Problems
(from The Science and Technology of Civil Engineering Materials by Young,
Mindess, Gray, and Bentur)
P255, (See last page of the chapter)
11.1. Why is gypsum always interground with cement clinker during the final stages of
Portland cement manufacture?
11.2. Classfy the following cements according ot the most appropriate ASTM
classification.
(a) C3S=55%, C2S=23%, C3A=11%, C4AF=9%
(b) C3S=43%, C2S=40%, C3A=1%, C4AF=10%
(c) C3S=50%, C2S=28%, C3A=7%, C4AF=11%
(d) C3S=60%, C2S=15%, C3A=13%, C4AF=8%
11.3. Which ASTM cement type is most appropriate for the following applications? What
blended cement could be substituted for the original choice? Give reasons for your
choices.
(a) Two foot thick foundation mat for a high rise building,
(b) Construction of a concrete foundation in late fall,
(c) Slip forming of a highway pavement,
(d) Construction of a sea-wall on the gulf coast.
Homework submission
Solution of the following problems shall be submitted by Oct 17, 12 pm. A box marked
with CE 2155 homework will be placed in the front counter of CE Dept office.
Problems 5.5, 7.3, 10.4, 18.6 highlighted in yellow in this file.