Mill tripping might take place due to one of the following reasons:
Mill discharge valves are closed
Loss of elevation D.C. supply for more than 2 secs.
Support ignition energy is removed Within 3 minutes of feeder
starting.
Motor protection operates.
One P.A. Fan trips (mill in excess of 3 will trip starting from
bottom).
In such a case the changeover to the other mill takes place. Procedure
for the changeover is:
Steps prior to putting the mill in service:
1. Measure and record internal clearances, tolerances, and spring
preloads.
2. Check and calibrate the coal feeders.
3. Functionally check the full movement and position indication of
all dampers.
4. Review primary airflow curves to ensure safe operation
throughout the operating range, ensuring adequate minimum
airflow as well as proper air-to-fuel ratios when operating above
minimum airflow.
5. After thoroughly checking mechanical tolerances and clearances,
close the mill and start primary airflows. Warm the mill to
normal operating temperature of 150F mill outlet temperature
Take out emergency push button and give clearance to UCB for
starting.
U.C.B: (to be made by desk operator)
Ensure no PTW pending.
Ensure at least one P.A fan and a seal air fan is in service. Check
the header pressure for both primary and seal air is normal.
Check that mill ignition energy is O.K.
Check that mill start permissive as per FSSS are satisfied (for the
help of operator these permissive are written on FSSS panel and
when the condition is satisfied it is indicated by a glowing bulb).
Ensure E.P zones have been charged (for first mill ).
Ensure attemperation valves are ready for operation.
Inform turbine operator of mill start up.
Get the electrical supply for the mill.
Inform the local operator to be near mill for start up.
Start the mill.
U.C.B
Check mill starting time and current. Ensure that they are
normal.
Open hot air gate.
Warm up the mill.
Start the R.C feeder and load the mill gradually.
Keep the air flow through mill-54 T/hr.
Keep watch on mill differential to avoid mill chocking.
Maintain mill outlet temperature between 75 degree Celsius to
80 degree Celsius.
As the pressure, temperature of main steam shoots up with coal
firing proper check should be kept on these parameters.
(Especially for first mill).