Contractor Site Access Request: Section A

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Contractor

Site Access Request

Fit-Out

Request Date:

Doc# MOPS053

Mall Operations

Project

Other

Permit Serial:

SECTION A: (Access Details ) - This permit is mandatory to access the site


Main Contractor: DUTCO TENNANT
Contact Name:

RAJESH RAJENDRAN

Contact Mobile:

0506571405

Project Scope:

Accessing the IDF Rooms and


Public area for Etisalat WiFi
Access Points for testing.

Unit name /
Mall area

24 hours

Specific Access
Timing:

List of Sub-Contractors / Suppliers

1. BUSINESS COMMUNICATION
LLC

Date To: 16/06/2016

Before Trading After Trading


08:00am 05:00pm

SECTION B: (Mall Rules & Regulations)

Site Access:
1. Present this permit to obtain access to the mall
2.

All workers must have valid U.A.E Labor

3.

9.

2. ETISALAT

10.

3. RTC

11.

4.

12.

6.

14.

7.

15.

8.

16.

Mall Public Corridor & Electric Room 5.

Date From:12/06/2016

City Centre
Deira

13.

Safety Rules on site:


1. All workers must wear: Safety shoes, Helmets and Vests
2.

Site must be equipped with: 4 fire extinguishers (2Co2 + 2Water)

Always display on site:

3.

Use only Aluminum scaffoldings

5.

Ladders above 3m are not allowed

documents to access the site.

Mall permit (Mandatory)

DM permit (if required)

Police permit (if required)


CAR Insurance (Mandatory)

MAF approved drawings (if required)


Updated List of labors' names
Emergency Contact Numbers

SECTION C: (Contractor Request Statement)

4.
6.
7.
8.
9.

and a Fire blanket.

Use only metal-halide lights

Hot works are not allowed without a valid permit

Hot works permit has to be renewed every 24 hours

No smelly (i.e. painting, spraying...) works without permit


No noisy works during trading hours

10. Any base builds services shall not to be altered without a permit
11. Use proper switches and connectors for electric wires
12. No eating or sleeping on site

We hereby agree that we are liable for any claim or demand for accident, injury, damage, loss and/or compensation of any kind
whatsoever arising out or in connection with all claims or demands which may arise out of any failure by us or our
subcontractors listed above which may be made against City Centre Deira in the performance of our obligations under the scope
of this project.

For assistance or further inquiries 24x7, contact:

Contractor Signature
& Stamp:

Mall Duty Manager: 050- 6515716

Security Control Room: 04-2093133

SECTION D: (Mall Approval)

Security Supervisor: 050- 4568238

This permit allows the above contractor / sub-contractors accessing the mentioned site on the dates and timing requested above.
All mall policies and safety standards shall be applied and maintained.
CCD StampMake
& Date:
all sub

Remarks:

Page

1/1

Version:

June 8, 2016

Doc#:

MOPS053