Cap Losses For Trafo 2
Cap Losses For Trafo 2
Cap Losses For Trafo 2
they kept 1 kW as losses for the case of both main power transformer and auxiliary transformer.
Evaluation of no load loss and load loss of transformer:
Hours in a year: 8760
Annual plant availability factor: 97%
Annual load factor: 70%
Tariff (Rs/kWh): NRs. 4.00/kWh
Escalation per year: 3%
Discount rate: 10%
Transformer on load since year: 2011
Evaluaiton of No Load Loss of Transformer:
S. No
Year
Escalation
Loss (kW)
Annual Lost Revenue
Discount Factor
Net PW
1
2007
1.03
1
39402.33
2
2008
1.06
1
40584.40
3
2009
1.09
1
41801.94
4
2010
1.13
1
43055.99
5
2011
1.16
1
44347.67
1
39402.33
6
2012
1.19
1
45678.11
0.91
36894.91
7
2013
1.23
1
45678.11
0.83
34547.06
8
2014
1.27
1
45678.11
0.75
32348.61
9
2015
1.30
1
45678.11
0.68
30290.06
10
2016
1.34
1
45678.11
0.62
28362.51
11
2017
1.34
1
45678.11
0.56
25784.1
12
2018
1.34
1
45678.11
0.51
23440.09
13
2019
1.34
1
45678.11
0.47
21309.17
14
2020
1.34
1
45678.11
0.42
19371.98
15
2021
1.34
1
45678.11
0.39
17610.89
16
2022
1.34
1
45678.11
0.35
16009.9
17
2023
1.34
1
45678.11
0.32
14554.45
18
2024
1.34
1
45678.11
0.29
13231.32
19
2025
1.34
1
45678.11
0.26
12028.47
20
2026
1.34
1
45678.11
0.24
10934.98
21
2027
1.34
1
45678.11
0.22
9940.887
22
2028
1.34
1
45678.11
0.20
9037.17
23
2029
1.34
1
45678.11
0.18
8215.609
24
2030
1.34
1
45678.11
0.16
7468.735
25
2031
1.34
1
45678.11
0.15
6789.759
Total equivalent NPV in Rs. = 417573 per kW
In USD = 5965.33 per kW