BQ Ducting
BQ Ducting
BQ Ducting
KEGIATAN
PEKERJAAN
INSTANSI
LOKASI
TAHUN
NO
1
2
3
4
5
6
7
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
URAIAN
Kepala Tukang
Tukang
Mandor
Pekerja Tidak Terlatih
Pekerja Terlatih
Tukang las
Instalasi Listrik
BAHAN
AC Split Duct 36.000 BTU ( 4 PK )
AC Split Duct 42.000 BTU ( 4,5 PK )
AC Split Duct 48.000 BTU ( 6 PK )
Alumunium tape
Bayonet + plain
Besi Hollow Galvanis 2 x 4
Box Plenum Duct + Peredam suara
Box R.A.G 100 X 30 Cm
Box R.A.G 100 X 50 Cm
Box R.A.G 30 X 20 Cm
Box R.A.G 30 X 25 Cm
Box R.A.G 35 X 20 Cm
Box R.A.G 45 X 20 Cm
Box R.A.G 50 X 20Cm
Box R.A.G 50 X 25 Cm
Box R.A.G 55 X 25 Cm
Box R.A.G 85 X 25 Cm
Box R.A.G 90 X 30 Cm
Box R.A.G 95 X 30 Cm
Box S.A.D 25 X 25 Cm
21 Box S.A.G 75 X 8 Cm
Page 1 of 40
NO
22
23
24
25
26
27
28
29
URAIAN
Box S.A.G 85 X 8 Cm
Breaket indoor + outdoor
Cat dasar
Cat Tembok mutu B, Anti Lumut dan Jamur
Conduit Pipa dia.20
Cornes (bubuk Semen putih utk gypsum)
Downlight 1.5 inch
Downlight 5 inch
Page 2 of 40
NO
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
65
66
67
68
69
70
71
72
73
74
URAIAN
Drainpen 75 x 180 cm + pipa pvc isolasi
Filter filedown
Filter Filedown R.Koridoor
Fitting plafond listrik
Flesibel Duct
Gantungan siku long drat
Grill main hole maintenance 0,8 m x 1,5 m
Gypsum Board ( 120 x 240 x 9 ) mm
Isolasi pipa tembaga
Jasa Pemasangan Unit AC R Koridoor
Kabel Control 3 x 2,5 mm
Kabel Control 4x2,5mm
Kabel NYM 2 X 2,5 mm
Kabel Termostrart
Kawat las perak
L Bow
Lampu SL 18 Watt
Lampu SL 8 Watt
Lampu TLED
Lem TD Duct
Lem Vynil
Mangkok
Material Bantu
Material Pemasangan unit
MCB
MCB Box isi 4 grup
Mounting Outdoor Indoor
Nut 12"
Paku Biasa bermacam ukuran 2" - 5"
Paku Gypsum
Paku Sekrup 3,5"
Penambahan Freon R 410
Penampang Drain
Pipa Drain + Isolasi
Pipa Tembaga 3/8 + Isolasi Termaflex ( Tebal )
Pipa Tembaga 5/8 + Isolasi Termaflex ( Tebal )
R.A.G 100 X 50 Cm
R.A.G 30 X 20 Cm
R.A.G 30 X 25 Cm
R.A.G 35 X 20 Cm
R.A.G 35 X 20 Cm
R.A.G 45 X 20 Cm
R.A.G 50 X 20 Cm
R.A.G 50 X 25 Cm
Page 3 of 40
NO
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
URAIAN
R.A.G 55 X 25 Cm
R.A.G 85 X 25 Cm
R.A.G 90 X 30 Cm
R.A.G 95 X 30 Cm
Running Start Up ( Test Comesioning )
S. A. G (Suply Air Gril) 100 x 10 cm
S.A.D 25 X 25 Cm
S.A.G 100 X 30 Cm
S.A.G 20 X 20 Cm
S.A.G 75 X 8 Cm
S.A.G 85 X 8 Cm
Saklar
Sealant
Suppot Indoor Outdoor
T Duss
TD Duct Panel embossed + embossed
Textil Tape
Tray Besi siku dan galvalum
Wallpaper
Page 4 of 40
HRG SATUAN
(RUPIAH)
Oh
Oh
Oh
Oh
Oh
Oh
titik
N
O
(RUPIAH)
###
###
###
###
###
###
unit
unit
unit
roll
m2
Btg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
###
Page 5 of 40
SATUAN
HRG SATUAN
(RUPIAH)
Bh
set
Kg
kg
Btg
kg
bh
bh
N
O
(RUPIAH)
###
###
Page 6 of 40
SATUAN
HRG SATUAN
(RUPIAH)
unit
bh
bh
bh
m2
Ls
lbr
roll
Ls
m
m
m
m
btg
bh
bh
bh
bh
kaleng
kg
bh
lot
unit
bh
bh
bh
buah
N
O
(RUPIAH)
###
###
###
###
###
###
hpl
kg
kg
ls
unit
m
m
m
Bh
Bh
Bh
Bh
Page 7 of 40
SATUAN
HRG SATUAN
(RUPIAH)
Bh
Bh
unit
unit
Bh
Bh
unit
Bh
Bh
bh
buah
unit
bh
m2
roll
unit
m2
Page 8 of 40
N
O
(RUPIAH)
ANALISA HAR
KEGIATAN
PEKERJAAN
INSTANSI
LOKASI
TAHUN
NO.
ANALISA
1
:
:
:
:
:
10 M2 Bongkaran
0.6 Oh
0.06 Oh
2 Oh
Plafond + Rangka
Tukang
Kepala Tukang
Pekerja terlatih
1 m Langit-Langit
0.364 lbr
0.11 kg
2.5 btg
0.06 kg
0.04 kg
0.3 kg
0.025 roll
0.26 Oh
0.4 Oh
0.04 Oh
0.013 Oh
1 m Mengecat Plafond
0.1 kg
Cat dasar
0.28 kg
Cat Tembok mutu B, Anti Lumut dan Jamu
0.1 kg
Cornes (bubuk Semen putih utk gypsum)
0.02 Oh
Pekerja terlatih
0.063 Oh
Tukang
0.0063 Oh
Kepala tukang
0.0025 Oh
Mandor
PEKERJAAN DUCTING
Untuk 1 m membutuhkan material dan upah sebagai beriku
0.400 Oh
Kepala tukang
0.400 Oh
Mandor
0.300 Oh
tukang
0.300 Oh
Pekerja Terlatih
TD Duct Panel embossed + embossed
1.338 m2
Bayonet + plain
0.439 m2
0.7 roll
Alumunium tape
Page 9 of 40
NO.
ANALISA
URAIAN PEKERJAAN
0.2 kaleng
0.2 buah
0.5 m2
0.5 buah
Lem TD Duct
Sealant
Gantungan siku long drat
Nut 12"
PEKERJAAN ACCESSORIES
0.400 Oh
Kepala tukang
0.200 Oh
Mandor
0.200 Oh
tukang
0.200 Oh
Pekerja Terlatih
9.000 buah
Nut 12"
1.000 roll
Isolasi pipa tembaga
1.000 ls
Grill main hole maintenance 0,8 m x 1,5
Page 10 of 40
URAIAN PEKERJAAN
Plafond + Rangka
-
Kepala Tukang
Pekerja terlatih
Jumlah per 10m2
Jumlah per 1m2
TOTAL
Pekerja terlatih
Kepala tukang
TOTAL
-
Kepala tukang
TOTAL
Pekerja Terlatih
TD Duct Panel embossed + embossed
Bayonet + plain
Alumunium tape
Page 11 of 40
URAIAN PEKERJAAN
Lem TD Duct
Gantungan siku long drat
Pekerja Terlatih
Material Pemasangan unit
TOTAL
Kepala tukang
Pekerja Terlatih
Isolasi pipa tembaga
Grill main hole maintenance 0,8 m x 1,5 m
TOTAL
Page 12 of 40
O
W
N
E
R
EKERJAAN
JUMLAH
SATUAN
-
LOKASI
E
TAHUN
S
T
I
M
A
T
E
(
O
E
)
###
Untuk 10 m membongkar lantai diper
-
Page 13 of 40
JUMLAH
SATUAN
###
-
Page 14 of 40
KEGIATAN
PEKERJAAN
INSTANSI
LOKASI
TAHUN
:
:
:
:
:
NO.
A
1
2
3
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Survey dan Pengukuran
Pembersihan Lokasi
Mobilisasi dan Demobilisasi
SUB TOTAL A
B
B1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Page 15 of 40
NO.
23
24
25
26
27
28
29
30
31
32
33
URAIAN PEKERJAAN
Box Plenum Duct + Peredam suara
S.A.G 75 X 8 Cm
S.A.D 25 X 25 Cm
R.A.G 100 X 50 Cm
R.A.G 95 X 30 Cm
R.A.G 90 X 30 Cm
R.A.G 50 X 25 Cm
R.A.G 30 X 25 Cm
R.A.G 35 X 20 Cm
R.A.G 30 X 20 Cm
Flesibel Duct
SUB TOTAL B1
B2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
NO.
30
31
32
33
34
35
36
URAIAN PEKERJAAN
R.A.G 100 X 50 Cm
R.A.G 85 X 25 Cm
R.A.G 55 X 25 Cm
R.A.G 50 X 20 Cm
R.A.G 45 X 20 Cm
R.A.G 35 X 20 Cm
Flesibel Duct
SUB TOTAL B2
C
1
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
D
1
2
3
Page 17 of 40
ANGGARAN BIAYA
VOLUME
1.0
1.0
1.0
SATUAN
HARGA
JUMLAH
SATUAN
HARGA
A.
###
###
###
Ls
Ls
Ls
SUB TOTAL A
NIUM DUCT
23.0
10.0
18.0
22.0
3.0
20.0
8.0
30.0
8.0
26.0
25.0
19.0
6.0
22.0
1.0
1.0
2.0
1.0
6.0
1.0
1.0
1.0
:
:
:
Rp
B
RUANG TAM
###
###
###
###
M
M
M
M
M
M
M
M
M
M
M
M
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
###
TOILET
###
###
Page 18 of 40
VOLUME
6.0
24.0
7.0
1.0
1.0
1.0
1.0
1.0
6.0
1.0
80.0
SATUAN
HARGA
JUMLAH
SATUAN
HARGA
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M
Rp
35.0
5.0
2.0
12.0
3.0
10.0
4.0
11.0
12.0
5.0
29.0
17.0
18.0
20.0
1.0
1.0
1.0
11.0
14.0
1.0
3.0
3.0
1.0
3.0
6.0
1.0
11.0
14.0
1.0
RUANG TAM
###
###
###
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
SNI. 1.14
SUB TOTAL D
Page 19 of 40
VOLUME
1.0
1.0
3.0
3.0
1.0
3.0
72.0
178.0
178.0
205.0
215.0
12.0
12.0
125.0
12.0
12.0
1.0
12.0
12.0
12.0
6.0
3.0
3.0
1.0
1.0
1.0
SATUAN
HARGA
JUMLAH
SATUAN
HARGA
Bh
Bh
Bh
Bh
Bh
Bh
M
Rp
Rp
Rp
Rp
Rp
Rp
Rp
M
M
M
M
Unit
M
M
Bh
Unit
Ls
Unit
Unit
Unit
Unit
Unit
Unit
Ls
Ls
Ls
JUMLAH
PPN (10%)
TOTAL
PEMBULATAN
Page 20 of 40
KEGIATAN
PEKERJAAN
INSTANSI
LOKASI
TAHUN
:
:
:
:
:
NO
A
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
B
B1
B2
JUMLAH
PPN (10%)
TOTAL
PEMBULATAN
Terbilang :
Diperiksa Oleh,
Asisten Teknis PU Cipta Karya
Provinsi Sumsel
Menyetujui,
Page 21 of 40
Page 22 of 40
N PEKERJAAN
###
##
JUMLAH
Rp
B
Rp
G RETURN LANTAI 2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
###
Dibuat oleh
Konsultan Perencana
CV Multibina Konsultan
Dibuat Oleh,
Konsultan Perencana
Muhtazili, ST
Direktur
Muhtazili, ST
Direktur
Mengetahui,
Mengetahui,
Page 23 of 40
Page 24 of 40
PROGRAM TERBILANG
Cek Bilangan
Terbilang:
TERBILANG
an keluar otomatis).
ok!