Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
DRAFT
GOVERNMENT OF INDIA
M I N I S T E R Y O F R A I LWAY S
T E C H N I C A L S P E C I F I C AT I O N
FOR
S U P E R V I S O R Y C O N T R O L A N D D ATA A C Q U I S I T I O N S Y S T E M F O R 2 5 K V
S I N G L E P H A S E 5 0 H Z a c T R A C T I O N P O W E R S U P P LY
Page 1 of 66
Page 2
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SPECIFICATION FOR:
Amendment
Number
Date of
Amendment
SIGNATURES
DATE
DESIGNATION
Total pages
& drawings
Amendments / Revision
PREPARED BY
CHECKED BY
APPROVED BY
SSE/SCADA
Director/PSI
Sr.EDTI
COPY NUMBER
Page 2 of 66
Page 3
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
INDEX
SECTION
HEADING
SECTION 1
SCOPE
SECTION 2
SECTION 3
SCADA SOFTWARE
SECTION 4
COMMUNICATION MEDIUM
SECTION 5
SECTION 6
TELECOMMANDS, TELESIGNALS
SECTION 7
TESTING
SECTION 8
SECTION 9
OF THE
SPECIFICATION
AND
MEASURANDS
AND COMMISSIONING
ANNEXURES
ANNEXURE 1
GOVERNING SPECIFICATIONS
ANNEXURE 2
ANNEXURE 3
ANNEXURE 4
ANNEXURE 5
ANNEXURE 6
ANNEXURE 7
ANNEXURE 8
Page 3 of 66
Page 4
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SECTION 1
SCOPE OF THE SPECIFICATION
1.1 INTRODUCTION
The specification is applicable for development of SCADA system on Indian
Railways for 25 kV ac traction power Supply system (including sub-urban) &
2X25 kV ac Auto Transformer Traction power supply system.
1.1.1 This specification covers various requirements of complete SCADA software and
hardware. The SCADA system shall work with IEC 60870-5-101, a companion
standard of IEC 60870-5 series of open protocol standards.
1.1.2 Since SCADA system consists of a number of sub systems like software,
hardware equipment like RTU, computers and other communication interface
devices, it will be the responsibility of the tenderer to provide successful
integration & satisfactory performance of complete system. For this purpose long
term commercial and technical tie up with the OEMs, if any, shall be ensured by
the tenderer.
1.1.3 The SCADA system shall be of highest reliability and based on the state-of-the art
technology. It shall be capable of monitoring and controlling traction power
supply from a remote location called Remote Control Centre (RCC). It should
enable TPC to monitor and control power supply to the remotely situated
switching stations from RCC reliably and safely. The system should be capable
of collecting, storing, displaying and analyzing data as stipulated in the
specification.
1.1.4 Interpretation of any technical meanings of the specifications and sorting out
technical disputes regarding this specification shall be decided by Director
General (Traction Installation), Research Designs & Standards Organization,
Lucknow (RDSO), whose decision shall be final and binding.
1.1.5 There shall be three main parts of the SCADA system Master Station
equipment, Remote Station equipment and Communication link, details of which
have been covered in this specification.
1.1.6 Remote Terminal Unit (RTU) shall serve as single point interface between
switching stations (All TSS, SP and SSP) and master station.
1.1.7 The tenderers shall familiarize themselves with site conditions before quoting
against tenders based on this specification. Conditions particular to individual
sites, including availability of communication and spare channels, conditions &
space at RCC, switching posts, proximity to Road/Rail, sequence in which RTUs
sites will be offered by railways for taking up work, and any special conditions
Page 4 of 66
Page 5
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SERVICE CONDITIONS
The equipment at RCC shall be installed indoor however rooms may not be air
conditioned. The SCADA equipment at controlled stations shall be installed
inside track side cubicles/ rooms and subjected to vibrations on account of
running trains on the near-by Railway tracks. The amplitude of these vibrations
lies in the range of 30 to 150 microns, with instantaneous peaks going up to 350
microns. These vibrations occur with rapidly varying time periods in the range of
15 to 70ms. The track side cubicles will not be air-conditioned and are liable for
exposure to polluted, dusty and corrosive atmosphere.
1.2.1 The locations at which the SCADA system equipment (RTU) in field are to
function shall be subjected to heavy rains and lightning during monsoon. The
extreme atmospheric condition limits for design purpose shall be as under:
Maximum ambient temperature
Minimum ambient temperature
Relative humidity
1.3
550 C
-100 C
100 % saturation during
rainy season.
1.3.1 At the RCC 415 Volts, 3 Phase 4 wire, 50 Hz supply shall be made available by
the purchaser.
1.3.2 In case of failure of the ac supply at the RCC, all the RCC equipment shall be fed
by the on line UPS.
1.3.3 The RTUs shall operate on 110 Volt dc supply provided by the Purchaser (Vdc:
110 +10 % & -20%).
1.4
DESCRIPTION OF THE AC
RAILWAYS (IR)
Page 5 of 66
Page 6
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
1.4.1.2 The supply to the Over Head Equipment (OHE) from TSS is fed through
interrupters located at Feeding Post (FP). Adjacent TSS normally supplies power
to the OHE on different phases to reduce unbalance in the supply authority grid.
To avoid the pantograph of a locomotive or electric multiple unit bridging the
supply from different phases, when it passes from one zone to another, a Neutral
Section is provided to separate the OHEs fed from different phases.
1.4.1.3 The switching station provided at neutral section is called Sectioning and
Paralleling Post (SP). In an emergency, when a TSS is out of power, feed from
adjacent TSSs on either side is extended up to the failed TSS by closing bridging
interrupters at SP on both the lines. The pantographs of electric locomotives or
electric multiple unit is/are lowered at the failed TSS to avoid short-circuiting the
phases at the insulated overlap.
1.4.1.4 Between TSS and adjacent neutral section, the OHE is divided into sub-sections
for isolating the faulty section for the purpose of maintenance and repairs The
switching stations provided at such points are called Sub Sectioning and
Paralleling Posts (SSP). The OHE of various tracks, in multiple track sections, are
paralleled at the SP & SSP to reduce voltage drop in OHE The sub sectors are
further divided into elementary sections by the use of manually operated isolators.
1.4.1.5 At TSS, FP, SP and SSP, equipment like power transformers, circuit breakers,
interrupters, single and double pole isolators, potential and current transformers,
lightening arresters, LT supply transformers etc. are installed. A masonry building
is provided for housing the control panels, SCADA equipment, battery and
battery charger, etc.
1.4.1.6 All TSSs, FPs, SPs and SSPs are generally unmanned. OFF load tap changing of
the transformers, switching ON and switching OFF of CBs, interrupters and
motor operated isolators are controlled through the SCADA system.
1.4.1.7 A Drawing showing general scheme of power supply for traction system is at
Annexure-9
1.4.2 Description of the ac traction system in sub urban area:
1.4.2.1
The conventional 25 kV ac system draws power from two of the three phases
of the incoming EHV lines and transforms it to 25 kV. Power is drawn from different
phases at adjacent TSSs, cyclically, to balance the load. The separation of phases on
secondary side is carried out on the OHE contact wire system by providing neutral
sections which do not draw power but provide mechanical continuity for passage of
the pantograph. The drivers of trains are instructed to switch off the 25 kV circuit
breakers of the locomotive to prevent flashover while the pantographs negotiate the
neutral section.
The protection system of Sub-urban area has been designed with numerical
protection relays, capable of isolating the shortest possible section in the fastest
possible manner.
Page 6 of 66
Page 7
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Page 8
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
feeder. Two inner side terminals are, via series capacitors or directly, connected to
each other, and their joint is solidly earthed and connected to the running rails.
The load current from the sub-station flows through the catenary and
returns to the sub-station through the feeder. Between two adjacent ATs, the load
current fed from the catenary to the locomotive flows in the rail and is boosted up
to the feeder through the neutral taps of the two ATs.
Mid-way between two sub-stations, a SP is introduced. At the point of
TSS and SP, a dead zone known as neutral section is provided in the OHE to
avoid wrong phase coupling. The power to the catenary and feeder on each side of
the TSS is fed by one feeder circuit breakers, even if there are two breakers for
one side. The two breakers are used as a stand-by for each other. For maintenance
work and keeping the voltage drop within limits, one or more SSPs are introduced
between the TSS and SP. On a double track section, a SSP normally has four
sectioning interruptors and one paralleling interruptor, and a SP has two
paralleling interruptors and two bridging circuit breakers. In case of fault on the
OHE, the corresponding feeder circuit breaker of the sub-station trips and isolates
it.
A figure showing the principles of AT feeding system and a typical power
supply diagram showing this general feeding arrangement at a traction sub-station
and sections of the OHE are given in Annexure-10.
1.4.3.2 Protection System at traction sub-station:
Following relays are provided for the protection of traction sub-station
transformers:
(a)
(b)
(c)
(d)
(e)
(f)
Differentials relay.
Over current relay on receiving side.
Earth fault relay on receiving side.
Instantaneous over-current relay on receiving side.
Phase failure relay (to detect malfunction of feeder circuit breaker).
Auxiliary relays for transformer faults i.e. Buchholz, excessive winding and
oil temperature strip and alarm, pressure relief device trip and alarm and low
oil level alarm.
(g) Over-current relay on 2x25 kV side as back-up to feeder protective relays.
1.4.3.3. Following relays are provided for the protection of OHE:
a. Distance relay (with a parallelogram protection characteristics)
b. Delta-I type fault selective relay.
c. Instantaneous over-current relay
d. Under-voltage relay to avoid wrong phase coupling
1.4.3.4 Auto reclosing of feeder circuit breaker:
Page 8 of 66
Page 9
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
A single shot auto-reclosing scheme for the feeder circuit breaker at traction substation has been adopted to facilitate reclosing of the breaker automatically once,
after a pre-set time delay after tripping of the breaker on OHE fault. This feature
will help in quick restoration of traction power supply to OHE if the fault is of a
transient nature.
1.4.3.5 All traction substations and switching stations are normally unattended and off
circuit tap changer of the transformer, circuit breakers, interruptors, and motor are
operated remotely from the RCC through the SCADA equipment.
The off circuit tap changer of the transformer, circuit breakers, interruptors
and motor operated isolators could also be operated locally as well as manually at
the TSS, SP and SSP as the case may be. At the TSS, a local/remote changeover
switch is provided on the control panel, as well as in the mechanism box of the
circuit breaker, interruptor and motor operated isolator. No control panel exists
for the interruptors /circuit breakers at the SP and SSP and therefore the
local/remote changeover switch is provided on the mechanism box of the
interruptor/circuit breaker.
Page 9 of 66
Page 10
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SECTION 2
MASTER STATION EQUIPMENT
2.1. INTRODUCTION
The Master station shall consist of latest Microsoft Windows operating system based
SCADA software, running on Server grade computers in dual-redundant mode & MMI
running on desktop PCs. All the equipment required for interconnection & smooth
functioning shall also be part of master station equipment. The overall scheme for Master
station equipment shall generally conform to that shown in Annexure 3.
2.1.1 The LAN switches, routers, LAN extenders or media converters (as required with copper
or OFC medium respectively), bandwidth management hardware & software and
networking wiring etc. in RCC shall be within the scope of supply of successful SCADA
tenderer.
2.2
2.2.1 RCC setup for 15 RTUs shall comprise of 2 server grade computers both in hot standby
mode and 2 Workstation-Grade PCs in client-server architecture. For any addition of up to
15 RTUs, 2 MMIs shall be added to the existing LAN system. RTUs shall communicate
with RCC for transfer of events/alarms & measurands in addition to implementing
telecommands. There shall be a provision of Energy Management Servers (EMS) in hot
standby mode and 2 MMIs.
a. Configuration of Workstationi. Each operator workstation will consist of two workstation-grade (not Desktop)
PCs.
ii. One PC will have provision for connecting four 32 VDUs. To achieve this, each
workstation grade PC shall be provided with a quad-output graphics display
adapter. A virtual desktop shall be created spanning across all the VDUs. The
graphics adapter shall have built-in memory of minimum 256MB, and support
resolutions up to 1920 x 1200.
iii. The second PC shall be provided with a single 32 VDU and a second output for
connecting to the projector.
iv. The SCADA software should support splitting of the SCADA graphics across the
VDUs.
b. SCADA Workstation Requirements
i. Single graphics display should be able to be viewed across the multiple VDUs, as
if being viewed on a large screen.
ii. Keyboard and mouse functions shall work across all VDUs as with normal
desktops
iii. The software shall allow opening of multiple simultaneous windows in each
VDU.
iv. The SCADA graphics should support zoom in/out facility with clutter/de-clutter
function. When zooming in more details (static as well as dynamic data) on the
graphics should become visible, and when zooming out the details should get
hidden with only salient/important information visible.
v. The zooming facility should not cause loss of clarity of the displayed
information.
vi. The clutter/de-clutter function shall be configurable by the system engineer
Page Number 10
Page 11
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Page Number 11
Page 12
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
RAM size
Hard disk
Monitor
Video Card
Servers
IBM, HP, Dell, ACER only
Intel
Xeon
Dual
Core
Processor 3.0 GHz or Quad
Core 2 GHz or higher
upgradeable to dual processing
4 cores.
8 GB upgradable up to 16 GB
Total storage of 1TB with
RAID-1hard disk controller
18.5 inch LED
Standard Graphics controller
Multimedia
Not required
with accessory
Optical Drive Dual Drives: 16x DVD-ROM
(DVD R/W)
Drive + 16 x DVD+/-RW
double layer write capability.
EMI immunity
Network
Interface Card
Number
of
USB ports
Server
Management
software
Accessories
Operating
System
Workstation-grade PCs
HP, Dell, ACER, IBM/Lenovo only
Intel Core i7 (3.9 G) Processor or latest
generation processor
8 GB
Min 500 GB, SATA
32 inch ( LED)
ATI /NVIDIA graphics controller with
16/32 MB RAM
Required
External USB DVD-R/W-Latest available
Description
LENOVO, HP, DELL, ACER
Intel core i3-370M, 2.4GHz
Minimum 4 GB SDRAM
500 GB or higher
In-built speakers
15 TFT
8x DVD+/-RW Drive with DVD+R double layer write
capability
Minimum Two
With external 220 V AC 50Hz power supply adapter.
Page Number 12
Page 13
of 66
Operating System
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Page Number 13
Page 14
of 66
2.3
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Details of UPS
The tenderer shall provide a reliable on line UPS system of 2x5 KVA rating along with the
batteries and associated equipment. The details of 2x5 kVA UPS system shall be as under.
Item
Rating
Arrangement
type
Description
Each UPS shall be continuously rated for 5 kVA at 0.8 PF, Input: 3-Phase
415 +10% &-15% Vac, 50 3% Hz, Output: Stabilized 240Vac, 50 Hz.
One UPS of 5 kVA rating shall be sufficient to cater for the entire load of
RCC (maximum 3 kVA at 0.8 PF).
The UPS system shall operate in dual redundant hot standby mode where
another 5 kVA UPS shall provide 100% redundancy to the system.
The malfunction of online UPS shall cause it to automatically isolate from
the system and the other UPS shall take up the load without any
interruption.
Each UPS shall be designed to operate as a true on-line, double conversion
system where the UPS output is independent of input supply voltage &
frequency variations.
Each UPS unit shall have separate battery set (200AH). The voltage of each
cell shall be 2 V and the bus voltage of Battery Bank shall be 180 V
suitable to UPS.
The UPS shall have Cold start facility.
Battery
Output
voltage
distortion
2.3.1 The scope of work shall comprise of UPS supply wiring to cover all RCC computers,
peripherals and communication equipment e.g. MODEMs, hubs etc. This shall also
include supply and wiring of 23W CFLs for each computer workstation & any other
emergency light points in RCC. An ac distribution board with 12 outlets (6 each of 15A
& 5A) from UPS supply shall also be provided.
2.3.2 The tenderer shall purchase the UPS system from reputed suppliers like Aplab, APC, HiRel, Emerson network power, Dubas, Numeric & Uniline, and its inspection shall be
carried out by purchaser at the time of routine testing to verify the key functional
requirements. The responsibility of ensuring good quality & service performance of UPS
system lies with the tenderer.
2.3.3 The UPS shall generally conform to international standards and shall be suitable for
operation with computer-based equipment. Alarm and display facilities shall be provided
on the front panel of the UPS for easy troubleshooting, operation and maintenance.
Page Number 14
Page 15
of 66
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.4.5
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Page Number 15
Page 16
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SECTION 3
SCADA SOFTWARE
3.1
INTRODUCTION
3.1.1 SCADA software shall be capable of working on latest version of Microsoft WINDOWS
operating system. Master station SCADA application software shall also include
licensed copies of OS for all terminals, LAN interface software, diagnostic software,
Communication system analysis software, Antivirus Software and any other software
essentially required for satisfactory working of the system. This shall also include the
software for RTU and / or LAN driver etc. The license fee wherever applicable of any of
the above software shall be borne by the successful tenderer.
3.1.2 The software shall be compatible for working on IEC 60870-5-101 companion standard
protocols based on IEC 60870-5-1 to 5 series of standards. It shall also support multiple
channels for communication to all RTUs.
3.1.2.1 The software shall fully support file transfers between RTU & RCC as defined by
different IEC 60870-5 series of standards. Protection relays supports IEC103 protocol.
This standard specifies own disturbance record format.
3.1.2.2 The tenderer shall be fully responsible for effective working of SCADA software. He
shall also provide after sales support, on chargeable basis even after expiry of AMC, by
offering AMC/up-gradation as per the requirement of purchaser.
3.1.3 The Software shall be general-purpose, suitable for any SCADA project of Indian
Railways, menu driven, GUI based and fully user configurable. It should have facility for
application engineering with necessary tools and library modules, so that it can be easily
customized. It should be possible to customize the software to specific need of mimic
and tabular displays, representation of various equipment and devices. It should be
possible to create new symbols and add to this library. The online features of the
application-engineering module shall allow for upgrades and modifications easily at site.
3.1.4 The architecture of the software shall be modular and it should be possible to upgrade it
to the newer versions of operating systems.
3.1.5 The software shall give fast response to operator actions and system events. SCADA
system stability should be sustained during event bursts. The software should be capable
to support system working at high speed data transfer rates achievable over OFC
communication networks as explained in the chapter 4.
3.1.6 Moreover the software/system performance should not degrade with the time as system
is continuously up (due to generation of temporary files etc. which the software should
be capable of cleaning/deleting automatically). The tenderer shall endeavor to ensure no
software hanging, requiring restart of system or individual computers.
3.1.7 Software data logging functions should have flexible time and event based sampling
from real time process database. All values should be registered with status/value and
time stamp.
3.1.8 The software may require up gradation/reconfiguration from time to time as per
Page Number 16
Page 17
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Page Number 17
Page 18
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
3.2.3.3 Operator should be able to cut off power to a sub-sector by selecting it and giving the
command. The system should open all the associated switching devices automatically
with confirmation for each device as an event.
3.2.3.4 There shall be option to abort a command before giving the confirmation.
3.2.3.5 All the operator commands should be logged as events. After a control command is
issued by the operator, and if the same could not be executed, then a message shall be
displayed indicating reason(s) for it.
3.2.3.6 The telecommand once issued, if not sent to RTU due to communication failure or
otherwise, shall be aborted after a predefined period and shall not be in queue.
3.2.4 Parameter loading to RTU
3.2.4.1 The RCC software shall be capable of parameter loading to the RTU in line with IEC
60870-5-101 & other basic standards of IEC 60870-5 series. Some configurable
parameters are as under.
i.
ii.
iii.
iv.
3.2.4.2 The de-bouncing time, dead band for measurands and the clock synchronisation time
period shall be settable and so selected that the optimum use of data communication
channel is made.
3.2.5 SCADA software configuration
The software should provide menu driven and user-friendly configuration. The
configuration shall define the various devices, their attributes and the traction system
specific details. The configuration of the software shall be carried out with the help of
user/purchaser to cover all details/address/nodes of traction supply operation e.g.
Interlocking, locked out signals, protection relays & elements, alarms with attributes,
power blocks, parameter settings and display/picture screen properties etc.
3.2.6 Time Synchronisation
The software should have the facility to synchronize the Host computer clock through
GPS. Master station servers shall be time synchronized from the GPS receiver directly
while all MMI shall be time-synchronized by the Main Server over Ethernet LAN. This
time synchronization shall be based on absolute time (containing year, month, day,
hours, minutes, seconds, milliseconds) sent by GPS clock on a serial communication
channel. It may be noted that the GPS receiver can also have LAN port for
communication, which will avoid using serial ports in RCC computers.
The clock of the RTUs shall be synchronized with servers as per IEC 60870-5-101
protocol as per the periodicity settable by the user.
Page Number 18
Page 19
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Accurate clock Synchronization in a RTU depends on knowing the time taken to transmit
a Telecontrol message to it from the central Controlling station containing the master
clock time thereby permitting an allowance to be made for the transmission time during
synchronization.
3.2.7 Test Procedure & Diagnostics
In general the software shall support basic test procedure and diagnostic checks for RTU
as per IEC 60870-5-101 & basic standards of IEC 60870-5 series.
3.2.7.1 RTU Diagnostics
The standard features mentioned under section 5.3.4 shall be available for online
diagnostics and maintenance of the RTU as per IEC 60870-5-101 protocol.
3.2.7.2 RCC Diagnostics
SCADA application software shall have minimum following inherent features to check
its own sub functions and report status to the operator:
a)
Online/standby /offline state of SCADA server/communication front ends.
b)
State of all RTUs.
c)
State of printers.
d)
Connection status of all the operator workstation.
The above diagnostics shall include the standard Windows OS tools like Windows
Diagnostics, Performance monitor and Disk administrator that are provided as part of the
administrator tools.
3.2.8 Communication Failures
Time out of the RTU and the CRC errors shall be progressively counted and displayed in
a tabular report as Communication failures for each RTU. The tabular report shall be
generated at 0000 hrs every day.
3.2.9 System security and access levels
3.2.9.1 The system should provide three security levels for access for different functions:
a) Traction power controller (TPC): - To view and Control.
b) RCC Engineer To edit configuration information and to add TPCs.
c) System Engineer- To add new RCC Engineers.
3.2.9.2 Although the SCADA system with dedicated network shall be kept isolated from the
internet however being on LAN with Energy Management Server having remote access
through Railnet over other computer having internet connection , such possibility cannot
be totally ruled out hence the SCADA vendor shall study the system vulnerabilities and
build the necessary security solutions like firewalls, up to date antivirus software, no
remote/e-mail/internet access, user access codes/passwords in the master station software
and hardware so that any possibility of a cyber-intrusion or attacks is eliminated.
However the EMS server will sync the SCADA server for updating the data base created
for storing traction energy details. Energy meters / transducers installed in the RTU will
update the energy parameters of the Posts in the SCADA server.
Page Number 19
Page 20
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
3.2.9.3 Suitable firewalls to be provided to secure the RCC servers & workstations. Hardware
firewalls should be employed for external interfaces.
3.2.9.4 The features and other details of the firewall proposed shall be approved by RDSO at the
time of design drawing approval of first SCADA system developed by any vendor. The
features shall be verified by RDSO at the time of type testing.
3.2.9.5 In addition to above backup and recovery procedures shall also be well defined by
SCADA vendor and purchaser shall be trained about the security threats and
vulnerabilities involved in the systems.
3.2.10 Manual Input:
Facility for marking (Manual input) shall be provided for any alarms, equipment status
including manually operated isolators, measurands and limit-settings, through keyboard.
3.2.11 Status Information:
Details like device name, current value/status, scans status (on/off scan), override status
and block status shall be displayed.
3.2.12 Block/De-block of RTU & control for devices:
Facility shall be provided to block / de-block a control point (Circuit Breaker, interrupter
and other controllable equipment at the controlled station) which disables/enables
control operations from the RCC. Facility should also be provided to block/ de-block of
RTU. The blocked condition of any equipment shall be suitably indicated on the
monitor.
3.2.13 Boundary post operation:
When a post separates the zones controlled by two adjacent RCCs, control of
breakers/interrupters at this post will be so arranged that the breakers/interrupters can be
closed by one RCC only when an interlock is released from the other RCC. However
opening shall be possible from any of the RCC. The boundary post details shall be
furnished by the purchaser.
3.2.14 Alarm Processing and displays:
3.2.14.1 Alarms should be generated as per the configuration of the software i.e. whenever the
state of the device is found to be in the abnormal condition or any measurands set limit
is violated. In the event of failure of RTU or any equipment at RCC such as Host or
MMI an equipment alarm should appear. When both the auxiliary contacts of a device
are either in open or in closed condition, such faults shall be detected and identified as
Complementary Faults. Such conditions shall also get logged in Alarm and event list.
3.2.14.2 The alarm list shall be of two kinds current and historic.
i.
Current alarm list should contain minimum 400 entries. The list will be ordered
chronologically. Acknowledgement status of an alarm shall also be indicated in
the current alarm list.
ii.
Historical alarms list shall consist of alarms for the last one month.
Page Number 20
Page 21
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
3.2.14.3 Operator shall be able to request for display of the alarms in chronological order
starting from any given time. Provision for sorting of Historic Alarms on various
options such as station-wise, tag wise, and in chronological order should be supported.
Alarm list should be printable on users request.
3.2.14.4 Alarm acknowledgement
3.2.15
3.2.16
i.
Page wise facility for alarm acknowledgement with a single click should also be
provided in addition to one by one acknowledgement.
ii.
There should be facility to define certain alarms with audible sound or prerecorded voice to attract the attention of the operator as per user requirement.
iii.
There shall also be facility for time delayed alarm operation e.g. alarm for
Tripped Capacitor Bank CB closing reminder.
Events display
i.
ii.
The event list shall also be of two kinds current and historic, same as explained
in alarms in Para above and similar options for sorting, displaying and printing of
event reports shall also be available.
Power Block
i.
ii.
Page 22
of 66
iii.
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
iv.
It shall be possible to display or print the information of all power block details
giving clear details regarding operator's identity, time of imposition and also the
system time. Power block details shall also be stored in the database for later use.
Page Number 22
Page 23
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
c. If any device in the sub-sector is overridden, a message is given to the operator and
the AFL is aborted. The message will be Disable the overridden values in the subsector and re-start AFL.
Page 24
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
conditions and that which requires the minimum of inputs from the user during
engineering, and during initiation of AFL.
3.2.20 The protection relays installed may have communication features compatible to IEC
60870-5-103. The fault waveform data stored in the relays at TSS/SSP/SP shall be
required to send Remote Control Center through SCADA. Necessary configuration tools
for fetching the stored data in the relays and analysis of the fault waves thereof shall be
integrated part of the SCADA software. In IEC 60870-5-103, Disturbance Recorder is
available using request of Frame Type 24 & 25.
3.2.21 Printers: The SCADA software shall support a minimum of two data-logging laser
printers connected on LAN.
3.2.22 Message pad: One page shall be provided for the operator to record/add important
messages. They can also be edited and removed by the operator. The messages will be
retained by the system even if the MMI is shutdown. When it is brought up again, the
last entered message shall be viewable by the operator.
3.2.23 Data logging and Reports generation
All alarms and events shall be logged by the system. Average values of selected analog
parameters may also be stored. The duration of this logging should be settable and Log
data should be stored automatically with date (year, month and day) and time (hours and
minutes) stamp in a file. The software should be capable of generating different types of
reports. Some of the reports which may be required are: i. Summary of CBs tripping during a specified period including the relay(s) which
caused the tripping
ii. Power Block availed report.
iii. Duration during the month when the voltage went above or below 27 or 17 KV at
the TSS and SP respectively.
iv. Duration during the month when the current is exceeding full load capacity of the
transformer.
v. Energy data interpretation, MD violation.
3.2.24 Voltage profile at TSS, SSP, SP & ATP:
Recording of Voltage Profile at TSS, SSP, SP & ATP shall be done and stored in the
RTU. Minimum duration for monitoring shall be 48 hours. The voltage parameter shall
be recorded when voltage is below 19 kV and above 28 kV. Voltage between 19 kV and
28 kV shall be considered as normal and hence no recording requires. It shall be possible
to display these values in form of Graph and Tabular report as and when required.
Filtering of voltage profile data shall be done by date and time. It shall be possible to
read from Voltage-Time graph the time and duration of low/high voltage along with
values.
3.2.23 Help functions:
On-line help and tutoring guide should be provided for all major functions in the MMI
using the HELP option. The help sections will guide the operator for any specific help
for carrying out certain tasks.
3.2.24 Tabular displays, Current & Historical trends diagrams/graphs:
Page Number 24
Page 25
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
3.2.24.1 The software shall be capable of providing tabular Display of data of a controlled
station e.g. equipment status, alarms and measurands.
3.2.24.2 The time versus value plot of measurands in a separate colour including the arithmetic
values on the measurands such as multiplication shall be displayed in a trend diagram.
3.2.24.3The trending shall include both historical trending and dynamic trending of current data.
The dynamic (current values) trending shall be for duration of one hour. For Historical
trend, average value of data shall be logged at the interval of 5 mts duration.
3.2.25 Failover of dual hot-standby systems
3.2.25.1 Hot standby systems shall be designed to improve the reliability of SCADA system by
having back-up machines that automatically takes over when the primary fails. The
standby systems for the main server shall ensure that there will be no loss of data,
alarms, event etc. due to the failure of primary server and data shall be updated normally
after the failure occurs. In the event of failure of primary server, the stand by server
computer system automatically takes over including the data acquisition and the
communication with RTUs over the existing channels. In any case the changeover from
main to standby computer shall not take more than 60s from the point of view of
SCADA system working. The failure of primary server shall be displayed on all MMIs
along with suitable alarm indication.
3.2.25.2 The system shall also support dual Ethernet LAN wherein each computer shall have
two LAN interfaces. From each computer, one LAN interface will be connected to first
network switch and the second interface to the other switch. After achieving this
connectivity, it shall be ensured that any failure of one LAN interface of computer, any
one LAN wire, any one LAN switch should not cause permanent break in LAN
connection between any two machines. In any such condition, the system should be able
to restore alternate LAN route within 30 seconds, also none of the equipment should be
declared offline/disconnected during LAN failure.
3.3
3.3.1 Full graphic, colored displays of controlled stations shall be provided by the software.
The display shall include ON/OFF status of equipment, (such as feeder CB trip, ac and
dc fail/low, RTU fail, communication fail, machine down etc.), alarms, measurands and
names of the controlled stations.
3.3.2 There shall be facility for viewing display of full section, suitably condensed to fit screen
size. This condensed picture shall be displayed on the MMI when called by the operator.
Condensed diagram may have fewer details as compared to the normal display but
operator shall be able to control any of the devices and accept / acknowledge any alarm.
Page Number 25
Page 26
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
3.3.2.1 If number of controlled stations is too large then the condensed picture for full section
may be displayed on two or three pages.
3.3.3 Alarms for circuit breaker(s) tripping(s) shall be displayed on MMI screen in addition to
flickering of circuit breaker symbol(s) till operator acknowledges the same. The
telecommand points like CBs, Interrupters etc shall be displayed with the distinct colour
schemes & attributes e.g.
Point blocked from control - distinct color
Alarm state - Blinking with distinct color
Alarm state and acknowledged - with distinct color
Point has complementary fault - distinct color
Point value non-current since the RTU is down. - Distinct colour
3.3.4 In addition of above the SCADA software shall be fully capable/ configurable of
showing different alarm states and their acknowledgement in a distinct color and display
attribute like blinking etc.
3.3.5 The software shall be capable to provide tabular display of data of any controlled station
e.g. equipment status, alarms and measurands. It shall also be capable of generation of
current trend diagrams (the time versus value plot) of single or multiple measurands.
Page Number 26
Page 27
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SECTION 4
COMMUNICATION MEDIUM
4.0 Telecom Arrangement for High speed SCADA (Up to 19.2 kbps)
4.1 Purchaser shall arrange communication medium between RCC and RTU. For this purpose
existing OFC network shall be used between RCC & way station nearest to RTU locations.
OFC has been laid along the track and terminated generally in OFC huts at way stations.
These OFC huts house STM1/4 equipment which are provided in short haul configuration
enabling extension of E1 to way stations. PD MUX are provided in the OFC huts which will
be used to provide RS 232c/V.24 connectivity for SCADA working. The connectivity from
OFC hut to RTU locations is on copper cable.
4.2 The communication setup for implementing high-speed communication is achieved through
the use of line drivers/ digital short haul modems and RS232c / V.24 cards (slow speed data
interface as per RDSO Specification IRS-TC-68/2012). The low speed interface data cards
are installed in the PDMUX. The interface is configurable as multi drop polled data circuits
used in SCADA applications. The purchaser shall provide necessary PD MUX and low
speed data card. These cards provide RS232c / V.24 interface, which will be connected to
the line driver to be installed in the OFC hut. The line drivers enable RS232c
communication over distances of up to 4 -5 km. (depending upon the condition of cables).
Corresponding line driver installed at RTU location receives these signals and converts it
back to RS232c signal, which is then connected to the RTU equipment.
The telecom scheme is depicted in the diagram given below.
Divisional HQ
(RCC Location)
Line driver/
Digital
Modem
RS 232c
WAY Station 1
Line driver/
Digital
modem
RS 232c
Line driver/
Digital modem
Heading
RS 232c
RTU
SCADA
Server
RTU
RCC Location
Copper cable
Copper cable
Line driver/
Digital Modem
Line driver/
Digital Modem
Line driver/
Digital Modem
RS 232c
RS 232c
RS 232c
WS-C6504-E
WS-C6504-E
FAN
STATUS
FAN
STATUS
Way Station N
WS-C6504-E
FAN
STATUS
2
1.7 in.
1.7 in.
1.7 in.
FAN-MOD-4HS
FAN-MOD-4HS
FAN-MOD-4HS
STATUS
LINK
LINK
LINK
LINK
LINK
LINK
LINK
E1
E1
LINK
8 PORT VOICE T1
OFC
E1
WS-X6608-T1
STATUS
LINK
LINK
LINK
LINK
LINK
LINK
LINK
LINK
8 PORT VOICE T1
E1
To Stn. 2
To Stn. N-1
E1
WS-X6608-T1
STATUS
LINK
LINK
LINK
LINK
LINK
LINK
LINK
LINK
8 PORT VOICE T1
STM1
STM1
STM1
Telecom Room
Telecom Room
Telecom Room
Figure: Telecom scheme for high speed (9.6/ 19.2 kbps) SCADA
In this scheme availability of RS232c / V.24 interface on PD MUX is required.
Page Number 27
Page 28
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Possibility 1: The existing PD MUX has availability of slot. In such case, compatible low
speed data card is required to be arranged and inserted in the existing PD MUX.
Possibility 2: The existing PD MUX does not have slot to provide the additional Low speed
data card. In such cases new link of PD MUXes shall be required on separate E1 link by
providing additional PD MUX at way stations from where the connectivity to RTU is
required to be extended on copper cable.
Railways/Purchaser shall provide compatible low speed data card and additional PD MUX
at way stations, in light of above possibilities.
4.3 Specification Low speed RS232c / V.24 data interface: As per RDSO specification IRS
TC-68/2012.
The digital multiplexing equipment with optical interface is provided with low speed data
interface. This interface proposed to be used for point-to-multi point low speed data
communication between RCC and stations. The interface is configurable as multi drop
polled data circuits used in SCADA applications.
4.4 Technical Requirements of Line driver/ Digital modem
1. To be used for serial data transmission with data rates from 2.4 kbps to 19.2 kbps
over a twisted pair copper cable (conductor dia. 0.5 mm) for a distance up to 5 km
2. User port: RS 232c interface
3. Line side: Interface for 2 or 4 wire copper conductor
4. Working on DC supply 48 V DC (Nominal) from S&T Battery Bank. For
uniformity, the supply voltage of Line Driver/ Digital Modem in OFC huts and
RTU, shall be 48 V DC. SCADA vendor shall provide DC-DC converter as per the
requirement.
5. Protection from surge on power supply port and communication port as the device is
expected to work in 25 kV traction areas.
Page Number 28
Page 29
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SECTION 5
REMOTE STATION EQUIPMENT
5.1
INTRODUCTION
The Remote Terminal Unit (RTU) shall be installed at TSS/SP/SSP/ATP to acquire data
from power system devices i.e. CT/PT circuits, numerical relays and device status signals.
RTU shall also be used for control of devices from Master station/RCC. The supplied
RTUs shall be interfaced with the substation/switching post equipment, communication
equipment, power supply distribution boards; for which all the interface cables, TBs,
wires, lugs, glands etc. shall be supplied, installed & terminated by the successful tenderer.
The RTUs & other equipment are subjected to severe temperature variations and
vibration conditions then the RCC equipment. Tenderer shall take care of these aspects in
his design. The prototype design of the RTU shall be approved by RDSO.
5.1.1 The RTU Hardware shall include redundant CPU modules, its associated digital
input/output modules, alarm input modules, analogue input modules, watchdog,
transducers, memory, redundant communication modems, interposing contactors,
redundant power supply units and surge arresters and other items necessary for its proper
functioning. In case of failure of CPU/PSU/Modem the redundant module will take care
without interrupting the functionality of SCADA, and an alarm for the failed module
shall be generated in the RCC and logged as event also.
5.2
5.2.1 The RTU cabinets shall be dust, rodent and vermin proof with doors. The doors shall
have proper rubber gaskets & locking arrangement. The cabinets shall have facility for
bottom entry of incoming/outgoing cables for operation of the equipment. The stainless
steel sheets of thickness not less than 1.6 mm as per IS: 6911- 1992 with mill finish of
number 1 shall be used for making the cabinets of RTU for Mumbai area. Suitable
reinforcements shall be provided wherever necessary. Except Mumbai area, the RTU
shall have cabinets made of CRCA sheets with powder coating. All panels shall be
indoor, and meet IP 51 class of protection.
5.2.2 The RTU for TSS/SSP/SP shall be floor mounted (At ATP & in Sub-urban area, the RTU
cabinet shall preferably be wall mounted type) and every endeavor shall be made by the
manufacturer to offer as small a cabinet as possible without compromising on
maintainability and serviceability of the RTU equipment. There shall preferably be only
one RTU cabinet housing all equipment. All enclosures shall conform to minimum
protection class IP 51 as per IEC 529. The interior of the panel shall be lighted using a
CFL lamp by a door controlled switch for maintenance purposes.
5.2.3 Modular type of construction shall be adopted to facilitate unit replacement of devices
wherever required. Surface mounted technology (SMT) shall be used for higher level of
reliability. Standard plug-in and connector arrangement shall be made for the printed
cards.
5.2.4 All electronic modules shall be mounted vertically and fixed on the main frame of the
cabinets. The RTU housing internal design shall be according to isolation needs and
space restrictions therefore generally only standard 19 inch racks with integrated
Page Number 29
Page 30
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
terminals shall be used for reducing the wiring. Suitable check points/ diagnostic
indications shall be provided on the cards for monitoring its healthiness.
5.2.5 All internal RTU control circuits and wiring of DI/DO & other signal circuits between C
& R panel and RTU shall be with 0.75 sq mm, 1100 Vac/ 1500Vdc grade PVC insulated
copper conductors conforming to IS 694.
5.2.5.1 RTU shall be wired with 1.5 sq mm PVC insulated copper conductors conforming to IS
1554 Part-I, 1100V ac/ 1500Vdc grade (screened wherever necessary) only for main
incoming 110Vdc & 240 V ac power supply (4 sq mm only for CT wiring).
5.2.5.2 The bunch of wires/cables shall be neatly dressed, laid in plastic trays and supported
suitably. Separate wire bunches shall be run for ac, dc, control and data circuits. Caution
plates & name labels shall be provided, wherever necessary.
5.2.6 Proper protection by providing MCBs (of ABB, Siemens, Schneider make only) to
different supply circuits shall be ensured.
5.3
5.3.1 The RTU shall be designed for handling telecommands, telesignals and telemetered
parameters as per the details given in this specification. All the changes (one or more) in
the status of the circuit breakers / interrupters /motor-operated isolators and alarms that
may occur between consecutive polling shall be stored by the RTU until they are reported
to the master stations along with their time of occurrence. Moreover a minimum of 400
events shall be stored in the RTU memory sequentially, in case of communication failure,
for reporting to the master station. For TSS, minimum 1000 events should be stored. The
events should also be stored in non-volatile memory so that these can be transferred to
RCC even if the RTU is power cycled.
5.3.2 RTU shall use IEC 60870-5-101 protocol for communication with RCC. The RTU shall be
configurable to report analog & status changes by exception to RCC. However, RTU shall
also support periodic reporting of analog data and periodicity shall be configurable from
10 sec to 1 hour. Digital status data shall have higher priority than the Analog data. The
dead-band for reporting Analog value by exception shall be settable from 1% to 10% of
the previously polled value. In addition, analog values shall also be reported to Master
station by exception on violation of a defined threshold limit.
5.3.3 RTU shall support Maximum Demand (Apparent power) calculation based on 5 to 60
minutes window periods based on inputs received from energy/power transducers. The
value of MD shall be reported to RCC after each window period. The energy transducers
having window period of 15 minutes may be used. Energy meter on HV side provided at
TSS can be used for MD value by interfacing with RTU through RS485. Methodology of
time synchronization between Electricity Board (EB) meter and Traction Sub-Station
(TSS) meter shall be explored and implemented by SCADA vendor for matching the MD.
Location of CT/PT may not be same for EB and TSS meters.
5.3.4 Initialization pulse to the CPU shall be given at predefined interval so that the CPU gets
reset automatically in case it halts due to any reason.
5.3.5 RTU firmware shall be capable of being reconfigured (under password control) locally
from the laptop/portable programming device and from the Central Master Station by
Page Number 30
Page 31
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
using RTU Maintenance Software. SCADA tenderer shall furnish authentic copies of RTU
firmware in CD/DVD to the purchaser. Document regarding File formats shall be
submitted along with design/ drawings of SCADA to RDSO for approval.
5.3.6 The RTU shall have self-monitoring/diagnostic for fault conditions. This shall provide
various details such as status of ROM, data bus, RAM check, battery low,
defective
cards etc. The RTU should generally support the test procedures as per standard protocol
IEC 60870-5-101. SCADA vendor shall submit the details of specific diagnostic function
to RDSO at the time of design document and drawing approval.
5.3.7 RTU shall be capable of locally implementing miscellaneous traction power control and
protection needs e.g.
i.
ii.
Operating System,
firmware
Diagnostic LEDs
Digital Input Card
General
Page Number 31
Page 32
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
No. of channels
Voltage sensing
Isolation
Protection
LEDs
Channel scanning period
Debounce filtering
Anti-chatter algorithm
Digital Output Card
Output Characteristics
Pulse durations
Isolation
LEDs
Analog input card
Number of channels
A/D converter
Isolation
Protection
LEDs
Accuracy
Vendor should submit the details of above i.e. Processor, RAM, Non-volatile memory
etc. in bill of material at the time of design drawing approval.
5.3.9 The RTU address shall be configurable. The RTU address should not be lost in case of
power swings or surges. It shall be possible for the purchaser to reconfigure the address
for the remote station. (The tenderer shall train the purchaser in the setting, configuring
of the RTU's.)
5.3.10 The RTU shall be compatible to implement serial MODBUS RTU communication with
the third-party meters, such as the one installed by State Electricity Boards.
5.3.11 Time accuracy of RTU time stamp shall be 1ms. A separate test to certify this would be
specified.
5.4
5.4.1 The RTU shall be capable to operate on 110 V dc (with +10% to 20% variation) supply.
The different voltage levels required for operation of various cards/modules of RTU
shall be provided by this PSU. The design of PSU shall enable easy troubleshooting and
replacement in case of failure.
Page Number 32
Page 33
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
5.4.2 The failure of PSU may lead to total shut down of the RTU hence the design and
selection of components for PSU shall be such as to achieve zero failure under extreme
service conditions. In no case the required output voltage level of PSU should drop
below designed value while taking on load. Overloading by any module due to its
internal failure should not cause the total failure of PSU.
5.4.3 The PSU shall have suitable EMI filters capable of filtering all switching surges,
electrical noise and high frequency transients.
5.4.4 The output voltage regulation shall be of the order of 1% from no load to 120 % load for
each class of the voltages. The ripple factor shall be less than 1% for 120 % loaded
conditions.
5.4.5 The PSU shall be designed for 120% of the load rating for 15 min. The PSU shall have
fold back characteristics beyond this.
5.4.6 The Power supply should be able to withstand momentary short circuit (longer than
20ms), and recover automatically once the short circuit condition is eliminated.
Particular output voltage level should be able to withstand overloading/ short circuit
condition caused by any card/ module. It should keep off the particular output voltage
level circuit only till elimination of overload/short circuit condition and thus not leading
the total failure of PSU.
5.4.7 Technical Particulars, characteristics and any other details of the PSU shall be submitted,
to the RDSO at time of design approval.
5.5
5.5.1 Interposing contactors/relays for operating the closing and tripping circuits shall form
part of the SCADA equipment. The contactors/relays shall be suitable for 110 V dc
supply varying from + 10 % to -20 %. The contacts of relays shall have a continuous
current carrying capacity of 5 A, making capacity of minimum 10 A and breaking
capacity of 2 A inductive load. Suitable spark quenching circuit shall be provided to take
care of breaking inductive loads.
5.5.2 The independent Transducers/Multi-Function Transducers (MFT) required for acquiring
Analog inputs from CT/PT shall also be supplied by the tenderer. Technical Particulars,
characteristics and any other details of the transducer shall be submitted at time of design
approval.
5.5.3 The transducers shall be selected for nominal 110 V ac (Ph-Gr voltage) and 1A/5A
CT/PT inputs. The transducers shall be suitable for 20% continuous over load and shall
be able to withstand 20 times the normal current rating for a period of one second. It
shall be able to accept the input voltages up to 120% of the nominal voltage. The
transducers offered shall have low VA burden. Transducers shall provide at least the
following parameters as a minimum with the specified accuracies.
Sl. No.
(i)
(ii)
Parameters
Voltage (Each phase to neutral and phase to phase)
Current (each phase)
Accuracy
0.5%
0.5%
Page Number 33
Page 34
of 66
(iii)
(iv)
(v)
(vi)
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
0.5% / 1%
1% / 2%
0.5 lag to 0.5 lead
110 V dc
5.5.3.1 Transducers shall be provided with RS485 interface to communicate with RTU over
Modbus protocol in multi-drop mode if required in future.
5.5.3.2 The multi-function transducers shall generally comply to the test requirements as per
latest IEC/IS standards including IEC 60687/IEC 60688/IEC 801-4/IEC 801-3.
5.5.4 The terminals required for interfacing the controlled stations with RTU at TSS shall be
provided by the Purchaser in the control and relay panel at TSS. The terminal at SP / SSP
shall be provided on a terminal board mounted on the wall inside the masonry building at
SP / SSP. The supply of cables and wiring between the control and relay panel / terminal
board and RTU shall be done by the successful tenderer. The wiring shall conform to
clause 5.2.5 above.
5.5.5 Tenderer shall provide a separate maintenance free low resistance earth for RTU as per
Specification no. RDSO/PE/SPEC/PS/0109 (Rev 0)-2008 with Amendment No.1
(28.10.2010) or latest for maintenance free earth for electrical installation. The RTU
body/frame shall be suitably connected to the separate earth and it shall be further
connected to the TSS earthing grid by copper flat of 25x3 mm for making them equipotential. Similarly the communication equipment ground shall be connected to the
signal ground of the incoming signal line. Overall responsibility to ensure suitable design
of RTU earthing arrangement to avoid failures of electronic cards etc. in RTU shall be of
the tenderer.
5.5.6 Protection against Surges
i.
The power supply unit/DC-DC converter of RTU shall have internal protections
against under voltage, over voltage, overload and short circuits in addition to
adequate protection against surges and lightening in compliance of IEC-61643-12,
61312 & 61024 and VDE-0100-534 as applicable.
ii.
In signaling line surge protection device of class D type shall be provided as per
IEC 61643-21 & VDE 0675 Pt 6.
Page Number 34
Page 35
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SECTION 6
TELECOMMANDS, TELESIGNALS, MEASURANDS
A6
A6.1
EQUIPMENT CAPACITY
A6.1.1 The SCADA equipment shall be designed for the following typical capacity of
telecommands, telesignals and telemetered parameters for a TSS, SSP and SP of double line
section. The figures given below may vary depending on the layout of TSS, SP and SSP in a
particular section, which could have single, three or more tracks, the details of which will be
given by the purchaser in the tender document. The RTU shall be wired and ready for use as per
the input/output list specified in the project or specified below. The RTU panel shall be
complete with relays, contactors, transducers etc. for the quantities as indicated in a contract.
Sr. No.
Controlled
Telecommands
Station
(DO)
1.
TSS
48#
2.
SP/SSP
16#
# These telecommands include both ON and OFF.
Telesignals
(DI)
96
32
Measurands
(AI)
8
4
A6.1.1.1
There shall be provision of spare AI, DI and DO cards/modules in RTU, in
addition to above as explained below.
Type Nos.
DI
DO
AI
1
1
Card/module
of Remarks
minimum capacity
16 for TSS & 8 for Spare cards/module complete with RTU
SP/SSP
wiring and contactors (for minimum
capacity) shall be provided.
8 for TSS/SP/SSP.
4 for TSS.
AI cards/module without transducers, for
future requirement of measurands like
energy parameters, battery charger
monitoring etc. IEDs/Energy Meter may
also be used to increase the accuracy &
reliability.
Some lump sum spares may be kept at RCC apart from (instead of) providing spare AI/DI/DO
cards in the RTU since it is practically not possible to ensure healthiness of so many cards over
a long period.
A6.1.2 Spare capacity shall be readily available to the purchaser and realized by simply
configuring from the software.
A6.1.3. The SSP and the SP RTUs shall be identical for the purpose of interchangeability and
standardization. TSS RTU design may be different.
A6.2
Typically following telecommands (ON & OFF) shall be provided at TSS/SSP/SP as per their
requirement/availability at any post.
Page Number 35
Page 36
of 66
S.No
1.
2.
3.
4.
5.
6.
7.
A6.3
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Details of telecommands
HV CBs
25 kV CBs
25 kV Interrupters
Auto reclosore release with lock out indication
Transformer tap changer (progression/regression)
Interlock release request at boundary post
To by pass panto flashover relay
TYPICAL REQUIRMENT OF TELESIGNALS
Typical telesignals at TSS/SSP/SP shall be for the following points as per their availability at
any post.
S.No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Details of telesignals
110 V dc low
240 V ac fail
Catanery indications
Transformer alarms
Transformer faults
Transformer & feeder CB trip circuit failure
Feeder CB operated on Distance Protection Relay (DPR)
Feeder CB operated on Over Current Relay (OCR)
Feeder CB operated on Wrong Phase Coupling (WPC)
Feeder CB operated on panto bridging
Feeder-PT. fuse fail
Transmission line PT fuse failure (if applicable)
Transformer tap positions
Auto recloser locked out
Panto Flashover Protection Relay By-passed
A6.3.1 In addition to above, the acquisition of telesignals associated with telecommands as per
Para 6.2 above shall also be required.
A6.4
The real time values like Active power, Reactive Power, Current, Voltage and power factor will
be acquired periodically by RTU from transducers. However, the kWh and kVARh readings will
be acquired at a rate configurable from 5 to 60 minutes in a step of 5 minutes with initial setting
as 15 minutes.
The respective RTUs shall be designed to telemeter the measurands as explained below.
A6.4.1 TSS
a)
b)
c)
d)
Page 37
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Note: - A particular project may require certain additional parameters to be handled in a special
way. It would be vendor's responsibility to understand and implement these requirements.
A6.5 Some of the telesignals (alarms / status inputs) have been discussed below for vendors
clarity.
A6.5.1 110V dc low
This indication shall appear when voltage of 110V battery falls below preset level of 103V
and/or 110V battery charger fails to deliver the output either due to failure of 240V ac input or
defect in the battery charger for a pre-defined period. The dc low alarm shall only be displayed
when the dc low voltage persists for more than 5 minutes.
A6.5.2 240V ac fail
This indication shall be telesignalled in case the alarm persists for a predefined period of 5 min.
For this purpose hardware timer may be used.
A6.5.3 Catenary status alarms
Outdoor type 25 kV/100V, 30 VA PTs are installed at all controlled stations (i.e. TSS/SP/SSP)
by the Purchaser for monitoring the catenary status.
A6.5.4 Feeder P.T. fuse fail
Failure of individual fuse of above PTs shall be monitored by the RTU. If associated relay has
not the facility of PT Fuse fail output then PT fuse fail indication shall be generated through
rectifier and no-volt relays.
A6.5.5 Transmission line PT fuse fail (wherever required)
Similar arrangement as explained in above Sub Para shall be adopted.
A6.5.6 Power Transformer alarm.
Page Number 37
Page 38
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
These telesignals shall appear in case of initiation by Buchholz relay, oil temperature indicator,
winding temperature indictor or oil level indicator. Necessary auxiliary contacts of various
relays/ indicators suitably wired up and terminated on the control and relay board at traction
substation shall be provided by the Purchaser.
A6.5.7Transformer Faults
These telesignals shall appear in the event of fault in the transformer resulting from operation of
inter-trip relay initiated by differential relay, earth leakage relay on HV or 25 kV side of the
transformer, Buchholz relay, winding temperature indicator, oil temperature indicator of IDMT/
instantaneous over current relay on HV side.
Note:- Separate telesignals shall be provided for each fault if demanded by purchaser.
A6.5.8 Transformer Trip circuit 110 V dc failure.
This indication shall appear in case of failure of 110 V dc supply to the trip circuits of 220 / 132
/ 110 / 66 kV or 25 kV transformer circuit breakers.
A6.5.9 Transformer tap positions
The conventional transformer tap changer switch has six tap positions. For each tap position one
NO type contact is provided. At any tap position, only the corresponding NO contact will
remain closed and the remaining contacts will remain open. Alternatively the traction power
transformers at TSS may be provided with AVR (automatic voltage regulator) operated on load
tap changer (OLTC) details of interface of which shall be furnished by purchaser.
A6.5.10 For future use RTU shall also be upgradable to receive 4 -20 mA, 0 -20mA, 0- -10mA,
0-+10mA, 0-5V as analogue inputs to acquire transformer tap position, winding temperature, oil
temperature etc. (if the above specified output is made available from OLTC, winding & oil
temperatures interfaces to RTU). In such case suitable circuitry shall be designed in RTU as per
details furnished by purchaser.
A6.6 Other relevant requirements
A6.6.1 The closing and tripping circuits of the circuit breakers, interrupters and motor- operated
isolators are designed to operate off 110 V battery supplies, the batteries shall be provided by
the purchaser.
A6.6.2 The protective relays like OCR, DPR and WPC reset themselves immediately after
operation. These relays are fast acting relays; circuit should be able to respond to input
stimulation for short time. Suitable anti bouncing filters should be provided for avoiding
repetitive alarms. The RTU shall be set to capture contact operations of 20 ms or more duration.
A6.6.3 For under-voltage monitoring at the SP, the catenary voltage sensing shall preferably be
done through rectifier and solid - state comparator circuits so designed that the de-energized
indication on the MMI appears at a voltage selectable between 50% and 70 % and disappears
between 60% and 80% of the rated voltage viz. 100 V ac.
A6.6.4 Other than special telesignals as explained in Para 6.5, the balance telesignals shall be
acquired through opto-couplers. The rectifiers, comparator circuits, no- volts relays, optocouplers, timers shall form part of the RTU.
Page Number 38
Page 39
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
B6
B6.1
B6.2
The above figures may vary depending on the layout of TSS, SP, SSP and ATP in a
particular section, which could have three or more tracks, the details of which will be
contained in the particular specification referred to in clause-10 hereof.
6.4.2.3 The number of parameters to be commissioned initially may be less than the
above figures and the balance designed capacity shall be available for future use. A
typical requirement of telecommands, telesignals and telemetered parameters on a
double line section is at Annexure-I.
B6.3
DESCRIPTION
Telecommands
220/132/110/66 kV circuit breakers
25 kV circuit breakers
25 kV Interrruptors
Auto-recloser Release with locked out
indication
Transformer tap changer
Interlock release request at boundary post
TSS
SP
SSP ATP
2 (3)*
10 (9)
2
4
2
2
-
5
-
2(3)
(as
applicable)
4 (3)
4
8**
* The figures given in the brackets are for traction substation having three single phase
(V-connected) transformers.
The figures given outside the brackets are for traction substation having two scottconnected transformers.
SN DESCRIPTION
TSS
SP
SSP
B. Telesignals (For details of telesignals actually required, clause 5.5.1 may by
refered to)
C. Telemetered parameters
1. 25 kV Bus/OHE voltage
2
2
2. Feeder current
2
-
ATP
8
Page Number 39
Page 40
of 66
3.
4.
Spares
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
4
Total 8***
2
4***
Page 41
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
From each SP
1. 110V dc low..
2. 240V ac fail
3. Catenary-1 fail
4. Catenary-2 fail
5. Catenary-3 fail
6. Catebary-4 fail
7. AT-1 Alarm
Page Number 41
Page 42
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
8. AT-1 Fault
9. AT-2 Alarm
10. T-2 Fault
11. At-3 Alarm
12. AT-3 Fault
13. AT-4 Alarm
14. AT-4 Fault
15. CB.1 Locked out due to low gas/air pressure.
16. CB.2 Locked out due to low gas/air pressure.
For details of AT-1 to 4 Alarms and At-1 to 4 Faults, explanation given in clause No.
B.6.4.1.I(b) (iv) may be seen.
III. From each SSP
1. 110V dc low
2. 240V ac fail
3. Catenary-1 fail (wherever required)
4. Catenary-2 fail (wherever required)
5. AT-1 Alarm
6. AT-1 Fault
7. AT-2 Alarm
8. AT-2 Fault
For details of AT-1 to 2 Alarms and At-1 to 2 Faults, explanation given in clause No.
5.5.1.I.b (iv) may be soon.
IV. From each ATP
1. AT-1 Alarm
2. AT-1 Fault
3. AT-2 Alarm
4. AT-2 Fault
5. 240V ac fail
6. 110V dc low
For details of AT-1 to 2 Alarms and At-1 to 2 Faults, explanation given in clause No.
5.5.1.I.b (iv) may be seen.
B.6.4.2 The protective relays viz. OCR, DPR and delta-I relay reset themselves immediately
after operation.
B6.4.2 Amongst the above tele-signals, the monitoring of dc low Indications shall be through
solid-state comparator circuits, while that of a.c. fail and PT fuse fail indication
through rectifier and no-volt relays, and that of catenary supply indications through
rectifier and solid-state comparator circuits. Monitoring of the balance indications shall
be through 110V dc interposing relays. The rectifier, comparator circuits, no-volt relays
and interposing relays shall form part of the RTUs.
B6.4.3 The terminal required for interfacing the controlled station with RTU at TSS shall be
provided by the railways in the control and relay panel at TSS. The terminal at
SP/SSP/ATP shall be provided on a terminal board mounted on the wall inside the
masonry building at SP/SSP/ATP. The supply of cable and wiring between the control
and relay panel/terminal board and RTU shall be done by the successful vendor. The
cable shall conform to IS:1554.
Page Number 42
Page 43
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SECTION 7
TESTING AND COMMISSIONING
7.1
INTRODUCTION
7.1.1
For any tenderer developing first SCADA system as per this specification, RDSO shall
conduct all the tests stipulated in clause Nos. 7.2.1 to 7.2.3.
7.1.2
The successful tenderer shall be required to submit the complete design details along
with drawings for approval of RDSO prior to proto type testing for first SCADA system.
Only after the designs and drawings have been approved and clearance given by RDSO
to this effect, the manufacturer shall take up manufacture of the prototype unit.
7.1.3
7.1.4
7.1.5
Before giving the call to RDSO/Purchaser representative for inspection and testing of
the prototype of the system, the manufacture shall submit a detailed test schedule
elaborating tests to be conducted in house and at outside agencies.
7.1.6
During the process of type testing or even later, RDSO representative reserves the right
to conduct any additional test(s) besides those specified herein, on any equipment / subsystem so as to test the system to his satisfaction or for gaining additional information
and knowledge. In case any disagreement arises between the manufacturer and
RDSO/purchaser during the process of testing or regarding the type tests and/or the
interpretation and acceptability of the type test results, it shall be brought to the notice of
the Director General (Traction Installations) RDSO, whose decision shall be final and
binding.
7.1.7
Only after clear written approval of the prototype unit based on results of the type tests,
the manufacturer shall take up bulk manufacture of the ordered equipment - which shall
be strictly with the same design, material and process as adopted for the prototype units.
7.2
7.2.1 Type Tests on RTUs: These are further divided into following categories.
a) Communication Protocol testing.
b) RTU functionality Tests.
c) Environmental, EMI& EMC testing of RTU.
Page Number 43
Page 44
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
a) Communication Protocol testing: All the important services as per IEC 60870-5-101
shall be verified. RTU shall be tested for its proper communication with relays / IED
compatible to IEC 103 & MODBUS. IEC 60870-5-101 compliance report for the
complete SCADA system shall be generated. IEC 60870-5-101 interoperability
document shall be submitted along with design drawing document for approval. All
testing shall be done in presence of RDSO representative.
(i) The Master station cum RTU simulator tool shall be used to test the communication
interfaces of Master station, RTU and Protection relays. The Master station simulator
tool shall be capable of emulating the master station for IEC 60870-5-101, IEC 60870-5103 & IEC 61850 protocols including MODBUS. The RTU simulator shall be capable of
emulating the slave protocols for the IEC 60870-5-101, IEC 60870-5-103 for Protection
relays and IEC 61850 protocols s. It shall also be possible to prepare illegal messages for
transmission, such as messages having invalid checksum.
(ii)The protocol analyser shall be used to monitor all communication traffic on a channel
(between Master station & RTU and between RTU & protection relays without
interfering channels operation. Channel traffic captured in the active or passive modes of
operation shall be displayed.
(iii)
The Master station simulator and protocol analyser tool shall also have following
features:
Each received message shall be checked for validity, including the check sum.
The tool shall maintain and display error counters so that the number of errors
during a period of unattended testing can be determined.
All fields of a message shall be displayed. A pass/fail indication for the message
shall be included.
Page 45
of 66
1.
2.
3.
4.
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ON
ON
ON
2 kV
1 kV
2 kV
2 kV
1 kV
2.5 kV
1 kV
2.5 kV
A
A
ON
Level
3
+/- 6 kV in contact
discharge mode or +/- 8
kV in air discharge
mode
10 V/m electric field
strength
ON
Level
3
30 A/m at 1 MHz of
magnetic field strength
ON
Level
3
ON
Level
3
30 A/m of magnetic
field strength
(continuous duration
sine wave)
10V, 9 KHz to 80 MHz
ON
VR3
ON
Class
A
5% of nominal DC
Voltage
150KHz 30 MHz
OFF
OFF
2 kVp
OFF
Measure Insulation
resistance using 500 V
DC Megger before &
after Power frequency
&Impulse voltage
withstand tests.
No
break
down
or
flashov
er
No
break
down
or
flashov
er
As per
manufa
cturer
standar
d
5.
6.
7.
Radiated Electromagnetic
Field Test as per IEC 60870-21
Damped Oscillatory Magnetic
Field Test as per IEC 60870-21
Power Frequency Magnetic
Field Test as per IEC 60870-21
8.
ON
Level
3
Level
3
Level
3
Level
3
ENVIRONMENTAL
a.
TEST FOR RTU
14. Dry heat as per IEC 60068-2-2 ON
Continuous operation at
700 for
for 96 Hours.
Page Number 45
Page 46
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ON
ON
ON
at 400C and 95 % RH in
0
operational condition for
12 Hours
00C operational condition 0
for 16 Hours.
At high temperature at
0
500c and low temperature
at 00 c ; Dwell time in
high or low temperature
for 3 Hours. Transition of
10c per minute, and for 5
such cycles in operational
condition.
18
Vibration test with severity of weight centered endurance by sweep frequency 10-50
Hz, displacement of 0.15 mm acceleration of 2 g and of duration of 2 Hours in each
axis. (Total 6 Hours).
Page 47
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
7.2.4.1 Visual inspection: RTUs shall be inspected for the features indicated in the approved
drawings.
7.2.4.2 Tests on status modules: The auxiliary contacts of the circuit breakers and interruptors
shall be simulated by relays. The supply shall be given to terminal block for checking the
ON and OFF status in the devices.
7.2.4.3 Telecommands: After giving the control commands from simulator (PC) the operation of
corresponding interposing contactors shall be checked. The command output from RTU
to the intended controlled device shall be checked at the terminal blocks provided for the
purpose.
7.2.4.4 Insulation resistance Tests: Insulation resistance of cables shall be checked without
connecting electronic circuits between various circuits, contacts, and terminals with a
500 V megger. It should not be less than 5 mega Ohms.
7.2.4.5 RCC PC/Servers/Printers/Laptop etc shall be checked as per approved drawings.
7.2.5 TESTS AFTER ERECTION AND COMMISSIONING:
7.2.5.1 Tests shall be carried out during/ erection/commissioning of the equipment at site on the
complete system in the presence of the purchasers representative to check the proper
erection and successful commissioning of the equipment. These tests shall be carried out
to check the compliance of the SCADA system with the stipulations made in the
specification/drawings.
7.2.5.2 Command operation time shall be measured.
7.2.5.3 Complete SCADA system working after full configuration shall be verified.
7.2.5.4 System response to abnormal conditions, hot and standby switchover, self check and
diagnostic features etc. Implementation of special logics shall also be verified.
7.2.5.5 RDSO shall also witness the erection & commissioning tests for first system developed
as per this specification.
7.3 PACKING & DISPATCH
i.
Each RTU panel shall be packed in a wooden crate after wrapping it in Foam sheet & a
polyethylene sheet. Wood used for crating should be 15-20mm thick, 75mm wide.
Separation between wooden stripes should be between 150-200mm
ii.
iii.
iv.
Each crate should have proper identification code and a list kept in side it giving details
of contents of the box and site for which it is meant.
Page 48
of 66
i.
ii.
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
The erection and commissioning of SCADA equipment shall be done by the successful
tenderer who shall arrange all tools, plants instruments and other material required for
the purpose at his cost.
If any testing or measurement on SCADA system communication equipment is needed,
same shall be carried out by the tenderer along with purchasers representative for
satisfactory working of the system.
Page Number 48
Page 49
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SECTION 8
TRAINING, MAINTENANCE AND WARRANTY
8.1 TRAINING OF RAILWAY STAFF
The successful tenderer shall train two Engineers and six Supervisors of the Purchaser, free
of cost at manufacturers works. The total duration of training shall be 2 weeks, of which
approximately 1 week will be at manufacturers work and 1 week will be at site. The cost of
travel & stay shall be borne by the purchaser. Any other training requirement shall be
specifically mentioned by purchaser.
The training shall broadly cover following aspects.
a) Identification of the various cards & components of a RTU.
b) Erection, commissioning and wiring of RTUs and trouble shooting of the RTU.
c) Configuration of addresses of the RTUs, future expansions of the RTU and setting up of
additional telesignals and telecommands.
d) Using the test instruments to check the communication cable performance parameters.
e) Training in operation of RCC software and MMI display functions.
f) Training in configuration of SCADA software, changing the setting of the software,
generating various reports etc.
g) Formatting of hard disk, loading of the Operating system, loading of the basic SCADA
application software and taking back up of files.
h) Operation & maintenance instructions recommended by OEMs of different SCADA
sub-systems.
8.2
Two laptop computers as specified in clause 2.2.11.2 for trouble shooting of the
faults of RTU and the SCADA system.
Two signal level meters (dB level meters) suitable for measurements on copper
cables.
One portable dual trace oscilloscope ( 2-channels, bandwidth 25 MHz, minimum
sampling rate of 50 MS/s)
Four digital multi meters Megger M 7027 / Fluke 27/Yokogawa 732 series only.
Full technical details of the instruments shall be furnished along with the offer.
If the model gets obsolete, the subsequent released model shall be applicable.
8.2.1 The Successful tenderer shall supply 6 sets of maintenance manual, troubleshooting
charts and guide lines for reliable and trouble free SCADA system operation including
all sub components of the system to the purchaser.
8.3
Page Number 49
Page 50
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
In order to give proper maintenance support, AMC for a period of four years (excluding
warranty period of three years) shall be part of the contract. The AMC shall be for
complete SCADA system including RTU, RCC Equipments i.e. computers, RCC/RTU
software and all other associated equipment like UPS, Modems, battery etc. Details of
AMC clauses such as payment conditions, bill paying/passing authority, the extent of
responsibility and other relevant aspects shall be included in tender documents.
8.3.1.1 The RCC equipments shall require replacement due to rapid change in technology,
ageing and obsolescence during the period of AMC as per following periodicity:
S.No.
1.
2.
3.
Equipment
Computers along with monitors & Printers
Low maintenance lead acid Batteries
UPS
To be changed after
5th Year
6th Year
6th Year
8.3.1.2 In addition to above 10% of the total holding of the different types of cards/modules of
RTU (e.g. DI, DO, CPU, AI, PSU, Modems etc.) shall be handed over to the purchaser
after 7 years or completion of the AMC period for using as spares for remaining life of
the SCADA system. Purchaser shall define the detailed scope of AMC.
8.3.1.3 The SCADA tenderer shall include these aspects while quoting prices for 04 years AMC.
Quote for AMC and supply of SCADA system along with successful commissioning
shall be separate, for better assessment of the price of complete SCADA system.
8.3.1.4 The purchaser shall clearly define the following in the tender document.
i. Minimum acceptable down time for RCC and RTU.
ii. No. of maintenance persons and their duty hours during warranty and AMC period.
iii. No. of days in a week when the maintenance person shall remain available to attend the
system faults.
8.3.1.5 Formula for costing up gradation in the same RTU & addition of complete RTU duly
integrated with RCC to be evolved and the same shall be mentioned in the offer clearly.
WARRANTY
8.3.2 The complete SCADA System with all parts and accessories supplied against a purchase
order/contract against the tender in which this specification is quoted, irrespective of
original individual equipment (imported/indigenous) shall be guaranteed for trouble free and satisfactory performance for a period of 42 months from the date of supply or
36 months from the date of commissioning, whichever period is earlier. Details of
warranty clause, the extent of responsibility and other relevant aspects shall be included
in the contract. The tenderer shall furnish detailed terms and conditions in this regard in
his offer. The warranty shall be for complete SCADA system including RTU, RCC
Equipment i.e. computers, RCC/RTU software and all other associated equipment like
UPS, Modems, battery, wiring, connectors/relays etc.
8.3.3 The successful tenderer shall make necessary arrangements for spare parts modules and
other items to be kept readily available so that there is minimum disruption to the
operations.
Page Number 50
Page 51
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
SECTION 9
ENERGY MANAGEMENT SYSTEM
9.1 SCADA software shall have integrated Energy Management functionality which shall
provide a comprehensive Energy Management System that incorporates modules offering:
SCADA capability through graphical MMI interface; advanced real-time viewing capability;
data-logging and viewing of historical logs; graphing, and analysis of data; Concurrent MD
calculation and alarm.
9.2 Communication with Energy Meters shall be through RS485 port in the RTU. The
communication protocol between RTU and the Energy Meter shall be MODBUS only.
9.3 A tri-vector meter on HV side shall be part of supply. The RTUs at TSS shall be interfaced
with tri-vector meter.
9.4 Currently maximum demand is being monitored at each Traction Sub-Station and once the
MD increases beyond the limit, high penalty is imposed which can be avoided by
considering concurrent MD. The idea of conceiving concurrent MD arisen out of making an
observation on the load profile of a section. It is observed that the load increases for a very
short period due to bunching of the train in section fed by one TSS while the adjacent or
next TSS to adjacent is having very less/ no load. Thus the total load in the section if
distributed equally does not cause overshooting of MD limit and when the trains due to
geographical/ operating condition run close to each other in some part of section while the
rest of the section may not have any train, causes overshoot of MD though the total load of
the trains is more or less same.
9.5 In view of the above, a scheme has to be evolved by the successful tenderer to monitor
concurrent MD by collecting data from all HV side meters at TSS via the RTU. Necessary
software to make the scheme feasible shall be the part of this specification and to be
supplied by the successful tenderer.
9.6 Maximum Demand should either be acquired from the Energy Meter, or calculated by the
RTU. SCADA system shall time-synchronize the RTUs over communication protocol. If
energy meters provide the MD data of the current cycle then energy meters must support
time-synchronization from the RTU, else RTU shall maintain MD data of the current cycle.
Since SCADA system is synchronized with GPS system, therefore the current cycle of MD
must also be synchronized with the GPS.
9.7 Maximum error allowed in time cycle of MD is 1 second, at any given time, the ongoing
cycle of MD shall never have drift of more than 1 second with respect to GPS time.
9.8 MD calculation inside the Energy Meter / RTU must take place at least every 500ms.
9.9 The energy management software shall consist of the following functions:
9.9.1 Real-time acquisition & viewing of the following parameters:
i.
ii.
Voltage
Current
Page Number 51
Page 52
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
The energy parameters stored in the server shall be accessed from any location in Head
Quarter / Divisions / Railway Board through Railnet.
9.11
9.12
The SCADA vendor shall provide necessary application to log data into the database of
EMS server and other software application for displaying on remote terminal.
Page Number 52
Page 53
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ANNEXURE 1
GOVERNING SPECIFICATIONS
(A) In addition to specific standards mentioned in the specification the SCADA equipment and
components thereof shall generally conform to the latest edition of bureau of Indian Standard
Specifications mentioned below:
IS:1554
IS:1765
IS:3700
IS:3895
IS:4007
IS:5051
IS:5786
IS:9521
Metal clad base material for printer circuits for direct current.
IS:9638
IS:9891
IS:10482
IS:2071
IS:3043
IS: 8828
EN 60950
EN 62040-2, EN 61000-32,3-3, 6-2, 6-4
EN 62040-3
24 core underground
Page Number 53
Page 54
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Surge protection
IEEE 802
standards
Ethernet
series
of
(ii)
(iii)
(iv)
TI/SPC/PSI/PT/0990 for PT
(v)
TI/SPC/PSI/CB/0000 for CB
(vi)
(vii)
Page Number 54
Page 55
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ANNEXURE 2
SCHEDULE OF GURANTEED PERFORMANCE
The tenderer shall be required to submit the following detail to the purchaser and also
confirm point wise deviation to each clause of the tender paper so as to help the purchaser to
evaluate the technical capability of the tenderer to carry out the work. WHEREVER
deviations are quoted they shall be supposed to be supported with detailed technical benefits
and/or financial benefits. In case no comments are given by the tenderer for this section or a
particular item of the section/ Annexures, it is deemed to be considered by the purchaser that
the tenderer has understood the detailed technical requirement of the specification and there
are no deviations to the specifications.
14.1
14.2 Are you an RDSO approved vendor for supply of SCADA system to Indian Railway?
Enclose necessary approvals with valid certificate to this extent.
14.3 Have you supplied earlier SCADA system to IR If yes quote the projects with
completion certificates.
14.4 Whether the tenderer agrees to supply the product as per this specification. In case of
disagreement or better proposals please mention point wise the clauses which are not
acceptable with reasons.
14.5 Technical details, ratings, make & model number of the computers and peripherals at
the RCC. (enclose relevant datasheets, features and brochures)
14.6 Technical details, make, ratings & model No. of the UPS being provided at the RCC.
(enclose relevant datasheets, features and brochures)
14.7 Technical details, make, ratings & model No. of the UPS battery set. (enclose
relevant datasheets, features and brochures).
14.8 Technical details of the RTU along with CPU, DI, DO & AI cards, operating voltage
ratings, dimensional details of RTU
14.9 Technical details, ratings, make & model number of the Modems used at RCC and at
RTU (enclose relevant datasheets, features and brochures)
14.10 Technical details, ratings, make & model number of the power supply units used in
RTU (enclose relevant datasheets, features and brochures).
14.11 Technical details, ratings, make & model number of the contactors used at RCC and
at RTU (enclose relevant datasheets, features and brochures)
Page Number 55
Page 56
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Testing instruments
1.12
Oscilloscope
a) Make and type
b) Other detailed particulars along with technical pamphlets.
14.13 Multimeter
a) Make and type
b) Other detailed particulars , along with technical pamphlets
14.14 Level meters (dB Meter )
a) Make and type
b) Other detailed particular along with technical pamphlets.
15
Do you confirm that you will take AMC of SCADA system as stipulated in
specification and provide spares, maintenance support and software up gradation
even after AMC period?
Page Number 56
EMS MMI1EMS
EMS MMI2
HOST SERVER
COMPUTER-2
ROUTER
100
ROUTER
LAN Extender /
MEDIA CONVERTER
RS 232
LAN Extender /
MEDIA CONVERTER
Base T
Ethernet cable
10
LASER JET
PRINTER
LINE DRIVER/
DIGITAL MODEM
Channel 2
Channel 1
LINE DRIVER/
DIGITAL MODEM
PRINT
SERVER
LASER JET
PRINTER
EMS SERVER 2
NETWORK SWITCH-2
(min 16 Port Switch)
OPERATOR
WORK STATION-2
(2 PCs Workstation-Grade)
OPERATOR
WORK STATION-1
(2 PCs Workstation-Grade)
EMS SERVER 1
NETWORK SWITCH-1
(min 16 Port Switch)
HOST SERVER
COMPUTER-1
GPS RECIVER
GPS Antenna
Page 57
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ANNEXURE-3
Page Number 57
Page 58
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ANNEXURE-4
POINT ADDRESS MAPPING
1.1. List of DI (Status)
1.1.1 Status available from Relays
IEC 60870-5-101
IEC 60870-5-103
TYP FU INF
N
Description
Protection Relay
TYPE
IOA
Per Feeder *
CB
Feeder Protection
Double-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
200
127
100
128
136/
137
36
101
128
38
102
128
68
103
128
78
104
128
79
105
128
80
106
128
85
107
126
100
108
126
101
109
126
102
110
126
104
111
126
106
112
126
107
113
126
108
114
128
27
115
128
28
116
128
29
Trip Circuit
supervision
PT Fuse failure
Feeder Protection
General Trip
Feeder Protection
Zone 1
Feeder Protection
Zone 2
Feeder Protection
Zone 3
Feeder Protection
breaker failure
Feeder Protection
WPC
Feeder Protection
OCR 1
Feeder Protection
OCR 2
Feeder Protection
OCR 3
Feeder Protection
SOTF
Feeder Protection
Lock-out
Feeder Protection
Reclaim (Auto
reclosed)
Reclose block
Feeder Protection
Remote lock-out
Feeder Protection
Zone1 Extension
Feeder Protection
Feeder Protection
Feeder Protection
Page Number 58
Page 59
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
AP-GP-LOW
ALARM
AP/GP trip
Feeder Protection
V. Delta-I Trip
Vec. Delta I
Catenary-1
Panto flash-over
Catenary-2
Panto flash-over
Catenary-3
Panto flash-over
Catenary-4
Panto flash-over
Transformer
General Trip
Transformer Diff
Delta I>>L1
Transformer Diff
Bucholz Trip
Transformer Diff
Transformer Diff
Transformer Diff
PRD Trip
Transformer Diff
DSS closed
Transformer Diff
HIS closed
Transformer Diff
GPS
Transformer Diff
OCR
OCR Trip
OCR
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
117
128
30
118
127
31
119
126
118
120
128
130
121
128
131
122
128
132
123
128
133
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
Single-point
information
124
176
68
125
126
94
126
176
27
127
176
28
128
176
29
129
176
30
130
127
31
131
127
32
132
127
33
133
160
27
OCR
Single-point
information
134
160
28
OCR
Single-point
information
Single-point
information
Single-point
information
135
160
29
136
160
30
137
160
68
Feeder Protection
OCR
Page Number 59
Page 60
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
1.1.2 Hardwired DI
Description
TR-1 110 V DC alarm
TR-1 110 V DC alarm circuit trip
FDR CB Panto Bridging
240 V AC FAIL
110 V DC LOW
Shunt Cap. PT Fuse Fail
TR-2 110V Alarm Circuit Fault
TR-2 110V Alarm Circuit Trip
TR-1 Tap Position-TAP1
TR-1 Tap Position-TAP2
TR-1 Tap Position-TAP3
TR-1 Tap Position-TAP4
TR-1 Tap Position-TAP5
TR-1 Tap Position-TAP6
TR-2 Tap Position-TAP1
TR-2 Tap Position-TAP2
TR-2 Tap Position-TAP3
TR-2 Tap Position-TAP4
TR-2 Tap Position-TAP5
TR-2 Tap Position-TAP6
Panto Flash over Relay Bypass
PSU on DC
PSU Overload
Spare Telesignal as per purchaser requirement
TR. CB-1 Status
TR. CB-2 Status
HVCB -1 Status
HVCB-2 Status
CAP CB Status
25KV Interrupter 1
25KV Interrupter 2
25KV Interrupter 3
25KV Interrupter 4
25KV Interrupter 5
Spare status for bi-status device as per purchaser
requirement
IEC 60870-5-101
TYPE
IOA
Single-point information
150
Single-point information
151
Single-point information
152
Single-point information
153
Single-point information
154
Single-point information
155
Single-point information
156
Single-point information
157
Single-point information
158
Single-point information
159
Single-point information
160
Single-point information
161
Single-point information
162
Single-point information
163
Single-point information
164
Single-point information
165
Single-point information
166
Single-point information
167
Single-point information
168
Single-point information
169
Single-point information
170
Single-point information
171
Single-point information
172
Single-point information
173
Double-point information 250
Double-point information 251
Double-point information 252
Double-point information 253
Double-point information 254
Double-point information 255
Double-point information 256
Double-point information 257
Double-point information 258
Double-point information 259
Double-point information 260-280
Page Number 60
Page 61
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
List of DO (Control)
1.2.1 DO Controls possible from Relays
IEC 60870-5-101
IEC 60870-5-103
TYP FU INF
N
Description
Protection Relay
TYPE
IOA
For Feeder *
Circuit Breaker
Feeder Protection
Double Command
2200
20
128
Feeder Protection
Single Command
2100
20
128
124/
125
19
HV OCR
Single Command
2101
20
127
92
LV OCR
Single Command
2102
20
127
92
Lockout reset
Transformer
HV CB only trip
possible
LV CB only trip
possible
TYPE
Double Command
Double Command
Double Command
Double Command
Double Command
Double Command
Double Command
Double Command
Double Command
Double Command
Single Command
Single Command
Single Command
Single Command
Single Command
Single Command
IOA
2250
2251
2252
2253
2254
2255
2256
2257
2258
2259
2150
2151
2152
2153
2154
2155-2175
List of AI (Control)
1.3.1 Parameters available from Relays
IEC 60870-5-101
IEC 60870-5-103
TYP FU IN
N
F
Description
Protection Relay
TYPE
IOA
For Feeder CB *
Current
Feeder Protection
1600
128
145
Voltage
Feeder Protection
1601
128
145
Feeder Protection
1602
128
73
Page Number 61
Page 62
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
Transformer
Current
HV OCR
Current
LV OCR
Incommer (From
Meter)
Voltage
Current
Power Factor
Power (Active)
Power (Re-active)
Power (Apparent)
Maximum Demand
Energy (Import)
Energy (Export)
1603
160
151
1604
160
151
1605
1606
1607
1608
1609
1610
1611
1700
1701
IEC 60870-5-101
TYPE
Measured value, short
floating point value
IOA
1612
Notes:
(*) For all per-feeder I/Os, for next Feeder, add 200 to IOA of first feeder.
IEC101 configurable parameters for compatibility:
1. IOA size 2 byte
2. Common add ASDU 1 byte
3. Link address 1 byte
4. ASDU Address 1 byte
5. COT 1 byte
6. MAX APDU is to be as per maximum frame length of 255
Events to be reported using M_SP_TB_1 & M_DP_TB_1. Multiple events to be
reported in a single frame, improving communication speed.
Double command C_DC_NA_1. Single Command C_SC_NA_1 ?
GI should be reported using: M_SP_NA_1 & M_DP_NA_1
Analog values to be reported using M_ME_NC_1
Energy counters to be reported using M_IT_NA_1
Page Number 62
Page 63
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ANNEXURE 5
110kV
R
110kV
Y
DIFFERENTIAL RELAY
1.
2.
3.
4.
5.
LOW OIL
WT HIGH
OT HIGH
BUCH GAS
BUCH TRIP
IDMT, REF
TSS/FP
Page Number 63
110kV
TSS/FP
110kV
CB 25kV
TRACTION TRANSFORMER
AT
7
8
9
SP
CT
CB 110kV
ISOLATOR 25kV
4
5
PT
ISOLATOR 110kV
LA
DESCRIPTION
SN
SYMBOL
SSP
NOTE:
1, THE SCHEMATIC DIAGRAM IS ONLY FOR
SINGLE ENDED FEED.
2. FOR DOUBLE ENDED FEED i.e. PARALLEL
OPERATION OF ADJACENT TSSs, THE
BRIDGING CBs AT SP SHALL BE CLOSED.
Page 64
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ANNEXURE 6
TRACTION SUPPLY ARRANGEMENT OF SUB URBAN AREA
SUB-SECTOR
SECTOR
SUB-SECTOR
Page Number 64
Page 65
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ANNEXURE- 7
SUB-SECTOR
SUB-SECTOR
SUB-SECTOR
SECTOR
Page Number 65
Page 66
of 66
Draft Technical specification No. TI/SPC/RCC/SCADA/ ------------ for SCADA system for 25
kV single phase 50Hz ac traction power supply.
ANNEXURE 8
2X25 KV AT TRACTION SYSTEM POWER SUPPLY DIAGRAM
Circuit Breaker
Interruptor
Isolator
Traction Transformer
Auto Transformer
Capacitor
Lightning Arrester
TSS
TSS
SSP
ATP
SP
ATP
SSP
Page Number 66