Toyota Production System
Toyota Production System
Toyota Production System
Basic Philosophy
Goals
of Toyota Production system (TPS)
1. Highest Quality Product
2. Lowest Possible Cost
3. Shortest lead time for Delivery
4. Jidoka
2. Kaizen
4. Jidoka
2. Kaizen
1. Elimination of 3 Ms
The way to keep the cost down
Old Economy
New Economy
Increase
Sales price
Sales
price
Increase
Sales price
Sales
price
Profit
Profit
Profit
Profit
Cost
Price
Increase
profit
Cost
Price
Cost
Price
Increase
profit
Cost
Price
Elimination
of
3 Ms
1. MUDA
2. MURI
Overburden
3. MURA -
Unevenness
MUDA =
Any Element in manufacturing process
Value
added
Work
Motion
Muda
(Non Value
Added Work)
Incidental
Muda
2. MUDA of Waiting
waiting for parts to arrive of machine to finish cycle
3. MUDA of Coveyance
any conveyance should be kept to minimum
4. MUDA of Processing
over--processing
over
5. MUDA of Inventory
any more than the minimum to get the job done
6. MUDA of Motion
any motion that does not contribute to adding value
7. MUDA of Correction
any repair or rework is Muda
MURA (unevevness)
= it is combinations of first 2 Ms
Due to Unevenness in production levels at times there is excess capacity
(MUDA) & at times there is overburden (MURI)
4. Jidoka
2. Kaizen
Continual Improvement,
The constant search for better way
Never ending Job Redesign
ZEN
To modify, to change
make good,
make better
= KAIZEN
Change for the better,
Continual Improvement.
The low-cost / no-cost method for
improvements
Search for
causes
4. Jidoka
2. Kaizen
When it is needed
In just the amount needed
Reduced inventory
Improved quality
Lower costs
Reduced space
requirements
5. Shorter lead time
6. Increased
productivity
7. Greater flexibility
Bad
Design
Lengthy
Setups
Inefficient
Layout
Poor
Quality
Machine
Breakdown
Unreliable
Supplier
To Expose Problems:
Reduce Inventory Levels
Bad
Design
Lengthy
Setups
Inefficient
Layout
Poor
Quality
Machine
Breakdown
Unreliable
Supplier
Poor
Quality
Lengthy
Setups
Bad
Design
Inefficient
Layout
Machine
Breakdown
Unreliable
Supplier
Pull System
Continuous Flow Processing with
Heijunka
Takt Time
Production
Step 2
Last Step 3
of
Production
First Step of
Production
Information Flow
Information Flow
Material Flow
Production
Step 2
Material Flow
100 sec
200 sec
300 sec
Process 1
100 sec
Process 2
100 sec
Process 3
Lead time300 sec
Total lead time for 1st bearing to come out: 201 sec
Total lead time for 100 bearing to come out: 300 sec
100 sec
Process 1
Process 2
Process 3
1s
1s
1s
3 sec
Lead time 102 sec
Standardized Work
It is the Standardized Procedures that
regulates every single work step in entire
process of producing an Automobile
Standardized work is repeated exactly the
same way in each cycle thereby avoiding
unnecessary movements & wasteful
efforts
Standard Documents
1. Production Capability Chart
Model /Type
33336 - 0K010
Part Name
1G
Section
Gear fifth
Soft machining
1
TOOL CHANGE
QUALITY CHECK
SL . NO
OPR NO
10
Internal broaching
20
Hobbing
30
40
MACHINE
NO.
OPERATION NAME
SBM 0001
Shaving
Visual check
MANUAL
TIME (sec)
AUTO
TIME (sec)
45
TOTAL TIME /
FREQ OF
PART (sec)
INSP/ SHIFT
51
SGC 0005
10
48
58
SCH 0005
34
40
SGC0026
TOTAL
10
42
52
Verified by
GL
GL
NAME
AM
SIGN
NAME
JP
SIGN
NAME
DBA
NAME
RB
40
30
FREQ. OF
CHANGE
(Nos)
TOOL
CHANGE
TIME (sec)
TOOL
CHANGE
TIME/ PART
(sec)
TOTAL TOOL
CHANGE TIME/
PART (sec)
MANUF.
CAPABILITY
AT 100 %/
TOTAL TIME/
SHIFT
PART (sec)
62
Nos
QTY/HOUR AT 100 %
Remarks
(Nos )
(Nos )
SBSI-001
12000
180
0.02
0.02
51.4
508.0
70
0.24
SG-005L
TIN
1400
240
0.17
0.17
58.4
446.8
62
SCFC-K005
50000
600
0.01
0.07
40.1
651.3
90
SK-001
10000
600
0.06
SCC-007
3500
240
0.07
0.07
52.2
499.5
69
Bottle neck
4350.0
600
0.4
0.4
0.4
65250.0
9000
38.4
1
Secs
0.36
0.18
of
447
6.0
169
AM(Y)
SIGN
60
No.of
units /
shift
58.4
Checked by
AM(W)
TIME FOR
INSP
( sec) *
PAGE
* 5/ SHIFT QUALITY CHECK IS CARRIED OUT OFFLINE , HENCE THERE IS NO MACHINE WAITING
Prepared By
No.of units
/ vehicle
REV NO
DATE
REASON
NAME
20/10/2005
Mohan M
30/09/2005
GM
SIGN
NAME
KGM
SIGN
Format change
Mohan M
SIGN
Standard Documents
2. Standard work combination
to establish relation
between man & machine time by defining work in one cycle
DATE: 10/09/2005
PART
NO :
PART
NAME:
MODEL/
0K070/080/090/100/11
TYPE
0/160/170
Transmission
SECTION
assembly
4X4
Assembly
PROCESS DESCRIPTION:
From: Check kanban and load A/H
in SZY - 0006
To : Pick and assemble 10 bolts to
A/H
TIME in Secs
AUTO
WALK
Process
No
Process description
Unclamp jig
20
16
MANUAL
LOOP:
20
30
40
PAGE 1OF 1
Main - 4
MANUAL
TAKT TIME :
CYCLE TIME:
88.5
Sec
AUTOFEED
81
Sec
WALKING
NO OF COMPONENTS /
SHIFT :
295
Nos
12A/ 20
50
60
WAITING
CYCLE START
70
80
90
CT
100
TT
40
2
TOTAL TIME :
SL NO
-
SEC.
58
Time /Part
-
WAIT
20
Prepared by
GL
NAME
SIGN
Madhu
Checked by
AM(W)
AM(Y)
NAME
SIGN
NAME
SIGN
DBA
Bharat
Approved by
GM
NAME
SIGN
TRP
REV No
DATE
REASON
NAME
00
10.09.05
Format change
Joshi
SIGN
Standard Documents
3. Standard work operation
defines standard
sequence of operation including safety and quality points
the member has to follow every cycle
DATE: 22.09.05
Page 1 of 1
TYPE
From
ALL
OPERATION
Transmision
Assembly
SECTION
To
After line
INLINE
INLINE
TESTER - I
TESTER - II
QTY
AIR LEAK
TESTER
Cc
2~4
6
13
7 ~ 12
QTY
QTY
``
Quality check
Safety
Standard inprocess
stock
Standard buffer
Takt time
Cycle time
85
81
Loop
Number
Verified by
GL
NAME
Madhu
GL
SIGN
NAME
Anil
Checked by
AM(W)
SIGN
NAME
DBA
SIGN
Approved by
AM(Y)
NAME
Bharat
SIGN
2
REV No
DATE
16
REASON
NAME
GM
NAME
KGM
SIGN
1
20.02.06
Takt up
Madhu
00
22.09.05
Format change
Joshi
20
SIGN
Standard Documents
Work Elemental Sheet explains all activities element
by element including key points which the member has to follow
DATE :24/11/2005
PART NO
0K070 - 0K0180
PART NAME
Transmission
assembly
OPN NO :
All
TYPE
QUALITY
Assembly
SECTION
PROCEDURE
SYMBOL
Time
WHY
10
3a
3b
SYMBOL MARK
SAFETY
SL NO
3c
PROBLEM ON VEHICLE
SKETCH
oil leakage.
4/4A
&4/4B
only
3b
4/2 only
4
If any abnormality found immediately stop the line, call the TL and wait for TL instruction.
PREPARED BY
VERIFIED BY
GL
GL
NAME
Anil
SIGN
NAME
Madhu
CHECKED BY
SIGN
NAME
DBA
APPROVED BY
AM(Y)
AM(W)
SIGN
NAME
Bharath
REV No
DATE
REASON
01
23.01.06
Takt up
24.11.05
Format change
NAME
GM
SIGN
NAME
KGM
SIGN
PC
Sridhar
SIGN
4. Jidoka
2. Kaizen
Jidoka
Jidoka = Ability of Production line to be
stopped in the event of abnormalities like
Quality Problems,
Equipment Malfunctions,
Work being late either by machines or
members
Types of Jidoka
1. Quality Gates in each process
Gear Checker for identifying Dents
Raw material
Process
Quality Gate
Check for
abnormalitie
s
Not OK
OK
To next Process
Types of Jidoka
2. Pokayoke or Fool Proofing
Torque wrenches linked to Conveyor
Assembly line
ConveyorTorquing of Bolts
OK
Required
Torque
Reached
Not OK
Automatically
Stop the
Conveyor
Continue
Operation
Types of Jidoka
3. Andon
Aid to highlight abnormality by Man / Machine
Team suspects
abnormality
OK
Judgemen
t
Not OK
Stop the line &
Call TL thru
andon
Continue
Operation
2. Maintain
1. Strong Foundation
TL undergoing training
Train Team
leaders &
Group
leaders
New Plant setup
TL training TM
Create
work
standards
Recruit &
Train
Team
members
by TL/GL
Operation Method
10
REVISION
Revision date
Page
Details
Make date
Maker
GM
Description:
FROM THE
Vital Points
DO NOT APPLY FORCE,
SLIDE GENTLY
WHILE UNLOADING CHECK
VISUALLY FOR OPERATION
COMPLETION
Section
GEARS
GL
KGS
Team
NO.1
TL
AM
Sketch
U N LO AD
Revision Matter
AM
PICK
LOAD
GL
TL
Demark
between
OK & NG
Haizen -
Kitting of
Assemblies
to avoid
missing
operations
2,
3,
4,
5,
TOOL CHANGE
TROUBLE SHOOTING
PERIODICAL MAINTENANCE
LINE START AND END PREPARATION
SHEET
8,
10,
Toyota Japan,
Thailand,
Philippines
Vast Knowledge
& Experience`
Monitor
variation in
machine
elements thru
Jishuhozen
Changes /
Deterioration
in machine
elements
ZERO BAD
2. Maintain Consistency
2.1 Trend Chart
Do not hesitate to stop the line
in case of quality abnormality
3. Continuous Improvement
3.1 Visibility of Abnormality
Distinguish
between
Normal &
Abnormal
Eliminate
abnormality by
taking
countermeasures
Find root
cause for
abnormality
by Why-Why
Analysis
Motor Fan
operation
easy
identification
Floating toy
for easy
oil level
indication
Checking
Detection
of
abnormalit
y
Sorting
Arranging
Cleaning
4S
Pride in
work place
Counterme
asures
Positive
effect
3.2 QA Network
Prevent occurrence & outflow of defects
Plan
Do
Take
countermeasures for
occurrence &
outflow of defects
Act
Make the critical
processes foolproof
Check
Check the criticality
of process by giving
ratings
3.3 QC Circle
Identify and eliminate problems at
operational levels by small group activities