Saudi Aramco Inspection Checklist
Saudi Aramco Inspection Checklist
Saudi Aramco Inspection Checklist
Rev 3
SAIC NUMBER
SAIC-N-2019
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
A1
REFERENCE
SAES-N-110,
Para. 5.1
SAES-N-110,
Para. 9.4.1
See Note 3.
A3
SAES-N-110,
Para. 9.6.1
SAES-N-110,
Para. 11.2.1
C) Vibration casting
A5
SAES-N-110,
Para. 11.2.2
A6
SAES-N-110,
Para. 11.2.3
A7
SAES-N-110,
Para. 11.2.4
A8
Cast or gunned test panels were cured for 24 hours, hammer tested &
visually inspected for correct curing. Test samples were acceptable &
free of voids, cracking, deformation, or honeycombing.
SAES-N-110,
Para. 11.2.6
A9
SAES-N-110,
Para. 11.2.7
Page 1 of 4
MH's SPENT
TRAVEL TIME
PASS
Castable Refractory Qualification & Testing for Applicators (SAES-N-110 Procedure, See Notes)
See Note 2.
A2
PLANT NO.
MECH-
SYSTEM ID.
QUANTITY INSP.
ACCEPTANCE CRITERIA
QR NUMBER
CONTRACTOR / SUBCONTRACTOR
A.
15-Dec-09
EQPT CODE
ITEM
No.
30-Jun-08
DATE APPROVED
FAIL
N/A
RE-INSP DATE
Rev 3
ITEM
No.
B.
B1
SAIC NUMBER
SAIC-N-2019
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
30-Jun-08
DATE APPROVED
15-Dec-09
QR NUMBER
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
Extreme Erosion Resistant Refractory Qualification & Testing for Applicators (SAES-N-120 Procedure, See Notes)
Refractory Applicators meet any specific Refractory Manufacturer
training & experience qualifications for specific type refractory installed.
SAES-N-120,
Para. 5.1
See Note 2.
B2
SAES-N-120,
Para. 12.2.1
B3
SAES-N-120,
Para. 12.2.2
B4
SAES-N-120,
Para. 12.2.3
B5
After 48 hours of air curing, test panels also passed a hammer test:
A) Test panel surface was lightly struck with 1-pound
ball peen hammer
B) No audibly notable voids were found
C) No evidence of insufficient hardness of
refractory was found.
D)
Questionable or defective refractory (dead dull sound) was not found.
SAES-N-120,
Para. 12.2.8
B6
B7
SAES-N-120,
Para. 12.2.8
SAES-N-120,
Para. 12.2.4
B8
Installer has clearly identified all qualification test panels & stores them
properly (until completion of the refractory application production work).
SAES-N-120,
Para. 12.2.3
C.
C1
SAES-N-100,
Section 3.2
Satisfactory examination & test results serve to qualify the mixing and
installation procedures & the nozzleman/gun operator teams as follows:
C2
D.
D1
SAES-N-100,
Section 3.2
FIRECLAY BRICK REFRACTORY QUALIFICATION FOR APPLICATORS for SAES-N-130 Procedure (See Notes Below)
Fireclay Brick Refractory Installers are responsible (qualified) to install
refractory systems per the requirements of SAES-N-130 & the specific
requirements of Refractory Manufacturers & Equipment Manufacturers.
Note: ONLY qualified personnel who are thoroughly experienced with the
refractory application shall be employed for & perform work.
Page 2 of 4
SAES-N-130,
Section 5
RE-INSP DATE
Rev 3
SAIC NUMBER
E1
SAIC-N-2019
WBS / BI / JO NUMBER
ITEM
No.
ACCEPTANCE CRITERIA
30-Jun-08
DATE APPROVED
REFERENCE
QR NUMBER
15-Dec-09
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
Refractory Ceramic Fiber REFRACTORY QUALIFICATION FOR APPLICATORS for SAES-N-140 Procedure (See Notes Below)
RCF Refractory Installers are responsible (qualified) to install refractory
systems per the requirements of SAES-N-140 & specific requirements of
Refractory Manufacturers & Equipment Manufacturers.
Note:
ONLY qualified personnel who are thoroughly experienced with the
refractory application shall be employed for & perform work.
SAES-N-140,
Section 5
AUTHORIZE INSPECTORS FOR REFRACTORY INSTALLATIONS (PER SA STDs & API RP 936, Section 1.4)
SAES-N-Series,
Section 4,
Definition
F2
SAES-N-100,
Section 3.2
F3
SAES-N-100,
Section 3.2
REMARKS:
REFERENCE DOCUMENTS:
1. SAES-N-100 -- Refractory Systems (30 Jan 2007)
2. SAES-N-110 -- Installation Requirements-Castable Refractories (30 Jan 2007)
3. SAES-N-120 -- Installation Requirements-Extreme Erosion Resistant Refractories (30 Jan 2007)
4. SAES-N-130 -- Installation Requirements-Fireclay Bricks (30 Jan 2007)
5. SAES-N-140 -- Installation Requirements-Refractory Ceramic Fiber (30 Jan 2007)
6. API RP 936-Refractory Installation Quality Control Guidelines-Inspection & Testing Monolithic Refractory Lining & Materials (Nov-2008)
ATTACHMENTS: None
NOTES:
1. This checklist applies to installers following the specific procedures in SAES-N-110, 120 , 130 & 140 as applicable to their workscope.
ONLY qualified personnel who are thoroughly experienced with the refractory application shall be employed for work & listed on roster
2. Manufacturer Instructions (Not Attached) relative to experience are also followed. Applicators meet manufacturer's minimum requirements listed.
3. Contractor provides a work history of the applicators on his roster to show their experience in a particular application along with any special
manufacturer specified training. A roster shall list the names and positions of all personnel and be counted toward Schedule Q required Insp ratios.
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
QC Inspector
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
PID Representative
Performed Inspection
QC Supervisor
T&I Witnessed
Name, Initials and Date:
Name, Organization,
Initials and Date:
Page 3 of 4
Rev 3
SAIC NUMBER
ITEM
No.
SAIC-N-2019
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
Quality Record Approved:
REFERENCE
30-Jun-08
DATE APPROVED
15-Dec-09
QR NUMBER
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
Y = YES
N = NO F = FAILED
Name, Organization,
Initials and Date:
Page 4 of 4