Flood Management in Malaysia

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 16

CHAPTER

(Mandatory).........................
..............................i
..........................ii
........iiiPAGE
(Optional).............................
...............................iv
TABLES...............................
...................................v
FIGURES.............................
..................................vi
SCHEMES...........................
.................................vii
CHAPTERS
Introduction..........................
..............1
Method.................................
.............................................
..............4
Results.................................
............18
Discussion...........................
...........38
Recommendation................
Conclusion,
...................53
BIBLIOGRAPHY..................
.................57
TABLE OF CONTENTS

CHAPTER
PAGE
ABSTRACT......................................................................................................................................
CHAPTERS
CHAPTER 1 Introduction.............................................................................................................
CHAPTER 2 Objective.................................................................................................................
CHAPTER 3 Statement Problem..................................................................................................
CHAPTER 4 Background, Literature Review, Discussion.........................................................
CHAPTER 5 Conclusion...........................................................................................................
REFERENCES..............................................................................................................................

Topic: Flood Management and Mitigation in Malaysia


Abstract
This research seeks to explain the creation and perpetuation of flood hazards in Peninsular
Malaysia in terms of a 'hazard response-in-context' model. Socio-political (socio-cultural and
political economy) and institutional contexts are found to be central to understanding hazards
as essentially socially-created phenomena superimposed onto a physical process system
through which hazards are transmitted. Malaysia is an ex-colonial, newly-industrialising
country. The pace of social, economic and political change is fast, as is the pace of
technological change. Other things being equal, these are the contexts in which flood hazards
are magnified. Contexts are changing, and changing physical systems have given rise to
increased flood risk, exposure and vulnerability. Other contexts, largely structural, such as
persistent poverty, low residential and occupational mobility, landlessness, and ethnic culture
have also contributed to increased vulnerability to flood hazards. The situation, behaviour and
response of individual floodplain occupants in Peninsular Malaysia are found to be heavily
influenced by macro socio-political contexts. These are also termed contextual forces and
they are fundamentally 'structural'. Macro contexts also 'condition' institutions (meso context)
and influence their approach to hazard management including their effectiveness. Institutions
(including organisations) were found to be largely inadequate in their management and
reduction of flood hazards, and can be improved to create positive influences on flood hazard
reduction as well as help individuals (micro context) cope more effectively. Both sociopolitical and institutional contexts were found to be important as they amplify hazards or fail
to adequately address and reduce them. The pioneering of what is termed 'segment analysis'

to analyse links between contexts at various levels is an important contribution in this


research. The research concludes that the hazard response-in-context model is appropriately
applied to Peninsular Malaysia as it handles both structural and institutional contexts and
individual management of flood hazards effectively.

Introduction
Malaysia is fortunate that it is not directly affected by serious disasters like
earthquake, hurricanes, typhoon, tornadoes, tsunamis and volcanic eruptions. This country is
also rich in water resources, receiving an abundant amount of rain every year. The average
annual rainfall is 2,400 mm for Peninsular Malaysia, 3,800 mm for Sarawak and 2,600 mm
for Sabah.
Even though Malaysia has seemingly sufficient water resources to meet all our needs
for the foreseeable future and not too excessive as compared to other countries like
Bangladesh, there are some water-related problems which have raised concerns among water
engineers and the public. The problems are not about having too little water to satisfy our
needs, as in some water-scarce countries in the world, or too much to cope with, rather, it is a
problem of not managing water effectively to achieve our desired objectives. In some river
basins, there is already the problem of water shortage especially during periods of prolong
droughts, and conversely, the problem of excessive water and floods during the wet season.
Increasingly, as we move towards the year 2020, the country is expected to face
serious challenges relating to flood and drought management. Per capita availability of water
will greatly decrease as a result of a growing population and greater per capita use of water
for a better quality of life, urbanization and industrialization. Other potential problems
include increased severity and frequency of flash floods, prolong droughts especially during
El-Nino years, water and land use conflicts, decreasing crop yields and increasing water

demand for food production, pollution control, outbreak of water-borne diseases, declining
aquatic biodiversity, deforestation, and uncontrolled erosion and sedimentation.
There are two major water-related problems affecting this country, i.e. excess water
(floods) and water shortage (droughts). These problems have disrupted the quality of life and
economic growth in the country and can result in severe damage and loss of properties, and
occasionally loss of human lives as can be seen in the recent December 2006 and January
2007 floods in Johor as well as the 1998 prolong water rationing widespread in the Klang
Valley area.
Objective
In this report, we want to identify the proper flood management and also the flood mitigation
project that had been conducted or will be implemented in the near fiture. So, by that
information, we can select the most effective way to prevent or lowering the aftermath effect
of the flood.
Essentially, the overall objectives of flood management should include:
i.

To reduce the adverse impact of floods and the likelihood of floods,

ii.

To promote sustainable flood management measures,

iii.

To look for opportunities to work with natural processes and to deliver,


if possible, multiple benefits from flood management,

iv.

To inform the public and relevant authorities about the flood risk and
how to deal with it.

Statement Problem
Occurrence of Flood Events
Flooding is the most significant natural hazard in Malaysia in terms of population
affected, frequency, area extent, flood duration and social economic damage. Having 189
river basins throughout Malaysia, including Sabah and Sarawak, the rivers and their corridors
of flood plains fulfill a variety of functions both for human use and for the natural ecosystem,
i.e. they are fundamental parts of the natural, economic, and social system wherever they
occur. At the same time, rivers might be the largest threat to entire corridor areas.
Since 1920, the country has experienced major floods in the years of 1926, 1963,
1965, 1967, 1969, 1971, 1973, 1979, 1983, 1988, 1993, 1998, 2005 and most recently in
December 2006 and January 2007 which occurred in Johor. The January 1971 flood that hit
Kuala Lumpur and many other states had resulted in a loss of more than RM 200 million then
and the death of 61 persons. In fact, during the recent Johor 2006-07 flood due to a couple of
abnormally heavy rainfall events which caused massive floods, the estimated total cost of

these flood disasters is RM 1.5 billion, considered as the most costly flood events in
Malaysian history. Recent urbanization amplifies the cost of damage in infrastructures,
bridges, roads, agriculture and private commercial and residential properties. At the peak of
that recent Johor flood, around 110,000 people were evacuated and sheltering in relief centers
and the death toll was 18 persons.
The basic cause of river flooding is the incidence of heavy rainfall (monsoon or
convective) and the resultant large concentration of runoff, which exceeds river capacity.
However, in recent years, rapid development within river catchment has resulted in higher
runoff and deteriorated river capacity; this has in turn resulted in an increase in the flood
frequency and magnitude. With 60% of the Malaysian population now residing in urban
areas, flash flooding in urban areas are perceived to be the most critical flood type
(surpassing the monsoon flood) since the mid 1990s. This is reflected in the flood frequency
and magnitude, social-economic disruption, public outcry, media coverage and the
governments escalating allocation to mitigate them.
In the coastal areas, flooding could be attributed to high tides and occasionally
aggravated by heavy rains or strong wind. In the last decade, also of great concern is the
increased occurrence of other flood-related disasters such as debris flood flow, mud flow and
land slides in mountain streams and hill slopes, not to mention the new threat of tsunamiinduced coastal flood disasters. Flood management aims to reduce the likelihood and the
impact of floods. Experience has shown that the most effective approach is through the
development of flood management programs incorporating a holistic approach with respect to
the following strategies :
i. Prevention - preventing damage caused by floods by avoiding construction of
houses, properties and industries in present and future flood-prone areas; by
adapting future developments to the risk of flooding; and by promoting
appropriate land-use, agricultural and forestry practices;
ii. Protection - taking measures, both structural and non-structural, to reduce the
likelihood and the impact of floods in a specific location;
iii. Preparedness - informing the public about flood risks and what to do in the event
of a flood;
iv. Emergency response developing emergency response plans and actions in case
of a flood; and
v. Recovery and lessons learned - returning to normal conditions as soon as possible
and mitigating both the social and economic impacts on the affected population.

Background
MAJOR FLOOD EVENTS AND CAUSES OF FLOODING
Several major floods have been experienced in the last few decades. As far back as 1886, a
severe flood with gale-force winds caused extensive damages in Kelantan. The flood of 1926,
supposedly the worst in living memory in Malaysia, affected most of Peninsular Malaysia,
resulting in extensive damages to property, road systems and agricultural land and crops. In
1967, disastrous floods surged across the Kelantan, Terengganu and Perak river basins, taking
55 lives. A few years later, in 1971, a catastrophic flood swept across many parts of the
country. Pahang was severely affected, suffering great economic losses in the form of
property and crops, as well as a death toll of 24. Kuala Lumpur, the Federal capital, suffered
equally the wrath of the flood, an incident that overshadowed all past memories of floods in
Malaysia. Flood occurrences seem to be getting more frequent in recent years, especially in
some cities like Kuala Lumpur, Penang and Kuching where rapid urbanisation is taking place.
The main causes of flooding in Malaysia are as follows:

Loss of flood storage as a result of development extending into and taking

over flood plains and drainage corridors


Increased runoff rates due to urbanisation
Inadequate drainage systems or failure of localised drainage improvement

works, extended insufficiently downstream


Constriction at bridges and culverts that are either undersized or partially

blocked by debris build-up or from other causes


Siltation in waterway channels from indiscriminate land clearing operations
Localised continuous heavy rainfall
Tidal backwater effect
Inadequate river capacity

Literature Review
FLOOD CONTROL MEASURES
Following the disastrous 1971 flood, the Government took several positive steps to deal with
the flood problem. Among these were:

Establishment of the Permanent Flood Control Commission


Establishment of flood disaster relief machinery
Implementation of structural measures
Implementation of non-structural measures
Setting up of flood forecasting and warning systems
Carrying out of river basin studies and preparation of drainage master plans
for major towns

Setting up of a nationwide network of hydrological and flood data collection


stations

Permanent Flood Control Commission


The Permanent Flood Control Commission was established by a Cabinet decision on
December 21, 1971 to study short-term measures to prevent the occurrence of floods and
long-term measures for flood mitigation. The Commission, in its first sitting, drew up the
following terms of reference:

To take measures for flood control and to reduce the occurrence of floods
In the event of floods, to minimise damage and loss of life and property

The main objective of the Flood Commission is prevention rather than cure. Since its
inception, the Commissions recommendations of projects for flood control have been made
with the overall view of meeting the objectives of the New Economic Policy of eradicating
poverty and restructuring society. The Commission is presently chaired by the Honorary
Minister of Agriculture with the Drainage and Irrigation Department (DID) acting as the
Secretariat. (In 2004, due to the recent Cabinet decision of placing DID under the newly
formed Ministry of Natural Resources and Environment, it is envisaged that the chairmanship
of the Commission will be transferred to the new Minister of Natural Resources and
Environment.)
Flood Relief Machinery and Organization
Following the disastrous flood of 1971, which affected many areas in Malaysia, the
Government has established the Natural Disaster Relief Committee in 1972 with the task of
coordinating flood relief operations at national, state and district levels with a view to prevent
loss of human lives and to reduce flood damage. The coordination of relief operations is the
responsibility of the Natural Disaster Relief Committee which is headed by the Deputy Prime
Minister of Malaysia in the National Security Council of the Prime Ministers Department.
The committee members consist of various Cabinet Ministers such as the Minister of
Finance, the Minister of Social Welfare, the Minister of Natural Resources and Environment,
the Minister of Science, Technology and Innovation, senior government officials such as of
the Governments Chief Secretary, the Army General, and related government
agencies/departments such as DID, MMD, MACRES, Social Welfare Department, Police
Department and Fire and Rescue Department.
The organization of flood relief and operation is based on the Operation Procedure
No. 29 published by the National Security Council. Beside, DID has published the Circular

No. 2/2003 Guidelines for Management of Flood Disasters during the Monsoon Season
and Flash Floods which is to coordinate the preparation of flood operations at federal, state
and district levels.
In accordance with the Operating Procedure under the flood relief mechanism, when
the river stage of any flood warning station reaches the Alert Level, DID begins to monitor
closely the flood situation. When it reaches Warning Level, DID will inform the relevant
flood control centers so that flood relief mechanism shall be activated. At Danger Level,
considerable areas are flooded and will warrant evacuation of flood victims. During the flood
season, the respective state DID office shall carry out flood forecast operation using real-time
telemetric data (rainfall and river water level) and river forecasting computer models. When
the river water level at any forecasting point exceeds critical level, the forecasts shall be
transmitted to the Flood Operation Centers and other relevant agencies such as the National
Security Division of the Prime Ministers Department and the National and State (Police)
Control Centre for flood relief/operation.
River Basin Studies
The objective of river basin studies is to draw up appropriate flood maps and also
feasible projects for the respective basin areas so that their development is properly managed
and that water resources management, including flood control measures, is effective and
well-controlled. These studies recommend the optional flood control planning and design
criteria for the respective basins. Generally, socioeconomic considerations for the basin will
dominate the design criteria.
Since 1972, a number of river basin studies have been carried out for rivers where
major flood problems exist. The objective of these studies is to draw up master plans for
water resources development, and measures for flood mitigation form an important
component. To date, more than 26 river basin studies have been completed, including Kuala
Lumpur (1974 and 2002), Pahang River (1974), Kelantan River (1978 and 1989), Terengganu
River (1978), Limbang River (1978), Kinabatangan River (1982), Samarahan River (1983),
Batu Pahat River (1984), Johor River (1985), Golok River (1985), Besut River (1988), Klang
River (1978,1989 and 1994), Menggatal, Sabah (1999), Miri Flood Diversion (2000), Linggi
(2000), Selangor River (2000), and Bernam (2001).
Realising the need for a long-term water resources development strategy and master
plan, the Government has carried out a National Water Resources Study (1982) to develop a
comprehensive and coordinated water resources development programme for the country.
The study has formulated a long-term plan for flood mitigation works in various floodprone

areas in the country. This includes improvement of 850 km of river channels, construction of
12 multi-purpose dams, 82 km of flood bypass, 12 ring bunds around urban centres, and
resettlement of about 10,000 people in flood-prone areas. The whole plan was estimated to
cost RM2.55 billion (1982 estimate) over a period of 20 years and will provide protection to
some 1.8 million people. (However, the cost for future flood mitigation works is now
estimated to be in the region of RM17 billion for the next 15 years and the estimated number
of people affected by flooding has now risen to 4.82 million.)
A number of studies have also been carried out with the aim of alleviating flood
problems in various locations in the country. These include the Cukai Flood Mitigation Study,
Lower Perak Flood Mitigation Study
and the Kangar Flood Mitigation Study, as well as drainage master plan studies for the towns
of Butterworth and Bukit Mertajam, Kuala Lumpur, Alor Setar, Sandakan/Tawau/Kota
Kinabalu, Bintulu, Johor Bahru, Kelang and Port Kelang, Seremban, Melaka, Kuantan, Kota
Bharu, Kuala Terengganu, Port Dickson, Raub, Kerteh, Teluk Intan, Penang, Langkawi, Batu
Pahat, Sungai Petani, Kuching, Ipoh and the Multimedia Super Corridor (MSC).
Flood Mitigation Measures
From the studies that have been carried out, various structural (curative) as well as
non-structural (preventive) measures have been proposed to alleviate flood problems. Under
structural measures, engineering methods are used to solve the flood problems. The river
capacity can be increased to accommodate the surplus runoff through channel improvement,
construction of levees and embankments, flood bypasses, river diversions, poldering, and
construction of flood storage dams and flood attenuation ponds, either singly or in
combination.
Non-structural measures, on the other hand, are proposed where engineering measures
are not applicable or viable, or where supplemental measures are required. They include
restriction of development, land use zoning, resettlement of population, flood proofing, and
flood forecasting and warning systems.
Numerous major flood mitigation projects for urban areas have been executed. Apart
from urban areas, the aspects of flood mitigation and flood fighting have also been
implemented in fast-growing agricultural areas such as the Integrated Agricultural
Development Project (IADP) areas, namely Perlis IADP, Western Johor IADP, Ketara IADP,
Kemasin Semarak IADP and Samarahan IADP.
Under the 2nd Malaysia Plan (1971-1975), only a sum of RM14 million was spent for
flood mitigation projects. This was followed by the 3rd Malaysia Plan (1976-1980) with an

expenditure of RM56 million, the 4th Malaysia Plan (1981-1985) with RM141 million, the 5th
Malaysia Plan (1986-1990) with RM155 million, the 6th Malaysia Plan (1991-1995) with
RM431 million, the 7th Malaysia Plan (1996-2000) with RM845 million, and the 8th
Malaysia Plan (2001-2005) with an allocation of RM2.7 billion. It is estimated that the cost
for future river improvement and flood mitigation works for the next 15 years will amount to
some RM17 billion.
STRUCTURAL MEASURES
(ENGINEERING SOLUTIONS)
Structural measures are actually engineering methods which include the following:
Flood Control Dams
These dams are constructed to retain flood water in order to protect areas downstream
of the dams. Construction of storage dams solely for flood control purposes is generally
economically not viable and such dams are frequently utilised for other purposes such as
water supply. In addition, dams constructed for hydroelectric purposes also have a portion of
their capacity allocated for flood detention.
Among the dams specially constructed for flood mitigation are Batu Dam, Semberong
Dam, Bekok Dam and Macap Dam, while irrigation dams include Muda Dam, Pedu Dam,
Timah Tasoh Dam, Bukit Merah Dam and Beris Dam. Hydroelectric dams built by Tenaga
Nasional Berhad include Kenyir Dam, Bersia Dam, Kenering Dam, Temenggong Dam and
Sultan Abu Bakar Dam. The Klang Gates Dam is an example of a dam built for water supply
but also serves as a flood mitigation dam.
Canalisation And Related Works
Canalisation works include the widening and deepening of channels as well as lining
the banks and beds of the channels. They also include the replacement of undersized
structures such as bridges. These works are necessary, as the original channels have become
undersized as a result of the increase in flood flows caused by development.
Bunding Of Rivers
Bunding of rivers prevents overtopping and flooding of the lowlying adjacent areas.
This option may give rise to problems of internaldrainage as a result of the bunding. Bunding
an urban area introduces high flood damage potential, as any occurrence of flooding as a
result of flood water overtopping or breaching the bund would be very damaging.
Storage Ponds Of Flood Attenuation

Ponds such as disused mining pools can be used for flood storage. The objective is to
divert the flood water through such ponds and thus regulate the outflow so that the flood
peaks are attenuated. This strategy has been used in the case of Batu/ Jinjang Pond Project in
Kuala Lumpur where excess flood water is diverted from Sg. Gombak to Batu Pond for
temporary storage and from Sg. Keroh to Jinjang Pond. Water in the pond will be released
slowly back to the river after the flood flow has subsided.

Poldering (Ring Bund)


Poldering is the provision of a ring bund surrounding the area to be protected. This is
normally carried out for an area which has high damage potential but for which the cost on
overall basin-wide protection would be prohibitive. It includes the provision of internal
drainage for the area to be protected and the evacuation of flood water by pumping during
periods of high river flows.
The present strategy of using structural flood control measures suchas the above has
proven effective in controlling floods and is usually the only option available for built-up
areas. However, structural measures usually incorporate hard engineering measures that

result in bigger channels conveying high flows at high velocities. These measures incur high
costs as well as require substantial land reserves for the channel.
Flood Diversion Channel Or Tunnel
Certain river stretches especially in major city centres, due to intensive development
along both riverbanks, can no longer be widened or deepened to accommodate the increasing
flood discharges through the city. Under such circumstances, excess flood water has to be
retained upstream in storage ponds or diverted downstream through a flood diversion channel
or tunnel. This is being implemented in Kuala Lumpur where the Stormwater Management
and Road Tunnel (SMART) Project has become a viable and innovative solution. The
SMART system, when completed, will alleviate flooding in the Kuala Lumpur city centre by
diverting large volumes of flood water from entering the city centre. The tunnel is designed to
incorporate a storm water channel and a motorway for dual purposes. The motorway section
of the tunnel is expected to ease traffic congestion at the southern gateway to KL City near
Sungai Besi. This concept is believed to be the first of its kind in the world.

NON-STRUCTURAL MEASURES (NON-ENGINEERING SOLUTIONS)


Non-structural measures are employed more for preventing floods from occurring and with
the aim of minimising losses due to flooding. These measures are broadly aimed at reducing
the flood magnitude through the management of catchment conditions as well as reducing the
flood damage. These measures comprise the following:
Integrated River Basin Management (IRBM)
Under the concept of IRBM, the whole river basin is planned in an integrated manner and all
factors are taken into consideration when a certain development plan is proposed. Factors like
zoning for river corridors, riparian areas, natural flood plains, conservation of wetlands,
storage ponds, etc. will be taken into consideration when preparing flood management plans.
The concept of IRBM has been incorporated into and will be implemented starting from the
8th Malaysia Plan.
Preparation of Guidelines and Design Standards
Suitable guidelines and design standards have been prepared, specifying clear requirements,
both physical as well as technical, for rivers and their reserves, as well as flood mitigation
and urban drainage projects. These guidelines and design standards, if followed strictly by the
public and private sectors, will help minimise the occurrence of floods. The Department of
Drainage and Irrigation has published more than 20 Hydrological Procedures as well as the
Urban Drainage Planning and Design Procedure No. 1 for use as reference materials and
guidelines by all planners, consultants and other Government agencies throughout the
country.
Recently in the year 2000, a new Urban Stormwater Management Manual (MASMA)
has been published by DID. The Manual has obtained Cabinet approval for implementation
commencing January 1, 2001 and is to be complied with by all local authorities and the
public and private sectors.
The Manual provides control-atsource measures and recommendations on flood
fighting by utilising detention/retention, infiltration and purification processes. This will
result in a more harmonious urban environment thereby enhancing the aesthetic value of the
surroundings as well as property values.

Flood Proofing
This measure consists of implementation of protective works to prevent the entry of flood
water into individual houses and specific places, for example, by bunding a building with a
wall so that the floor is not submerged during a flood, thereby reducing flood damage. In
flood-prone cities like Kuala Lumpur and Penang, entrances to basement car parks should
incorporate some flood proofing measures.
Flood Forecasting and Warning System
The provision of flood forecasting and warning system is an important, practical and low-cost
measure to minimise flood losses. Flood forecasts given early will enable people living in
flood-prone areas to be warned so that they can evacuate themselves and their belongings
before the arrival of the flood. This can considerably reduce flood loss and damage and above
all, the loss of human lives. Following the 1971 flood, telemetric forecasting systems have
been installed in the major river basins, namely Kelantan, Pahang, Perak, Sadong,
Kinabatangan, Klang, Terengganu, Besut, Dungun and Johor, which are susceptible to major
floods from time to time. A similar system was recently installed in the Muar river basin in
Johor and more are being planned for another 20 river systems. VHF flood forecasting
systems have been established in smaller basins. In river basins which are subjected to flash
floods, little lead time is available for effective warning. Therefore flood warning sirens,
which automatically trigger once the flood level reaches a critical point, have been installed
at strategic locations along certain urban rivers to alert the local residents of impending floods
with the aim of minimising flood damage.

Since 1980, flood warning boards have been erected in the major river systems.
Levels marked on these warning boards are correlated to the levels at the observation point
and they enable the residents of the villages to assess for themselves what the situation would
be like in their areas, upon receiving information on the water level through radio broadcasts,
village heads and/or police. In recent years, a web-based information system on flood
warning and flood information can be readily obtained through http://infobanjir.moa.my.
Finding and Discussion

Conclusion
Based on the experience accumulated over the years in
implementing flood mitigation works, DID is today more conscious of the need to carry out
such projects on a river basin basis rather than on a piecemeal approach. This kind of
approach will involve a shift from the traditional thinking in terms of controlling flooding
through expensive engineering structures to viewing the solution in terms of managing
flooding by incorporating structural as well as non-structural measures.

References
Ghani, A. A., Zakaria, N. A., Abdullah, R., & Chang, C. K. (2009). Case Study: Flood
Mitigation of the Muda River. JOURNAL OF HYDRAULIC ENGINEERING, 251261.
Khalid, M. S., & Shafiai, S. B. (2015). Flood Disaster Management in Malaysia: An
Evaluation of Flood Delivery System. International Journal of Social Science and
Humanity, 398-402.
Loi, H. K. (1996). Flood Mitigation and Flood Risk Management in Malaysia. International
Workshop on Floodplain Risk Management, (pp. 205-216).
Nadiatul Adilah Ahmad Abdul Ghania, *. N. (2012). Study on Characteristics of Sediment
and Sedimentation Rate at Sungai. Malaysian Technical Universities Conference on
Engineering & Technology 2012, MUCET 2012 (pp. 81-92). Kuantan: Universiti
Malaysia Pahang.
Sharma, H., & Singh, J. (2013). Run off River Plant: Status and Prospects. International
Journal of Innovative Technology and Exploring Engineering (IJITEE), 210-213.