Tentative Induction Training Program for Newly Recruited Assistant Executive Engineers (AEEs)

Sl No.
1

Focus areas
Administration and
Establishment

Investment Planning

Major Topics
OWD as an Organization, its structure, Service rules, Financial
Rules, Employee responsibilities, Ethics, Delegation of Powers,
Linkages with other major departments like Law, Finance,
Revenue, Forests, Urban, Irrigation, Industry, Tourism etc. Public
Grievance Management, Government Protocols and Managing
Elected Representatives

Statutory, Regulatory and


OPWD Code and Manual, Statutory requirements (Land
Compliance Requirements and Acquisition, R and R Policy Implementation, Forest and
Mechanism
Environment Clearances and their Process), Compliance
Requirements during works (Audit, Safety, Labor laws, Industrial
Act, Fire regulations, Environment Protection, Construction Waste
Disposal etc.), MV act, Right to Information, Legal Cases, Audit
Response etc.

Structural Design and


Associated Codal Provisions

Structural Design of Roads (Flexible, Rigid Pavement); Culverts,


Bridges and Flyovers; Buildings. This shall include applicable
Codal Provisions and Design software use.

Remarks

Type of Approvals, Project Planning, Survey and Investigations,


Estimation (setting specifications, BOQ) and Costing (SOR, AOR,
Costing), Preparation of Reports (Feasibility, DPR)

Procurement
Approval and Procurement Procedures (including e-procurment)
for works, goods and services, Tendering (Process and
Documentation), Development of Contract Agreements. These
shall include Analysis for Private Sector Participation,
Development of PPP and EPC Contracts etc.

Duration, days

Works Management

Construction Techniques, Construction Supervision (inlcuding


documentation) and Project Management, Quality Management
(including QA Manual), Development of Composites, Sampling
and Testing of Materials, Utility Shifting, Liaison with Other GOO
Departments, Contract Management (Scope, Checks amd
Measurements, Billing, Project Completion, Mandatory
obligations of Contractors, Contract Variations, Revised
Approvals, Dispute Resolution, Contract Closure)

3.5

Project Management -1.5 days;


Quality Management, Quality
Manual and Testing - 3 days,
Contract Management - 3 days
9

Asset Management

Maintenance Budgeting, Asset Management

1.5

IT

IT applications in infrastructure development works, egovernance in OWD and GOO

1.5

Road Safety

Road Safety Policy, Road Accident/Fatalities and Linkages to Road


Design, Data Management, Action Planning

10

Emergency Management

11

Communication and
Documentation

Preparation and Response Mechanism during emergency/natural


disasters

Written communication, drafting notes, file management etc.

0.75

0.5

1.5

12

Study/Exposure Visits

Construction sites (Roads, Buildings, Bridge works and site


offices) to study construction techniques, maintaining field
records and their dissemination, sampling of materials, resource
management etc.; Material Testing lab for Quality Managment

13

Examinations

Two periodic examinations (0.5 day each)

14

Ceremonies

Registration, Inaugural, Valedictory

TOTAL

Use of WAMIS, IoTMS etc.

0.75

48

Includes laboratory visit/Demo


on Testing of Materials (2.0 d)

Half day on First day and 0.25 d


on last day of Trg.

equals 2 months, including


sundays and holidays

Week 1
Day

Time, h
9:00 AM

10:00 -11:15 h

Inaugural Function: Welcome, Official Introduction, Brief of Dept

11:15 - 12:00 h
12:00 -13:30 h
13:30 -14:30 h

Tea
GOO System, Functioning and Structure of OWD, Performance of OWD
Packed Lunch

14:30-16:00 h
16:00-16:20 h
16:20-17:00 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
2

13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:00 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h

13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h

13:15 -14:15 h
14:15-15:45 h

15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Activity/Topic of Lecture
Registration - Distribution of Training Kit (Bag, Course Book, Impotant Phone nos,
Trg Schedule and Trg Materials)

10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Resource Person

Back-end Support

Venue

HRD Cell
EIC Cum Secretary (W), EIC,
SE (ISAP and HRD)

Service Rules of GOO (Conduct rules, Transfer rules, promotion policy, benefits
and compensation: leave, medical, pension; asset declaration, tax compliance,
Vigilance etc.)
Tea
Service Rules of GOO (contd.)
Financial Rules of GOO including Audit Aspects (TA, DA, Loans and Advances,
provident Fund, Gratuity, Pension, Billing, Imprest)
Tea
Delegation of Powers, Job Responsibilities of AEE, Ethics and harrassment in
workplace
Lunch
Institutional Stakeholders/linkages with MoRTH, NHAI at GOI; Law, Finance,
Revenue, Forests, RD, Urban, Irrigation, Industry, Tourism. Energy within GOO etc.
Tea
Complain handling, Public Grievance Management, Government Protocols (for
Elected Representatives, GOI Officials, GOO officials)
Project approvals and their requiremets, Project Planning
Tea
Pre-Construction activities, Surveys and Investgations, soil exploration for road
projects
Lunch
Preparation of a DPR (requirements, format, contents) for a road project
Tea
Pre-Construction activities, Surveys and Investgations, soil exploration for bridge
projects
Preparation of a DPR (requirements, format, contents) for a bridge project
Tea
Pre-Construction activities, Surveys and Investgations, soil exploration for a
building project
Lunch
Preparation of a DPR (requirements, format, contents) for large/high rise/green
buildings
Tea
Understanding/setting Specifications for roads, bridges and buildings
Understanding Schedule of Rates (SOR) and Analysis of Rates (AOR) and the devel
Tea
Estimation and Costing of road and bridges
Lunch
Landscaping and architectural issues in building design
Tea
Estimation and Costing for Buildings (Residentail, non-residential, Framed and
load Bearing wall construction etc.)
Visit to a Modern Survey lab - to provide demo of modern survey equipment
Lunch
Visit to a Hydro-Geological Investigation lab and demo of specific tests

Week Two

Day 1

Day 2

10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h

Estimation and Costing of Non-scheduled items


Tea
Exercise on Estimation and Costing - roads
Lunch Break
Exercise on Estimation and Costing - bridges
Tea
Exercise on Estimation and Costing - Residentail Buildings
OPWD Code - Development, Role, Importance, Major Contents
Tea
OPWD Manual - Importance, Use
Lunch Break
Environmental Guidelines for Large Project Clearance, Process of acquiring
Clearances, Understanding EIA
Tea

OPWD Code and Manual, Statutory requirements (Land Acquisition, R and R Policy Implementation, Forest and
Environment Clearances and their Process), Compliance Requirements during works (Audit, Safety, Labor laws,
Industrial Act, Fire regulations, Environment Protection, Construction Waste Disposal etc.), MV act, Right to Information,
Legal Cases, Audit Response etc.

Day 2

16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
Day 3

13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h

Day 5

Initiating, Filing and Processing of land diversion proposal, Utility shifting


Tea
CPW Accounts Code
Compliance requirements (Audit, Safety, Labor laws)
Tea
Compliance requirements (Fire Regulations, Environment Protection, Waste
Disposal etc.)
Lunch Break
Right to Information Act, Supply of Information, Compliance to Audit
Tea
?????

10:00 -11:30 h

Procurement Procedures (including e-procurment) for works, goods and services


and their approvals, procurment Manual, Contractor Classes and their registration

11:30 - 11:45 h

Tea

11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h

Day 6

Permission for Tree cutting and Coordination with Forest Department officials
Lunch Break

13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

11:45 -13:15 h
Day 4

Land acquisition process - Justification, Identification, Liaison with Revenue,


Process, Payments, Transfer and Taking over, Closure
Resettlement and Rehabilitation Policy of GOO, Implementation issues
Tea

11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Salient Features of Standard Bidding documents for works, goods and services;
changes in SCC (special conditions of Contracts), Inclusion of maintenance/Defect
Liability/OMT
Lunch Break
Evaluation of Different Types of Tenders (EOI, RFP based)
Tea
Role of PPP and anaysis requirements for a PPP project
Tendering methods, Publicity, Pre-bid meetings, Submissions, Evaluations,
approvals including requirements under e-procurement
Tea
Development of Contract agreements (K2, F2, P1, PPP, EPC etc.), Work order,
Contracts
Lunch Break
????
Tea
????

Week Three

Day 1

Day 2

Day 3

Day 4

Day 5

10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h

Design Parameters/Criteria for Roads, Road Design Standards


Tea
Horizontal alignment design, super elevation design and application
Lunch Break
Vertical alignment design
Tea
Co-ordination of horizontal and vertical alignments
Principles of Junction Design - Junction Capacity Assessment and Design
Tea
Road Pavement, Materials, Traffic Load Design Requirements
Lunch Break
Design of Road surface
Tea
Alternate analysis of Routes
Economic Analysis of Roads
Tea
Road work in Hilly Terrains, protection works
Lunch Break
Demo on Computer aided road design
Tea
?????
BRIDGE DESIGN (THREE DAYS) - Culverts, Flyovers, Bridges
Tea
Lunch Break
Tea
?????
Tea
Lunch Break
Tea

Day 5

16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Day 6

Tea
Lunch Break
????
Tea
????

Week Four

Day 1

10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h

Day 2

Day 3

Day 4

15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
Construction Supervision

Examination (2.5 hr)

10:00 -11:30 h

Layout, alignment marking, road geometrics- horizontal and vertical curves,


super-elevation, longitudinal gradient, camber etc. (IRC73:1980 Geometric
Design Standards for Rural Non-Urban Highways)

11:30 - 11:45 h

Tea

11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

10:00 -11:30 h

11:30 - 11:45 h
Day 5

Building Design Principles and Relevant Codes


Tea
Design Loads for Buildings: Dead, Live, Wind, Seismic, Other loads
Lunch Break
Design of Foundations: Crawl space, basement, slab-on-grade with stem wall,
monolithic slab, piles, piers and alternative methods
Tea
Footing Design: Gravel and concrete Footings, Concrete footing,
Reinforced Wall Foundation Design, Slab on grade design;
Tea
Column Design, Frame Design
Lunch Break
Wall design: Un-reinforced masonary wall design
Tea
????
Considerations in design of energy efficient, green buildings
Tea
???
Lunch Break

11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h

Day 6
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Construction of Enbankments, sub-grades, sub-base, base course, BT Works


(Reference: MoRTH Specifications for Road and Bridge Works -5th Revision: Pocket
Book For Highway Engineers and Relevant IRC Codes)
Lunch Break
Construction of Rigid Pavements - semi-mechanizd methods
Tea
Construction of Rigid Pavements - Mechanizd methods
Building Materials - Cement, reinfrocement steel, structural steel, quality and
conformation criterai with reference to relevant BIS Code; Bricks-Kiln burnt, Clamp
burnt bricks, flyash bricks, hollow bricks/blocks; Concrete - Grades of concerte,
normal mix, design mix; Coarse aggregate - grading, requirement of physiacl
properties - Aggregate Impact value, Flakiness and elongation index, Abrasion
value
Tea
Foundatoin - Load bearing walls, Column footing (isolated, combined), Framed
Structure, raft/mat foundation, pile foundation, plate load test, pile load test
Lunch Break
Construction of Building Super-structure - Plinth to roof formwork, Scaffolding,
cantering an shuttering, construction joints expansion joints, reinforcement
detailing, placing etc. as per BIS 456-2000 and Special publication SP:32
Tea
MID TERM COURSE EVALUATION
Construction of CD works, Drains, Culverts, Causeways, Bridge and Floor
protection works
Tea
Types of Bridges: Minor, Major, submersible, High level
Open, Well, Raft, Pile
Lunch Break

Foundation: -

Study of GAD, Layout of alignment, Fixing Center line of piers and abutments,
Fixing of benchmarks, Maintaining of History Book and Site Order book
(Reference: Pocket Book of Bridge Engineers)
Tea
Well Foundation- Recording tilt and shift during shinking, register for tile and shift,
Confirmatory boring vis-a-vis plugging of wells, Test pile - pile capacity

Week Five
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
Day 1
14:15-15:45 h

15:45 -16:00 h

Day 4

10:00 -11:30 h

Tea

11:45 -13:15 h

Quality control tests for layers of flexible pavmentEmbankment,Subgrade,Granular subbase,Wet mix macadam,Bituminous
macadam,Dense bituminous macadam,Semi-dense bituminous concrete etc.
Lunch Break

13:15 -14:15 h

15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Quality control tests for layers of flexible pavmentEmbankment,Subgrade,Granular subbase,Wet mix macadam,Bituminous
macadam,Dense bituminous macadam,Semi-dense bituminous concrete etc. contd.
Tea
????
Labrotory Demonstration test & Field test for Quality Management
Tea
Labrotory Demonstration test & Field test for Quality Management
Lunch Break
Labrotory Demonstration test & Field test for Quality Management
Tea
Labrotory Demonstration test & Field test for Quality Management

10:00 -11:30 h

Project Management - Principles (components, Planning, Scheduling, PERT, CPM)

11:30 - 11:45 h

Tea

11:45 -13:15 h

Project Management - Principles - (Resource management, Monitoring)


Lunch Break

13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h

Day 5

13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h

Day 6

13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Week Six (Field Visits)


10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
Day 1
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
Day 2

Types of Cement (OPC, PPC, SPC); Nominal mix, mix design; Workability (slump),
water /cement ration, hiney-combing, seggregation, bleeding, porous concrete,
proper placing and compaction, durability, dense concerte, poor qulaity concrete
resulting in deterioration/distress like cracking, spalling, corrosion of
reinforcement
Tea

11:30 - 11:45 h

14:15-15:45 h

Day 3

Bearing, Expansion joints, Wearing Coat, railing, Reinforced Earth Technology


Lunch Break

Construction Machinery - Concrete mixtures (drum/pan type), batcg mix plant ,


plate vibrator, needle vibrator, hot mix plant, sensor paver,
Introduction to Quality Management, Quality Control, Quality Assurance and
Quality Audit

16:00-17:30 h

Day 2

Construction Supervision - Contd.


Bridge Superstructure - solid slab, girder and slab. Box - girder, pre-stressed
girder, steel, composite structures
Tea

Demon on Project Management


Tea
Demo on Project Management (Resource requirements and their management)
Types of Contracts, Contract Management, Role of officers
Tea
Scope, Checks and Measurements, Enteries/Records and their verification
Lunch Break
Mandatory obligations of Contractors, Billing (bill forms, Running bill, final bill),
Verifications and Payments
Tea
Deviations - Extra items, quantity variations, substitute items
Incentives, Liquidated damages/compensation, price escalation
Tea
Reporting, Contract Variations, Approvals and Revisions Rescission of contracts
Lunch Break
Dispute Resolution, Contract Closure
Tea

Six days have been planned for field visits (2 each for Road, Building and Bridge
works)

These shall be adjusted during


various weeks

Day 2

Day 3

Day 4

Day 5

Day 6

11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Week Seven
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
Day 1
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Day 2

Day 3

Day 4

Lunch Break
Tea

Tea
Lunch Break
Tea

Tea
Lunch Break
Tea

Road Assessment surveys


Tea
Road maintenance
Lunch Break
Periodical Inspection, Repair/Rehabilitation of Bridges
Tea
Acquaintenance with Mobile Bridge Inspection Unit

10:00 -11:30 h

Repair of Buildings (rehabilitation/retrofitting), leak repair, crack repair, spalling of


concrete, measures for prevention of cracks in buildings

11:30 - 11:45 h

Tea

11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h

Day 5

Tea

13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h

Plinth Protection, Anti-Termite Treatemt, Use of construction chemicals and


admixtures, Earthquake resistant building design, Construction detailing and
measures
Lunch Break
Maintenance budgeting and Asset Management (ORAMS)
Tea
Maintenance budgeting and Asset Management(ORAMS) -contd.
Software for Estimate, Road Design
Tea
Computer based building Design
Lunch Break
Computer based bridge design
Tea
IT strategy of GOO and IT Road map of OWD
Concept of e-Nirman and Demo,
Tea
Concept of WAMIS, IoTMS etc. and a demonstration
Lunch Break
Demonstration on e-procurement
Tea
Concept of HRMIS, Demonstration
Road Safety: Meaning, Stakeholders and their roles, GOO Policy
Tea
Analysis of Road accident/fatalities, Black spots, Linkages to road design
(including IRC: 67 -2012: Code of Practice for Road signs - Third Revision, Junction
Development)
Lunch Break
Road Safety Audit, Road Safety Action Planning
Tea

MOVE TO DESIGN

Day 5

16:00-17:30 h

Day 6

10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Preparation and Response Mechanism during emergency/natural disasters

Tea
Lunch Break
Tea

Week Eight

Day 1

Day 2

Day 3

Day 4

Day 5

Day 6

10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h
10:00 -11:30 h
11:30 - 11:45 h
11:45 -13:15 h
13:15 -14:15 h
14:15-15:45 h
15:45 -16:00 h
16:00-17:30 h

Communication skills (oral)


Communication skills (written)
Communication skills (presentations by participants, reaction by facilitator)
Communication skills (presentations by participants, reaction by facilitator)

Examination (2.5 hr)


Motivational talk
Tea
Personality Development
Lunch Break
Leadership and Team Building
Tea
Motivational Movie
Tea
Lunch Break
Talent Show (participants)
Financial planning for self (Taxation, Mutual Funds, SIP, Insurance etc.)
Tea
Finance and Accounting in GOO offices
Lunch Break
Documentation, Filing and Office Management
Tea
???
Final Training Program Evaluation
Lunch Break
Valedictory Function (prizes to best performing participants) and Address