Mud Block Construction
Mud Block Construction
Mud Block Construction
A REPORT SUBMITTED BY
SHRETIKA GUPTA
100901039
FACULTY OF ARCHITECTURE
MANIPAL UNIVERSITY, INDIA 576104
pg. 1
MATERIAL REPORT
CERTIFICATE
This is to certify that this material study report on is the bonafide work of SHRETIKA
GUPTA (100901039) in partial fulfilment of the requirements for the award of the
degree of Bachelor Of Architecture in Faculty Of Architecture , MIT, Manipal University,
Manipal, during the year 2014.
Certified further that to the best of my knowledge the work reported herein does not
form part of any other report on the basis of which a degree or award was conferred
on an earlier occasion on this or any other candidate.
DIRECTOR
INTERNAL EXAMINER
EXTERNAL EXAMINER
FACULTY OF ARCHITECTURE
MANIPAL UNIVERSITY, INDIA-576104
NOVEMBER 2014
pg. 2
MATERIAL REPORT
GYPSUM
pg. 3
MATERIAL REPORT
CONTENTS:
1.
INTRODUCTION .......................................................................................... 6
2.
3.
4.
5.
6.
7.
COST: ........................................................................................................ 60
pg. 4
MATERIAL REPORT
LIST OF FIGURES
FIGURE 1 GYPSUM BOARD WALL
6
FIGURE 2 MANUFACTURING PROCESS OF GYPSUM BOARD
8
FIGURE 3: COMMON FLANKING PATHS
17
FIGURE 4A AND 4B: DEFLECTION HEAD A AND DEFLECTION HEAD B
17
FIGURE 5A: EXPOSED / PAINTED STEEL COLUMN:
18
FIGURE 6: PERFORMANCE OF TYPICAL CEILING / PARTITION JUNCTIONS EXAMPLE STAGES
OF SOUND INSULATION (EXCLUDING OTHER FLANKING PATHS)
20
FIGURE 7: COMPOSITE CALCULATION CHART
22
FIGURE 8: LIGHTWEIGHT SYSTEMS VERSUS THE MASS LAW
22
FIGURE 9: OPTIMUM DESIGN OF PANEL LININGS FOR CTR
23
FIGURE 10: ACOUSTIC BENEFITS OF STAGGERED STUDS
23
FIGURE 11: ACOUSTIC BENEFITS OF GYPFRAME ACOUSTUDS
24
FIGURE 12: ACOUSTIC BENEFITS OF RESILIENT BARS (PARTITION)
24
FIGURE 13: ACOUSTIC BENEFITS OF TWIN STUD FRAMEWORK
25
FIGURE 14: ACTIVAIR TECHNOLOGY
31
FIGURE 15: ACTIVAIR TEST PRINCIPLE
32
FIGURE 16: MINIMUM DISTANCE OF CABLING
33
FIGURE 17: STANDARD ZONES OF CABLING
33
FIGURE 18: CROSS-NOGGING CUT-OUTS
33
FIGURE 19: GENERAL ARRANGEMENT OF SERVICE SUPPORT PLATES SHOWING STUDS AT
600MM CENTRES
34
FIGURE 20: GYPFRAME STUDS SERVICE CUT-OUT DETAILS - GYPFRAME C AND GYPFRAME I
STUDS
34
FIGURE 21: GYPFRAME STUDS SERVICE PUSH-OUT DETAILS ACOUSTUDS
35
FIGURE 22: SOCKET BOX INSTALLATION UP TO 60 MINUTES FIRE RESISTANCE
35
FIGURE 23: SOCKET BOX INSTALLATION UP TO 120 MINUTES FIRE RESISTANCE
35
FIGURE 26: EXAMPLES OF GYPSUM WALL PARTITIONS
60
pg. 5
MATERIAL REPORT
1.
INTRODUCTION
Gypsum board is the generic name for a family of panel-type products consisting
of a noncombustible core, primarily composed of gypsum, with a paper surfacing
on the face, back, and long edges. Often called drywall, wallboard, or plasterboard,
gypsum boards noncombustible core makes it different from plywood, hardboard,
and fiberboard. When joints and fastener heads are covered with a joint treatment
system, gypsum board provide a monolithic surface that is ready for decorative
treatment.
Gypsum is a mineral found in sedimentary rock formations in a crystalline form
known as calcium sulfate dihydrate. One hundred pounds of gypsum rock contains
approximately 21 pounds (or 10 quarts) of chemically combined water. Gypsum
rock is mined or quarried and then crushed. In a process called calcining, the
crushed rock is ground into a fine powder and heated to about 350 degrees F,
driving off three fourths of the chemically combined water. The calcined gypsum
(or hemihydrate) becomes the base for gypsum plaster, gypsum board and other
gypsum products
To produce gypsum board, the calcined gypsum is mixed with water and additives
to form a slurry that is fed between continuous layers of paper on a board machine.
As the board moves down a conveyer line, the calcium sulfate recrystallizes or
rehydrates, reverting to its original rock state. The paper becomes chemically and
mechanically bonded to the core. The board is cut to length and conveyed through
dryers to remove any free moisture. (Refer to page no. 6 for manufacturing
process). Gypsum manufacturers also increasingly rely on synthetic gypsum as
an effective alternative to natural gypsum ore. Synthetic gypsum is a byproduct
primarily from the desulfurization of the flue gases in fossil-fueled power plants.
pg. 6
MATERIAL REPORT
2.
The predecessor todays gypsum board was called Sackett Board, a composite
material made of layers of thin plaster placed between four plies of wool felt paper.
The manufacturing process was patented in 1894 by Augustine Sackett, now
considered the grandfather of the gypsum board manufacturing industry.
A sheet of Sackett Board was approximately 1/4 inch thick and 36-inches square.
Its open edges tended to erode and the felt paper did not provide for a satisfactory
wall finish. However, it was an excellent base for the application of gypsum plaster
and in many geographic areas, Sackett Board became a replacement for wooden
slat lath.
A rapid series of improvements in board manufacturing technology between 1910
and 1930 resulted in the finishable material gypsum board is today. In 1910, a
process for wrapping the board edges was created, followed in short succession
by the elimination of the two inner layers of felt paper, the replacement of the
exterior facings with paper-based coverings, the creation of air-entrainment
technology to make board lighter and less brittle, and the evolution of joint
treatment materials and systems.
In the 1940s, manufacturers sought to increase the naturally occurring fire
resistance of regular core gypsum board. A new product was eventually introduced
that clearly demonstrated extra fire resistance, hence the name type X. Gypsum,
glass fibers, and vermiculite are the components of type X that provide superior
fire resistance.
Further modifications to the original type X were made in the 1960s. The
formulations of gypsum board used in some systems particularly ceiling systems
were improved without compromising the fire-resistive qualities. The new product
demonstrated additional fire resistance over type X core, and thus the term
improved type X was coined.
To meet market demand in the United States and Canada, each year over 20 billion
square feet of gypsum board is manufactured.
3.
The typical manufacturing process of gypsum board has been mentioned in the
next page. (Refer to page no. 6)
pg. 7
MATERIAL REPORT
1.Raw Materials
High-quality gypsum rock is
extracted at quarries or mines
near plants or transported by
cargo ship, rail or truck.
2.Crusher
Large rocks are crushed into
small pieces. At some plants,
the crushed rock undergoes a
surfacedrying process before
going to the grinding mill.
3.Grinding Mill
The mill reduces small rocks to
a very fine, chalk-like powder
called land plaster.
4.Calcine System
The land plaster is heated in
large kettles to remove most
of the water from the plaster.
pg. 8
9.Cut-off Knife
At the end of the line, a
blade cuts the hardened
board into various lengths.
7.Forming Station
The board forming line starts with
two large rolls of recycled paper or
fiberglass mats. The slurry is poured
onto the bottom sheet and is
immediately covered by the facing
sheet from the other roll.This
sandwich passes through a pair of
forming plates or rolls which
determine the thickness of the
board. The face paper or mat
wraps around the sides of the
sandwich to enclose the edges of
the board.
6.Mixer
In the mixer, water is added
back to the stucco to form a
slurry, and foam is added to
the slurry to make the
wallboard more lightweight.
10.Transfer Table
Here the cut lengths are
turned face-side up to protect
the face paper or mat, then
fed into the kiln.
11.Kiln
The board kiln completes the
drying process, leaving the
gypsum board virtually
moisture-free.
MATERIAL REPORT
4.
pg. 9
MATERIAL REPORT
pg. 10
MATERIAL REPORT
pg. 11
MATERIAL REPORT
pg. 12
MATERIAL REPORT
5.
I.
Fire performance
II.
Building acoustics
III.
IV.
Robustness
V.
VI.
Service installations
VII.
Standards
Another key design aspect is how the dry lined building element interacts with the
associated structure. If this is ignored the performance of the element can be
completely nullified. The key factors are covered including gap sealing, why it is
preferable to take partitions through to the structural soffit and why it is important to
design out flanking sound transmission.
In practice, the dry lined element will need to be fully compatible with building services
- electrical, heating and ventilation, plumbing, etc. This means that service installation
should be fully assessed at the design stage to ensure that the layout of services is
compatible with the ceiling module or location of stud work. Proprietary access panels
can be specified at locations where access for maintenance is required.
I.
FIRE GROWTH
The choice of materials for walls and ceilings can significantly affect the spread of fire
and its rate of growth, even though they are not likely to be the materials first ignited.
The specification of linings is particularly important in circulation spaces where
surfaces may offer the main means by which fire spreads, and where rapid spread is
most likely to prevent occupants from escaping. Two properties of lining materials that
influence fire spread are the rate of flame spread over the surface when it is subject
to intense radiant heating, and the rate at which the lining material gives off heat when
burning.
pg. 13
MATERIAL REPORT
COMPARTMENTATION
The spread of fire within a building can be restricted by sub-dividing it into
compartments separated from one another by walls and / or floors of fire resisting
construction. Two key objectives are:
To prevent rapid fire spread, which could trap occupants in the building.
To reduce the chance of fires becoming large, which are more dangerous not only to occupants and fire service personnel, but also to people in the
vicinity of the building.
The appropriate degree of sub-division depends on:
The use and fire loading of the building, which affects the potential for fires
and their severity, as well as the ease of evacuation.
The height to the floor of the top storey in the building, which is an indication
of the ease of evacuation and the ability of the fire service to intervene
effectively.
pg. 14
MATERIAL REPORT
Why gypsum is so effective in fire?
Gypsum plasters and plasterboards provide good fire protection due to the unique
behaviour of gypsum in fire. When gypsum-protected building elements are exposed
to fire, dehydration by heat (calcination) occurs at the exposed surface and proceeds
gradually through the gypsum layer. Calcined gypsum on the exposed faces adheres
tenaciously to uncalcined material, retarding further calcination which slows as the
thickness of calcined material increases. While this continues, materials adjacent to
the unexposed side will not exceed 100C, below the temperature at which most
materials will ignite, and far below the critical temperatures for structural components.
Once the gypsum layer is fully calcined, the residue acts as an insulating layer while
it remains intact.
II.
SOUND INSULATION
Sound insulation is the term describing the reduction of sound that passes between
two spaces separated by a dividing element. In transmitting between two spaces, the
sound energy may pass through the dividing element (direct transmission) and through
the surrounding structure (indirect or flanking transmission). In designing for sound
insulation, it is important to consider both methods of transmission. The walls or floors,
which flank the dividing element, constitute the main paths for flanking transmission,
but this can also occur at windows, heating or ventilation ducts, doorways, etc.
The acoustic environment of the room and / or the building and the ability to reduce or
eliminate air paths in the vicinity of the sound reducing element, e.g. door sets, glazing,
suspended ceiling cavities, ductwork, etc., will have a significant effect on its
performance. For these reasons it is unlikely that figures quoted from laboratory test
conditions will be achieved in practice. When the background noise is low,
consideration may have to be given to a superior standard of sound insulation
performance in conjunction with the adjoining flanking conditions. In any existing
pg. 15
MATERIAL REPORT
sound insulation problem, it is essential to identify the weakest parts of the composite
construction. The Building Regulation requirements regarding the sound insulation of
walls and partitions only relate to the transmission of airborne sounds. These include
speech, musical instruments, loudspeakers and other sounds that originate in the air.
In most cases, floors must also resist the transmission of impact sounds, such as
heavy footsteps and the movement of furniture.
pg. 16
MATERIAL REPORT
pg. 17
MATERIAL REPORT
sound insulation. Therefore, to optimize sound insulation performance, other
measures may need to be taken.
A suspended ceiling installed on both sides of the partition may provide a similar
cloaking effect to that of steel angles. Ceiling channels (e.g. CasoLine mf)
incorporating imperforate plasterboard can deliver a similar reduction in air leakage at
the partition head. A tight fit between the ceiling perimeter and the surface of the
partition lining board is important, although mechanically fixed perimeters are not
essential.
Ceilings with recessed light fittings may be less effective and if these cannot be sealed
in some way, the installation of cloaking angles at the partition head should be
considered. A suspended ceiling may also reduce the level of sound flanking
transmission via the soffit. Where perforated ceilings are used, (e.g. Gyptone) the
angles as shown in Figure 4b are recommended. However, if the distance between
the ceiling and the deflection head is greater than 200mm and the ceiling plenum
contains (e.g. Isover) insulation (minimum 25mm), then the angles may not be
required.
pg. 18
MATERIAL REPORT
Figure 5D: ENCASED STEEL COLUMN WITH ADDITIONAL FRAMING, INSULATION AND
PLASTERBOARD LINING
pg. 19
MATERIAL REPORT
Figures 5A and 5D are example details relating to a typical scenario where a partition
is specified against a requirement of Rw 50 dB. Although these details refer to
structural steel column abutments, similar principles apply when abutting structural
steel beams.
Figure 6: PERFORMANCE OF TYPICAL CEILING / PARTITION JUNCTIONS EXAMPLE STAGES
A.
B.
Figure 6A: CONCEALED GRID - LINED WITH A SINGLE LAYER OF PLASTERBOARD AND
C..
D.
Figure 6C: CONCEALED GRID LINED WITH A DOUBLE LAYER OF PLASTERBOARD WITHIN
pg. 20
MATERIAL REPORT
Lightweight construction
Typically the average sound insulation of a material forming a solid partition is
governed by its mass. The heavier the material, the greater its resistance to sound
transmission. To increase the sound insulation of a solid partition by about 4 dB, the
mass must be doubled. This is known as the empirical mass law.
For example, a 100mm solid block wall of average mass 100kg/m2 will have an
approximate Rw value of 40 dB, whereas a 200mm solid wall of the same material
would have an Rw value of 44 dB.
Increasing mass is a very inefficient way of achieving sound insulation and one of the
advantages of using lightweight cavity partitions and walls is that better than predicted
sound reduction values can be achieved. Figure 8 - Lightweight systems versus the
mass law (page 20) shows how lightweight systems consistently exceed mass law
predictions. This demonstrates that adding mass is not always the best method when
satisfying acoustic design requirements and that lightweight systems, if correctly
designed, can provide very effective acoustic solutions. A simple stud partition, for
example, can have a Rw rating 6 dB better than predicted by the mass law. In this
case, the maximum sound insulation obtainable will be governed by transmission
energy through the stud frame. The use of other frame types or configurations can
result in even better insulation.
If Gyproc plasterboard or British Gypsum specialist boards are fixed to timber stud
frame using a flexible mounting (Gypframe RB1 Resilient Bar) or a more flexible frame
is used (Gypframe studs and channels), then frame energy transmission is minimized
and results significantly better than the mass law prediction can be achieved.
The use of two completely separate stud frames can produce even better results. In
this case, the maximum transmission of energy is through the cavity between the
plasterboard linings. The air in the cavity can be considered as a spring connecting
the linings, which allows the passage of energy. The spring will have some inherent
damping, which can be significantly increased by the introduction of a sound absorbing
material, such as mineral wool, positioned in the cavity. The increased damping of the
air-spring results in a reduced coupling between the plasterboard linings and a
consequent decrease in sound transmission. Air-spring coupling becomes less
significant as the cavity width increases. In practice, cavities should be as wide as
possible to insulate against low frequency sounds.
Two important effects, resonance and coincidence, occur in partitions and walls.
These are governed by such physical properties as density, thickness and bending
stiffness, whereby a reduction in sound insulation occurs at certain frequencies.
In lightweight cavity constructions these effects can be decreased by the use of two or
more board layers. A simple way of increasing the sound insulation performance of a
single layer metal stud partition is, therefore, to add an additional layer of plasterboard
pg. 21
MATERIAL REPORT
to one or both sides. This will increase the sound insulation performance by
approximately 6 dB or 10 dB respectively.
pg. 22
MATERIAL REPORT
pg. 23
MATERIAL REPORT
Gypframe AcouStuds
Gypframe AcouStuds are metal stud sections optimized to give enhanced sound
insulation performance. Figure 11 Acoustic benefits of Gypframe AcouStuds shows
the performance improvement possible using acoustic stud technology compared with
a standard C stud of the same cavity dimension.
GypWall quiet sf
This wall type utilizes Gypframe RB1 Resilient Bars to partially de-couple the
plasterboard linings from the partition stud frame, leading to enhanced levels of sound
insulation. Figure 12 - Acoustic benefits of resilient bars (partition) shows the
improvements possible when including Gypframe RB1 Resilient Bar on one or both
sides of a standard Gypframe 70mm C Stud partition.
pg. 24
MATERIAL REPORT
GypWall audio and GypWall quiet IWL
The most acoustically effective wall designs are twin frame walls. Minimal or no
bridging between the plasterboard linings and the increased cavity size allows
optimum performance from the wall. Figure 13 - Acoustic benefits of twin stud
framework shows the difference achievable by using a twin framed wall approach as
opposed to a standard GypWall classic C stud partition. The plasterboard linings and
insulation are the same for both partitions and the key difference is the overall partition
thickness - typically 211mm for the standard partition and 300mm for the twin framed
option. With this type of design, further improvements in performance can be achieved
by increasing the cavity size and / or increasing the board specification.
Sound absorption should also be taken into consideration while designing the gypsum
wall partitions.
III.
Thermal insulation
Thermal insulation helps to reduce the risk of surface condensation by maintaining
surfaces above the dew point temperature subject to adequate heating being provided.
In buildings that are heated infrequently, the thermal insulation should be located as
near as possible to the internal surface of building elements to provide rapid thermal
response. These surfaces will then be less prone to surface condensation during the
warm-up period, which is often when the maximum amount of water vapour is
produced. Being located on the warm side of the structure, Gyproc ThermaLine
laminates will help to provide this rapid thermal response and will also reduce the
thermal bridge effects in a building, e.g. at lintels and reveals.
With some construction types the potential problem may be one of interstitial
condensation. Gyproc ThermaLine laminates are available with integral vapour control
pg. 25
MATERIAL REPORT
to minimise the risk. Alternatively, the choice of construction may demand a different
position for insulation, away from the surface lining. Surface condensation will not
generally be a problem in these circumstances, particularly where adequate heating
is provided. Consideration should be given to establishing whether the particular
construction brings with it any increased risk of interstitial condensation.
For most constructions the use of vapour permeable insulation, in combination with
other building materials of low vapour resistance, will allow the structure to breathe
naturally. In this instance, the likely occurrence of interstitial condensation will be
shifted to less problematic areas, such as masonry walls (inner face of the outer leaf).
Ventilation
Ventilation removes the water vapour produced within a building to the outside air.
Adequate ventilation, including the provision of small controllable slot ventilators in
windows, electrical extractor fans controlled by humidistats in bathrooms and kitchens,
and cooker hoods extracted to the outside air, will help to reduce harmful condensation
and mould growth. Ideally, ventilation should control the internal air to between 40%
and 70% relative humidity (RH) for human occupation.
Vapour control layer
A vapour control layer, usually in the form of a membrane, is used to substantially
reduce the transfer of water vapour through a building element in which it is
incorporated.
A vapour control layer, positioned on the warm side of the thermal insulation within a
building element, helps to reduce the risk of interstitial condensation occurring within
that element. However, other precautions may also be necessary, either in
combination with, or as alternatives to, a vapour control layer. These include the use
of ventilated cavities and the provision of materials of low vapour resistance,
particularly on the colder side of the construction.
Existing masonry walls
Internal lining
Gyproc products with vapour control layers can reduce interstitial condensation,
providing the wall has low vapour resistance. The wall should not incorporate any other
material of high vapour resistance. Blown cavity fill where it is impractical to provide a
new internal lining to existing cavity walls, mineral wool can be blown into the cavity.
In conjunction with adequate heating, the internal surface of the wall will be kept above
dew point temperature, and the permeability of the mineral wool material will not
impede the natural diffusion of moisture vapour away from critical areas within the
structure.
New masonry walls
Full or partial cavity fill Positioning Isover CWS or Hi-Cav 32 insulation batts within the
cavity, either as full-fill or in conjunction with a residual cavity, can maintain the internal
surface of the wall above dew point temperature or negate the cold bridging effects of
pg. 26
MATERIAL REPORT
mortar joints. Thus a water vapour resistant treatment to the surface of internal plaster
finishes is not always necessary, as any interstitial condensation will occur on the inner
surface of the outer leaf. Thistle building plasters, or Gyproc WallBoard fixed in the
DriLyner or GypLyner systems, form suitable linings. Where water vapour resistance
is required, the plasterboard lining surface can be treated with two coats of Gyproc
Drywall Sealer. Alternatively, Gyproc WallBoard duplex can be specified within the
DriLyner mf system.
Thermal laminate drylining
A dry lining of Gyproc ThermaLine laminates may also be considered, either with a
clear cavity or in conjunction with Isover insulation for thermal insulation purposes and
to provide a vapour control layer.
Metal frame walls
These walls comprise of light gauge roll-formed galvanised steel components
engineered to form the structural frame. High levels of thermal insulation are a feature
of this form of construction, and care must be exercised to ensure that there are no
risks of interstitial condensation occurring within the structure.
In Metsec Steel Framing Systems, Isover Steel Frame Batt (SF1) or rigid foam
insulation is located to the outside of the steel frame. Isover Steel Frame InFill Batts
(SF2) are positioned in the stud cavity and Gyproc duplex grade plasterboards can be
used as the internal face lining. The dew point will then fall within the outer cavity or
external cladding. This principle is often referred to as warm frame or hybrid, and
applies equally to roof conditions.
Timber frame walls
To reduce the risk of interstitial condensation occurring on the inner surface of the
sheathing, a vapour control layer is required as part of the internal lining. This can be
provided by using Gyproc duplex grade plasterboards or appropriate Gyproc
ThermaLine laminates incorporating the vapour control. Provision should also be
made for water vapour to escape outward, through very low vapour resistance
sheathing boards, breather membranes, external claddings and by vented cavities. It
is also good practice to ensure that any accumulation of moisture is directed outwards
by incorporating flashings, drainage outlets and suitable timber detailing.
Warm construction
In warm roof construction, the thermal insulation is located on top of a high
performance vapour control layer over the roof decking. The construction is referred
to as a warm roof because in winter, with adequate heating, the temperature of the
vapour control layer, and of the materials below it, is maintained close to that of the
internal air. It is not necessary to include a vapour control layer at ceiling level or to
ventilate the roof cavities. Consideration should be given, however, to the provision of
vertical vapour control layers as necessary, e.g. the use of Gyproc duplex grade
plasterboards in roof voids between rooms, to reduce the movement of vapour to
adjacent rooms, which may be at different temperatures.
pg. 27
MATERIAL REPORT
IV.
Robustness
Movement
Deflection of upper floor and roof slabs can cause appreciable stress in partitions.
Where such deflection is likely to occur, the partition to structural soffit junction detail
must be designed to accommodate movement, whilst still complying with any fire or
acoustic performance requirements. Additional attention to detailing will be required to
optimise sound insulation performance. The detail included in GypWall staggered
shows a good practice solution incorporating steel angles, either side of the head and
sealed to the structure, which results in only a 1 dB - 2 dB loss in performance.
Where partitions cross a movement joint in a structural floor or roof slab, they should
be provided with a movement joint at the same point, and be capable of the same
range of movement as the floor or roof joint. Gyproc Control Joint provides a suitable
solution for movement up to 7mm. Gyproc Control Joint may also be required to relieve
pg. 28
MATERIAL REPORT
stresses induced by extreme environmental conditions. For example, consideration
could be given to installing control joints at 10m centres in linings that are subjected
to either extreme or variable temperatures.
Environmental conditions
Temperature
Gyproc plasterboards, British Gypsum specialist boards and Thistle plasters should
not be used where the temperature will exceed 49C. Prolonged exposure to high
temperature, and / or multiple exposure for short periods, results in the gradual
continued calcination of the gypsum and loss of its inherent properties.
Gyproc plasterboards, British Gypsum specialist boards and Thistle plasters can be
subjected to freezing conditions without risk of damage.
Moisture
Glasroc H tile backer can be used as a tiling substrate in high moisture applications.
Gyproc plasterboards should not be used in continuously damp conditions nor in
buildings that are not weather tight. However, Gyproc Moisture Resistant board,
Gyproc SoundBloc mr, Gyproc DuraLine mr, Gyproc FireLine mr, Gyproc CoreBoard
and British Gypsum specialist boards are all suitable for use in intermittently damp
conditions or sheltered external situations in conjunction with an appropriate
decorative finish. This should take the form of ceramic tiling or other suitable moisture
impervious coating by others. Two coats of Gyproc Drywall Sealer applied to the face
of standard grade plasterboards, with the edges adequately protected from moisture
may also be suitable to receive a tile finish. The application of Gyproc Drywall Sealer
provides surface water absorption resistance only, and does not meet the performance
requirements for moisture resistant grade boards as defined in BS EN 520, type H1.
Glasroc F specialist boards are also suitable for use in sheltered external situations.
Relative humidity (RH)
In moderate humidity situations, i.e. 40% to 70% RH, no special precautions need to
be taken when using Gyproc plasterboards, other than those necessary to prevent
interstitial condensation. However, whenever the buildings heating system is turned
off a rapid increase in the relative humidity can occur as the building cools down. This
could lead to the occurrence of potentially harmful surface condensation. Precautions
to avoid this problem should be taken, e.g. by continuing to run the ventilation system
after the heating is turned off.
Low humidity does not affect the plasterboards, but may lead to distortion of timber
framing members as they dry to below their usual moisture content. Intermittently high
relative humidity, i.e. above 70% RH, requires special treatment to the face of the
plasterboards, and only moisture resistant grade plasterboards or British Gypsum
specialist boards should be used. Suitable surface treatments include ceramic tiling
and water vapour resistant paint systems. Gyproc plasterboards are not considered
pg. 29
MATERIAL REPORT
suitable in continuously high humidity conditions. Certain British Gypsum ceiling
products are suitable for use in environments above 70% RH.
Wall lining
Glasroc H tilebacker is suitable for use as a wall lining in areas such as shower
enclosures, swimming pool halls and adjacent areas. Moisture Resistant grade board
and Glasroc F specialist boards are not suitable to be used in those areas, but can be
considered for use in adjacent areas of wall lining and in most domestic situations.
Attention to detail is critical and, in addition to the guidance given above for ceiling
linings, the following additional guidance should be considered:
The lining boards must be lifted clear from any floor where free water is possible and
a suitable skirting detail must be employed which will not allow water penetration.
In extreme moisture environments, Glasroc H tilebacker must be used in conjunction
with a tanking system.
Thistle plasters are not recommended for this type of environment with the exception
of Thistle Dry-Coat undercoat which could be considered in conjunction with a
completely sealed, impervious, tiling system.
V.
We typically spend 80% of our time indoors, in schools, offices, hospitals and our
homes. Clean air is something we assume we have in the buildings in which we live,
work and learn, yet impurities found in the air can cause health problems and a
reduction in our general wellbeing.
Volatile organic compounds (VOCs)
Although we dont notice them, pollutants called volatile organic compounds (VOCs)
are often present in the air we breathe naturally emitted from furniture, carpets,
paints, varnishes, cleaning products and building materials. VOCs are organic
compounds having an initial boiling point less than or equal to 250C. They are emitted
as a gas from a liquid or solid and enter the surrounding air. VOCs are numerous and
varied. They include both human-made and naturally occurring chemical compounds
a common example is formaldehyde (CH2O).
Some of the health problems VOCs can cause
People often complain about health problems after extended periods of time spent
indoors. Studies have shown that many of these symptoms can be attributed to VOCs
Headaches
Nausea
Allergies and increased allergic reactions
pg. 30
MATERIAL REPORT
Lack of concentration
Eye irritation
Fatigue
Breathing problems
ACTIVair technology
ACTIV air is a new technology added to certain British Gypsum products. It is designed
specially to decompose VOC emissions into non-harmful inert compounds, thus
eliminating the risk of re-emission.
ACTIVair:
Makes the air up to 70% cleaner
Uniquely captures and converts VOCs
Will continue to work for at least 50 years
Poses no risk of re-emission even if the product is damaged or at end of life
Works though an emulsion paint finish
Is fully recyclable through the British Gypsum closed loop Plasterboard Recycling
Scheme (PRS)
Has no impact on installation or the performance of the products or systems they are
included in regards to fire, acoustics, thermal or durability compared to standard
versions of the products.
pg. 31
MATERIAL REPORT
VI.
Service installations
pg. 32
MATERIAL REPORT
pg. 33
MATERIAL REPORT
Figure 19: GENERAL ARRANGEMENT OF SERVICE SUPPORT PLATES SHOWING STUDS AT 600MM
CENTRES
Figure 20: GYPFRAME STUDS SERVICE CUT-OUT DETAILS - GYPFRAME C AND GYPFRAME I
STUDS
pg. 34
MATERIAL REPORT
pg. 35
MATERIAL REPORT
pg. 36
MATERIAL REPORT
6.
pg. 37
MATERIAL REPORT
GypWallclassic
GypWall classic is the industrys original lightweight drywall partition system, providing
cost-effective, multi-purpose solutions suitable for all types of buildings.
Application: Due to the design flexibility of British Gypsum systems, they can be
tailored to meet the requirements of a wide range of applications.
Design
Planning - key factors
The position of services and heavy fixtures should be pre-determined and their
installation planned into the frame erection stage.
Partition to structural steelwork junctions- When designing the layout of rooms
requiring separation by sound insulating walls abutting structural steelwork,
consideration should be given to the potential loss of sound insulation performance
through the steelwork.
Cavity fire barriers
Minimum 12.5mm Gyproc plasterboard, screw-fixed into the web of perimeter
channels or vertical studs, will provide a satisfactory closure to flame or smoke.
Services
Penetrations
Penetrations of fire-resistant or sound-insulating constructions for services need
careful consideration to ensure that the performance of the element is not downgraded
and also that the services themselves do not act as the mechanism of fire spread or
sound transmission.
Independent support
When designing for the installation of services such as fire dampers and associated
ductwork through a GypWall partition, consideration should be given to the size and
weight of the damper - this will determine whether it can be supported directly from the
partition or needs to be independently supported from the structure.
The cut-outs in the studs can be used for routing electrical and other small services
(see Construction details 1). Switch boxes and socket outlets can be supported from
Gypframe 99 FC 50 Fixing Channel fixed horizontally between studs, or a high
performance socket box detail used where higher acoustic performance is required.
Where Gypframe AcouStuds are used, services are routed through 50mm x 28mm H
shaped push-outs, at the same centres as shown in Construction details 1a for
pg. 38
MATERIAL REPORT
conventional cut outs. Cables should be protected by conduit, or other suitable
precautions taken to prevent abrasion when they pass through the metal frame.
pg. 39
MATERIAL REPORT
Construction details
pg. 40
MATERIAL REPORT
pg. 41
MATERIAL REPORT
pg. 42
MATERIAL REPORT
pg. 43
MATERIAL REPORT
pg. 44
MATERIAL REPORT
pg. 45
MATERIAL REPORT
pg. 46
MATERIAL REPORT
pg. 47
MATERIAL REPORT
pg. 48
MATERIAL REPORT
Services
Electrical
The installation of electrical services should be carried out in accordance with BS
7671. The cut-outs in the studs can be used for routing electrical and other small
services (see GypWall classic Construction details 1). Switch boxes and socket
outlets can be supported from Gypframe 99 FC 50 Fixing Channel fixed horizontally
between studs, or a high performance socket box detail where higher acoustic
performance is required. Where Gypframe AcouStuds are used, services are routed
through 50mm x 28mm H shaped push-outs, at the same centres as shown in
GypWall classic Construction details 1a for conventional cut-outs. Cables should be
protected by conduit, or other suitable precautions taken to prevent abrasion when
they pass through the metal frame.
Heating pipes
Where heating pipes, particularly micro-bore systems, are to be located within the
partition, it is recommended that only one pipe is passed through each aperture in the
metal framework. If this cannot be accommodated for whatever reason, it may then be
necessary to incorporate proprietary pipe restraining clips or other means of keeping
the pipes apart to prevent vibration noise.
pg. 49
MATERIAL REPORT
Ducts
Where a large number of electrical cables or pipes have to be accommodated, a
service duct can be created by closing up the stud centres to 450mm and omitting the
intermediate nogging. Electrical cables should be attached using an appropriate cable
retaining device in order to satisfy the requirements of BS 7671.
Fixtures
Lightweight fixtures can be made directly to the partition linings. Medium weight
fixtures can be made to Gypframe 99 FC 50 Fixing Channel. Heavyweight fixtures (to
BS 5234), such as wash basins and wall cupboards, can be fixed using Gypframe
Service Support Plate.
CONSTRUCTION DETAILS
(Please turn to next page)
pg. 50
MATERIAL REPORT
pg. 51
MATERIAL REPORT
pg. 52
MATERIAL REPORT
pg. 53
MATERIAL REPORT
pg. 54
MATERIAL REPORT
pg. 55
MATERIAL REPORT
GypWall quiet
Design
Planning - key factors
The position of services and heavy fixtures should be pre-determined and their
installation planned into the frame erection stage. All penetrations will need to be
adequately stopped for fire and acoustics.
Cross-bracing
The Gypframe C Stud frameworks must be braced using short lengths of Gypframe
99 FC 50 Fixing Channel. Braces should be installed at 1200mm maximum centres,
or at mid-height for walls less than 2400mm high. Braces must be fixed using two
Gyproc Wafer Head Drywall Screws into each Gypframe C Stud.
Partition to structural steelwork junctions
When designing the layout of rooms requiring separation by sound insulating walls
abutting structural steelwork, consideration should be given to the potential loss of
sound insulation performance through the steelwork.
Cavity fire barriers
Stone mineral wool cut neatly to fit across the cavity forms a suitable closure.
Services
Penetrations
Penetrations of fire-resistant or sound-insulating constructions for services need
careful consideration to ensure that the performance of the element is not downgraded
and also that the services themselves do not act as the mechanism of fire spread or
sound transmission.
Electrical
The installation of electrical services should be carried out in accordance with BS
7671. The cut-outs in the studs can be used for routing electrical and other small
services.
Switch boxes and socket outlets can be supported from Gypframe 99 FC 50 Fixing
Channel fixed horizontally between studs, or a high performance socket box detail
where higher acoustic performance is required. Cables should be protected by
conduit, or other suitable precautions taken to prevent abrasion when they pass
through the metal frame.
Fixing floor and ceiling channels
Gypframe Floor & Ceiling Channels must be securely fixed with a row of fixings at
600mm maximum centres. For 94mm channels and above, two rows of staggered
pg. 56
MATERIAL REPORT
fixings are required, each row at 600mm centres and each fixing 25mm in from the
flange. If the floor is uneven, a 38mm thick timber sole plate equal to the width of the
channel should be used. If the concrete or screeded floor is new, consideration should
be given to the installation of a damp-proof membrane between the floor surface and
the channel or sole plate.
Deflection heads
Partition head deflection designs may be necessary to accommodate deflections in
the supporting floor. Deflection heads may also be required to the underside of roof
structures subjected to positive and negative pressures. For special detailing which
minimizes the loss of acoustic performance:
CONSTRUCTION DETAILS
(Please turn to next page)
pg. 57
MATERIAL REPORT
pg. 58
MATERIAL REPORT
pg. 59
MATERIAL REPORT
7.
COST:
pg. 60