Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Calculation Sheet Lifting Set DNV 2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

12/2/2015

CalculationSheetLiftingSetDNV2.71

SustainingResultsThroughEngineering

Voereentrefwoordin

Zoek

Home | Diensten | Werkwijze | Expertise | Referenties | Tools | Organisatie

Tools

WijzijnopzoeknaareenStress/FEAEngineer!

Publicaties

CalculationSheetOffshorePadEyesacc.toDNV2.71

Onlinetools

WiththissheetastandardslingsetincludingpadeyesisproposedinaccordancewithDNV2.71and/or
EN12079.Thedimensionsmaybealteredforanoptimizeddesign.

CalculationSheetLiftingSet
DNV2.71
Linksnaaroverigeonlinetools

Code
Slingtype
Efficiencyofslingtermination
Designtemperature
Shackletype

DNVCertificationNotesNo.2.71:April2006
SteelCoredRopeSling,grade1770
K=0.9(forferrulesecuredeyes)
20C
GreenpinanchorshacklewithboltTypeIV,Class6

Designloads

NormenenRichtlijnen

Taremass

3800

kg

Payload

1200

kg

Loadcontingency

CO

Rating

5150

kg

WorkingLoadLimit

WLLmin

9,1

tonnes

Numberofslings

Maximumslingangle

45

Lengthbetweenlugs

LL

140

mm

Widthbetweenlugs

LW

12

mm

Minimumslinglength

SL

99

mm

Containerlength

CL

8500

mm

Containerwidth

CW

2500

mm

Containerheight

CH

1000

mm

WLLrqd

9,1

tonnes

10

tonnes

3%

tovertical

Masterlink
WLLmasterlinkrequired
WLLmasterlinkchosen

size

188

UsageFactor

UF

MBLmasterlinkchosen

MBL

40

ActualFactorAgainstFailure

FAF

4,4

WLLquadassemblyrequired

WLLrqd

9,1

tonnes

WLLquadassemblychosen

WLLchs

10

tonnes

tonnes

Quadassembly

http://www.stemar.com/tools/node27nlnl/calculationliftingsetaccordingdnv2.71

1/3

12/2/2015

CalculationSheetLiftingSetDNV2.71

size

138

UsageFactor

UF

MBLmasterlinkchosen

MBL

40

ActualFactorAgainstFailure

FAF

4,4

tonnes

Forerunner
Diamforerunnerrequired

Dfrr

UsageFactor

UF

MBLforerunnerchosen

MBL

65,8

ActualFactorAgainstFailure

FAF

6,51

ReachDownHeightquad

RDHquad

2185

32

mm

tonnes

mm

MinimumForRunerlengthof885mmrecommended
Slinglegs
Diamslinglegsrequired

Dslr

UsageFactor

UF

MBLslinglegchosen

MBL

25,7

ActualFactorAgainstFailure

FAF

7,19

WLLshacklerequired

WLLrqd

4,3

WLLshacklechosen

WLLchs

PinDiam

22

mm

InsideWidth

31

mm

InsideLength

76

mm

RSL

71,4

kN

20

mm

tonnes

Shackles

4,7

tonnes
tonnes

Padeyes
ResultingSlingLoad

AISI304

Material

Repl

190

N/mm2

Withcheekplates

HoleDiam(<1,06*PinDiam)

DH

23

mm

Padeyeradius

35

mm

Platethickness

tp

15

mm

Cheekplatethickness

tc

mm

Outerdiameterofcheekplate

Dcheek

55

mm

Totalthickness

25

mm

FillinggradeEye

FGEye

0,81

FillinggradePin

FGpin

1,05

Shackleclearance

CL

52

mm

Contactstress

cont

264,2

N/mm2

Tearoutstress

tear

304

N/mm2

30

mm

55

mm

110

mm

Thissheetisforstudypurposesonly.StemarEngineeringisinnowayresponsibleforanyconsequences
duetoutilisingthiscalculationsheet.Resultsmustalwaysbecheckedwithregardtocodeconformityby
aqualifiedengineer.

http://www.stemar.com/tools/node27nlnl/calculationliftingsetaccordingdnv2.71

2/3

12/2/2015

CalculationSheetLiftingSetDNV2.71

StemarEngineeringBV
Berenkoog32|1822BJAlkmaar
T:+31(0)725615254|F:+31(0)725623637
W:www.stemar.com
K.v.K.Alkmaar37045056
Contact

Disclaimer

Productsheets

CreatedbyTrefnetPoweredbySharkCMS

http://www.stemar.com/tools/node27nlnl/calculationliftingsetaccordingdnv2.71

3/3

You might also like