Kaysafe ITP
Kaysafe ITP
Kaysafe ITP
12 Linkfield Corner,
Redhill.
Surrey, RH1 1BB
UNITED KINGDOM
CLIENT
Page
Project
of
Inspection
P.O.:
STEP No
STEP DESCRIPTION
Procedure
Drawing
Specification
Acceptance
Criteria
Verifying
Document
Approval Of Drawings
QAM S.5.0
ASME B.31.3
ASME B.16.34
DRAWINGS
QAM S.11.0
SNT-TC-1A LEVEL 2
OR EQUIVALENT
PROCEDURES &
QUALIFICATIONS
QAM S.7.0
P.O. REQUIREMENTS
UNPRICED COPIES
SUB-ORDERS
QAM S.8.0
SUB-ORDERS
Identify Material
QAM S.8.0
MAT. STDS
MATERIAL CERTS.
EN10204 3.1.
QAM S.8.0
MSS SP55
Q.PLAN
In Fabrication Inspection
QAM S.10.0
P.O. REQUIREMENTS
Q.PLAN
PROCEDURE
PMI REPORT
QAM S.12.0
ASME B.31.3
Q.PLAN
10
PROCEDURE
ASME B31.3
HYDROTEST REPORT
11
Marking
QAM S.13.0
MSS SP55
P.O. REQUIREMENTS
PED 97/23/CE
Q. PLAN
12
Dimensional Check
QAM S.12.0
DRAWINGS
NOT WITNESSED
In
House
Client
0 Rev. 0
Page
0 Project
CLIENT
P.O.: 0
of
Inspection
STEP No
STEP DESCRIPTION
Procedure
Drawing
Specification
Acceptance
Criteria
Verifying
Document
13
QAM S.11.0
DRAWINGS AND
P.O. REQUIREMENTS
RELEASE NOTE
14
Documentation Review
QAM S.6.0
P.O. REQUIREMENTS
MATERIAL CERTS.
NDE REPORTS
Q.A. MANAGER
In
House
Client