sari pul
Kandahar
Kandahar
Sari pul
MPW
MRRD
MRRD
MRRD
MRRD
MPW
MRRD
MRRD
MPW/MRRD
MPW/MRRD
MRRD
MPW/MRRD
MRRD
Sari pul
Sari pul
Sari pul
Sari pul
Sari pul
MPW/MRRD
MPW/MRRD
MRRD
MPW/MRRD
MPW
MPW
MRRD
MRRD
MRRD
MRRD
MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MRRD
MPW/MRRD
MRRD
MPW/MRRD
MRRD
Responsible
agency
Badghis
Sari pul
Sari pul
Badghis
Badghis
Badghis
Badghis
Badghis
Badghis
kundoz
Samangan
Samangan
Samangan
Samangan
Kapisa
Kapisa
Kapisa
Kapisa
Badghis
Project
Location
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1388
1388
1388
1388
1387
1388
1388
1387
1387
1387
1387
1387
1387
1387
1387
1387
Project Duration
(year)
Start
End
212
165
156
157
158
159
160
161
162
163
164
155
143
144
145
146
147
148
149
150
151
152
153
154
142
141
140
133
134
135
136
137
138
139
132
No.
Rehabilitation of the following four roads in MoPHammad Agha district. A- Pul Kandahari, B- Zahid
$DEDG&7DQGL0XJKXO.KDLODQG'6DG6DQJWR$DE3DUDQ
Road construction from Hazra district to Hesarak
&RQVWUXFWLRQDQG5HKDELOLWDWLRQRIUXUDO5RDGV$ERXWNPDOORI/RJDUZLOOEHQHW
*UDYHOLQJRIWKHDOO5RDGVIURPWKHFHQWUHWRWKH'LVWULFWVNPEHQHFLDULHV
construction of Sub Road from Shamalzo to Shinkai District About 65 Km
&RQVWUXWLRQRI'DLFKRSDQ5RDG$ERXWNP%HQHFLDULHV$OOSHRSOHRI7KH'LVWULFW
Reconstruction of Road and Culverts form centre to the Districts About 250 km 80 villages
&RVWUXFWLRQRI5RDG)URP&HQWUHWRWKH6KDPDO]DL'LVWULFWNP%HQHFLDULHV
Construction of rural roads and culverts 120 km in different villages of Dehrawod district (120000
EHQHFLDULHV
5RDG&RQVWUXFWLRQIURP.KDV8UR]JDQ.PEHQHFLDULHV
$VSKDOWLQJRI5RDGIURP7DUHQNRWXSWRS&KRUD'LVWULFW$ERXW.P%HQHFLDULHV2QJRLQJ
GTZ)
Construction and graveling of roads from Shozali Fararoad to Saghar district (90km) 100000 beneciaries.
$VSKDOWLQJRIURDGV&KLJK&KLUDQ&LW\O.PDERXWEHQHFLDULHV
$VSKDOWLQJRIURDGVIURP&KLJK&KLUDQWR++HUDWNPEHQHFLDULHV
Road construction from Pushtagazak up to Sowich (35km)
Construction and gravelling of road from Pasband up to Purchaman (200km
Construction and gravelling of road from Pasband up to Purchaman (200km
Gravelling of road from Gholdara up to centre of Chaharsada (120)
Construction and graveling of road from centre of Shahrak district up to centre of province (120 km)
Construction of road from Shorba up to Gaqand Dolaina (70 km).
Construction and gravelling of road from Khobid up to Nawai Sfanj (40 km).
Gravelling of roads from Tolac up to Chisht Sharif (65 km).
&RQVWUXFWLRQRI)DUDKFLW\URDGVDVSKDOWNP%HQHFLDULHV
Construction of road from border to Farah centre & Pusht road Khak Safed district.(asphalt 30km,
EHQHFLDULHV
5RDGJUDYHOOLQJIURP6DUSX]DWR)HUR].RWDOLQ.PDQGEHQHFLDULHV
&RQVWUXFWLRQRIWZREULGJHVLQ3XUFKDPDQGLVWULFWPEHQHFLDULHV
&RQVWUXFWLRQRI%ULGJHLQ$QDU'DUDGLVWULFWRQ+DURRW5LYHUPEHQHFLDULHV
Creation of Road Along The Border About 130km Asphalt Road
&RQVWUXFWLRQRIEULGJHRQ+HOPDQGULYHULQ6DU6KLODYLOODJH=DUDQM$ERXWP%HQHFLDULHV
Construction of bridge on the Helmand river in the Char Burjak district of Nimroz province. (1800
Construction of road From Paron to Dahane Pirok (66km).
Construction of road from Nuristan to Badakhshan (60km).
Construction of road from Pyar to Colam Pyar up to Colam (35km).
Construction of the Chanar Khor road to Ashpi (Kamdish district). About 40 km & the (13,000
EHQHFLDULHV
Project Name
Noristan
Farah
Farah
Farah
Nimroz
Nimroz
Nimroz
Noristan
Noristan
Noristan
Farah
MRRD
MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MPW/MRRD
MRRD
MPW/MRRD
MRRD
MPW/MRRD
MRRD
MPW
MPW
MRRD
MRRD
MRRD
MRRD
MPW/MRRD
MRRD
MRRD
MRRD
MPW
MPW/MRRD
Urozgan
Ghor
Ghor
Ghor
Ghor
Ghor
Ghor
Ghor
Ghor
Ghor
Ghor
Ghor
Farah
MRRD
MRRD
MRRD
MoRR
MRRD
MRRD
MRRD
MRRD
MRRD
MPW/MRRD
Responsible
agency
Urozgan
Urozgan
Logar
Logar
Zabul
Zabul
Zabul
Zabul
Zabul
Logar
Project
Location
1387
1387
1387
1388
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1388
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
Project Duration
(year)
Start
End
213
166
167
168
169
170
171
172
173
174
175
176
189
188
187
186
185
184
183
182
181
178
179
180
177
Project Name
No.
Khost
Badakhshan
Kabul Urbon
Paktia
Paktia
MRRD
MRRD
KM/MPW
MPW/MRRD
MPW
MRRD
MRRD
Paktia
Paktia
MPW
MPW
MPW/MRRD
MRRD
MoTCA
MPW/MRRD
MRRD
MRRD
MRRD
MPW/MRRD
MPW/MRRD
MRRD
MPW/MRRD
MPW
MPW/MRRD
MPW/MRRD
MPW/MRRD
Responsible
agency
Paktia
Paktia
Kunar
Kunar
Kunar
Kunar
Noristan
Noristan
Hilmand
Hilmand
Hilmand
Hilmand
Khost
Khost
Khost
Kunar
Kunar
Project
Location
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
1387
Project Duration
(year)
Start
End
216
Date of Submission
February 2008
217
EXECUTIVE
SUMMARY
WATER IS LIFE: EACH DROP IS A
LEGACY FOR PRESENT AND FUTURE
GENERATIONS
1.
Introduction
219
3.
220
Poverty Alleviation