Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Ovation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

Ovation

Simulation Solutions

Current market issues pose some thought-provoking questions:

Aging Workforce
More than 50% of the utility workforce is over 45 years old.

With retirement right around the corner, how are


you going to capture the wealth of existing process
knowledge to share with the next generation?
Federal Regulations
The North American Electric Reliability Corporation (NERC) critical infrastructure
protection standards (CIPs) require power plants to secure their production systems.

Are you prepared to adhere to these standards and validate


that your control system is not vulnerable to security threats?

Abnormal Situations
Abnormal operating incidents can be triggered at any time by failures
in equipment, people, processes, or some combination of the three.

Is your staff equipped with the right tools to deal


with an events life-cycle from prevention to
awareness, response, and post-analysis?

New Unit Operations


Whether in startup or ramping up megawatts to meet load demand your
personnel need to know exactly what to do and when to do it on your new unit.

Is your operations staff ready to quickly and safely startup and control your new plant to meet the immediate
need for more power?
Changing Conditions
Your existing units are frequently being upgraded, from adding new environmental equipment
to operate within government guidelines or fine tuning processes for improved performance.

Do you have the technology to study and evaluate proposed


plant changes and their affect on your people, processes,
and assets before proceeding with a major capital project?
Investor Pressure
Todays competitive business environment increases the pressure to obtain the
biggest return on any investment. You are expected to accomplish more with fewer
staff and reduced budgets.

Can you justify the cost of new technology with a quick


return that will save you not only money but time?

Ovation Simulation
Meeting the challenges of the 21st century

Emersons Ovation Simulators can help to transition personnel and technology during times
of change. With Ovation Simulation, the complete understanding of complex operations
and unique plant characteristics gained through years of on-the-job experience can be easily
transferred from your current operations experts to the next generation.

Ovation Simulation can assist your facility with:


Operator training and
qualification programs

Procedure development
and validation

Training with simulators


provides comprehensive
operator instruction for
new personnel, while
meeting the need to provide
periodic refresher training
and qualification for more
experienced operators.

Simulation flexibility allows for


development of the best plant
operating practice procedures
and the systematic transfer of
plant and process knowledge
from the most experienced and
productive operators to the
entire operations staff.

Ovation Simulation using virtual technology minimizes hardware costs


while providing full functionality.

Our plant operators say


the Ovation Simulator is

Control logic testing


and verification

Engineering test bed for


plant process improvements

Through simulation, you can


gain confidence in new control
strategies before implementing
them on the actual plant
distributed control system.
This practice results in fewer
unexpected plant incidences,
avoids plant trips, reduces
maintenance expenses, and
leads to safer operations and
greater availability.

As an engineering tool,
simulators provide a realistic
platform for evaluating plant
equipment modifications
before project execution. With
the ability to easily explore
various what-if scenarios, plant
engineers can better assess the
affect of plant changes prior
to making an investment, thus
reducing risks and improving the
results of implemented projects.

the best training tool ever


provided to them. The
decision by management to
invest in this technology is
viewed by the operators as
a long-term investment in
them. It provides a training
program custom designed
to maintain and improve
their skills which ultimately
provides better and more
efficient plant operation.
Terry Briggs
Shift Leader, Operations
Dairyland Power Cooperative
J.P. Madgett Station

Ovation Simulation provides high-level tools for configuring and tuning


plant process models.

Flexible Solutions
For accurate decision making

Ovation Simulators can be tailored to meet the unique operational challenges of your
facility. Utilizing tie-back logic, process algorithms, and comprehensive high-fidelity models,
Ovation Simulation can provide a full range of training and engineering solutions that best
fits your needs and budget.
Ovation Simulation using tieback logic is a valuable tool for
fundamental operator training,
control system navigation, and
process familiarization. Tieback simulation is also used for
checking new control strategies
prior to loading the logic on the
actual control system.
If a high degree of realism is
desired, Ovation Simulators
using high-fidelity models and
process algorithms can be
applied to simulate major plant
systems, auxiliary systems, or
the total generating unit.

This level of simulation provides


not only the most realistic
training experience available, but
also serves as an accurate test
bed for process or equipment
what-if engineering studies.
Emerson takes the world
of simulation a step beyond
the traditional classroom
environment and places it
directly in your control room.
Power generators will soon
be able to integrate the best
of both worlds, control and
simulation, to further enhance
their operations by improving
reliability and availability while
dealing with a workforce in
transition.

Ovation Simulators can include


session start/stop, save, and
rewind functions to provide
greater flexibility during the
training experience. Additional
options are also available, such
as the ability to allow instructor
initiated malfunctions for various
plant events during training
sessions. This capability prepares
operators to decisively react to
abnormal situations.
By implementing a flexible
design, you can readily keep
your simulator current with
plant control operations. As
changes or additions are made
over time in plant DCS control
logic or equipment, the Ovation
Simulator can be easily modified
to keep pace with those
adjustments.

Use of the Ovation Simulator


helped to ensure that Con
Edisons investment in ERRPs
new plant technology would

Ovation Simulators can be


used to replicate a variety of
plant systems such as:
Conventional Boiler
Applications:
Superheaters, reheaters,
economizers, drains, and
attemperators
Burner management
Sootblower
Precipitator
Flue gas desulphurization
Selective catalytic reduction
Coal and ash handling
Feedwater systems
Cooling water systems
Auxiliary Systems such as
compressed air, auxiliary
boilers, and chemical feeds
Heat Recovery Steam
Generators

Typical Ovation Simulator


applications include:

be optimized by well trained

Control logic development,


testing, and verification

operators and accurate

Control system navigation


and familiarization training

controls. One major benefit

Startup and shutdown training

was safe and efficient plant

Steady-state operation
training including load
handling

startup that reduced the

Malfunctions and abnormal


situation training including
runbacks

from 4 months to 1 month.

Operating procedure
development
Operator certification and
testing programs

plants commissioning time

Hsiu-Chen Wang
Senior Engineer
Consolidated Edison of New York
East River Repowering Project

Plant engineering development


test bed

Steam Turbines
Gas Turbines
Electrical Systems such
as generator, excitation,
switchyard, and DC electrical
Renewable Plant Applications

Precise Engineering
For world-class simulation

Project Management
Successful project execution
requires an experienced team
of industry experts, project
managers, and lead engineers
who know how to apply
technologies designed
specifically for the power
generation industry.

Emerson has been at the


forefront of simulation since
its introduction more than 30
years ago. Our Ovation
specialists have engineered
simulation solutions for
numerous types of plants
configured with equipment from
a host of leading OEMs.

Emersons team consists of


highly skilled support personnel
who are dedicated to designing
and implementing innovative
simulation solutions. The
methodology applied to every
Ovation Simulator project relies
on accuracy and attention to
detail using well-defined and
validated processes.

Step 1
Plant Walk Down

Step 2
Model Design

Step 3
Implementation

Step 4
Testing

Working closely with


your personnel, Emerson
confirms the scope
of supply and project
schedule. Ovation
Simulation specialists
perform a plant walk
down while interviewing
your staff about typical
plant processes and
operations.

A design document is
created that details the
modeling requirements
for your simulation. The
design is reviewed by
the Emerson team and
your experts to ensure
modeling accuracy.

Simulation models
and control logic are
loaded into assembled
hardware. The models
and logic are integrated
and tested to validate
proper operation.

Formal factory accept


ance testing is performed.
Your selected personnel
and the Emerson
simulation team exercise
models using
a variety of plant
conditions.

Service
Behind every Ovation Simulator
project stands an array of
service and support personnel
to assure your solution delivers
the utmost in performance and
reliability. Emerson stays with
you long after your project has
been completed through our
long-term maintenance and
support programs.
Keeping pace with plant
equipment and control system
changes is critical for accurate
plant simulation. Maintaining
an Ovation Simulator is a
straightforward process since
it uses the actual logic and
graphics from your control
system; translation of this
software is not required. As
your plant upgrades to the
latest control technology or
expands to include new plant

processes, so can your Ovation


Simulator. When required, our
team of experts will upgrade
your simulator to the same
technology used in your plant
DCS. The models within your
simulator will also be upgraded
to reflect any plant equipment
or process changes.
We offer an array of support
modules through our
comprehensive SureService
customer support programs.
These programs help you to
maintain healthy operations
and enable you to leverage
todays digital technologies
for predictive and preventative
maintenance and operations.

The Ovation Simulation Advantage


Reduce
Plant startup times through enhanced operational
readiness and tested control strategies
Forced outages by providing tools for effective
operator guidance
Project risk by decreasing human error
Operations and maintenance costs through
improved operator effectiveness
Improve
Potential revenue by doing more with less
Safety by preparing plant operators for correct
reaction to equipment malfunctions and
uncharacteristic plant situations
Operator training for quick response to normal
and abnormal plant operation

Why Emerson?

Unparalleled Industry Expertise


For over a century, Emerson has energized the power industry with new and
revolutionary ideas. We understand the complexity of power generation operations,
your unique application requirements, and your stringent performance criteria better
than anyone else in the business. This knowledge is embedded in every simulation
solution.

World-class Technology
Using the worlds most advanced technology, Emerson has been helping customers
to train operators on the control of critical power generation processes for decades.
Ovation Simulators provide a comprehensive solution to help meet operational
readiness objectives for either new-build or existing-unit challenges.

Collaborative Environment
The Emerson simulation team is not complete without the expertise and skill provided
by your staff. We encourage your training, projects, and generation station personnel
to be involved throughout our simulator development process to ensure your
complete satisfaction.

Long-term Support
Emerson has a long history of providing our customers with the highest level of
support. Our commitment to long-term support for your Ovation Simulator will help
you achieve business objectives, reduce or contain operating and service costs, and
keep your system running at peak performance today and well into the future.

Strength and Stability


When executing critical projects, you need to know that the partners you select
are strong and stable, and will continue to be a solid corporate presence far into
the future. Emerson has a long history of designing, implementing, and supporting
simulation technologies. We have an unparalleled portfolio of growth and success,
even in years characterized by a lean business cycle. Our clear technology leadership
and fiscally stable operations make Emerson the logical choice to design, engineer,
and support your simulation projects.

10

EMERSON. CONSIDER IT SOLVED.

The contents of this publication are presented for informational purposes only, and while every effort is made to ensure their
accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services
described herein or their use or applicability. All sales are governed by our software licensing agreement, and terms and
conditions, which are available on request. We reserve the right to modify or improve the designs or specifications of our
product at any time without notice.
2012 Emerson Process Management Power & Water Solutions, Inc.
The Emerson logo is a trademark and service mark of Emerson Electric Co. Ovation, SureService, PlantWeb, and AMS Suite are
marks of Emerson Process Management. All other marks are property of their respective owners.

Emerson Process Management Power & Water Solutions, Inc.


www.EmersonProcess-PowerWater.com
200 Beta Drive
Pittsburgh, PA 15238
USA
T: 1-800-445-9723
T: 1-412-963-4000
F: 1-412-963-3644

PWS_003818 R3
10/12

1 Panda Crescent
Singapore 128461
T: (65) 6777-8211
F: (65) 6770-8015

11A Konstruktorska Street


02-673 Warsaw
Poland
T: +48-22-458-9100
F: +48-22-458-9146

You might also like