Instrumentation Design Basis
Instrumentation Design Basis
Instrumentation Design Basis
Project No.
Document No.
Date
: P002429-001
: 2429.1-00-IC-DAB-001
: 06-09-2013
Page 1 of 49
SYNOPSIS
This document presents the Design Basis for Instrumentation & Control for the Specialty Chemical
Production Plant, Liquid Sulphur Dioxide (SO2) Plant, Centralised Utility Building and Offsite Storage
facilities. This Design Basis shall be used for detailed engineering design of this project.
DESCRIPTION
ORIGIN
REVIEW
L&T-IES
DATE
APPROVAL
VS/RD
MM
SBA
15-02-2013
KD
MM
SBA
25-03-2013
KD
MM
SBA
30-03-2013
KD
MM
SBA
06-09-2013
CLIENT
DATE
APPROVAL
Page 2 of 49
DISCLAIMER
This report has been prepared on behalf of and for exclusive use of ADDAR and is subject to and
issued in accordance with the agreement between ADDAR and L&T-IES. L&T-IES accepts no liability
or responsibility whatsoever for it in respect of any use or reliance upon this report by any third party.
Copying this report without the permission of ADDAR or L&T-IES is not permitted.
Page 3 of 49
Table of Contents
1
Introduction
Scope of Document
General Information
3.1
Abbreviations
3.2
Units of Measurement
3.3
Reference Documents
3.4
Legends
9
9
10
11
11
12
12
12
15
15
15
16
16
16
16
16
17
17
18
18
19
Hazardous Area
7.1
Certifications
7.2
Classification
7.3
Protection Type
7.4
Accessories
7.4.1 Intrinsic Safety Barriers
20
20
20
20
20
20
22
22
22
23
10
Field Instrumentation
24
11
Electronic Transmitter
26
Page 4 of 49
12
Flow Measurement
12.1 Orifice Plate
12.2 Flowmeter Types
27
27
28
13
Level Measurement
13.1 Level Gauges
13.2 Level Switch
13.3 Level Transmitters
30
30
30
31
14
Pressure Measurement
14.1 General
14.2 Pressure Gauges
14.3 Pressure Switches
14.4 Pressure Transmitters
32
32
32
33
33
15
Temperature Measurement
15.1 Temperature Gauges
15.2 Resistance Temperature Detector (RTD)
15.3 Thermocouple
15.4 Thermowells
15.5 Temperature Transmitter
35
35
35
36
36
36
16
Analytical Instruments
37
17
Weighing Instruments
38
18
Valves
18.1 General
18.2 On/Off Valves
18.3 Control Valve
18.4 Solenoid Valves
18.5 Limit Switches
39
39
39
39
40
40
19
Cables
19.1 Cable Type
19.2 Cable Specification
19.3 Cable Glands
19.4 Cabling Philosophy
41
41
41
42
42
20
Junction Box
43
21
44
22
46
23
Cable Trays
47
24
Installation
24.1 Instrument Installation
24.2 Cabinet Installation
48
48
48
Page 5 of 49
25
Spare Philosophy
49
List of Tables
Page 6 of 49
Introduction
Arab House for Industrial Consultancy a business unit of ADDAR GROUP (hereinafter
referred to as ADDAR) plans to design and execute grass root project for Specialty
Chemical (SA) Production Plant with annual capacity of 6000 MT in Jubail Industry city,
Kingdom of Saudi Arabia (KSA). Along with this facility, ADDAR is also setting up 15000 MT
per year Sulphuric Acid Plant, 4000 MT per year Liquid Sulphur Dioxide (SO2) Plant and 450
Nm3/hr capacity Hydrogen Plant for own consumption. In addition to above mentioned four
Process Plant Buildings, The project will have Centralised Utilities, off-site Storage,
Administrative Buildings and Infra-structure facilities.
Larsen & Toubro Integrated Engineering Services (hereinafter referred as L&T-IES) shall
provide detail engineering services for two process plants namely, Speciality Chemical Plant
& Liquid Sulphur Dioxide (SO2) Plant, Centralised Utilities, Off-site Storage and Administrative
Buildings & Infra-structure.
Page 7 of 49
Scope of Document
The purpose of this document is to cover the design basis, standard engineering practices for
Instrumentation and Control shall be followed during engineering activities.
Page 8 of 49
General Information
3.1
Abbreviations
The list of abbreviations and their meanings that are used in this document are as mentioned
below:
ANSI
API
AWG
ASTM
MPMS
ASME
ATEX
Atmosphere Explosives
BS
ISA
IEC
ISO
BASEEFA
NACE
NEMA
NFPA
FCI
DCS
PLC
EMC
Electromagnetic Compatibility
FM
Factory Mutual
UPS
IP
Ingress Protection
HART
Page 9 of 49
3.2
SASO
**
ADDAR to confirm/specify
Units of Measurement
Units of measurement shall be in accordance with ISO requirements and refer to:
A list of commonly used SI units in process calculations is shown in the Table 3-1 below:
Table 3-1 Commonly Used SI Units
Unit Name
Kilogram per centimetre
square(gauge)
bar(gauge)
Millimetre bar (gauge)
Cubic metre
Litre
Normal Cubic metre
Degree Celsius
Hertz
Joule
Kilogram
Tonne
Inch
Milimeter
Meter
Metre per second
Milligram per litre
parts per million
Millisecond
Second
Minute
hour
Newton
Ohm
Square metre
Square cm
Square mm
Quantity
Notation Standard
Pressure
Kg/cm2(g)
bar (g)
mmbar(g)
3
Volume
Temperature
Frequency
Energy
Mass
Length
Velocity
Concentration
Time
Force
Resistance
Area
m
litre
3
Nm
o
C
Hz
J
kg
t
Inch ()
mm
Mtr
m/s
mg/l
ppm
ms
s
min
hr
N
m2
2
cm
mm2
Page 10 of 49
3.3
Quantity
Electrical potential
Power
Volumetric Flow
Mass Flow
Density
Differential Pressure
Conductivity
Relative Humidity
Current
Level
Viscosity
Notation Standard
mV
V
W
m3/ hr
l/min
Kg/hr
Kg/ m3
mmWC
S/m
%
A
%
cP
Reference Documents
Section 13420
Section 13430
3.4
Legends
Following marks shall be checked in the relevant bracket:
[ ]
Applicable
[ M]
Mostly Applicable
[ P]
Partially Applicable
Not Applicable
[ D]
Page 11 of 49
4.1
General
The precedence applying for use of the Codes, Standards, Specification, Regulatory &
Statutory requirements for this project is as follows:
International Standards
4.2
REF
ANSI B1.20.1
ANSI B16.20
ANSI/ISA 75.01.01
ANSI/ISA 75.04
ANSI/ISA 75.05.01
ANSI/ISA 75.08.01
Page 12 of 49
REF
ANSI/ISA 75.11.01
ANSI/ISA 75.16
ANSI/ISA 75.19.01
ANSI/ISA 75.22
ANSI/ISA RP75.23
ISA S5.5
ISA S7.3
Manual of Petroleum Measurement Standards - Chapter 3 Tank Gauging Section 1A: Standard Practice for the Manual
API RP 550 P1
API RP 551
ASME B16.5
ASME B16.10
ASME B46.1
Temperature Measurements
Thermowell installations in power and process piping
Page 13 of 49
REF
BS 1780
BS 3693
Instrumentation Cable
BS 5308
BS 5792
BS 6739
EN50082-2
2: Industrial Environment
Control Valve Seat Leakage
FCI 70-2
IEC 332
IEC 60529
ISA RP4.2
ISA RP31.1
ISO 5024
ISO 5168
Page 14 of 49
REF
NACE MR 01 75
Containing Environments in Oil and Gas Production-ISO 15156Part 1, Part 2, and Part 3
Enclosures for Electrical Equipment (1000 Volts Maximum)
National Electrical Code
4.3
NEMA 250
NFPA 70
4.4
Regulatory Requirements
All aspects of the Project shall comply with the requirements of the latest versions of all
relevant regulatory requirements i.e. Royal Commission.
4.5
Statutory Requirements
ADDAR shall be responsible for obtaining all statutory approvals, as applicable for all
instruments and control systems.
Page 15 of 49
5.1
Site Conditions
5.1.1 Wind
PARAMETER
Jubail Value
N,NNW
(For December-February)
-, NW
42.7
5.1.3 Temperature
5.1.3.1 Ambient Temperature
PARAMETER
Jubail Value
52C
42.1C
46.0C
30.0C
11.1C
49.9C
2.9C
Page 16 of 49
5.1.4
PARAMETER
Jubail Value
60
60
Jubail Value
10 - 50
10- 100
38 - 65
At maximum design temperature of 60C, the relative humidity to be considered for design is
50%. At normal design temperature of 34C, the relative humidity to be considered for design
is 75%.
Jubail Value
1011.0
1008.8
1010.0
5.1.6 Rainfall
PARAMETER
Jubail Value
145
225
50
Page 17 of 49
5.1.7 Altitude
Altitude above Mean Sea Level (M.S.L): 2.58 Mtr
Lowest Low Water Level (L.L.W.L.) below mean sea level: 0.6 Mtr
Highest High Water Level (H.H.W.L.) above mean sea level: 0.6 Mtr
5.2
Site Information
STATE
Jubail Value
Jubail, 25 km
Dammam, 110 km
Jubail, 20 km
Dammam, 105 km
Page 18 of 49
DCS
Non-Hazardous area
[ D ]
Hazardous area
IEC
Following points must be considered while designing basic instrumentation & control system:i)
ii)
recommended
practices
and
other
applicable
standards.
Material
All instruments and equipment shall be suitable for use in a hot, humid and tropical
industrial climate in which corrosive gases and/or chemicals may be present. As a
minimum, all instruments and enclosures in field shall be dust proof and weather
proof to IP-65 and secure against the ingress of fumes, dampness, insects and
vermin. All external surfaces shall be suitably treated to provide protection against
corrosive plant atmosphere.
Page 19 of 49
Hazardous Area
7.1
Certifications
7.2
[ ]
Certification
[ D ]
BASEEFA
[ D ]
ATEX
[ D ]
PTB
[ D ]
FM
Classification
[ M ]
7.3
Protection Type
[ ]
[ ]
[ ]
7.4
Accessories
7.4.1
Analog Input
[ ]
Analog Output
[ ]
Digital Input
[ ]
Digital Output
All intrinsic safety barriers shall be active isolating type only and shall have isolation
between input, output and power supply.
ii)
Barriers must be selected based on entity concept. Cable parameters shall also be
considered while matching entity parameters.
Page 20 of 49
The signal transfer accuracy of barrier shall be at least equal to or better than the
transmitter selected.
iv)
Each instrument in the hazardous area and the intrinsic barrier shall be certified for
intrinsic safety by a statutory authority.
v)
Each input and output in a loop shall have separate barrier. No barrier shall be
shared between two loops or input/outputs.
vi)
Any intrinsically safe loop requiring any device to be connected in the hazardous side
permanently or temporarily shall also be intrinsically safe.
vii)
Configuration tools whenever required for any intrinsically safe item which forms part
of the intrinsically safe item shall also be certified intrinsically safe.
Page 21 of 49
8.1
Moisture free Instrument air shall be distributed to various equipment of C&I system
like pneumatic control valves, on-off valves etc. Pneumatic instrument connections for
signal and air supply shall be 1/4" NPT.
ii)
Minimum design pressures of 5 bar (g) for instrument air to pneumatic actuator of the
valves shall be provided.
8.2
Power Supply
i)
ii)
Electrical power supply shall be standardized at 120 V AC+/- 5%, 60 Hz+/-1%, via
redundant Uninterrupted Power Supply (UPS).
iii)
Non-UPS power supply shall be used for other utilities such as panel lighting.
Page 22 of 49
The complete operation, control and monitoring of Speciality Chemical Plant, Liquid
Sulphur Dioxide (SO2), Utilities and Offsites shall be performed from DCS located in
the DCS room. The DCS shall consist of operator work stations and engineering work
stations as required to be finalised during detailed engineering. The safety integrity
level (SIL) shall be SIL 1 as a minimum.
ii)
iii)
Controller Level
Communication level
Sulphuric acid plant shall be operated from dedicated localised PLC located in the
respective area,. Signals from sulphuric acid plant PLC shall also be sent to DCS for
data acquisition purpose.
iv)
The Hydrogen Generation Plant shall be operated from a dedicated localised PLC
placed in the rack room. An engineering/operating workstation shall be supplied &
installed by Hydrogen Generation package vendor in the Control Room for controlling
and monitoring the plant.
v)
The interface of the above mentioned localised PLC with DCS shall be done with
Fieldbus protocol (type to be specifically defined during detailed engineering stage).
Fieldbus communication shall be from PLCs /Remote Terminal Unit (RTU) and shall
be directly connected to main DCS.
Page 23 of 49
10
Field Instrumentation
i)
Field mounted direct actuated flow and temperature switch shall not be used. Instead,
receiver switch/trip amplifier shall be used along with flow element and temperature
element. Whenever specified in job specification, flow and temperature transmitters
may be directly connected to control system to achieve switch action.
ii)
iii)
Ranges for instruments shall be selected in general, such that in normal process
operation the indication is between 40% - 60% of span for linear and 60% - 80% of
span for square root inputs.
iv)
All process switches shall be provided with sealed micro switch contacts rated for the
specified application. Contacts shall be Single Pole Double Throw (SPDT) type
unless otherwise specified. Contacts used shall be gold plated.
v)
Ranges for process switches shall be selected, in general, such that the set point falls
preferably in the middle 30% of full adjustable range i.e. the set point shall fall
between 35% - 65% of adjustable range.
vi)
vii)
All field instruments, junction boxes and local panels located in hazardous area shall
be intrinsically safe protection, however if intrinsically safe equipment are not
available, then flameproof enclosure as per IEC shall be considered, if flameproof
enclosure is not available then purging must be provided as per NFPA.
viii)
The makes and models of all different types of field instruments shall be standardized
for better inventory control.
ix)
Material for sour service shall be certified in accordance with NACE MR 0175.
x)
All field instruments i.e. transmitters, switches, on-off valves, control valves and
junction boxes shall be provided with SS tag nameplates.
Page 24 of 49
xi)
For material selection, if any specific material of construction / wetted parts is not
available for the instruments, then superior or suitable alternative materials
compatible with the service fluid shall be used, also while selection it is to be ensured
that dissimilar galvanic corrosion does not cause a decrease in the service life of the
equipment.
xii)
For field instruments located in outdoor area, suitable mounting brackets and weather
canopies for protection from direct sunlight/rain shall be provided.
xiii)
All circuit grounds, shields and drain wires shall be connected to the 'system ground'
bus which is isolated from 'AC mains earth'.
Page 25 of 49
11
Electronic Transmitter
Type:
[ ]
Smart Type
Signal:
[ ]
4 to 20mA
Accuracy:
[ M ]
Enclosure:
[ ]
Power Supply:
[ ]
Cable Entry:
[ ]
NPT
Yes, HART
Display:
[ ]
Hand-Held HART communicator shall be provided for online maintenance and calibration of
the electronic transmitters.
Page 26 of 49
12
Flow Measurement
12.1
Orifice Plate
Sizing Calculation:
[ ]
Plate Dimensions:
[ ]
Plate Material:
[ ]
SS316 or better
Accuracy:
[ ]
Tapping:
[ ]
[ ]
[ ]
SS 316 or better
Jack Bolts:
[ ]
Required
Tap Valves:
[ ]
Required
2500 mmWC
[ M ]
500:1250:5000:10000 mmWC
i)
Differential Pressure Range for the orifice meter shall always be selected less than
allowable pressure drop across the orifice.
Page 27 of 49
ii)
Flow measurement shall normally be carried out using thin square edged concentric
orifice plate mounted between a pair of weld neck flanges for line size 2" and above;
however, for flow measurement in lines less than 2", integral flow assembly shall be
selected.
12.2
Flowmeter Types
Type:
[ M ]
[ ]
[ ]
Rotameter
[ ]
Turbine meter
[ ]
[ M ]
Wetted Material:
[ ]
SS316 or better
Mounting:
[ M ]
i)
Remote/Head Mounted
For all conductive fluid (more than 5 S/m) (except gas/steam fluid), corrosive
services, electromagnetic type meter to be used.
ii)
For application where density, temperature and viscosity are required along with flow,
Coriolis mass flow meter shall be used.
iii)
For accurate flow integration for fiscal metering/custody transfer turbine meter/
Coriolis mass flowmeter shall be used.
iv)
For steam application and where high rangeability is required, Vortex type Flowmeter
shall be used.
Page 28 of 49
v)
Page 29 of 49
13
Level Measurement
13.1
Level Gauges
Type:
[ M ]
Reflex Type
[ M ]
Wetted Material:
[ ]
SS316 or better
Process Connection:
[ M ]
2 Flange
i)
Reflex type level gauges shall be used for colourless and clean services.
ii)
Magnetic type of level gages shall be used for corrosive, flammable, sour, toxic,
viscous fluid, and in high pressure as well as high temperature applications.
13.2
Level Switch
Type:
[ M ]
Vibrating Fork
[ D ]
Float Type
Wetted Materials:
[ ]
SS316 or better
Process Connection:
[ D ]
1 NPT
Enclosure:
[ ]
NPT
Contact Seal:
[ ]
Hermetical
Page 30 of 49
13.3
Level Transmitters
Type:
[ M ]
[ M ]
Displacer Type
[ ]
Radar Type
[ ]
Ultrasonic Type
Wetted Material:
[ ]
SS316 or better
Process Connection:
[ M ]
[ M ]
[ M ]
[ M]
Mounting:
[ D ]
i)
ii)
For corrosive, fouling and services where purging is required, differential pressure
type level measurements shall be used.
iii)
For viscous fluid and solid services, radar type level measurement shall be used. Also
for solid services ultrasonic level measurement shall also be used.
iv)
For Ultrasonic and Radar type level measurement, the range of the transmitter shall
be such as to cover the complete level span of the vessel taking care of blocking
distance and frequency attenuation due to obstructions.
Page 31 of 49
14
Pressure Measurement
14.1
General
i)
ii)
All pressure gauges with maximum operating pressure exceeding 60 kg/cm(g) and
gauges in toxic service shall be solid front type.
14.2
Pressure Gauges
Sensing Element:
[ ]
Bourdon tube
[ ]
Diaphragm
Measurement Type:
[ ]
Gauge
[ ]
Compound
Sensor Material:
[ ]
Stainless Steel
Dial Size:
[ ]
Front Glass:
[ ]
Shatter Proof
Case Material:
[ ]
Stainless Steel
Process Connection:
[ ]
NPT
Accuracy:
[ ]
Enclosure:
[ ]
Page 32 of 49
14.3
Pressure Switches
Sensing Element:
[ ]
Diaphragm
[ ]
Bellows
Measurement Type:
[ ]
Gauge
Sensor Material :
[ ]
SS316 or better
Indication Type:
[ ]
Indicating/Non-Indicating (Blind)
Enclosure:
[ ]
Contact Seal:
[ ]
Hermetically sealed
NPT
Process Connection:
[ ]
NPT
Contact Rating:
[ ]
14.4
Pressure Transmitters
Sensing Element:
[ ]
Piezoresistive
Measurement Type:
[ ]
Gauge/Differential
Page 33 of 49
Sensor Material:
[ ]
SS 316 or better
Enclosure:
[ ]
Process Connection:
[ ]
NPT
[ D ]
Page 34 of 49
15
Temperature Measurement
15.1
Temperature Gauges
Sensing Element:
[ ]
Bi-metallic
Dial Size:
[ ]
Case Material:
[ ]
SS316 or better
Accuracy:
[ ]
15.2
Sheath Material:
[ ]
SS316 or better
Accuracy:
[ ]
Thermowell Connection:
[ ]
NPT
Enclosure:
[ ]
Page 35 of 49
15.3
Thermocouple
Type:
[ D ]
Enclosure:
[ ]
Thermowell connection:
[ D ]
NPT
15.4
Thermowells
Type:
[ ]
[ ]
Thermowell Material:
[ ]
SS 316 or better
Process Connection:
[ D ]
1 Flanged RF
[ ]
[ ]
Any pipe line size less than 4" nominal bore shall be blown to 4" size to install thermowell.
15.5
Temperature Transmitter
Mounting:
[ ]
Remote Mounted
Temperature Transmitters shall have a built-in linearising function to produce an output linear
to temperature range.
Doc. No. 2429.1-00-IC-DAB-001
Page 36 of 49
16
Analytical Instruments
Analyser Type:
[ M]
pH
[ M]
Conductivity
[ M]
Gas
Accuracy:
[ M]
[ M]
[ M]
Enclosure:
[ ]
SS316 or better
Page 37 of 49
17
Weighing Instruments
Load Cell Type:
[ ]
Bending
[ ]
Shear (Beam)
[ ]
Compression
Sensing Element:
[ ]
Strain Gauge
Sensor Material:
[ ]
Accuracy:
[ M]
+/- 0.05%
Enclosure:
[ ]
Page 38 of 49
18
Valves
18.1
General
The action of valves on failure (Fail open (FO), Fail Close (FC)) in operating medium shall be
determined by process requirement with regard to safe operation and emergency shutdown
requirements.
18.2
On/Off Valves
Type:
[ M ]
Body Material:
[ ]
Leakage Class:
[ M ]
Process Connection:
[ ]
Actuator Type:
[ M ]
18.3
Pneumatically operated
Control Valve
Type:
[ M ]
Body Material:
[ ]
Leakage Class:
[ M ]
Process Connection:
[ ]
Flanged
Actuator Type:
[ ]
Pneumatically operated
Required
Page 39 of 49
18.4
Solenoid Valves
Type:
[D ]
Universal/NO/NC
[D ]
Direct/Pilot Acting
Body Material:
[ ]
SS316 or better
Enclosure:
[ ]
Insulation Class:
[ ]
Class H
18.5
Limit Switches
Type:
[ ]
Proximity
Enclosure:
[ D ]
Contact Seal:
[ ]
Hermetically sealed
Page 40 of 49
19
Cables
19.1
Cable Type
Signal and Power Cables:
[ ]
As per IEC/SASO
Separation:
[ ]
[ ]
3 core
19.2
[ ]
[ ]
Cable Specification
Fire Protection:
[ ]
[ ]
Outer Sheath:
[ ]
PVC Insulated
Page 41 of 49
Core Material:
[ ]
Copper
Conductor Insulation:
[ ]
Screen:
[ ]
Inner Sheath:
[ ]
Polyethylene
Armour:
[ ]
19.3
Cable Glands
Type:
[ M]
Stainless Steel
Threading:
[ ]
19.4
NPT
Cabling Philosophy
i)
For all analog and digital signals to/from DCS, instrumentation pair cable shall be used.
ii)
For local push button signals (Electrical Signals), control cable shall be used.
Page 42 of 49
20
Junction Box
Material :
[ ]
[ ]
Stainless Steel
Mounting:
[ ]
Column
[ ]
Wall
Enclosure:
[ ]
i)
ii)
Terminal size in junction box shall be suitable for 0.5 mm2 to 2.5 mm2 cables.
iii)
Drain port shall be provided with nozzle & valve assembly for all junction boxes.
Page 43 of 49
21
Operator Interface:
[ ]
Power Supply:
[ ]
Redundant UPS
Built in DCS
Redundancy:
[ ]
Controller level
[ ]
[ ]
[ ]
Communication level
[ ]
Client-Server level
Functional Requirements:
[ ]
Control Algorithm (P, PI, PID, Adaptive, Ratio, Gain control, etc.)
[ ]
[ ]
[ ]
Data Acquisition
[ ]
Interlock Logics
[ ]
Alarm Management
[ ]
Historian trending
[ ]
Dynamic Graphics
Page 44 of 49
[ D ]
250 ms
i)
Failure of any one redundant part shall not interrupt other system functions; A failure
can be a hardware failure, software failure, power supply failure or the loss of one AC
feeder in a dual feeder system.
ii)
The switch-over time from primary to back up controller and vice-versa shall be of the
order of one second in case of failure of primary controller.
iii)
All controllers shall have facility for bumpless auto-manual and manual-auto transfer
and set point adjustment.
iv)
Flow, pressure and level controller shall be provided with proportional plus integral
action, while temperature controller with proportional plus integral plus derivative
action.
Page 45 of 49
22
The control system cabinets located inside air-conditioned control rooms shall have
appropriate IP rating, totally enclosed, free standing type with a 3mm (minimum), LM5/LM-6 material and dimensions measuring 2200mm (H) x 1200mm (W) x 800mm
(D). Dimension indicated are subjected to change during detailed engineering.
ii)
The cabinets shall have full height front and rear double leaf doors with louvers and
filters, suitable gland plates for top/bottom cable entry, isolated system and electronic
shield earthing buses, eye bolts and lifting hooks, etc.
iii)
The panel surfaces shall be painted with appropriate colour and adequate paint film
thickness.
Page 46 of 49
23
Cable Trays
[ D ]
[ D ]
[ D ]
i)
Cable shall be run through cable tray, duct and trench as applicable during detailed
engineering.
ii)
Instrument and control cables shall not be grouped with power cables particularly
where there is already a possibility of induced pick-up affecting the signal.
iii)
All cable routes shall be fully co-ordinated with the relevant disciplines to preclude
interference of services and structures and ensure that routes do not obstruct correct
and safe access to mechanical equipment for maintenance and repair purposes.
iv)
Cable in hot areas shall have proper heat protection. Flexible conduits shall be
provided wherever necessary.
v)
Cable tray shall run in a two-tier arrangement and the top tier shall be covered.
vi)
Ladder Cable tray shall be most commonly used, perforated cable tray shall only be
considered for branch trays.
vii)
For intrinsically and non-intrinsically safe instrument cable separate cable tray shall
be envisaged. Blue colour tape shall be provided with intrinsically safe cable tray.
Page 47 of 49
24
Installation
24.1
Instrument Installation
i)
The flow meter pipe shall be fully supported in both in the vertical and horizontal
orientations and not cause any strain on the flowmeter.
ii)
iii)
iv)
For pressure instruments installations, siphons shall be used for steam high
temperature applications.
v)
All gauges and switches for pipelines and vessels shall be installed in separate wells.
vi)
Control valve actuating systems and cabling shall not be located in close proximity to
high temperature sources.
vii)
24.2
The control valves shall be installed after the orifice plate in the direction of flow.
Cabinet Installation
i)
All controls, instruments and devices mounted on the front of the control cabinets
shall be flush mounted.
ii)
All panels, cabinets shall be welded or bolted to floor channels, also before
installation of cabinets and desks, the necessary openings and inserts required shall
made on the floor as applicable.
Page 48 of 49
25
Spare Philosophy
DCS:
[ D ]
[ D ]
10% or minimum one of each (range, type) (To be finalised during detailed
engineering)
Page 49 of 49