Saturn Drive
Saturn Drive
Saturn Drive
NEW
GENERATION
VSB
SAWEWA SOFT-START
VSB SAWEWA AG
Oberwolfhauserstr. 8
CH-8633 Wolfhausen Switzerland
Tel. ++41-55-263 15 75 Fax ++41-55-263 15 79
www.vsb-sawewa.ch
C:\dokumentation\ddalic11.08.00
NEW
GENERATION
VSB
SAWEWA SOFT-START
P2
P3
1 2 3 4 5 6
100 SEC
30 SEC
J8
START....J1
TOP OF RAMP....1
SUPERVISION O.K....2
PHASE O.K.....3
INHIBIT TIME
....4
/
PUMP DOWN
1
2
3
4
Star-Delta-Starters
Auto-transformer starters
Primary resistance starters
Softstarters
Auto-Transformer
Auto-transformer starting offers more
control than the star-delta method,
however voltage is still applied in
steps.
Star-Delta
Star-Delta starting is the cheapest form
of reduced voltage starting, however
performance is limited. The two most
significant limitations are:
__________________________________________________________________________________________
Tel. +41 55 263 15 75, Fax +41 55 263 15 79, E-Mail: info@vsb-sawewa.ch (Dok e/01.10.00/tp) page 3
Soft-Starter
Soft-Starters are the most
advanced of the reduced voltagestarters. They offer superior control
over current and torque as well as
incorporating advanced motor
protection and interface features.
The main starting advantages softstarters offer are:
1. Smooth control of voltage and
current FREE from steps or
transitions.
2. Capable of frequent starting.
3. Capable of handling changing
start conditions.
4. Soft-Stop-Control to extend
motor deceleration times.
Soft-Starters can be broken down
into the following categories:
Torque controllers
Open loop voltage
controllers
Closed loop voltage/current
controllers (Current-Limit)
Functional description
The VSB soft starter operates with a 6pulse actuator circuit and is controlled
in all three phases leading to the
motor.
The device works with either a voltage
ramp (controlled via the Preset and
Time potentiometers) or with a currentguided ramp. The following is a
description of a current-guided start
(current limit).
The Motorola 68HC705
microprocessor is used to monitor the
ignition of the semiconductors. A
current transformer measures the
motor current (current limit option).
When the microprocessor receives the
command to start, it generates a linear
start-up ramp.
The start-up ramp accelerates to the
preset current limit and remains at that
level until the motor current is reduced
by the higher rotor speed.
The start-up current setting could be
too low. In this case, the time-out
signal is used. This only permits the
motor current limit to apply for a limited
period of time. Once the preset time
has elapsed, the ramp is automatically
ended.
There are 16 possible settings for
different sizes of motors. The required
setting can be made with the
Current Limit switch on the mains
electronics unit (See the Motor
Settings table).
Relay contacts
Top of ramp relays
The relay signal indicates that the
start-up process by the VSB SoftStarter has ended or has progressed
far enough to switch the load.
Terminals marked 8, 9, 10
This relay (250V/8A) closes the
connection between pins 8 and 9 as
soon as the start-up peak has been
reached. A connection remains
between pins 9 and 10 during start-up
and whenever the VSB Soft-Starter is
switched off.
Supervision relay
An optocoupler is used in each phase
to synchronize the ignition pulses and
to monitor the rotary field of the phase
conductor.
__________________________________________________________________________________________
Tel. +41 55 263 15 75, Fax +41 55 263 15 79, E-Mail: info@vsb-sawewa.ch (Dok e/01.10.00/tp) page 5
__________________________________________________________________________________________
Tel. +41 55 263 15 75, Fax +41 55 263 15 79, E-Mail: info@vsb-sawewa.ch (Dok e/01.10.00/tp) page 6
Potentiometers
P1 Ramp Time
Ramp time setting of between approx.
0.3 and 30 sec. for the voltage ramp.
P2 Preset
0
1
2
3
4
5
6
7
8
9
A
B
C
D
E
F
0.0 x
1.0 x
1.5 x
2.0 x
2.2 x
2.5 x
2.7 x
3.0 x
3.2 x
3.5 x
3.7 x
4.0 x
4.2 x
4.5 x
4.7 x
5.0 x
Switches
Start-up inhibitor/delay:
Switch
position
0
1
2
3
4
5
6
7
8
9
A
B
C
D
E
F
Inhibit time
in min.
0
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
__________________________________________________________________________________________
Tel. +41 55 263 15 75, Fax +41 55 263 15 79, E-Mail: info@vsb-sawewa.ch (Dok e/01.10.00/tp) page 7
Important note:
The start-up inhibitor only works if the
VSB Climate-Starter is permanently
connected to the mains, and the
compressor is controlled via the start
signal (pins 2-3). After a break in
voltage, a newly created start-signal
leads directly to the motor being
started up. The delay is not reactivated
until the next start.
Pushbutton
Jumpers / Plugs
J6 RS232 interface
This interface allows VSB to make
customer-specific changes to ramp-up
and lots of other parameters on the
VSB Soft-Starter.
S1 Test Supervision
Test activation to check that the
supervision function (P-status or
semiconductor function control) is
working properly.
Start signal
The start signal is generated by closing
the connection between pins 2 and 3
on the main electronics unit by means
of isolating.
If the contact is opened, the VSB SoftStarter stops.
__________________________________________________________________________________________
Tel. +41 55 263 15 75, Fax +41 55 263 15 79, E-Mail: info@vsb-sawewa.ch (Dok e/01.10.00/tp) page 8
3.
Connect the motor conductors
Connect all the motor conductors to
your motor as shown in the diagram.
Do not install any p.f. correction
capacitors between the device output
and the motor.
4.
Create a start signal
The start signal is generated on the
main electronics unit by means of
isolating. Closing the connection
between pins 2 and 3 = start, opening
= stop.
__________________________________________________________________________________________
Tel. +41 55 263 15 75, Fax +41 55 263 15 79, E-Mail: info@vsb-sawewa.ch (Dok e/01.10.00/tp) page 9
1.
Visual inspection
Compare the delivery document with
the rating plate on the device
delivered. Do the details match?
2.
Cooling
Is the VSB Soft-Starter positioned in
such a way as to allow natural
ventilation? The cooling fins should be
positioned vertically and the cooler
should not be blocked either on the top
or the bottom.
3.
Connections
Isolate the current and check that all
the connections on the device are
secure. They may have come loose
during transport or in operation?
Are the phase conductors in the VSB
Soft-Starter connected in the correct
phase? The VSB device monitors the
rotary field and inhibits operation if the
phase conductors are not connected in
the sequence A, B, C.
Are the motor leads connected
correctly?
Is there a start signal between pins 2
and 3?
4.
Electrical test
Switch on the current and check that
the mains voltage to connection
terminals L1, L2, and L3 is correct (+/10 %).
Perform the same check on the VSB
Soft-Starters output terminals to the
motor.
The supply voltage for the VSB
electronics unit is connected by us at
the factory. If this connection is correct,
LED 1 / green is illuminated
permanently.
__________________________________________________________________________________________
Tel. +41 55 263 15 75, Fax +41 55 263 15 79, E-Mail: info@vsb-sawewa.ch (Dok e/01.10.00/tp) page 10
__________________________________________________________________________________________
Tel. +41 55 263 15 75, Fax +41 55 263 15 79, E-Mail: info@vsb-sawewa.ch (Dok e/01.10.00/tp) page 11
Installation in the
switchgear cabinet
During installation, ensure that you leave sufficient clear space around the
VSB device. The minimum requirements are 100mm above and below the
device, and 50 mm on either side of the device.
Install the VSB SAWEWA motor Starter vertically.
Do not position it close to devices which give off heat.
Ensure that the room is adequately ventilated.
Make sure that you leave the spaces specified above.
Provide ventilation slots.
Ensure that the device is adequately ventilated, otherwise use an
external cooler with a filter.
The fan must blow upwards.
Fans
VSB use fans for size 3 or bigger in order to avoid areas of the VSB
Motors starter overheating
Throughput 100dm 3/s
We would advise you not to use plastic casing because this possesses
inadequate thermal conductivity.
Loss of power
The loss of power of the power elements is approx. 3 watts per (IN) A of
the VSB Motor Starter.
Bypass
Miscellaneous:
Back-up fuses
EMC
Maintenance
Even though the VSB Motor Starter does not require any preventive
maintenance, we would still advise you to carry out the following checks
during commissioning and then a regular intervals thereafter.
Check the screwed joints and connections
Ensure that the ventilation is working properly
Ensure that the temperature remains within the permissible limits
Clean it if it is dirty.
CAUTION
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic180800
AMBIENT
CONDITIONS:
Type of protection
IP 00 standard
IP 44 optional
IP 54 optional
Shock protection
Ambient temperatures
Relative humidity
Degree of soiling
Assembly height
Installation position
Vertical
CHARACTERISTIC
ELECTRICAL
DATA :
Voltage supply
Frequency
Supply voltage
220-230-240V
380-415V
440-460-500V
Nominal current
6,51800A
Motor power
31000kW
Ramp-up
The voltage ramp can be varied from 0,3s to 60s via potentiometer Time.
Start voltage output at the motor: can be set via the potentiometer Preset.
Preset-Range from 0-90% of the supply voltage
Ramp-up with a current-limit (optional), variable from approx. 15x IN via
Switch Current-Limit.
The current-guided ramp-up time is adjustable up to the optional current
limit with jumper J8/Current-Limit-Time to 30s (standard) or 100s.
Deceleration/Soft-Stop
(01-10-00/TP)
NEW
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic180800
L1 ( L2 / L3 )
3 bis 6V
U ( V / W)
Open thyristor
With the simple assembling shown here, the lamp should light when the S switch is
closed and remaining lighting when open.
If not, the thyristor is defective.
10
3 bis 6V
NEW
THYRISTOR TEST
Copying of this document, and giving it to others and the use or communication of the contens thereof, are forbidden without express authority.
Offenders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic\180800
VSB E-START
E006**** - E110****
K006**** - K110***
H012**** - H090****
2
ST1
12 3 J
J
2 8 91011
121314
151617
1819
L
1 L
2L
3 U VW
L N
VSB
ESTART100-5
REL2 REL1
TR7
P1 P2 P3 S
W
1 S
W
002SEC
123456 1
830SEC
J
VSB
ESTART 100-5
ST1
ST2
ST2
R E LR4 E L 3R E LR2 E L 1
4 J
61 M
R
AMPPRESETS
ST
OO
FP
TLIMIT
CURRENT M
N
IIE
HB
IT
IV
S
T
IE
T
S
IU
O
IP
NER-
ST2
1 L3 41 L2 4 1 L1 4
TR7
TR7
REL4 REL3
ST1
L2 4 1 L1 4
P1 P2 P3
S
W
1 1
S
W
123
456
0
0S2
EC
830SEC
J
1 L3 4 1 L2
1 L3 4 1
4 J
61 M
R
AMPP
R
E
S
E
T S
S
O
F
T L
CU
R
N
IIE
HB
IT
IV
SU
T
IE
T
O
P
M
IRT
IENTM
T
S
IP
O
IER
N
12 3 J
J
2 8 91011
121314
151617
1819
7 12
J
4 1 L1 4
7 12
J
712
J
P1 P2 P3 S
W
1 S
W
002SEC
12345 6 1
830SEC
J
4J
6 1 RAMPPRESET SOFTCURRENTM
N
I HB
IT
IS
S
IU
O
IP
NERM
TIE
STOPLIMITTIE V
VSB
ESTART 100-5
1 23 J
J
2 891011
1213
1415
1617
1819
L1 L2 L3
L1 L2 L3 U
U V W
SIZE / BAUGRSSE
-1-
SIZE / BAUGRSSE
-2-
SIZE / BAUGRSSE
-3-
L1
L2
L2
U1 V1 W1 PE
L1-L2-L3 =
NETZANSCHLSSE /
PHASE CONDUCTORS
SIZE 3 / BAUGRSSE 3
L/N-230 V =
THE SUPPLY OF THE FANS /
VERSORGUNG FR LFTER
1U-1V-1W;2U-2V-2W =
MOTORENLEITER /
MOTOR CONDUCTORS
PE = ERDE / GROUND
INTERNE VERBINDUNGEN ZW. HAUPTELEKTRONIK UND DEM SOFT-START GERT WERDEN DURCH VSB SAWEWA WERSEITIG VORGENOMMEN.
CONNECTION DIAGRAM
SIZE 1-2-3 / BAUGRSSE 1-2-3
STANDARD CONNECTION / STANDARDBESCHALTUNG
Copying of this document, and giving it to others and the use or communication of the contens thereof, are forbidden without express authority.
Offenders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
NEW
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic180800
VSB SOFT-SWITCH
VSB SOFT-SWITCH
S009**** - S024****
S033**** - S060****
SIZE / BAUGRSSE
-2A-
J6
RAMP
TIME
PRESET
SIZE / BAUGRSSE
-3A-
SUPER4J61 T
RA
ME
PPRESET S
ST
OO
FP
TL
CU
RIT
RENTINHIBIT
IM
IM
TIMEV
S
IO
IN
1
5-
2-
3-
4
4 1 L1
L2
4 1
REL1
L3
REL2
REL3
L1
1
4
5-
4-
5-
2-
3L2 5L3
3-
A2
13No
4-
5-
CL03
8
L1 L2 L3
4-
5-
CL03
N
2-
3-
2-
3-
A2
U1V1W1
A2
W2U2V2
TR7
R
E
L
4
L2
4-
5-
3-
A2 A1
13No
1L1
4-
2-
3-
L3
4-
C
L0
3
ST1
3L2 5L3
5-
2-
R
E
L
1
4-
8 9 1011 12 13 14 15 16 1718 19
C
L0
3
8 9
3-
R
E
L
2
2-
ST2
A1
1L1
A
2
13No
R
E
L
3
5-
3L2 5L3
TR7
REL4
L1 4
4 1
L3 4 1 L2
REL1
REL2
REL3
REL4
4-
30 SEC
J8
P3 SW1 S
W2
1234 56 100SEC
30SEC
J8
J2
3-
A
2 A
1
13No 1L1
P1 P2
VSB
ESTART 100-5
2 3
2-
SW2
100 SEC
VSB
ESTART 100-5
ST1
3L2 5L3
P3
SW1
1 2 3 4 5 6
J1
ST2
A
1
1L1
P2
1 2
J1
2 3 J289 101112
13141516171819
TR7
L1 L2 L3
P1
P2 P3
SW1 S
123 456
10W
0S2
EC
30SEC
J8
J7
J712
P1
J71 2
4 J6
1 T
RA
ME
P PRESET S
ST
OO
FP
TL
CU
RIT
RENTINHIBIT
S
IM
IM
TIME V
S
IU
O
IP
NER-
VSB
ESTART 100-5
ST2
ST1
A1
A2
1L1
2-
3L2
5L3
3-
4-
13No
5-
A1
A2
1L1
2-
L3
L2
L1
5L3
3-
4-
13No
5-
CL 03
CL 03
3L2
2-
2T1
3-
4-
4T2
6T3
5-
2-
14No
2T1
3-
4-
4T2
6T3
5-
14No
A2
U1 V1 W1
A2
W2 U2 V2
PE = ERDE / GROUND
L1-L2-L3 =
NETZANSCHLSSE /
PHASE CONDUCTORS
INTERNE VERBINDUNGEN ZW. HAUPTELEKTRONIK UND DEM SOFT-START GERT WERDEN DURCH VSB SAWEWA WERSEITIG VORGENOMMEN.
CONNECTION DIAGRAM
SIZE 2A-3A / BAUGRSSE 2A-3A
SOFT SWITCH
Copying of this document, and giving it to others and the use or communication of the contens thereof, are forbidden without express authority.
Offenders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
NEW
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic180800
VSB E-START
H012K*** - H110K***
K009K*** - K186K***
E009K*** - E186K***
VSB
ESTART
100-5
REL2 REL1
REL3
TR7
REL4
P1 P2 P3
S
W
1 100S
W
2SEC
12 3456
830SEC
J
ST2
ST1
L3 4 1 L2 4 1 L1 4
ST2
ST1
R E L 4R E L 3R E LR2 E L 1
4J
6 1M
R
AMP PRESETS
ST
OO
FP
TLIMIT
CURRENTM
N
IIE
HB
IT
I V
S
T
IE
T
S
IU
O
IP
NER-
L3 4 1 L2 4 1 L1 4
1 2 3 J
J
28 9101112
131415
161718
19
TR7
71 2
J
7 12
J
P1 P2 P3
S
W
1 S
123456
1W
002SEC
830SEC
J
4 6
J1 M
R
AMP PRESETS
OO
FP
TC
URRENT M
N
ITIE
HB
IT
IS
TIE
ST
LIMIT
V
S
IU
O
IP
NER-
V
SB
ESTART
100-5
131415
161718
19
1 2 3 J
J
2 89101112
L
L1 W2
L1 W2
L2
U2
L2 V2
L2 U2
L2 V2 U1 V1 W1 PE
U1 V1 W1
SIZE / BAUGRSSE
-3-
SIZE / BAUGRSSE
-2-
L1
W2 L2
U2
L2
V2
U1 V1 W1 PE
L1-L2-L3 =
NETZANSCHLSSE /
PHASE CONDUCTORS
SIZE 3 / BAUGRSSE 3
L/N-230 V =
THE SUPPLY OF THE FANS /
VERSORGUNG FR LFTER
PE = ERDE / GROUND
1U-1V-1W;2U-2V-2W =
MOTORENLEITER /
MOTOR CONDUCTORS
INTERNE VERBINDUNGEN ZW. HAUPTELEKTRONIK UND DEM SOFT-START GERT WERDEN DURCH VSB SAWEWA WERSEITIG VORGENOMMEN.
CONNECTION DIAGRAM
SIZE 2-3 / BAUGRSSE 2-3
"W3" - SPECIAL CONNECTION / SONDERBESCHALTUNG
Copying of this document, and giving it to others and the use or communication of the contens thereof, are forbidden without express authority.
Offenders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent orthe registration of a utility model or design.
NEW
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic180800
VSB E-START
VSB KLIMA-START
E150**** - E500****
E150**** - E500****
L-N
PLEASE CONNECT 230V FOR
THE SUPPLY OF THE FANS
L-N
FR LFTER 230V ANSCHLIESSEN
SIZE / BAUGRSSE
-4ST2 ST1
1 L34 1 L2 41 L1 4
LN
230 V
TR7
L2
L1
VSSTA
BRT100-5
E
R ER LE R
4L ER
3 LE 2L 1
L3
4J
61 R
M
S
O
F
TL
C
U
R
E
T
IN
S
IB
P
IT
ERTA
M
IPEPRESETS
T
O
P
M
IR
T
IN
T
M
IH
EO
S
V
IU
N
P
1 P
2P
3 456
S
W
1100S
W
2
123
3
0
S
E
CSEC
8
J
LN
230V
123J
J
2891
011
21
3 1
41
51
61
71
81
9
TR7
SW2
100 SEC
30SEC
J8
P3
SW1
12 3 4 5 6
L3 W
P2
VSB
ESTART 100-5
RAMP PRESET
TIME
L2 V
P1
REL1
4 J6 1
REL2
J12 3
REL3
J7 1 2
L1 U
L1 U
REL4
ST2
ST1
712
J
L2 V
L3 W
PE = ERDE / GROUND
L1-L2-L3 =
NETZANSCHLSSE /
PHASE CONDUCTORS
U-V-W =
MOTORENLEITER /
MOTOR CONDUCTORS
INTERNE VERBINDUNGEN ZW. HAUPTELEKTRONIK UND DEM SOFT-START GERT WERDEN DURCH VSB SAWEWA WERSEITIG VORGENOMMEN.
NEW
CONNECTION DIAGRAM
SIZE 4 / BAUGRSSE 4
Copying of this document, and giving it to others and the use or communication of the contens thereof, are forbidden without express authority.
Offenders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent orthe registration of a utility model or design.
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic180800
VSB E-START
K006E***
E006E***
L3
L2
L1
TR7
30 SEC
J8
SW2
100 SEC
VSB
ESTART 100-5
1 2 3 4 5 6
SW1
P2
P1
P3
PRESET
RAMP
TIME
1
J6
REL1
2 3
L1 N
J2
REL2
J1
REL3
12
REL4
ST2
ST1
J7
8 9 10 11 12 13 14 15 16 17 18 19
U N
L1 /N =
NETZANSC HL SSE /
PH ASE COND UCTORS
PE - ERD E/GROU ND
U-N=
MOTOREN LEITER
MOTOR CONDU CTOR S
INTERNE VERBINDUNGEN ZW. HAUPTELEKTRONIK UND DEM SOFT-START GERT WERDEN DURCH VSB SAWEWA WERSEITIG VORGENOMMEN.
CONNECTION DIAGRAM
SINGLEPHASE / EINPHASIG
SIZE 1 / BAUGRSSE 1
Copying of this document, and giving it to others and the use or communication of the contens thereof, are forbidden without express authority.
Offenders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent orthe registration of a utility model or design.
NEW
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic180800
6.5
140
4 1
L2
L1
4
1 2 3 4 5 6
210
L3
230
1
REL4
REL3
REL2
10
REL1
120
120
100
5
SIZE / BAUGRSSE
-1-
12
10
25
10
50
215
48
535
L3
4 1
L2
L1
354
REL3
REL2
REL1
L2 V
L3 W
150
48
REL4
450
1 2 3 4 56
L1 U
515
SIZE / BAUGRSSE
-4-
DIMENSIONS
SIZE 1 - 4 / BAUGRSSE 1 - 4
Copying of this document, and giving it to others and the use or communication of the contens thereof, are forbidden without express authority.
Offenders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
NEW
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic180800
100
100
300
300
130
130
6.5
190
L3
4 1
L2
110
110
1
L1
4
4
4 1
10
260
260
300
300
L3
280
300
300
L2
L1
6.5
176
120
120
280
280
40
SIZE / BAUGRSSE
-2-
190
190
130
130
10
SIZE / BAUGRSSE
-3-
6.5
130
130
6.5
300
P2
P3
SW1
280
300
300
300
280
300
L3
4 1
L2
L1
P1
2-
3-
4-
5-
2-
3-
4-
5-
CL 03
2T1
max 135
30
170
SIZE / BAUGRSSE
-2A-
max 150
4T2
6T3
14No
2T1
4T2
6T3
14No
280
280
40
SIZE / BAUGRSSE
-3A-
DIMENSIONS
SIZE 2-2A-3-3A / BAUGRSSE 2-2A-3-3A
Copying of this document, and giving it to others and the use or communication of the contens thereof, are forbidden without express authority.
Offenders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
NEW
GENERATION
VSB
SAWEWA SOFT-START
C:\dokumentation\ddalic180800