BQ Ducting

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 40
At a glance
Powered by AI
The document outlines specifications and pricing for HVAC installation work. It includes a list of materials, labor rates, and provides estimates for installation on different floors.

The document appears to be estimating costs for installing an HVAC system in a government building based on pricing schedules for materials and labor. It includes recaps by work area and totals.

The main items listed include materials for ductwork, air conditioning units, electrical work, as well as labor rates for different roles on the project. Over 70 material items are detailed across multiple pages.

Harga Perhitungan Sendiri (HPS)

DAFTAR HARGA SATUAN BAHAN DAN UPAH

KEGIATAN
PEKERJAAN

: PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING S


: PENGADAAN INSTALASI TATA UDARA PENDINGIN RUA
EX BP 7. PALEMBANG

INSTANSI
LOKASI
TAHUN

: BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (


: PALEMBANG - SUMATERA SELATAN
: 2016

NO
1
2
3
4
5
6
7
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

URAIAN
Kepala Tukang
Tukang
Mandor
Pekerja Tidak Terlatih
Pekerja Terlatih
Tukang las
Instalasi Listrik
BAHAN
AC Split Duct 36.000 BTU ( 4 PK )
AC Split Duct 42.000 BTU ( 4,5 PK )
AC Split Duct 48.000 BTU ( 6 PK )
Alumunium tape
Bayonet + plain
Besi Hollow Galvanis 2 x 4
Box Plenum Duct + Peredam suara
Box R.A.G 100 X 30 Cm
Box R.A.G 100 X 50 Cm
Box R.A.G 30 X 20 Cm
Box R.A.G 30 X 25 Cm
Box R.A.G 35 X 20 Cm
Box R.A.G 45 X 20 Cm
Box R.A.G 50 X 20Cm
Box R.A.G 50 X 25 Cm
Box R.A.G 55 X 25 Cm
Box R.A.G 85 X 25 Cm
Box R.A.G 90 X 30 Cm
Box R.A.G 95 X 30 Cm
Box S.A.D 25 X 25 Cm

21 Box S.A.G 75 X 8 Cm

Page 1 of 40

NO
22
23
24
25
26
27
28
29

URAIAN
Box S.A.G 85 X 8 Cm
Breaket indoor + outdoor
Cat dasar
Cat Tembok mutu B, Anti Lumut dan Jamur
Conduit Pipa dia.20
Cornes (bubuk Semen putih utk gypsum)
Downlight 1.5 inch
Downlight 5 inch

Page 2 of 40

NO
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
65
66
67
68
69
70
71
72
73
74

URAIAN
Drainpen 75 x 180 cm + pipa pvc isolasi
Filter filedown
Filter Filedown R.Koridoor
Fitting plafond listrik
Flesibel Duct
Gantungan siku long drat
Grill main hole maintenance 0,8 m x 1,5 m
Gypsum Board ( 120 x 240 x 9 ) mm
Isolasi pipa tembaga
Jasa Pemasangan Unit AC R Koridoor
Kabel Control 3 x 2,5 mm
Kabel Control 4x2,5mm
Kabel NYM 2 X 2,5 mm
Kabel Termostrart
Kawat las perak
L Bow
Lampu SL 18 Watt
Lampu SL 8 Watt
Lampu TLED
Lem TD Duct
Lem Vynil
Mangkok
Material Bantu
Material Pemasangan unit
MCB
MCB Box isi 4 grup
Mounting Outdoor Indoor
Nut 12"
Paku Biasa bermacam ukuran 2" - 5"
Paku Gypsum
Paku Sekrup 3,5"
Penambahan Freon R 410
Penampang Drain
Pipa Drain + Isolasi
Pipa Tembaga 3/8 + Isolasi Termaflex ( Tebal )
Pipa Tembaga 5/8 + Isolasi Termaflex ( Tebal )
R.A.G 100 X 50 Cm
R.A.G 30 X 20 Cm
R.A.G 30 X 25 Cm
R.A.G 35 X 20 Cm
R.A.G 35 X 20 Cm
R.A.G 45 X 20 Cm
R.A.G 50 X 20 Cm
R.A.G 50 X 25 Cm
Page 3 of 40

NO
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93

URAIAN
R.A.G 55 X 25 Cm
R.A.G 85 X 25 Cm
R.A.G 90 X 30 Cm
R.A.G 95 X 30 Cm
Running Start Up ( Test Comesioning )
S. A. G (Suply Air Gril) 100 x 10 cm
S.A.D 25 X 25 Cm
S.A.G 100 X 30 Cm
S.A.G 20 X 20 Cm
S.A.G 75 X 8 Cm
S.A.G 85 X 8 Cm
Saklar
Sealant
Suppot Indoor Outdoor
T Duss
TD Duct Panel embossed + embossed
Textil Tape
Tray Besi siku dan galvalum
Wallpaper

Page 4 of 40

RGA SATUAN BAHAN DAN UPAH

DAFTAR HARGA SATUAN BAHAN DAN UPAH

N RUTIN/BERKALA AREA JAKABARING SPORT CITY


NSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPKAD
PEKERJAAN
MBANG

LOLA KEUANGAN DAN ASET DAERAH (BPKAD)


LOKASI
TAHUN
SATUAN

HRG SATUAN
(RUPIAH)

Oh
Oh
Oh
Oh
Oh
Oh
titik

N
O
(RUPIAH)

###
###
###
###
###
###

unit
unit
unit
roll
m2
Btg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

###

Page 5 of 40

SATUAN

HRG SATUAN
(RUPIAH)

Bh
set
Kg
kg
Btg
kg
bh
bh

N
O
(RUPIAH)

###

###

Page 6 of 40

SATUAN

HRG SATUAN
(RUPIAH)

unit
bh
bh
bh
m2
Ls
lbr
roll
Ls
m
m
m
m
btg
bh
bh
bh
bh
kaleng
kg
bh
lot
unit
bh
bh
bh
buah

N
O
(RUPIAH)
###
###
###
###

###

###

hpl

kg
kg
ls
unit
m
m
m
Bh

Bh
Bh
Bh

Page 7 of 40

SATUAN

HRG SATUAN
(RUPIAH)

Bh
Bh

unit
unit
Bh
Bh
unit
Bh
Bh
bh
buah
unit
bh
m2
roll
unit
m2

Page 8 of 40

N
O
(RUPIAH)

Harga Perhitungan Sendiri (HPS)

ANALISA HAR
KEGIATAN
PEKERJAAN
INSTANSI
LOKASI
TAHUN
NO.
ANALISA
1

:
:
:
:
:

PEMELIHARAAN RUTIN/BERKALA ARE


PENGADAAN INSTALASI TATA UDARA
BADAN PENGELOLA KEUANGAN DAN
PALEMBANG - SUMATERA SELATAN
2016
URAIAN PEKERJAAN

10 M2 Bongkaran
0.6 Oh
0.06 Oh
2 Oh

Plafond + Rangka
Tukang
Kepala Tukang
Pekerja terlatih

1 m Langit-Langit
0.364 lbr
0.11 kg
2.5 btg
0.06 kg
0.04 kg
0.3 kg
0.025 roll
0.26 Oh
0.4 Oh
0.04 Oh
0.013 Oh

Gypsumboard, tebal 9 mm + Rangka Besi


Gypsum Board ( 120 x 240 x 9 ) mm
Paku Sekrup 3,5"
Besi Hollow Galvanis 2 x 4
Paku Biasa bermacam ukuran 2" - 5"
Paku Gypsum
Cornes (bubuk Semen putih utk gypsum)
Textil Tape
Pekerja terlatih
Tukang
Kepala tukang
Mandor

1 m Mengecat Plafond
0.1 kg
Cat dasar
0.28 kg
Cat Tembok mutu B, Anti Lumut dan Jamu
0.1 kg
Cornes (bubuk Semen putih utk gypsum)
0.02 Oh
Pekerja terlatih
0.063 Oh
Tukang
0.0063 Oh
Kepala tukang
0.0025 Oh
Mandor

PEKERJAAN DUCTING
Untuk 1 m membutuhkan material dan upah sebagai beriku
0.400 Oh
Kepala tukang
0.400 Oh
Mandor
0.300 Oh
tukang
0.300 Oh
Pekerja Terlatih
TD Duct Panel embossed + embossed
1.338 m2
Bayonet + plain
0.439 m2
0.7 roll
Alumunium tape

Page 9 of 40

NO.
ANALISA

URAIAN PEKERJAAN
0.2 kaleng
0.2 buah
0.5 m2
0.5 buah

Lem TD Duct
Sealant
Gantungan siku long drat
Nut 12"

PEKERJAAN PEMASANGAN UNIT AC SPLIT DUCTING


1.000 Oh
Kepala tukang
0.680 Oh
Mandor
0.500 Oh
tukang
0.300 Oh
Pekerja Terlatih
1.000 Ls
Material Pemasangan unit

PEKERJAAN ACCESSORIES
0.400 Oh
Kepala tukang
0.200 Oh
Mandor
0.200 Oh
tukang
0.200 Oh
Pekerja Terlatih
9.000 buah
Nut 12"
1.000 roll
Isolasi pipa tembaga
1.000 ls
Grill main hole maintenance 0,8 m x 1,5

Page 10 of 40

ANALISA HARGA SATUAN PEKERJAAN

PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY


PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPKAD EX BP 7. PALEMBAN
BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD)
PALEMBANG - SUMATERA SELATAN

HARGA SATUAN (Rp)


BAHAN
UPAH

URAIAN PEKERJAAN

Plafond + Rangka
-

Kepala Tukang
Pekerja terlatih
Jumlah per 10m2
Jumlah per 1m2

TOTAL

Gypsumboard, tebal 9 mm + Rangka Besi Hollow


Gypsum Board ( 120 x 240 x 9 ) mm
Paku Sekrup 3,5"
Besi Hollow Galvanis 2 x 4
Paku Biasa bermacam ukuran 2" - 5"
Paku Gypsum
Cornes (bubuk Semen putih utk gypsum)

Pekerja terlatih

Kepala tukang
TOTAL
-

Cat Tembok mutu B, Anti Lumut dan Jamur


Cornes (bubuk Semen putih utk gypsum)
Pekerja terlatih

Kepala tukang
TOTAL

utuhkan material dan upah sebagai berikut


Kepala tukang

Pekerja Terlatih
TD Duct Panel embossed + embossed
Bayonet + plain
Alumunium tape

Page 11 of 40

HARGA SATUAN (Rp)


BAHAN
UPAH
TOTAL

URAIAN PEKERJAAN
Lem TD Duct
Gantungan siku long drat

ANGAN UNIT AC SPLIT DUCTING


Kepala tukang

Pekerja Terlatih
Material Pemasangan unit
TOTAL

Kepala tukang

Pekerja Terlatih
Isolasi pipa tembaga
Grill main hole maintenance 0,8 m x 1,5 m
TOTAL

Page 12 of 40

O
W
N
E
R

EKERJAAN

UANGAN GEDUNG BPKAD EX BP 7. PALEMBANG

JUMLAH
SATUAN
-

LOKASI
E
TAHUN
S
T
I
M
A
T
E
(
O
E
)

###
Untuk 10 m membongkar lantai diper
-

Page 13 of 40

JUMLAH
SATUAN
###
-

Page 14 of 40

Harga Perhitungan Sendiri (HPS)

RENCANA ANGGARAN BIA

KEGIATAN
PEKERJAAN
INSTANSI
LOKASI
TAHUN

:
:
:
:
:

PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY


PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG
BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD)
PALEMBANG - SUMATERA SELATAN
2016

NO.
A
1
2
3

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Survey dan Pengukuran
Pembersihan Lokasi
Mobilisasi dan Demobilisasi
SUB TOTAL A

B
B1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

PEKERJAAN PABRIKASI DAN PEMASANGAN PREIHSULATED ALUMINIUM DUCT


PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 1
Ducting Dimensi 30" X 12"
Ducting Dimensi 26" X 12"
Ducting Dimensi 24" X 12"
Ducting Dimensi 24" x 10"
Ducting Dimensi 22" x 10"
Ducting Dimensi 20" X 10"
Ducting Dimensi 16" X 12"
Ducting Dimensi 16" X 10"
Ducting Dimensi 14" X 10"
Ducting Dimensi 12" X 10"
Ducting Dimensi 10" X 8"
Ducting Dimensi 10" X 10"
Box S.A.D 25 X 25 Cm
Box S.A.G 75 X 8 Cm
Box R.A.G 95 X 30 Cm
Box R.A.G 90 X 30 Cm
Box R.A.G 55 X 25 Cm
Box R.A.G 50 X 25 Cm
Box R.A.G 35 X 20 Cm
Box R.A.G 30 X 25 Cm
Box R.A.G 30 X 20 Cm
Box R.A.G 100 X 50 Cm

Page 15 of 40

NO.
23
24
25
26
27
28
29
30
31
32
33

URAIAN PEKERJAAN
Box Plenum Duct + Peredam suara
S.A.G 75 X 8 Cm
S.A.D 25 X 25 Cm
R.A.G 100 X 50 Cm
R.A.G 95 X 30 Cm
R.A.G 90 X 30 Cm
R.A.G 50 X 25 Cm
R.A.G 30 X 25 Cm
R.A.G 35 X 20 Cm
R.A.G 30 X 20 Cm
Flesibel Duct
SUB TOTAL B1

B2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 2


Ducting Dimensi 30" X 12"
Ducting Dimensi 26" X 12"
Ducting Dimensi 24" X 12"
Ducting Dimensi 24" x 10"
Ducting Dimensi 22" x 12"
Ducting Dimensi 22" x 10"
Ducting Dimensi 20" X 12"
Ducting Dimensi 20" X 10"
Ducting Dimensi 18" X 10"
Ducting Dimensi 16" X 10"
Ducting Dimensi 14" X 10"
Ducting Dimensi 12" X 10"
Ducting Dimensi 10" X 8"
Ducting Dimensi 10" X 10"
Box S.A.D 25 X 25 Cm
Box R.A.G 100 X 50 Cm
Box R.A.G 100 X 30 Cm
Box S.A.G 85 X 8 Cm
Box S.A.G 75 X 8 Cm
Box R.A.G 85 X 25 Cm
Box R.A.G 55 X 25 Cm
Box R.A.G 50 X 20Cm
Box R.A.G 45 X 20 Cm
Box R.A.G 35 X 20 Cm
Box Plenum Duct + Peredam suara
S.A.G 100 X 30 Cm
S.A.G 85 X 8 Cm
S.A.G 75 X 8 Cm
S.A.D 25 X 25 Cm
Page 16 of 40

NO.
30
31
32
33
34
35
36

URAIAN PEKERJAAN
R.A.G 100 X 50 Cm
R.A.G 85 X 25 Cm
R.A.G 55 X 25 Cm
R.A.G 50 X 20 Cm
R.A.G 45 X 20 Cm
R.A.G 35 X 20 Cm
Flesibel Duct
SUB TOTAL B2

C
1
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17

PEKERJAAN UNIT LANTAI 1 DAN LANTAI 2


Pipa Tembaga 5/8 + Isolasi Termaflex ( Tebal )
Pipa Tembaga 3/8 + Isolasi Termaflex ( Tebal )
Pipa Drain + Isolasi
Kabel Control 4x2,5mm
Penambahan Freon R 410
Penampang Drain
Kabel Termostrart
Filter Filedown
Suppot Indoor Outdoor
Tray Besi siku dan galvalum
Jasa Pemasangan Unit AC
Running Start Up ( Test Comesioning )
Material Bantu
AC Split Duct 48.000 BTU ( 6 PK )
AC Split Duct 42.000 BTU ( 4,5 PK )
AC Split Duct 36.000 BTU ( 4 PK )
SUB TOTAL C

D
1
2
3

PEKERJAAN LAIN LAIN


Administarsi dan Dokumentasi
Pembuatan Shop Drawing & Asbult Drawing
Pembersihan Akhir
SUB TOTAL D

Page 17 of 40

ANGGARAN BIAYA

NGAN GEDUNG BPKAD EX BP 7. PALEMBANG

VOLUME

1.0
1.0
1.0

SATUAN

HARGA

JUMLAH

SATUAN

HARGA
A.
###
###
###

Ls
Ls
Ls
SUB TOTAL A

NIUM DUCT
23.0
10.0
18.0
22.0
3.0
20.0
8.0
30.0
8.0
26.0
25.0
19.0
6.0
22.0
1.0
1.0
2.0
1.0
6.0
1.0
1.0
1.0

:
:
:

Rp

B
RUANG TAM
###
###
###
###

M
M
M
M
M
M
M
M
M
M
M
M
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

###

TOILET
###
###

Page 18 of 40

VOLUME
6.0
24.0
7.0
1.0
1.0
1.0
1.0
1.0
6.0
1.0
80.0

SATUAN

HARGA

JUMLAH

SATUAN

HARGA

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M
Rp

35.0
5.0
2.0
12.0
3.0
10.0
4.0
11.0
12.0
5.0
29.0
17.0
18.0
20.0
1.0
1.0
1.0
11.0
14.0
1.0
3.0
3.0
1.0
3.0
6.0
1.0
11.0
14.0
1.0

RUANG TAM
###
###
###

M
M
M
M
M
M
M
M
M
M
M
M
M
M
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

SNI. 1.14
SUB TOTAL D

Page 19 of 40

VOLUME
1.0
1.0
3.0
3.0
1.0
3.0
72.0

178.0
178.0
205.0
215.0
12.0
12.0
125.0
12.0
12.0
1.0
12.0
12.0
12.0
6.0
3.0
3.0

1.0
1.0
1.0

SATUAN

HARGA

JUMLAH

SATUAN

HARGA

Bh
Bh
Bh
Bh
Bh
Bh
M
Rp

Rp

Rp

Rp
Rp
Rp
Rp

M
M
M
M
Unit
M
M
Bh
Unit
Ls
Unit
Unit
Unit
Unit
Unit
Unit

Ls
Ls
Ls

JUMLAH
PPN (10%)
TOTAL
PEMBULATAN

Page 20 of 40

REKAPITULASI RENCANA ANGGAR

KEGIATAN
PEKERJAAN
INSTANSI
LOKASI
TAHUN

:
:
:
:
:

PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CIT


PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GE
BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD)
PALEMBANG - SUMATERA SELATAN
2016

NO
A

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN

B
B1

PEKERJAAN PABRIKASI DAN PEMASANGAN PREIHSULATED ALUMINIUM DU


PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 1

B2

PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 2

PEKERJAAN UNIT LANTAI 1 DAN LANTAI 2

PEKERJAAN LAIN LAIN

JUMLAH
PPN (10%)
TOTAL
PEMBULATAN
Terbilang :

Diperiksa Oleh,
Asisten Teknis PU Cipta Karya
Provinsi Sumsel

Ir. Imam Santoso


Nip.19631002199502100

Menyetujui,
Page 21 of 40

Pejabat Pelaksana Teknis Kegiatan (PPTK )


BPKAD Prvinsi Sumsel

Lamuda Marbun, SE, Msi


Nip.196709151991031006

Page 22 of 40

APITULASI RENCANA ANGGARAN BIAYA

AREA JAKABARING SPORT CITY


ARA PENDINGIN RUANGAN GEDUNG BPKAD EX BP 7. PALEMBANG
AN ASET DAERAH (BPKAD)

N PEKERJAAN

###
##

JUMLAH
Rp

REIHSULATED ALUMINIUM DUCT


G RETURN LANTAI 1

B
Rp

G RETURN LANTAI 2

Rp

Rp

Rp

Rp
Rp
Rp
Rp

###

Dibuat oleh
Konsultan Perencana
CV Multibina Konsultan

Dibuat Oleh,
Konsultan Perencana

Muhtazili, ST
Direktur

Muhtazili, ST
Direktur

Mengetahui,

Mengetahui,

Page 23 of 40

Kuasa Hukum Pengguna Anggaran


Kuasa
(KPA)
Hukum Pengguna Anggara
BPKAD Prvinsi Sumsel
BPKAD Provinsi Sumsel

Laonma Pasindak lbn Tobing,Laonma


SE
Pasindak lbn Tobin
Nip.196310121984031002
Nip. 19631012198403100

Page 24 of 40

PROGRAM TERBILANG

Bilangan Yang Dimaksud


Trilyun
Ratus Milyar
Puluhan Milyar
Ratus Juta
Puluhan Juta
Ratus Ribu
Puluhan Ribu
Ratusan
Puluhan
#N/A Rupiah
Sen

Masukkan nilai angka


dimaksud (akan diterj
dalam huruf)

Cek Bilangan
Terbilang:

Hasil (akan keluar otomatis).

TERBILANG

Masukkan nilai angka yang


dimaksud (akan diterjemahkan
dalam huruf) -

an keluar otomatis).

ok!