CAMTECH/E/2002/AT/1.
CHAPTER 4
PERIODIC OVERHAULING
Overhauling of a transformer is normally undertaken either if it is faulty (internal)
or at the end of 7 to 10 years of its service. Periodical Overhauling
(POH) of
transformer can be done either in repair shop or through trade.
4.1
4.2
2.
Visual checking:
a.
Check condition of tank for cracks.
b.
Check HV. and LV. bushings for any
cracks/chipped discs.
c.
Check conservator tank, oil level indicator
glass.
d.
Check condition of silica gel container and
silica gel.
FIGURE 4.1
HV, LV BUSHING
February, 2002
10
CAMTECH/E/2002/AT/1.
e.
f.
g.
3.
4.
5.
FIGURE 4.2
WINDING AND TAP
CHANGER CONNECTION
b.
c.
d.
e.
Tighten core bolts and other fasteners to secure the core and winding
properly and replace by new one if worn out.
c.
d.
e.
f.
g.
h.
i.
Replace silicagel.
j.
k.
Fill the equipment with new filtered oil with 50KV BDV, (60 KV BDV
for new oil as per RDSO requirement).
l.
FIGURE 4.4
DRYING CHAMBER
February, 2002
11
CAMTECH/E/2002/AT/1.
6.
7.
8.
Final observation
a.
b.
c.
oil,
moisture
FIGURE 4.5
CHECKING OF WINDING
AND TAP CONNECTION
d.
Measure
BDV
content(ppm)
e.
Measure tan delta, polarization index and compare with previous recorded
values.
f.
g.
Check control boxes, terminal boxes for water tightness against ingress of
moisture.
FIGURE 4.6
TERMINAL AND CONTROL BOXES
COMPONENTS
9.
Painting of equipment.
Performance of transformer after POH shall be evaluated by comparing
the result of Insulation Resistance , Polarization Index of windings , BDV, water
content (ppm), tan delta, acidity & DGA of transformer oil. All these values shall
be kept in records for monitoring the performance in service.
*****