Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

WD 13 Bobrn 2011

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

WD-13-BOBRN-2011

(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

INDIAN RAILWAYS

PARTICULAR SPECIFICATION
FOR
BOGIE OPEN RAPID DISCHARGE HOPPER WAGON
TYPE `BOBRN AND ITS VARIANTS
BROAD GAUGE-1676 mm
(B.G. 5 6)
Issued By:
Wagon Directorate
Research Designs and Standards Organization
Manak Nagar, Lucknow -206011.

March,2011

Price:Rs.1600 /-

Page 1 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

CONTENTS
Clause
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Description
Scope
Definitions
Welding
Testing
Standard Specification
Use of Alternatives
Particular Requirements
Spare Parts of Door Operating Mechanism (RDSO Design).
Training of Railway Supervisor/ Skilled Staff on Door Operating
Mechanism.
Inspection
`As Made' Drawings, Photographs and Models.
ANNEXURE

Annexure-I
Annexure-II
Annexure-III
Annexure-IV
Annexure-V

Method of Determining the Tare Weight of Wagons.


Performance Test for Door Operating Mechanism (DOM).
Proforma for Single Wagon Air Brake Test.
Nylon Brake Gear Bushes in the Brake Gear on Under frame.
List of Spare Parts of Door Operating Mechanism (RDSO Design).

Page 2 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

INDIAN RAILWAYS
PARTICULAR SPECIFICATION
FOR
BROAD GAUGE BOGIE OPEN RAPID DISCHARGE
HOPPER WAGONS
TYPE BOBRN AND ITS VARIANTS
...
1.

SCOPE
This Specification covers the particular requirements for the manufacture and supply of
Broad Gauge Bogie Open Rapid Discharge Hopper Wagons Type BOBRN and its
variants strictly to the relevant drawings of relevant wagon outlined in RDSO index drawing
No. WD-91071-S-50 and General Standard Specification No. G-72 (Rev. Latest) with latest
amendment issued by RDSO (Wagon), Manak Nagar, Lucknow-226011. These wagons shall
be supplied complete in all respect.

1.2

Cast steel bogie complete together with bogie brake rigging, wheels and axle sets with
cartridge roller bearing narrow jaw adapters along with elastomeric pads thereon, top &
bottom centre pivots, C.P. pins and constant contact side bearers referred to in clause 7.3,
high tensile straight centre buffer coupler (non transition) together with high capacity
draft gears, striker castings, yokes, yoke pins, yoke pin support plates as referred to in
clause 7.4 and complete air brake equipment along with pipes and pipe joints as
referred to in clause 7.5 shall be fitted with these wagons.

1.3

The Contractor shall prepare his own working drawings based on the aforesaid key design
drawings and submit them to the `Engineers' for approval before undertaking construction.
The Contractor shall ensure that working drawings submitted for approval of the `Engineers'
are fully in accordance with key design drawings and deviations, if any, are specially pointed
out. Approval of the `Engineers' will only pertain to the design features, important controlling
dimensions and the deviations from the design drawings specially pointed out by the
Contractor. Other details in drawings will not be checked by the `Engineers' and the
responsibility for the same will be that of the Contractor.

2.

DEFINITIONS

2.1

Purchaser' means the President of the Republic of India.

2.2

Engineer' means Research Designs and Standards Organization, Ministry of Railways,


Manak Nagar, Lucknow- 226011 and will be represented by Ex. Director Standard Wagon,
RDSO.

2.3

Inspection Officer' means the person, firm or department nominated by the purchaser to
inspect the work on his behalf and the deputies of the Inspecting Officer so nominated.

2.4

Contractor' means the person, firm or company with whom the order for the supply is
placed and shall be deemed to include the contract's successors(approved by the Purchaser),
Page 3 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

representatives, heirs, executors and administrators as the case may be unless excluded by
the terms of contract.
2.5

Sub-Contractor' means the person, firm or company from whom the contractor may obtain
any material or fittings to be used in the manufacture of the above parts.

3.

WELDING

3.1

General requirements and comprehensive guidance with regard to edge preparation, fit up
for welding, welding procedure and inspection of welded joints are contained in Clause 8
of General Standard Specification No. G-72 (Rev. Latest) with latest amendment which
can be had from Director General, RDSO, Manak Nagar, Lucknow 226 011.This should
be strictly followed.

3.2

Wherever welding is specified or adopted in the manufacture of the wagons or in the


fabrication of sub-assemblies and components, the manufacturer shall submit his proposed
welding procedure and sequence to the Inspecting Officer and obtain his approval for the
same. This, however, will not in any way reduce the Contractor's responsibility for
satisfactory execution of the contract in all respects as stipulated in Clause 4 of General
Standard Specification No.G-72 (Rev. -Latest) with latest amendment.

3.3

The Contractor shall furnish three copies of the "Welding Procedure and sequence of
assembly of the Wagon" which is finally approved by the Inspecting Officer, to the
Purchaser/Engineers, before commencement of regular production.

4.

TESTING

4.1

Before taking series production of wagon, a pattern wagon shall be manufactured and got
approved by the Engineers.

4.2

The `Pattern Wagon' shall be tested as detailed in Clause 12 of General Standard


Specification No. G-72 (Rev. Latest) with latest amendment. Clearance found between
various members of underframe and bogie shall be measured under tare, fully loaded,
overloaded and unloaded condition and submitted to the Engineers through the Inspecting
Officer. In case of Contractors who would take up the manufacture of this type of wagon for
the first time, the tests to be conducted on the Pattern Wagon' shall be decided in
consultation with the Engineers. The pattern wagon will have to be cleared by the Engineers
before taking up of series manufacture.

4.3

The performance of Air Brake Equipment of each wagon shall be tested with single wagon
test as per proforma given in Annexure-III.

4.4

As a result of prototype load tests if some modification to the wagon is called for the same
shall be executed by the manufacturer.

Page 4 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

4.5

Testing of Door Operating Mechanism shall be done as per Annexure-II.

5.

STANDARD SPECIFICATIONS
All materials required for the manufacture of the wagons shall conform to the latest issue of
relevant specifications as adopted by RDSO for Railway's use unless otherwise specified
herein.

6.

USE OF ALTERNATIVES
In Clause 7 of this Specification, as also in some of the drawings listed at RDSO index
drawing no. WD-91071-S-50, certain alternatives showing different methods of manufacture
or use of alternative materials, which are technically permissible, have been indicated.
Wherever such alternative use has been permitted, the tenderer must quote separately for the
alternatives.

7.

PARTICULAR REQUIREMENTS

7.1

Leading Particulars

7.1.1
7.1.2

The key details of the wagons are as per relevant drawing of the relevant wagon outlined in
RDSO index Drg. No. WD-91071-S-50. (with latest alteration)
Cast steel bogie to latest RDSO specification with latest amendment as per relevant drawing
of the relevant bogie outlined in RDSO index drawing no. WD-91071-S-50 (with latest
alteration).

7.1.3

Provided with cartridge taper roller bearing (with narrow jaw adapters).

7.1.4

Provided with high tensile centre buffer coupler (Non-transition)

7.1.5

Provided with bottom discharge doors having Double Link Mechanism operated by
pneumatic systems with compressed air supply from loco & external compressed air supply
(input through quick coupling & double check valve)

7.1.6

Provided with gradual release air brake system.

7.1.7

Provided with Automatic Load Sensing Device.

7.1.8

Provided with Slack Adjuster to relevant drawing of relevant wagon outlined in RDSO index
drawing no. WD-91071-S-50 (with latest alteration).

Page 5 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

7.2

Material of Construction
(i) Under-frame members like center-sill, sidesills, end sills, side stanchions, side
coping,
hopper frame etc.
(ii) Side wall, end slope plate, vertical support
plate, pressings etc.
(iii) Longitudinal ridge with ribs, cross ridge,
connecting plate, end-ridge, cross-brace, door
holds, door clips & door stiffener, etc.
(iv) Door flap, hopper plates & end slope plate
(upper portion)
(v) Door hinge
(vi) Other Items

Details are provided in relevant


construction drawings mentioned
in RDSO index drawing no. WD91071-S-50
(with
latest
alteration).

7.3

Bogie & Wheel 7.3.1 The wagon shall be equipped with Cast Steel Bogie to latest RDSO
specification with latest amendment as per relevant drawing of relevant wagon outlined in
RDSO index drawing no. WD-91071-S-50 (with latest alteration).
This bogie
will be fitted with springs and load proportionate friction damping
arrangement for Broad Gauge (1676 mm) wagons.

7.3.3

These bogies complete in all respect including wheel sets, cartridge bearings and elastomeric
pads shall be fitted with these wagons.

7.4

Coupler & Draft Gears

7.4.1

Wagon shall be equipped with: -

i.

High tensile centre buffer coupler to RDSO STR with latest revision/amendment to relevant
drawing of the relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with
latest alteration).

ii.

High capacity draft gear to RDSO STR with latest revision/amendment to relevant drawing
of the relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest
alteration).
7.4.2 The fitment of coupler, high capacity draft gear, striker casting, yoke pin support,
and yoke etc. shall conform to the relevant drawing of the relevant wagon outlined in RDSO
index drawing no. WD-91071-S-50 (with latest alteration).

7.4.3

The uncoupling
gear for the centre buffer couplers shall be to the relevant drawing of
relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration).

7.5

Air Brake

7.5.1

The wagon shall be equipped with graduated release air brakes equipped in accordance with
RDSO Specification with latest amendments to relevant drawing of the relevant wagon
outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration).
Page 6 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

7.5.2

The brake equipment and pipe layout of the wagon shall be to the relevant drawing of the
relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration).

7.5.3

Air brake equipment consisting of distributor valve (suitable for automatic empty load device
of two stage type), pipe bracket, brake cylinder, auxiliary reservoir, cut off angle cocks,
single piece load sensing device, flexible hoses and hose couplings for BP as specified in the
relevant specification (with latest amendment) mentioned at relevant drawing of the relevant
wagon shall be fitted with these wagons.

7.5.4

The pipes and joints consisting of brake pipe, branch pipes and pipe joints as specified
in RDSO specification(with latest amendment ) mentioned at relevant drawing of relevant
wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration). shall
be fitted with these wagons.

7.5.5

The complete air brake equipment including the pipes and joints shall be fitted on pattern
wagon as per relevant drawing of the relevant wagon outlined in RDSO index drawing no.
WD-91071-S-50 (with latest alteration) and offered to the `Engineers' for approval. The
Contractor shall be obliged to carry out any modification on the layout of the air brake
equipment, if found necessary by the `Engineers'.

7.5.6

Contractor shall proceed with the bulk production of the wagon only after the final approval
of the layout of complete air brake equipment, on the pattern wagon.

7.5.7

During the bulk production of wagons, Contractor shall ensure that the complete air brake
equipment is fitted on the wagon correctly as per the dimensions shown in the layout
drawing. Special care must be taken with regard to the clamping of pipes.

7.5.8

The wagon shall be fitted with brake gear arrangement to the relevant drawing of the
relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest
alteration).

7.5.9

The wagon shall be fitted with hand brake as indicated in relevant drawing of the relevant
wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration).

7.5.10 The wagon shall be fitted with Automatic Empty Load Device as shown in relevant drawing
of relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest
alteration). to provide 2.2 kg/cm2 and 3.8 kg/cm2 cylinder pressure under empty and fully
loaded conditions respectively, as shown in relevant drawing of relevant wagon outlined in
RDSO index drawing no. WD-91071-S-50 (with latest alteration).The system shall meet all
the provisions relating to the characteristics and tests of brake equipment stipulated in "UIC
Code No. 541".
7.5.11 The wagon shall be fitted with Slack Adjuster to relevant drawing of the relevant wagon
outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration).

Page 7 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

7.6

Bottom Discharge Doors

7.6.1

The wagon shall be equipped with R.D.S.O. designed, Double Link Mechanism
pneumatically operated Bottom Discharge Doors, generally to relevant drawing of the
relevant wagon and shall be supplied by the Contractor. Prototype wagon shall be given
Performance Test as per Annexure-II.

7.6.2

Details of Door Flaps , Hinges and linkages shall be as per relevant drawing of the relevant
wagon and the door operating air pipe layout shall be as per relevant drawing of the
relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest
alteration).

7.6.3

The doors are to be operated through a Manual Pneumatic Valve (M.P.V). The valve can be
operated through two push buttons provided one at each end of the valve. The operation of
one push button facing the side sill will allow the actuation of air drive system for opening
the door, while the actuation of other button will close the door as shown in the relevant
drawing of the relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with
latest alteration).The air connection of the reservoir for door-operating cylinder is given to
the hose coupling for air pipe system shown in the above mentioned drawing. The air
pressure required for door operation is 5kg/cm to 6kg/cm.

7.6.4

In case the DOM Air Reservoir does not have compressed air supply from the loco, the
compressed air may be supplied through Quick coupling & double check valve, fitted on
wagon for operation of DOM through Manual Pneumatic Valve (M.P.V), as explained in
para 7.6.3

7.6.5

Air Cylinder
The overall dimensions of air cylinder shall be as per the relevant drawing of the relevant
wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration). The
testing pressure of the cylinder should be 10 Kg./cm. The cylinder should be capable of
working for six years trouble free service in actual field operation for which a guarantee from
the manufacturer shall be obtained.

7.6.6

Filter
The overall dimensions of the filter shall be as per relevant drawing of the relevant wagon
outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration).The filter
should be provided with 10 Micron elements and tested for a pressure of 10 Kg/cm. The
filter should be provided with automatic/manual water drainage system. The filter, except the
element, should be guaranteed by the manufacturer for six years trouble free service in actual
operating condition.

7.6.7

Control Valve
The overall dimensions of the control valve shall be as per relevant drawing of the relevant
wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration).The
Page 8 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

valve shall be tested against test pressure of 10 kg/cm2 and should be guaranteed by the
manufacturer for six years trouble free service under actual operating conditions.
7.6.8

Anti Pilferage
Anti-pilferage measures for Door Operating Mechanism parts to relevant drawing of the
relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with latest
alteration) shall be provided.

7.7

Painting & Marking

7.7.1

The surface preparation of the wagon shall be as indicated in Clause No.11 of General
Standard Specification No. G-72 (Rev.Latest ) with latest amendment

7.7.2

Wagon Superstructure shall be painted with paint system as specified in Clause No. 11.2.6 of
G-72 (Rev. -Latest) with latest amendment.

7.7.3

Other sub-assemblies like Bogie, Couplers, Airbrake shall be painted as per G-72 (Rev.
Latest)with latest amendment.

7.7.4

Wheel and axle assemblies for wagon shall be painted as specified in IRS:R-19/93 (Part 1
with latest revision)

7.7.5

Zebra strips shall be painted on the outside corners of the wagon with paint of Red Colour
No. 537 to IS:5-1978 and Ready Mixed White Paint to IS:127 as indicated in relevant
drawing of the relevant wagon outlined in RDSO index drawing no. WD-91071-S-50 (with
latest alteration)..

7.7.6

The marking on the wagon shall be as indicated in relevant drawing of the relevant wagon
outlined in RDSO index drawing no. WD-91071-S-50 (with latest alteration)..

7.7.7

The tare weight of the wagons shall be marked in tonnes upto one decimal plate, as
determined by the method detailed in Annexure-I.

7.7.8

The operating direction (On and Off) of side operated hand brake wheel shall be marked as
indicated in relevant drawing of the relevant wagon outlined in RDSO index drawing no.
WD-91071-S-50 (with latest alteration)..

7.7.9

Standard Plates shall be attached on the underframe sole bars at diagonally opposite corners
as shown in relevant drawing of the relevant wagon outlined in RDSO index drawing no.
WD-91071-S-50 (with latest alteration)..One plate on each underframe shall be in Hindi to
relevant drawing of the relevant wagon outlined in RDSO index drawing no. WD-91071-S50 (with latest alteration).Mild Steel drop stamped standard plate is acceptable as an
alternative.

Page 9 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

7.7.10 Railway's initials to be marked will be intimated later. The mechanical code to be stenciled
and stamped at locations as shown in relevant drawing of the relevant wagon outlined in
RDSO index drawing no. WD-91071-S-50 (with latest alteration).
8.

SPARE PARTS OF DOOR OPERATING MECHANISM (RDSO DESIGN)

8.1

Mandatory spare parts for DOM as per Annexure-V shall be supplied by the manufacturer of
the wagon along with order of `BOBRN' wagons.

9.

TRAINING OF RAILWAY
OPERATING MECHANISM

9.1

The Contractor shall arrange to train sufficient number (10 No. per 100 No. wagon or part
thereof) Railway Personals free of cost on following aspects of Door Operating Mechanism
to be covered in five working days:-

SUPERVISOR/SKILLED

STAFF

ON

DOOR

- Salient features of Door Operating Mechanism.


- Adjustment procedure during mounting of Door Operating
Mechanism on Wagon.
- Testing Procedure.
- Tools used for mounting of Door Operating Mechanism
- Trouble Shooting.
9.2

The Contractor shall provide free accommodation to Railway Personnel during training.

10.

INSPECTION
The inspection of the wagon with all its fittings is to be carried out by RDSO Wagon
Inspection Directorate. The Wagon Manufacturer will provide all the facilities to the
Inspecting Officer during various stages of manufacture of wagons.

11.

DRAWINGS
Wagons shall be manufactured strictly to relevant drawing of the relevant wagon outlined in
RDSO index drawing no. WD-91071-S-50 (with latest alteration). The alteration numbers
indicated against each drawing are, however, subject to advancement in course of
construction of these amendments in manufacturing of components. Copies of such amended
drawings will be supplied to the Contractor free of cost. The drawings listed are complete in
all respects and any detailing, if necessary, will be done by the Contractor.

12.

AS MADE' DRAWINGS, PHOTOGRAPHS AND MODELS

12.1

Drawings

12.1.1 The Contractor shall supply two sets of `As Made' Polyster Film Tracings(50 Micron thick
matte) of drawings followed in the manufacture of the wagons for the record of Purchaser
and Engineers. These tracings shall conform to the requirement as detailed in Clause 21 of
General Standard Specification No. G-72 (Rev.Latest)with latest amendmentThe Contractor
Page 10 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

shall incorporate in the above set of tracings, any deviations, modification and relaxations
granted in the course of manufacture.
12.1.2 The `As Made' drawings detailed above shall contain full details of each
component/assembly/sub- assembly, inclusive of the material specification, actual average
weight and reference drawings. The general order of the drawings, title block etc. shall be
strictly as indicated in SK.67521 with space for IRS drawings number left blank. The size of
the sheet shall be A1(841 mm x 594 m)and the Code of Practice for drawings shall conform
to IS Specification No. 696.

12.2

Photographs
The Contractor shall furnish to the Engineers free of cost suitably mounted colour photos 600
mm x 450 mm bringing out the Salient Features as called for in Clause 21 of General
Standard Specification No. G-72 (Rev.Latest) with latest amendment.

12.3

Models
The Contractor shall furnish to the Engineers, if and when required, free of cost, a 1/16
scale model made out of steel or acrylic transparent sheet as called for in Clause 21 of
General Standard Specification No. G-72 (Rev.Latest) with latest amendment.

***

Page 11 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

ANNEXURE-I

METHOD OF DETERMINING THE TARE WEIGHT OF WAGONS

All Contractors(whether equipped with weigh bridges or not in their works) will arrange to
weigh each wagon of identical design and mark individual tare weight on them by actual weighmwnt
. the tare weight so arrived shall be deducted from the gross load to arrive at the correct carrying
capacity that shall be marked on the wagons.
Tare weight of the wagons shall also be intimated to the Engineers duly certified by the
inspecting officer.

***

Page 12 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

ANNEXURE-II
PERFORMANCE TEST FOR DOOR OPERATING MECHANISM (DOM)

1.

The Wagon Manufacturer should install a Test Rig/use the pattern wagon along with a
suitable pit below it to test the complete DOM to simulate the working condition of DOM.

2.

For each order, the DOM shall be actuated 2000 times, 1000 times door opening and 1000
times door closing on the test rig/pattern wagon. For 1000 door opening and 1000 door
closing, the failure of the DOM shall not exceed 0.3%.

3.

The DOM shall be checked for five times with full payload on prototype wagon by unloading
the payload over the pit. It shall be ensured that the moving parts under the centre sill do not
infringe during movement. The unloading Test is however, not mandatory for those Wagon
Builders who has already executed an order earlier of BOBRNM1 /BOBRNHSM1 Wagon
with Double Link Door Mechanism of RDSO Design and have no adverse report from
Railways on functioning of Door Mechanism. Loaded prototype wagon in this case should be
moved and checked inside the Builders Yard for a distance of 5 Kms at a speed not less than
6 Kmph.

4.

During the Unloading Test, the wagon unloading time shall be checked and recorded. The
unloading time should be 15 seconds or less.

5.

Leakage Test

(i)

Charge the system to maximum operating pressure and cut-off the supply of air to the
system.

(ii)

Observe the reservoir pressure for one minute and record the drop of pressure, if any. It
should not exceed 0.1 kg/cm2 in one minute.

6.

Self Operation
Operate the DOM with air from reservoir only with main supply to reservoir cut-off. Record
the number of cycle, which can be done, and pressure drop for each cycle.

Page 13 of 16

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

ANNEXURE-III
PROFORMA FOR SINGLE WAGON AIR BRAKE TEST
S. NO.
1
2
3
4
4.1

4.2

4.3
5
5.1
6.

7.

8.
8.1

8.2

9.

10.
11.
11.1

Check
Pressure in BP
Pressure in AR
Leakage from the system
Full service application after charging
Brake cylinder filling time
(Pressure rise from 0 to 3.6 kg/sq.cm.)
a) Empty
b) Loaded
Maximum brake cylinder pressure
a) Empty
b) Loaded
Reduction in BP pressure required for full service
application.
Release after full service application.
Draining time (Brake cylinder pressure to fall from 3.8 +0.1
kg/sq.cm. to 0.4 kg/sq.cm.)
Sensitivity of brakes Isolate brake pipe from mainline.
Check the response of brakes when brake pipe pressure is
reduced at the most equal to 0.6 kg/sq.cm. in 6 sec.
Insensitivity of brakes isolate brake pipe from mainline.
Check the pressure of brakes when brake pipe pressure is
reduced atleast equal to 0.3 kg/sq.cm. in 60 sec.
Emergency application:
Brake cylinder filling time
(Pressure to rise from 0 to 3.6 kg/sq.cm.)

Specified
5 0.1 kg/sq.cm
5 0.1 kg/sq.cm
0.1 kg/sq.cm. in one minute.

a) Empty
b) Loaded
Maximum brake cylinder pressure
a) Empty
b) Loaded
Piston stroke
a) Empty
b) Loaded
Leakage from brake cylinder after emergency application.

18 to 30 sec.
18 to 30 sec.

Automatic exhausting of brake cylinder and control


chamber.
Apply emergency brakes
(i.e. BP = 0 kg/sq.cm.). Check
the brake cylinder pressure after giving a brief pull to release
hook.

Date

18 to 30 sec.
18 to 30 sec.
2.2+0.25 kg/sq.cm.
3.8 + 0.1 kg/sq.cm.
1.3 to 1.6 kg/sq.cm.

45 to 60 sec.
Brake should apply within 6
sec.
Brake should not apply

2.2 +/- 0.25 kg/sq.cm.


3.8 +/- 0.1 kg/sq.cm.
100 +/- 10 mm
110 +/- 10 mm
0.1 kg/sq.cm.
minutes

Within

Brake cylinder and control


reservoirs should exhaust
automatically.

Signature & name of


Testing Authority.

Page 14 of 16

Actual

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

ANNEXURE-IV
NYLON BRAKE GEAR BUSHES IN THE BRAKE GEAR
(ON UNDER FRAME)
1.

Brake gear bushes of Nylon-66 shall be procured as per Schedule of Technical Requirements
(STR) to relevant drawing of the relevant wagon outlined in RDSO index drawing no. WD91071-S-50 (with latest alteration).

2. Nominal dimensions of Nylon-66 bushes to be used will be same as of steel bushes, inclusive of
step sizes, outside diameter. However, the tolerances and the chamfering should
be as per
Fig.1 of the STR.
3. Universal holes should be drilled initially in the form type support brackets or fork end of
pull/push rods. These holes should be drilled together to the required size only after the assembly
but before the Nylon bushes are fitted therein. This will ensure that the two holes are concentric
and, therefore, the pins passing through the bushes fitted therein will not tilt.
4. Steel pins used with the Nylon-66 bushes shall be with fine
surfaces with the bush.

***

Page 15 of 16

finish machined on all contact

WD-13-BOBRN-2011
(Sup:WD-12-BOBRN-2009, WD-04-BOBR-90-91)
(Sup:WD-01-BOBRNHSM1(BMBS)-009)

ANNEXURE-V
LIST OF SPARES FOR DOOR OPERATING MECHANISM
(RDSO DESIGN)

S.No. Description

Drg. No.

1.

Operating Shaft

2.

Bush ( Bronze )

3.

Safety Lock Spring


Assembly
Pin with Washer &
Bulb Cotter32 Dia x
94 Long
Pin with Washer & Split
Pin, 32 Dia x 103 Long

The details are given


in the relevant
drawing of the
relevant wagon
outlined in RDSO
index drawing no.
WD-91071-S-50
(with latest
alteration).

4.

5.

6.

7.
8.
9.

No. of Spares per


100 Nos. wagons or
thereof.
10
20
3
25

Pin with Washer &


Bulb Cotter 37Dia x 93
Long.
Clevis Pin with
Washer & Split Pin
Pin with Washers &
Split Pins
Hook Pivot Pin
with Washers &
Split Pins.

3
3
3

***

Page 16 of 16

You might also like