20.312 - D25 - Rev 01 Site Installation Method Statement
20.312 - D25 - Rev 01 Site Installation Method Statement
20.312 - D25 - Rev 01 Site Installation Method Statement
Document No.
Revision - 01
D25
Page 1 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
REVISION RECORD
Revision
No.
Description
00
01
Originated
Checked
Approved
DMR
Aug/2013
DMR
16Jan2014
JWH
30:Jan:2014
JWH
30:Jan:2014
INTELLECTUAL PROPERTY
Contract Name/Number-
Document No.
Revision - 01
D25
Page 2 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
2.
Listed at appropriate places within this Method Statement are the drawings and documents needed to complete
the work. Where the Issue Level has been left blank the SPCC, installer or Schade Technical Advisor, as
appropriate, is to enter the Issue Level of the drawings and documents provided by Schade.
3.
Listed within the main body of the Method Statement are the Operations necessary to complete the work.
SPCC, the installer or Schade Technical Advisor, as appropriate, is to sign off and date in the "Operation
Complete" column each operation as it is completed satisfactorily.
4.
The symbol X is used in the column headed "Document required" to denote a requirement for a written
procedure or a specific record. In addition, the Symbol AP is used to denote where Schade approval of a
procedure is required before implementation. SPCC, the installer or Schade Technical Advisor is to record
beneath these symbols the identity of the procedure or record document so produced.
Reference is also to be made in this column to the identity of any Technical Query or Concession, approved by
Schade, which represents a departure from specified requirements.
5.
Symbols for Schade verification are shown in the column headed "Verification" according to the following
Code:
A1 - 100% inspection R1 - 100% Document Review
A2 - Sample inspection R2 - Sample Document Review
SPCC or the installer, as appropriate, is to obtain the Schade Technical Advisors counter-signature beneath the
symbol as required and as work proceeds.
An Operation shown as A1 must be signed off before proceeding with the next Operation.
An Operation shown as W1 or W2 is to be performed in the presence of the Schade Technical Advisor.
6.
Operations are to be performed in the sequence written unless otherwise agreed by the Schade Technical
Advisor.
Contract Name/Number-
Document No.
Revision - 01
D25
Page 3 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
CONTENTS
I.
II.
GENERAL LIST OF DRAWINGS & DOCUMENTS REQUIRED FOR USE WITH THIS METHOD STATEMENT .................. 5
III.
METHOD STATEMENT........................................................................................................................................... 7
1.
INTRODUCTION .................................................................................................................................................... 8
2.
FOUNDATIONS ................................................................................................................................................... 11
3.
4.
5.
6.
Contract Name/Number-
Document No.
Revision - 01
D25
Page 4 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
I.
Contract Name/Number-
Document No.
Revision - 01
D25
Page 5 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
II.
Drawing/Document Title
Number
6000_00_003
Family Tree of Assemblies
Rev.
05
6003_02_003
00
6035_02_007
00
6095_02_002
6561_02_007
6562_02_007
6565_02_009
6186_02_002
02
01
01
02
00
6968_00_001 #
20.312_D15 #
00
02
6130_02_003
6104_02_009
6102_02_006
6101_02_003
6101_02_004
00
00
02
00
00
6100_02_003
6566_02_007
6198_02_002
6115_02_003
Assembly of Platform
Platform Structure
Assembly of Platform Walkways
Assembly of Platform Support
01
01
00
00
6103_02_006
6103_02_007
02
02
6723_02_001
Thrust Pad
00
6105_02_003
00
6106_02_003
00
6107_02_003
00
Contract Name/Number-
Document No.
Revision - 01
D25
Page 6 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
6133_02_001
00
6108_02_003
00
6058_02_004
01
6460_00_009
02
6974_00_001
6974_00_002
6974_00_003
6974_00_004
6974_00_005
6974_00_006
6974_00_007
6974_00_008
6974_00_009
00
00
00
00
00
00
00
00
00
6400_00_002
02
6410_00_002
01
6340_00_002
02
20.312_D26
00
6495_00_001
00
20.312_D04
Manufacturing Specification
04
6975_00_001
00
Contract Name/Number-
Document No.
Revision - 01
D25
Page 7 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
III.
Ref.
METHOD STATEMENT
Description of Operation
Operation
Complete
Document
Required
Verification
Contract Name/Number-
Document No.
Revision - 01
D25
Page 8 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
1.
INTRODUCTION
1.1
1.2
Operation
Complete
Document
Required
Verification
Schade
packing list
A1
A2
A1
A2
A1
R1
A1
when
they are
installed
A2
A1
A2
A1
W2
A1
A1 Main
Pivots
1.5
Calibration
certificates
Contract Name/Number-
Document No.
Revision - 01
D25
Page 9 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
1.7
1.8
1.9
Schade
packing list.
Suppliers
documents
A1
A2
Schade
packing list.
Suppliers
documents
A1
A2
Schade
packing list.
Suppliers
documents
A1
A2
X
Marked up
drawings &
documents
A1
A1
Workshop
copy
R1
R1
Workshop
copy
R1
R1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 10 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
Workshop
records
R1
R2
Workshop
records
R1
R2
Contract Name/Number-
Document No.
Revision - 01
D25
Page 11 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
2.
FOUNDATIONS
2.1
2.2
2.3
Mark up copy
of drawing
6460_00_009
A1
A2
R1
A1
A1
A1
A1
A1
A1
2.5
Contract Name/Number-
Document No.
Revision - 01
D25
Page 12 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
2.7
2.8
Grout
suppliers
instructions
A1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 13 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
3.
R1
X
Record all
dimensions
A1
W1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 14 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
W1
W1
A1
W1
X
Drawing
W1
W1
X
All
dimensions
A1
W1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 15 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
A1
A1
A1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 16 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
W1
X
All
dimensions
A1
W1
A1
A1
A1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 17 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
X
Procedure
X
Dimension
R1
W1
A1
A1
A1
A2
A1
A1
X
Procedure
R1
W1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 18 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
X
Dimension
A1
A1
A1
A2
A1
A1
A1
A1
A1
A1
A1
R1
A1
R1
A1
A1
A1
A1
X
Dimension
Side Beam
Refer to the following Schade drawings:6975_00_001, Tippler Erection Sequence
Diagram (step 5)
6565_02_009, Side Beam Structure
6974_00_003, Transport Drawing (Side Beam)
Contract Name/Number-
Document No.
Revision - 01
D25
Page 19 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
Workshop
records
R1
R1
3.5.3 Lift the Side Beam and position between the End
Rings obtaining equal gaps (4mm max.) at both
ends. Use temporary supports as required.
X
Procedure
A1
R1
A1
X
Dimension
A1
R1
A1
W1
3.6
Contract Name/Number-
Document No.
Revision - 01
D25
Page 20 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
Schade
drawings and
workshop
records.
A1
A2
R1
SKF
installation
instructions
A1
W1
A1
A1
Notes-
Contract Name/Number-
Document No.
Revision - 01
D25
Page 21 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
3.9
Clamps
Refer to the following Schade drawings:6975_00_001, Tippler Erection Sequence
Diagram (step 7)
6102_02_006, Assembly of Tippler Clamp
6974_00_005, Transport Drawing (Clamp)
Workshop
records
A1
A1
A1
W1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 22 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
Workshop
records
R1
W1
Workshop
records
R1
W1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 23 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
X
Procedure
R1
W1
A1
A1
X
Procedure
R1
W1
A1
W1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 24 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
A1
A1
A1
W1
A1
A1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 25 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
Gantrail
WPS
Gantrail
instructions
A1
A1
A1
A1
A1
W1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 26 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
A1
W1
A1
W1
A1
W1
3.16 Platform
Refer to the following Schade drawings:6975_00_001, Tippler Erection Sequence
Diagram (step 10)
6100_02_003, Assembly of Platform
6035_02_007, Assembly Of 14m Pivot Frame
Tippler
6115_02_003, Assembly of Platform Support
6095_02_002, Assembly of Pivot Frame Tippler
Structure
3.16.1 With reference to Schade drawing 6100_02_003
section D-D, position Pivot Rollers (item 6,
6712_01_001) into the End Ring toe slot. Locate
at bottom of slot and centrally across the width.
W1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 27 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
X
Procedure
R1
W1
A1
A1
A1
R1
W1
A1
W1
X
Procedure
X
Procedure
Contract Name/Number-
Document No.
Revision - 01
D25
Page 28 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
Notes
A1
A2
A1
A1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 29 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
Workshop
records
A1
W1
A1
A2
A1
A2
Contract Name/Number-
Document No.
Revision - 01
D25
Page 30 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
A1
A2
A1
A2
A1
A2
X
Supplier
documents
R1
A1
A2
Contract Name/Number-
Document No.
Revision - 01
D25
Page 31 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
X
Supplier
documents
R1
A1
A2
A1
A1
A1
A1
A1
A1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 32 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
Check the following: Stop (item 4) is 69mm min. above the top
of both rails.
Stop can be pushed down by hand
(without lever moving), representing a
wagon rolling over it.
Stop lowers when the handle is raised.
Foundation bolts (6058_02_004 item 36)
are fully tightened.
3.26.4 After installation of the Run-Back Stop, re
check its operation and the platform to rail
alignment.
A1
A1
A1
A1
X
Suppliers
documents
R1
A1
A1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 33 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
Description of Operation
Operation
Complete
Document
Required
Verification
X
Suppliers
documents
R1
A1
A1
Contract Name/Number-
Document No.
Revision - 01
D25
Page 34 of 34
METHOD STATEMENT
This Method Statement is not to be copied or disclosed to third parties, unless otherwise agreed in writing.
This Method Statement is the property of Schade Lagertechnik GmbH
Ref.
4.
Description of Operation
Operation
Complete
Document
Required
Verification
DIMENSIONAL CHECK
In conjunction with Schade Technical Advisor,
carry out checks and record important
dimensions.
Record on
drawings
A2
A2
A1
A2
R1
R2
5.
FINAL INSPECTION
Final inspection to confirm that the equipment,
including paintwork, is in its correct state and all
extraneous materials have been removed.
6.
X
Collate all
records