HVAC Report
HVAC Report
HVAC Report
Client : Al Batah
End User: Al Batah
Date: 19.05.2015
As per the tender design a diversity of 92% was applied to conclude the total
required cooling load as 1200 TR, and as per the instructions by consultant to
retain the same load for the revised architectural plan we have applied a
diversity of 88%, however as per the calculated diversity determined by chilled
water plant sizing we need a total cooling load of 1329.1 TR for the whole facility.
(Chilled water plant sizing attached for your reference)
We strongly recommend to revise the capacity of chillers and chilled water
pumps to avoid any issues related to cooling in future.
Important point to be considered is that chillers and pumps start degrading with
time resulting in the reduced efficiency levels of overall chilled water plant,
which in turn will have impact on building cooling load.
As per the above observations we strongly recommend to upgrade the chilled
water plant size as per the actual calculated diversity by HAP instead of applying
diversity manually which has no technical justification.
Description of total cooling load variation with respect to revised architectural
layouts.
WAREHOUSE
PAINTING
1
The total net increase in the total selected load is 34.5 TR.
As per the tender drawings the above area was sandblast with no air
conditioning.
As per the revised architecture heat load for the above areas has been
calculated as per the inputs provided by Consultant.
Total calculated cooling load is equal to 46.4 TR
Total selected load is equal to 47 TR
The total net increase in the total selected load is 47 TR.
As per old architectural plan total selected load for this area was equal
to 80 TR
As per the new architectural layout there is no prototype area in the
factory building.
Total selected load for this area is equal to 0 TR.
The total net saving in the total selected load is 80 TR.
As per consultants instruction the same load has been retained for the
above area
DINING HALL
As per the tender drawings the above area was rain leak testing with no
air conditioning.
As per the revised architecture heat load for the above areas has been
calculated as per instruction by Consultant.
Total calculated cooling load is equal to 102.2 TR
Total selected load is equal to 102 TR
The total net increase in the total selected load is 102 TR.
PLANT COMPOUND
1
The same load has been retained for the above area