Part 1
Part 1
Part 1
Page No.
1 to 91
93 to 137
138 to 172
D. ESTABLISHMENT, GENERAL
AND MISCELLANEOUS
173 to 197
E. ENERGY AUDIT
198 to 214
A.
S.No.
1.
2.
3.
4.
5.
6.
SUBJECT
Ref.No.
Memo.No.CE/0/DE/MT/A3/401/97,
to be maintained - Instructions
dt.13-10-97
-Instructions - Issued.
D.No.1147/97, dt.6-10-97
Cir.Memo.No.CEP-231/DT-HVDS/
D.No.413/97, dt.30-9-97
accountability fixed.
Stations
MT/D.No.335/97.dt. 6-9-97.
CE(T) to CM/Cir./D.No.229/97
dl. 17-7-97.
Page No.
2
3
4
9
10
7.
13
8.
20
9.
D.OLr.No.CPS/SP/111/IR/Vol. 1/316/97,
21
dt. 25-6-97.
Endt. No. SE/EA/F-36/410 dt. 18-6-97
23
28
B.P.Ms.No.I7, dt.27-5-97.
31
32
113/97, dt26-5-97.
of Batterics/97-18, dt.10-7-97.
Memo.No.CE/O/MT/A3/F.DTR(Repairs)/
D.No 232/97, dt.3-7-97
10.
of agrl. Loads.
13.
Lr.No.CE(0)/F.Misc./0&M/D.No 546/97
dt.24-5-97.
M/T/DE/T/W.Instrctions/Task Foce/
D.No.22/97, dt.23-5-97.
D.No.21/97, dt.21-5-97.
33
34
38
S.No.
17.
SUBJECT
Ref.No.
Memo.No.CPT.233/Capacitor/97-6,
dt. 14-5-97
Page No.
39
Lr.No.CPT/TA/Techi.539/97,
42
EHT sub-stations.
dt.21-4-97
19.
M(Tr.)DE(T)W/Instns./15/97,
43
20
Instructions.
Reported occurrence of bus touching power
dt. 13-4-97.
Cir.Memo from Chairman on 4-4-97.
45
Mcmo.No.CEE/Tr./Pcshi/514/97,
46
EHT Lines.
dt. 1-4-97.
22.
to be conducted.
Replacement of Burnt/stuck-up meters.
dt.11-12.96.
23.
24.
Memo.No. CE(O)/SET(O)/DE/MT/AE2
55
60
officer/Expenditure.
50
54
No.l561/96,dt.3-5-96.
25.
26.
61
dt. 26-7-96
agencies.
27.
Memo.No.CE(0)/MRT/Al/D,No. 1753/96
62
28.
9-7-96.
Facilities at Private repairs sheds,
Memo.No.CE(0)/MRT/Al/D.No.l744/96
63
dt 8-7-96.
29.
67
of information to be furnished.
30.
Memo.No.CE(0)/F/Corres/D.No.l48/97,
68
31.
dt.28-6-97.
Memo.No.CE/Tr/SP/MRT/D.No.777,
70
32.
71
Estt.-APSEB-Opcration circles-Distribution
D.No.1295/96, dt.12-6-96.
B.P(P&G-Pcr)Ms.No.41,dt.22-5-96.
72
dt.9-6-96.
33.
ii
34.
iii
Memo.No.CE/OP/SP-85/96, dt 25-4-96.
74
S.NO.
35.
SUBJECT
Ref. No.
Page No75
Lr.No.CPT.412/0&M/Lines/Calibration of
36.
76
37.
Memo. No.CE(PS)/F.Misc/D.No.34/96,
78
dl 10-4-96.
38.
illumination
Repair of power transformers
dt 6-4-96.
39
40.
Cir.Memo,No.EQP/l/D.No.79/96.
79
80
dt. 11-3-96.
Memo No.CEE/EC/D.No.375/96.
81
dt.28-2-96.
41.
42.
43.
82
Memo.No.CE(0)/16/F-Misc/
D.No.53I/96, dt.22-2-96.
Cir.No.CE(0)/A-3/DTR/1361/96,
83
reducing overloading
dt.13-2-96.
B.P.(Opn.)Ms.No.239, dt.2nd Jan.1996.
84
44.
Memo.No.CE(0)-16/F-
Misc/D.No.378/95, dt.19-12-95
85
-Certain instructions.
45.
Memo.No.CE(0)-16/F-Misc./
46.
provided.
Capacitor surcharge on agrl. Service
D.No.298/95, dt 17-10-95.
Telephone Message dt. 19-8-95.
47.
48.
49.
Memo.No.CE(O)-I6/F-Misc /
86
87
88
D.No.214/95,dt 14-8-95.
Lr.No. CE(O)-16/F-O&M Estimates/
89
D.No.213/95, dt.14-8-95.
Memo. No. CE(0) -16/F-Misc./
90
D.No.204/95, dt 1-8-95.
50.
Memo.No.CE(0)-16/F-Misc./
cities/towns-Instructions
D.No.l86/95,dt 12-7-95.
iii
91
B. COMMERCIAL
SUBJECT
Sl.No
1
2.
3.
4.
7.
Ref.No.
Page No.
92
B.P(Opn.-Comml.) Rt.No.110,
dt.29-9-97.
95
Memo.No.CEE/RE/El/A6/PWS/
D.No.387/97, dl.25-9-97
97
98
B.P.(Opn.-Comml.)Ms.No.45,
dt.6-9-97.
99
94
101
Lr.No.CE(0)/F.Misc./0&M/D.No.577/97.
dt. 27-5-97
Lr. No. CE(O)/F.Misc./O&M/D. No. 546/97
dt. 24-5-97
Memo. No. CE(Comml. )/AE/T&C/GENL/
325/97, dt. 16-5-97
103
106
B.P(Opn.-CommI.)Ms.No. 13,
dl. 14-5-97.
B.P.(Opn-Comml) Ms.No.10), dt.7-5-97.
108
D.O.Lr.No.CE{0)F.Corres/D.No. 106/97,
dt.5-5-97.
B.P.(Opn-Comml.) Ms.No.8,
dt. 28-4-97
112
1 2
104
105
110
114
Sl.N
o17.
SUBJECT
Ref. No.
Memo No.CE(Comml.)/P02/543/96,
dated. 18-7-96
117
B.P.(Opn-Comml.) Ms.No.22,
118
dt.22-6-96
18.
Page No
Memo No.CEO-16/F-
122
123
dated: 14-5-96.
Colonies.
21.
B.P.(Opn-Comml) Ms.No.14,
dt 7-5-96.
124
28.2.1 an d 28.2.2.
22.
Memo.No.CE(Comml (/Consumption
126
B.P(Opn-Comml.)Ms.No.284,
dt. 21-3-96
127
B.R(Opn-Comml.)Ms.No.281,
dt. 16-3-96
128
27.
28.
B.P.(Opn-Comrnl.)Ms.No.279,
dt.8-3-96
Rebate/1770/75-901/95/dt.27-9-95.
LT loads.
dt. 14-9-95
dated 26-8-95.
130
131
132
134
Memo.No.CEO-16/F.MISC./D.No.l88/95,
dt. 14-7-95.
135
C. EVENUE
SI.No
SUBJECT
Ref.No.
1. Assigning S.C.Nos. and Meters the same day - Issue Memo.No.CE(O)/F/D.No. 148/97,
dt. 28-6-97
and receipt of meters - Maintaining Meters Issue
Page No.
136
Register.
2. Format for inspection of EROs
Endt.No.TS, dt.21-6-97
3.
138
141
143
Memo.No.DP/DM(MPP)/MPPI-A2/407/97-2, 145
dt. 1-5-97
Memo.No.DP/DM(MPP)/MPP I-A2/407/97-1,
146
dt. 30-4-97
follow up - Instructions.
8. Revenue & Billing - Certain Instructions to SEs and Memo.No.FA&CCA/LT.Rev/AO(R)/LT/JAO
EROs on Revenue Billing - Disconnections.
9. Electricity-HT Services-Sealing of AB Switches
142
148
152
dt.29-8-96
Memo.No.CEO-16/F-MISC/D.No.284/96,
153
communicated.
11. Meter Readings - Review of meter reading registers
dt. 15-7-96.
B.P.Ms.No.(Opn.) 18, dt. 10-6-96.
156
by Chairman - Instructions.
12. Replacement of burnt/stuck-up meters.
Memo.No.CE(0)/SETO/DE/MT/AE2/
159
160
Memo.No.CE(O)-16/F.Misc./D.No.96/96,
161
dt.27-4-96.
Services.
16. Stuck-up and burnt meters
dt.7-12-95.
implementation if instructions.
Memo.No.CEO-16/FMisc./D.No.363/95,
Memo.No.CEO-16/F.Meters/D.No.248/95,
164
166
dt.25-8-95
Memo.No.CE(0)-16/F.Mis./D.No.249/95,
167
dt. 25-8-95
Urban areas.
18. Non-maintenance of required clearances for
electrical lines posing public Hazard-Instructions.
Memo.No.CE(O)-16/F.Misc./D.No.239/95,
dt. 19-8-95.
168
D.
Sl.No
Ref.No.
Page No.
171
Memo.No. DP/DIR/DM(IR)POII/I/657/97
173
dt.22-8-97.
B.P.(P&G.Per.)Ms.No.ll2, dated:8-8-97.
174
Memo.No.DP/DS(Per)/DM(P)/1466-
177
Hl/95-7, dt.23-6-97.
Memo.No.DP/DS(Per)/DM(P)/1466-Hl/
178
95-6, dt.23-6-97.
Lr.dated:21-6-97.
180
182
184
186
188
190
191
dt. 11-4-97
B.P.(Opn-P&MM) Ms.No.129,
dt.28-6-95.
195
E. ENERGY AUDIT
Sl.No.
1.
SUBJECT
Ref.No
Page No.
196
Memo.No.CE(0)/CE(C)F.EA.MIS./D.No.58/
of EA - Instructions.
96, dt.28-6-96.
2.
200
3.
201
-Furnishing of - Reg.
dt. 9-10-95.
D.O.Lr.No.TS/Cir./D.No.2138/95, dt.9-9-95.
206
209
4.
5.