Irc 34-2011 Recommendations For Road Construction in Areas Affected by Water Logging Flooding and Salts Infestation PDF
Irc 34-2011 Recommendations For Road Construction in Areas Affected by Water Logging Flooding and Salts Infestation PDF
Irc 34-2011 Recommendations For Road Construction in Areas Affected by Water Logging Flooding and Salts Infestation PDF
MMENDATIONS
FOR
N TRUCTION IN AREAS
A FFECTED
LOGGING, FLOODING
AND/OR
L S INFESTATION
(First Revision)
I
(The Official amendments to this document would be published h)'
the IRe in its periodical, 'Indian Highways' which shall he
considered as effective and as part of the cod(.'/guiddilil'S/III ' 1I1I I I.
etc. from the date specified tlu-reiu)
IRC:34-2011
RECO
DATONS
FOR
OAD CONSTRUCTION IN R AS
A
TED
BY WATER OGGING, LOODI G
A OIOR
SALTS INF STATIO
Published by
AY,201 1
IRC:34-2011
First Published:
Reprinted
Reprinted
Reprinted
First Revision
January, 1970
May, 1974
May, 1980
August, 1996
May, 2011
...
IRC:34-2011
CONTENTS
Page No.
Personnel of the Highways Specifications and Standards Committee
(i)
Introduction
Scope
18
20
22
23
Annex-1
29
IRC:34-2011
Sinha, A.V.
(Convenor)
2.
Puri, S.K.
(Co-Convenor)
3.
Kandasamy, C.
(Member-Secretary)
Members
4.
Datta, P.K.
5.
Gupta, K.K.
6.
Sinha, S.
7.
8.
Katare, P.K.
9.
10.
Reddy, K Siva
11.
Basu, S.B.
12.
Bordoloi, A.C.
13.
Rathore, S.S.
14.
Pradhan, B.C.
15.
Prasad, D.N.
16.
Kumar, Ashok
17.
Kumar, Kamlesh
18.
Krishna, Prabhat
19.
Patankar, V.L.
20.
Kumar, Mahesh
(i)
IRC:34-2011
21.
Bongirwar, P.L.
22.
Sinha, A.K.
23.
Sharma, S.C.
24.
25.
Gupta, D.P.
26.
Momin, S.S.
27.
28.
Shukla, R.S.
29.
Jain, R.K.
30.
31.
Singh, B.N.
32.
Nashkar, S.S.
33.
34.
Alam, Parwez
35.
Gangopadhyay, Dr. S.
36.
37.
Sinha, V.K.
38.
Jain, N.S.
39.
40.
Ex-Officio Members
1.
President, IRC
2.
3.
Secretary General
Corresponding Members
1.
2.
Khattar, M.D.
3.
Agarwal, M.K.
4.
Borge, V.B.
(ii)
......
~ _ ~ ~
he
I
I
IRC:34-2011
INTRODUCTION
In water logged areas, due to water, whether from capillary rise, seepage from earthen
shoulders or penetration 'from pavement layers, the subgrade of pavements gets saturated.
Reduction in load carrying capacity of subgrade is related to the degree of saturation of
subgrade. The strength of pavement layers laid over the subgrade is dependent on the support
of subgrade. Due to loss in load carrying capacity of subgrade, the strength of pavement
layers also reduces. Load from traffic remaining the same with the reduction in strength of
subgrade, pavement deterioration gets accelerated. It is common observation that pavement
which behaves very well during summer months suddenly starts getting damaged on on-set
of monsoon. During the prolonged period of monsoon, the pavement gets affected by water
develops cracks which get converted into potholes.
Pavements with good drainage remain intact even during monsoon. The water entering the
subgrade has to be drained out or prevented from reaching upto subgrade level.
Realizing the advantages that can be had by keeping water away 'from subgrade, Shri Mahesh
Kumar Convenor H-4 Committee Engineer-in-Chief Haryana PWD, thought to have a relook into the IRC:34:1970, "Recommendation for road construction in water logged areas".
The work of rewriting the revised version was done by a subgroup consisting of Shri Arun
Kumar Sharma, CE, MORT&H, Mrs. Minimol Korulla, Chief Consultant and Ms. Shabana
Khan, Consultant, Macaferri. Their valuable contribution is greatly acknowledged.
The revision of document includes recommendations to use modern materials and techniques
for solving problems associated with water logging. Some of the modern techniques
recommended are
a)
b)
c)
d)
e)
Recommendations for some case studies have been made in the revised document. The
draft revision was approved by H-4 Committee (Personnel given below) in the meeting held
on 13.10.2010. The Highways Specification and Standards Committee deliberated on this
document on 22.10.2010 and cleared for presentation in Council Meeting. At Nagpur Council
Meeting the document was cleared with authority to Convenor to modify as per comments of
Council members. The Convenor further reviewed the document in light of the comments of
the Council members. The document was submitted for printing by the Convenor on
12.03.2011.
Kumar, Mahesh
Convenor
Co-Convenor
Mathur, Sudhir
Member-Secretary
1
I
IRC:34-2011
Members
Chand, Faquir
Dhodapkar, A.N.
Sangal, M.M
Gupta, Sanjay
Singh, R.B.
Saha, D.C.
Sen, Samiren
Jain, M.K.
Kansal, R.K.
Chitra, R.
Koul, A.L.
Kumar, Satender
(Rep. of DGBR)
Pradhan, B.C.
Corresponding Members
Verma, M.S.
Ex-Officio Members
President, IRC
(Liansanga)
1 SCOPE
These recommendations deal with the problem of road construction in waterlogged areas,
including those subjected to flooding and/or infested with detrimental salts like sulphates
and carbonates. The recommenda.tions relate both to the construction of new roads and to
the remedial measures to be adopted in the case of existing roads.
1.1
For the purpose of these recommendations for coarse grained soil, water logged
areas are considered to be those where the level of subsoil standing water is such that for
prolonged periods the bottom of subgrade immediately below the pavement is well within
the capillary fringe of the water table i.e. within about 1.5 m. For embankment with fine grained
soils the capillary fringe of water table may be up to 10.0 m.
2
1I
I
IRC:34-2011
Remedial measures for following situations are included in these
1.2
recommendations:
i)
ii)
iii)
iv)
Hill roads with phreatic line cutting the side of hill slope: Wet portion
of side slope of hill above pavement is an indication that phreatic line is
above the pavement level. Higher water table will soak the subgrade (for
details refer para 8.4).
v)
vi)
Vii)
viii)
ix)
1.3
Due to soaking of subgrade, frequent formation of cracks in pavement and then
conversion of cracks to potholes are common in all these cases mentioned in para 1.2 above.
Water in pot holes accelerates deterioration of pavements. These cracks and potholes require
IRC:34-2011
frequent repairs. These roads in addition to capillary rise of ground water leading to softening
of subqrade may also be affected by flooding and/or ground water infested with detrimental
salts like sulphates and carbonates.
As a result of migration of water by capillary action from the high water table/high flood level,
the subgrade soil gets further saturated and this leads to a gradual loss in its bearing capacity.
With the loss in bearing capacity of soil, axle load remaining the same, deterioration of
pavement gets accelerated. It is important to ensure the drainage of storm water and lowering
of subsoil water so that subgrade remains dry. Remedial measures should be taken to keep
water away from subgrade.
2.2
Due to Flooding
Where continuous flooding for long periods takes place the progressive deformation of
subgrade and pavement is accentuated by ingress of water from the top of the wearing
surface, earthen shoulders or sides of embankment. The flood water saturates the subgrade
thus reducing the bearing capacity. In case of bituminous pavements, the already inadequate
waterproofing of the surface is impaired further by stripping of the binder due to prolonged
contact with water. While in the concrete pavement, water in the subgrade may lead to
pumping and cracking of pavement.
2.2.1
2.2.2
Sufficient cross drainage structures should be provided so that water can pass
across the embankments.
2.2.3
In case tlood water cannot be allowed to flow across the embankment, due to
likelihood of submergence of human settlements on the other sides of embankment, then
embankment should be designed to withstand the effect of flood water. Good quality granular
soil should be used in embankment construction so that the soil remains intact during flooding.
During high Hoods, phreatic line should remain well within the cross section of earthen
embankment. Services of geotechnical/irrigation engineer should be taken for design of
such embankment which is more or less acting as an earthen dam. Seepage across
embankment and possibility of piping should be taken care of.
2.3
The problem is aggravated if in addition to water logging and/or flooding, harmful salts like
sulphates of sodium, calcium or magnesium and sodium carbonate are present either in the
,t
IRC:34-2011
sub grade soil or in the ground water. Damage to crust from harmful salts can be in two ways
- due to physical or chemical effect.
2.3.1
In waterlogged areas (infested with detrimental salts), the salts keep on moving up with
capillary moisture. During subsequent evaporation of the salt-laden water, the salts are left
behind and they get concentrated in the surface layers. The salts increase many times in
volume upon hydration under suitable humidity and temperature conditions. Alternate*
hydration and dehydration results in repeated formation of salt crystals occupying much more
volume than the amorphous salts lodged in the voids. In due course, these repeated volume
changes break up the structure of the pavement, working from the top downwards particularly
due to seepage/capillary rise.
2.3.2
The damage due to chemical action is mainly on account of sulphates of calcium, magnesium
or sodium. Construction works specially vulnerable to this type of attack are those containing
cement like cement concrete pavements and stabilized soil cement base/subbase courses.
2.3.2. 1
Cement concrete
The sulphates present in the subsoil which migrate to the top by capillary action, react with
the free lime liberated from cement resulting in the formation of gypsum. The reaction is
accompanied by a considerable increase in the volume of the solids which is known to lead
to the destruction of the hydrated cement matrix. After gypsum has been formed, or if calcium
sulphate itself is found in that soil or ground water, tri-calcium aluminate in the hydrated
cement combined with sulpho-aluminate which gives rise to further expansion of volume and
damage. Apart from the formation of gypsum and calcium sulpha-aluminate, the
decomposition of hydrated calcium silicate by sulphate solution is an additional factor affecting
the durability of concrete. However, this would occur normally only in the case of calcium or
magnesium sulphate solution which is found generally in waterlogged areas near the sea.
Dissolved carbon dioxide and bicarbonate salts present in certain marshy and rice growing
areas also take part in the leaching of lime liberated from hydration of cement and slowly
attacking the cementitious calcium silicate hydrated gel formed. Such solutions are
characterized by pH value in the acidic range, usually below 5.
Concrete is not directly attacked by solid sulphate salts, but only by their solutions in water
so that it is the amount of salts dissolved in the ground water that determines tile rate of
*
(As a result of research carried out in India, it has been demonstrated that crystallization
of sodium sulphate takes place when temperature is below 32 degree celsius and relative
humidity above 80 percent. In northern parts of the country these conditions exist
generally during the period of winter rains)
IRC:34-2011
attack. As a result of chemical action of sulphates, the cement concrete pavements suffer
internal disintegration and gradual falling from the underside. The process described is,
however, slow.
2.3.2.2
Soil cement
Presence of sulphates in waterlogged areas has a detrimental effect on soil cement mixtures
similar to that in the case of cement concrete pavements.
2.3.2.3
Bituminous construction
It does not appear that these salts, in the concentration they normally occur in soil, ground
water or sea water have any detrimental chemical effect on bituminous construction.
2.3.2.4
Water-bound macadam
Salts do not directly affect un-surfaced water bound macadam constructions provided the
filler material used in them is inert and free of harmful constituents.
b)
c)
3.2
Different treatments are suggested under each group. Some of these can be made
use only on new construction, and others on old, while some hold good for both. Broad
guidelines about these are provided at the beginning of each section.
- - -~~~~~- ----~------------'I
IRC:34-2011
4.1
Satisfactory results could be achieved by providing 1.50 to 1.80 m deep drainage channels
(below the ground line) as close to the road bank as shown in Fig. 4.1. These channels are
connected by suitable outfalls to natural drainage. Alternatively, buried drains of suitable
design such as French/Fin drains could be provided at the edges of the pavement for lowering
of water table. Either of these measures will be effective in keeping the bottom of subgrade
above the capillary fringe. This method of drainage is applicable to all types of road
construction (whether rigid or flexible) and should be preferred wherever economically
feasible.
GL
If the existing road surface is of granular type and lies within 1.0 m of the
new formation level, it shall be scarified to a depth of 50 mm or as directed
so as to provide ample bond between the old and new material. The
thickness of the soil layer, if any, interposed between the bottom of the
sub-base and the top of the scarified surface, shall not be less than 0.5 m,
and the soil shall meet the specified properties and compaction
requirements as for the subgrade.
ii)
IRC:34-2011
iii)
If the level difference between the existing road surface and the new
formation level is more than 1.0 m, the existing surface shall be roughened,
after ensuring that minimum thickness of 0.5 m of subgrade is available".
-- -
Bottom of Subgrade
HFL
v
GL/ FL
HFL
GL/ FL
Existing Low
Height Embankment
Fig. 4.2 Raising of the Embankment
4.3
In case, it is not possible to provide drainage system for disposal of storm water then the
storm water can be drained into underground aquifer by providing vertical drains. For more
details about vertical drains for storm water drainage refer IRC:SP-50. Cross-section of
vertical drain is shown in Fig. 4.3. Salient features of vertical drains are:
a)
b)
c)
The inlet pipes of vertical drain are 750 mm above the bottom of inlet
chamber so that debris will not enter the vertical drain. The debris stored in
the inlet chamber can be cleaned.
d)
PERFORATIONS
GL
SANDLAYE~ERMEABLESTRATA
METAL FILLING
------------------'-_
.....
..
_--~-_.~
IRC:34-2011
4.4
4.5.1
If practical and economically possible, the bottom of subgrade level should be raised by
minimum 1.50 m above the general ground level/high flood level. Work of raising the
embankment shall be done as per Clause 13.1 of IRC:36 or relevant clauses of MORT&H
Specifications for Road and Bridge Works. In case resources don't justify raising of
embankment, then lowering of local water table is second best alternative.
4.5.2
4.5.2.2
b)
c)
Aggregate filters
Requirements of aggregate filter given in IRC:SP-50, Clause 8.6 is reproduced for ready
reference,
IRC:34-2011
"A properly designed and installed aggregate filter should be able to retain soil and prevent
soil particle movement, thus eliminating piping potential. Properly, designed aggregate filters
ensure that there are no large voids within the filter and particularly at the soil filter interface
of a subsurface drainage structure. A single component aggregate filter may be used to
protect relatively coarse soils whereas drainage through fine soils usually requires a
multi-layered aggregate filter, A multi-layered filter consists of a fine aggregate gradation
which retains the natural soil particles at their oriqinal positions and a coarser filter aggregate
which prevents particles of the fine aggregate filter from migrating into the perforations of a
drainage pipe or granular water transport medium." A properly designed and installed
aggregate filter should be able to retain soil and prevent soil particle movement, thus
eliminating piping potential. Grading requirements for filter material given in MORT&H
specifications for road and bridges works is reproduced in Table 4.5.2.5.
Table 4.5.2.5 Grading Requirement for Filter Material Percent by
Weight Passing the Sieve
Sieve Designation
Class I
53mm
45mm
26.5 mm
22.4 mm
11.2 mm
Class II
Class III
97-100
100
95-100
50-100
100
48-100
20-60
5.6mm
92-100
28-54
4-32
2.8 mm
83-100
20-35
0-10
1.4 mm
59-96
0-5
710 micron
35-80
6-18
355 micron
14-40
2-9
180 micron
3-15
90 micron
0-5
0-4
0-3
100
Note1: When the soil around the trench is fine grained (fine silt or clay or their mixture) then
Class I grading, when coarse silt to medium sand or sandy soil then Class II grading
and when gravelly sand then Class III grading should be adopted.
Note 2: The thickness of backfill material around the pipe should not be less than 150 mm.
Therefore considering that the minimum diameter of the pipe as150 mm, the width of
the trench should not be less than 450 mm.
4.5.2.3
Fabric filters
Requirements of filter fabrics given in IRC:SP-50 Clause No 8.7 is reproduced below for
ready reference.
10
IRC:34-2011
"Filter fabrics or Geotextiles are generally manufactured from polyester or polypropylene or
similar fibres, either woven or non-woven in variety. Specification of Geotextile has been
covered in MORT&H Specifications for Road & Bridge Works. For subsoil drainage system
bio-degradable fabric filters are not used as their life span is very short. Geotextiles eliminate
the need for aggregate filters, as mentioned in para 4.5.2.2. The fine pore size and high
permeability of non woven geotextile make them suitable filter for a broad range of soil
gradations. Also, such filters are available with varying pore sizes and permeability properties
so as to meet the need of nearly all subsurface drain designs. Use of filter fabric is shown in
Fig. 4.5.2.3.
.,...- ........
............
FABRIC (FIRST
STAGE) FILTER
'~'II--COARSE AGGREGATE
(SECOND STAGE) FILTER
r: :::::::::: I
I:::::::::::: I
I:::::::::::: I
I::.. .: I
I::..
FINE GRADED
GRANULAR (SECOND
STAGE) FILTER
FABRIC WRAPPED
STAGE) FILTER
(b)
(a)
SUB BASE
l~ti~~sf~~~2:~:::g~2:=!:::~f::::' COARSE
I\(j(iRE(iATE
FILTER -----t;;~~V
FABRIC
FABRIC (FIRST STMil~) FILTER AROUND COARSE
AGGREGATE DRAINMiE BLANKET
4.5.2.4
'.
IRC:34-2011
4.5.2.5
J
~
Size of the holes may be close to 085 size of material surrounding the pipe subject to being
minimum 3 mm and maximum 6 mm. 085 stands for size of the sieve that allows 85 percent
of the material to pass through it. The back fill may consist of sand gravel material or crushed
stone satisfying the grading of Table 4.5.2.5 (in case where no specific design exercise
based on filtration and permeability criteria has been carried out). The back fill should be
free of organic material, clay balls and other deleterious material.
. . . - - - - CARRIAGEWAY---"l.Om
2.5 %
----------......
N')N PERFORAI'I'D PIPE
HFL
...L-
The trench is then filled with granular material. The top of trench is covered with impervious
material/Geomembrane so that surface water does not enter the trench. Across the trench,
at every 10m interval, a cross trench of same size is to be provided. In the cross trench the
pipe shall not be perforated. Alternatively fin drain/French drain with perforated PVC/
polymeric/synthetic pipe 150mm dia can be considered. The top of Fin drain/French drain
can be sealed by impervious material/geomembrane. Geomembrane should be protected
with Type-I geotextile (IRC:SP-59). For definition of French drain/Fin drain, refer paras 4.5.2.6
and 4.5.2.7. The water collected in drain shall be suitably disposed off. Subbase shall have
better permeability then overlaying layers.
Location of subsurface drain with respect to pavement layers can be adjusted depending
upon the location where water is entrapped. Location of drain with respect to pavement
layers is shown in Fig. 4.5.2.5.1.
12
IRC:34-2011
BASE
SUBBASE
SUBGRADE
1--_ALTERNATIVE DRAIN
PALCEMENTS
IMPERMEABLE SHOULlWR
BASE
SUBBASE
SUBGRADE
0.75 rnm
12
4.5.2.6
180 N
90 N
French Drains
French drains are edge drains which consist of two components, permeable drainage media
and filter media. Permeable drainage media ensures that water can be transported within
the drain. The filter ensures controlled movement of ground water from the soil into the
subsurface drain. In some instances, a porous pipe is installed at the base of the trench to
increase the water transport capacity of the drain. For french drains permeable drainage
media is graded gravel aggregate and filter media is Geotextile. French drains are shown
Fig. 4.5.2.6.
4.5.2.7
Fin Drains
Fin drains are edge drains which are also referred as drainage composite edge drains that
can be used for pavement drainage purpose. It consists of plastic spacer/net enveloped in a
13
IRC:34-2011
Geotextile. The plastic spacer/Geonet substitutes for the aggregate and acts as drainage
medium. The Geotextile acts as filter. Fin drains with thick plastic core are normally capable
of transporting water both vertically and horizontally with the structure, while thinner Fin drains
normally required the addition of a pipe to transport the water away, shown in Fig. 4.5.2.7.
For specification of drainage composite as fin drain, refer para 4.6.2.
~
Filter Fabric
~I--Selected
\WS~~~a
Backfill
Aggregate
~~~~:zg__ Porous
..
(a)
pipe
(b)
ilter Fabric
Plastic Spacer
......................
Porous Pipe
4.6
Depression of subsoil water level can be achieved by providing the drainage channel with
drainage composite or V-shaped drain below which aggregate drain at the edges of the
pavement for the lowering of water table and connecting these by suitable outfalls to natural
drainage as shown in Fig. 4.6.
Drainage composite shall be able to meet the drainage and protection requirements in
structurally demanding water draining application. It should be able to effectively eliminate
hydrostatic pressure against below grade structures and aid in dewatering saturated soil by
collecting and conveying groundwater to a drain pipe for discharge.
4.6.1
Drainage composite shall be made with lightweight three-dimensional,
high-compressive strength polyethylene core and heat bonded/needle punched polypropylene/
polyester geotextile, provided on one side or both sides of the core as per requirements.
14
J"
IRC:34-2011
FMBANKMENT
ROAD
PHREATIC LINE
ROAD
!'IIHI'ATIl'liNI'
IlHAINA( ;1',('( IM"( ISITI',
',Il(;!',IlHAIN (i1(ITI'XTlli'/'liTFR
ON HOT" SIIII' 01,1'1 OW NI':rCORF
HAVIN(; IN!'I ANI 1'1(IW ('A!'Al TIY
PERFORATED PIPE
OF 0.55 l/scc/m
DRAINAGE COMPOSITE
(I!'
100 kPa
PERFORATED PIPE
PERFORATED PIPE
Fig. 4.6 Typical Cross Section of Road in Cutting with Drainage Composite
4.6.2
4.6.2.1
Geotextile properties
4.6.2.2
Note:
~0.15mm
Permittivity - EN ISO11058
16 kN/m
This method of drainage is applicable to all types of road construction (whether rigid or
flexible) and should be preferred wherever economically feasible.
4.7
Capillary Cutoff
4.7.1
capillary cutoff could be provided to arrest the capillary rise of water in the embankment.
Provision of capillary cutoffs could, however, may prove to be expensive and may be justified
only in special circumstances.
4.7.2
The capillary cutoff may be a layer of coarse or fine sand and graded gravel. For
details refer IRC:36-201 O. Layer thicknesses recommended for different situations are given
in Table 4.7.2.
15
----------------IRC:34-2011
Table 4.7.2 Recommended Thickness of Layer of Capillary Cutoff
:sr.
No.
suuanons
1)
350
150
150
2)
300
100
100
4.7.3
The cutoff should be placed at least 0.15 m above the ground level or the standing
water level, whichever is higher, as illustrated in Fig.4.7. But in no case it shall be positioned
higher than 0.6 m below the top of the sub grade. When provided, the cutoff medium should
extend under the berms as well i.e. for full formation width as shown in Fig. 4.7 (for location
of cutoff with respect to ground level/high tlooc level). Apart from sand/granular material,
Drainage Composite as specified in para 7.2.2 of this document can be considered as
suitable alternative for capillary cutoff. Drainage composite has Geomembrane on the
underside and geotextile filter on upper side. The drainage composite serves dual function
of cutoff as well as drainage media. The impermeable sheet helps in capillary cutoff, drainage
core allow the free flow of water and geotextile acts as separator and filter. The embankment
surface on which capillary cutoff is to be provided should have camber for gravity flow of
water through the drainage composite.
The surface of the embankment/sub-grade at all times during construction shall be maintained
at such a crossfall (not flatter than that required for effective drainage of an earthen surface)
as will shed water and prevent ponding.
4.7.4
Suitable types of capillary cutoffs are listed under Section 7. For any cutoff medium
say high density polythene sheet or drainage composite, it will be advisable to cover it with a
15 cm thick layer of granular material like sand for the dual purpose of acting as a drainage
course for water infiltrating from the top and of protecting the envelope during construction
against rupture by sharp particles in the fill material. For drainage composite there is no
need of additional cover of granular layer as the composite consists of geotextile as one
component which will provide protection while acting as a filter and the core of drainage
composite (geonet) will provide the drainage path.
16
IRC:34-2011
Till' III( uu.sr POSITION
Of Till'. ('AI'I1.1.ARY
('\ ITO!'I'
SUBGRADE
NOT LESS THAN
O.6m
ArLEAST
O.15m
HFL
GL
L
I..
I,IINI' (11'1APII.I,ARY
SAil IRATIIIN
CAPILLARY CUTOFF
HFL
----1-
---L
GROUNDWATER TABLE
CAPILLARY CUTOFF
~~~~~~~~~~~
~~~~~~~~~~~-
-------------------------------------------- ------------
,..-,.-,.-,.-,.-,.-,..-,.-,.-,..-,..-,.-,.-,..-,.-,.-,....,
,..-,.-,.-,.-,.-,.-,.-,.-,.-,.-,.--
ii'
, '
1r
ZONE OF CAPILLARY
SATURATION
GROUND LEVEt
4.7.5
Drainage blanket and a small drain can be used for capillary cut off as shown in Fig. 4.7.5(a)
while deep drain can be used for lowering water table. Combination of capillary cutoff and
deep formation drain is shown in Fig. 4.7.5 (b) .
...
SAND/GRANULAR MATERIAL
PERFORATED PIPE
CONNECTED TO SUITABLE OUTFALL
(a) Drainage blanket and small drain to prevent water table from rising into pavement layer
17
IRC:34-2011
SAND/GRANULAR
MATERIAL--J
5.1
5.1.1
In areas subjected to frequent floods where the highest flood level is not too much
above the natural ground level, it is recommended that the embankment should be raised so
that the bottom of the subgrade is at least 1.50 m above the highest recorded flood level as
detailed in para 4.2.
The embankment will be subjected to wave action due to floods. To protect the
5.1.2
embankment from wave action, stone pitching of designed thickness over graded filter/
geotextile is required.
5.1.3
Sufficient number of cross drainage structures as per site requirement should be provided,
for movement of water across the embankment. For free flow of water across the embankment
at least 2 culverts/km should be provided.
5.1.4
In case, water current hits the embankment, cross drainage structures of adequate
waterway should be planned.
5.1.5
In case, it is not possible to provide sufficient cross drainage structures for water
to flow across the embankment, then the profile of road embankment should be as indicated
in Fig. 5.1.
18
7r
IRC:34-2011
TOE WALL
APRON
in the stretches where bank are not overtopped by flood by water, these should be
protected against erosion as per IRC:56-2010.
5.1.6
Submersible bridges or causeways may be designed and constructed in areas
subject to overtopping during floods.
5.2
In situations where it is considered inevitable to let flood water pass over the road, also
traffic is heavy and flooding expected for prolonged periods, cement concrete surfacing of
appropriate thickness should be provided for at least two lanes of traffic. Wider paved surfaces
perform better under flooding due to distribution of traffic load in a wider area. If the pavement
at the designated place of water crossing is flexible even then there is merit in providing a
layer of 50 mm bituminous concrete as wearing coat. The cement concrete pavement should
be provided for at least two lanes of traffic. The cement concrete pavement, when provided,
should have a dry lean concrete/cement/lime stabilized soil base of 15 cm thick underneath
the slab. When asphaltic concrete is selected as the surfacing, the mix should be dense
graded and resistant to flood conditions.
The profile of the downstream side of embankment should allow smooth flow of water down
the embankment. For dissipation of energy of flow of water, a trough can be provided as
shown in Fig. 5.1.
5.3
In built up areas with houses/shops on either side of road, the water stagnates on
the road surface. In case neither underground sewer system, deep drains, raising of sub
grade of existing road nor sub surface drain can be provided on an existing road, it is better
to suggest realignment of the road. Till such time the bypass road is ready, the road crust as
shown in Fig. 5.3 may be provided. Use of well dressed stone/concrete paver block over a
layer of cement concrete (stone set in cement mortar) can be considered. For further details
following guidelines can be referred:
IRC:SP-63: Guidelines for the use of interlocking concrete block pavement
IRC:SP-20: Rural Road Manual (Clause 8.10.2)
19
IRC:34-2011
6.1
No special measures are considered necessary from the standpoint of physical/
chemical action of harmful salts except those stated in Sections 4 and 5 if the concentration
of sulphates in the subgrade soil is below 0.2 percent (as sulphur trioxide) in ground water.
Similarly, sodium carbonate concentrations of up to 0.2 percent in subgrade soil and
0.02 per cent in the ground water are considered unharmful. Salt concentrations may be
determined in accordance with the procedure laid down in relevant I.S.1 Standards -IS 2720,
Part XXIII 'Methods of Test for Soils: Determination of Calcium Carbonate', and IS 2720, part
XXVII-'Methods of Test for Soils: Determination of Total SUlphate'.
No damage is expected from dissolved carbon dioxide or bicarbonate salt solutions (met
with in certain marshy areas) provided the pH value of the solutions is higher than 5.
Where the concentration of these salts is in excess of the safe limits speci'fied above, special
measures as indicated below are recommended as a gUide for road construction. These
measures are in addition to those recommended in Section 4.
6.2
Flexible Pavements
6.2.1
Even if concentration of salts in the subgrade or ground water is higher than the safe limits
described in para 6.1, no special measures other than those set forth in Section 4 are
considered necessary for water bound macadam roads with or without bituminous surfacing
except that the filler used in water bound macadam and soling should be inert and free from
harmful salts.
20
IRC:34-2011
6.2.2
Mechanical Stabilization
b)
Cement, Lime and flyash stabilization - For details refer "Guidelines for
soil and granular material stabilization using Cement, Lime and Fly Ash"
(IRC:SP-89)
c)
Bituminous stabilization
If the above constructions are contemplated in waterlogged areas infested with salts, the
soil used for stabilization should not contain more than 0.2 percent of total soluble sulphates
and carbonates or stabilization shall be with the cementitious materials which are resistant
to CI and SO 4 salts.
Besides this, to prevent the harmful salts in the sub grade or ground water from coming in
contact with stabilized soil course, a suitable capillary cutoff out of those described in
para 4.7 should be provided underneath the pavement extending across the full width of the
roadway.
6.3
Rigid Pavements
When sulphates are in excess of the safe limits prescribed in para 6.1, the following additional
measures are recommended during the construction of cement concrete pavements over
and above the provisions of paras 4.1 and 4.2.
6.3.1
Since all types of concrete, irrespective of the type of cement used, are more
vulnerable to salt attack during the initial period of hardening than when fully set, it is of
importance to prevent contact between the ground water and concrete in the early stages.
For this purpose, applying a light coat of bitumen to the underside of precast units, protecting
cast-in-situ concrete by a thin bituminized coating on the base just below the slab, or provision
of one of the capillary cutoffs mentioned in para 4.7, are some of the measures recommended
for adoption under relatively mild conditions of exposures to sulphate attack, viz., when sulphate
concentration in soil is upto about 0.5 percent.
Under more severe conditions, i.e. when sulphatss are in excess of 0.5 percent, the bituminous
coatings used should be thicker (For the purposes of this specification, thin coats are
considered to be those in which the rate of application of straight-run bitumen is 12 kg per
10m2 and thick coats are those in which the rate of application is 20 kg per 10m 2 ) as they
are known to possess higher durability.
Furthermore, the following measures are suggested as suitable for minimizing adverse
chemical effect of the sulphates on concrete:
i)
IRC:34-2011
ii)
6.3.2
In areas where there is danger of damage from dissolved carbon dioxide or
bicarbonate salts as evidenced by pH values of below 5, the provision of a waterproof layer
below the concrete pavement, such as heavy duty bituminized paper or polythene sheet, and
use of a dense, well compacted, high quality concrete are the measures recommended for
adoption.
Sand blanket of adequate thickness over the full width of embankment is recommended
as an effective capillary cutoff. The thickness of the sand blanket needed to intercept
capillary action depends on the particle size of sand and may be determined from the following
formula:
where
2d,xd.'
til +d 2
---
-"
7.2
7.2.1
Providing a High Density Polyethylene sheet, manufactured from HOPE resins, duly
contrasted, that comply with the most rigorous requirements established for their use. The
sheet shall contain not less than 95 percent of pure HOPE polymer and a balance not higher
than 5 percent of carbon black, antioxidants and thermal stabilizers. For specification of
geomembrane refer para 4.5.2.5.1 .
22
IRC:34-2011
7.2.2
7.2.2. 1
Geotextile properties
Apparent Opening Size - EN ISO 12956
0.15 mm
8 kN/m
410 g/m2
13.5 kN/m
2.2 kN
830 g/m 2
0.61Im.s
0.551Im.s
Impermeable geomembrane
Water proofing extruded film by Polyethylene
@ 100
@
kPa
200 kPa
7.2.3
~5mm
Such roads get frequently damaged whenever water stands in the adjoining ground. For long
term maintenance free pavement, it is suggested that subqrade of the pavement should be
23
.;-
IRC:34-2011
raised as mentioned in para 4.2. In case there are difficulties in raising the embankment, the
level of sub soil, should be lowered as brought out in para 4.5. Schematic arrangement for
providing subsurface drains in low height embankment is shown in Fig. 4.5.2.5.
8.2
Water falling in the sloping central verge needs to be collected and disposed off by drainage
system consisting of water inlet chamber, open drains and hume pipe culvert (below the
existing embankment).
CENTRAL VERGE
4.5m
CRASH BARRIER
UNIDIRECTIONAL CAMBER
=----
LONGITUDINAL DRAIN
CRASH BARRIER TO SHIELD
THE OPEN DRAIN
UNIDIRECTIONAL CAM~BE~R.-ii_ _.~rt
8.3
Pavements of such roads gets affected by water table of adjoining high bunds. To lower the
level of underground water, there is generally a need to provide aggregate drains on either
side of road as shown is Fig.8.3. Subsurface drains below V-shaped drain are effective in
lowering water table. For specifications of aggregate drains refer Table 4.5.2.5.
----s~~---~
AGGREGATE DRAIN
AGGREGATE DRAIN
In 7
IRC:34-2011
8.4
Hill Roads with Phreatic Lines Cutting the Bottom of Hill Slope
Fig. 8.4 (a)
8.4.2
For pervious layer located at a depth where it is not practical to provide vertical
subsurface drain as shown in Fig. 8.4 (a), horizontal perforated pipes into the hill side, and
at the face of hill slope breast wall in dry rubble stone masonry should be provided. Behind
the breast wall granular filter should be considered. Alternatively free draining wire crate
wall/Gabion (machine made woven wire crate of wire dia 2.7 mm as per IRC:56-2010)
retaining wall should be provided. The perforated pipes may project outside the breast
wall so that seepage water can be collected directly in the open longitudinal drain.
Concrete caping at pipes shown in Fig. 8.4 (c) shall be provided. For details refer
to Fig. 8.4 (b) and 8.4 (c).
FILTER MATERIAL
PERFORATED OR
POROUS PIPE CONNECTED
TO SUITABLE OUTFALL
25
IRC:34-2011
--
PERFORATED OR
POROUS PIPE
ROADWAY
SIDE DRAIN
IMPERVIOUS LAYER
Fig. 8.4 (b) Cross-Section of Hill and Road Showing Arrangement for
Collection of Sub Surface Flow
PERSPECTIVE VIEW
26
-------------------------------
----------------
IRC:34-2011
8.5
Phreatic line should be below the pavement on bund road. For lowering the phreatic line (if it
affects the subgrade) sub-surface drain towards the river/canal as shown in Fig. 8.5 can be
considered. The seepage water so collected in drain should be suitably disposed off. In
case of single lane carriageway, camber should be opposite to river side.
'--.,.~. ._
BUN D ROAD
. ._ _
;;;UN~~i::lRE::CTlONi\L('i\MIII':/(
'.1
GL
SUBSURFACE DRAIN I
FRENCH DRAIN I FIN
DRAIN CONNECTED TO
SUITABLE OUTFALL
8.6.1
Hill roads at bends get damaged due to flow of water from the hills. At such bends
after extra widening paved shoulder with cement concrete paver block/stone set in 1 m width
on hill side can be considered.
8.6.2
At bend locations, rigid pavement in general performs better as compared to
granular pavement with bituminous wearing coat.
8.7
8.7.1
If sufficient land is available between road and rail track, for disposal of storm
water, open drain/underground sewers should be provided. These open drain/underground
sewers need to be connected to suitable outfall.
8.7.2
In case there are difficulties in providing open/underground drain and water
stagnates between (A) and (B) shown in Fig. 8.7, at such locations where water table is low,
storm water can be discharged into the underground aquifer by providing vertical drains
shown in Fig. 4.3. Alternatively aggregate drain/french drain suitably connected to outfall
can be considered.
ROA
I"
2m
,I
Fig. 8.7 Drainage of the Area Between Road and Rail Track Marked A and B.
27
7=
IRC:34-2011
8.8
8.9
Raise the sub grade as suggested in para 4.2. In case it is not economically
viable to raise the subgrade then underground sewer for disposal of storm
water should be considered. Stone set pavement performs very well in such
areas as mentioned in para 5.3.
28
IRC:34-2011
Annex-1
(Clause 4.5.2.5.1)
S.
No.
Designation
(ISO)
Designation
(ASTM)
Designation
(IS)
1)
EN ISO 12956
ASTM D 4751
IS 14294
2)
EN ISO 11058
ASTM D 4491
IS 14324
3)
EN ISO 10319
ASTM D 4595
4)
EN ISO 12236
ASTM D 4833
5)
EN ISO 9864
ASTM D 5261
6)
EN ISO 9863
ASTM D 5199
7)
EN ISO 12958
ASTM D 4716
Title
29
Geosynthetics -- Static
puncture test (CSR test)