State Load Despatch Center,Airoli (MSETCL) Statement I

Daily system Report for 30/Nov/2016 WEDNESDAY


GENERATION (MUs)
II
EXCHANGES (MUs)

I
A) MSPGCL

Daily

1) Thermal
2) Hydro
3) Gas
Total MSPGCL
B) 1) APML
2) JSWEL
3) VIPL
4) RPL(AMT)
5) WPCL
6) PGPL
7) Other IPP
C) 1) TPCL Thermal
2) TPCL Hydro
3) TPCL Gas
4) R-INFRA Thermal
D) STATE
1) Thermal

Monthly

146.897
20.445
7.782
175.124
51.649
15.306
12.505
0.000
3.965
0.000
8.988
15.338
4.249
4.433
10.878

Daily

1) Gujrat

-9.202

2) Madhya Pradesh

7.534

258.482

3) Chattisgarh

7.960

204.220

106.761

2977.520

-0.596

-21.284

120.146
17.915

3409.736
503.559

19.757

620.860

20.930

759.827

0.000

-18.480

4) Maharashtra Net
5) Goa (Amona)
Total
a) Mumbai Schedule

424.930
118.344 b) Mumbai Drawl
125.261 c) MSEDCL Bilateral *
305.078
Include PX

(A2+C2)
(A3+B6+C3)

TOTAL STATE

24.694
12.215
3.434
1.218
307.087

7848.419

Monthly

-1.513

d) Mumbai Bilateral *
265.526

(A1+C1+C4+(B1-B6))

2) Hydro
3) Gas
4) Wind
6) SOLAR

4028.351
465.829
303.157
4797.337
1613.398
578.001
332.938
228.754
122.140
16.149
214.829

E) InterState Exchanges

17.915

503.559

Include PX

1.896

44.819

Include Standby

0.000

0.000

372.578

10893.243

54.655

1594.472

427.233

12487.715

584.173 H) ENERGY CATERED (MUs)


444.567 1) MSEDCL
164.070 2) Mumbai Discoms
36.751
9077.980 TOTAL STATE

* Displayed for information, not added in total.

DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)


PARTICULARS
MSPGCL Thermal
MSPGCL Hydro
MSPGCL Gas
MSPGCL Total Generation
Central Sector Receipt
WIND
CPP / IPP Thermal
CPP / IPP Gas
SOLAR
Exchange with Mumbai
MSEDCL DEMAND MET
Load Shedding
MSEDCL DEMAND
TPCL GENERATION
R-INFRA GENERATION
MUMBAI DEMAND
STATE DEMAND MET
STATE DEMAND
Frequency (Hz)

Statement II

A. Morning Peak at B. Day Peak at 18 C. Evening Peak at D. Night Minimum


11 Hrs
Hrs
19 Hrs
at 4 Hrs
6272
6322
6338
5876
1637
1645
1329
119
307
293
303
319
8216
8260
7970
6314
5740
5292
5784
3245
101
73
89
258
4086
4121
4078
3415
0
0
0
0
161
4
0
0
-964
-828
-947
-454
17340
16922
16974
12778
0
0
0
0
17340
16922
16974
12778
1325
1345
1290
698
500
506
505
386
2789
2679
2742
1538
20129
19601
19716
14316
20129
19601
19716
14316
49.88
49.76
49.95
49.97

FREQUENCY PARTICULARS
MAXIMUM FREQ.
MINIMUM FREQ.
AVERAGE FREQ.
50.14 Hz at 06:01 Hrs
49.5 Hz at 17:43 Hrs
49.91
Note : The report is based on Operational Data and is for statistical purpose only.

Shift Engineer

FREQ. BELOW 49.2 Hz


0 % of Time(min)

Shift Incharge
0 of 5

Annexure-1
State Load Despatch Center,Airoli (MSETCL)
Daily and Progressive Generation,Maximum,Minimum for 30/Nov/2016
Generation
Generating unit

Daily
(Mus)

Generation

Monthly Max
(Mus) (MW)

Generating unit

Min
(MW)

Koradi

Daily
(Mus)

Monthly Max
(Mus) (MW)

Unit 2

0.00

6.15

0.00

16.15

Min
(MW)

50

Unit 5

0.00

0.00

Total

Unit 6

0.00

0.00

PENCH (MS)
Pench (MS)

0.14

12.05

Total

0.14

12.05

Stage 1-2

6.08

137.90

550

40

Unit 7

0.00

54.21

Unit 8

12.40

303.52

544

485

Total

12.40

357.73

Koyna

Bhusawal
Unit 2

0.00

0.00

Stage 4

7.09

167.56

758

Unit 3

0.00

0.00

Stage 3

2.88

65.21

240

Unit 4

9.10

276.79

510

355

Total

16.05

370.66

Unit 5

8.98

305.68

460

350

Hydro

Total

18.08

582.48

KDPH

0.65

16.22

37

18

VTRNA

0.44

2.52

58

Parli
Unit 4

0.00

0.00

TILLARI

0.37

11.01

62

Unit 5

0.00

0.00

BHTGR/VEER

0.00

0.00

Unit 6

4.65

114.14

217

184

BHIRA T.R.

0.31

5.84

80

Unit 7

4.64

126.43

212

180

RNGR+BHTSA

0.38

9.66

16

15

Total

9.29

240.57

BHANDARDRA

0.00

0.00

ELDARY

0.00

0.00

Chandrapur
Unit 3

4.39

133.35

200

166

SMLHY_PTN

0.70

17.23

39

26

Unit 4

4.33

132.37

191

167

GHATGHAR

1.53

32.69

250

Unit 5

9.72

234.30

455

351

Total

4.39

95.17

Unit 6

9.90

293.15

460

364

Wind

Unit 7

9.25

266.76

430

339

Total

3.43

164.07

Unit 8

10.34

296.38

500

360

Total

3.43

164.07

Total

47.92

1356.31

APML(Mus)

51.65

1613.40

JSWEL(Mus)

15.31

578.00

VIPL(Mus)

12.50

332.94

RPLAMT(Mus

0.00

228.75

WPCL(Mus)

3.96

122.14

CPP

Paras
Unit 3

0.00

0.00

Unit 4

5.31

150.20

250

190

Total

5.31

150.20

Khaparkheda
Unit 1

3.92

114.12

190

150

Other(Mus)

Unit 2

3.98

124.30

195

160

Total

8.99

214.83

92.41

3090.06

Unit 3

3.95

120.44

200

160

SOLAR

Unit 4

3.92

109.30

181

156

Total

1.22

36.75

Unit 5

10.72

310.58

505

380

Total

26.49

778.73

Total

1.22

36.75

Unit 3

4.03

125.04

190

165

Trombay 5

9.99

266.11

493

314

Trombay 6

0.00

0.00

Unit 4

4.04

80.75

184

Unit 5

0.00

40.10

161

Trombay 7A

2.84

79.05

122

107

Trombay 7B

1.60

46.21

68

63

Total

8.07

245.89

Trombay 8

5.35

158.82

245

199

TATA Hydro

4.25

118.34

426

24.02

668.54

1-2

10.88

305.08

508

386

Total

10.88

305.08

Tata

Nasik

Uran
All Units

7.78

303.16

Total

7.78

303.16

0.00

10.00

453

287

R-INFRA

PGPL
Unit 1

* Infirm Power
Particulars

Daily (Mus)

Total

Summary
Monthly

Chandrapur 9

8.81

88.23

Koradi 9

9.92

184.69

Koradi 10

0.62

7.61

Parli 8

0.00

35.91

Particulars

Summary

Daily (Mus)

Monthly
(Mus)

Particulars

MSPGCL Thermal

146.90

4028.35 MSPGCL Total

MSPGCL Thml+Gas

154.68

4331.51 Koyna 1,2 & 4 Total

MSPGCL Hydro

20.44

465.83 State Total

Daily (Mus)
175.12

Monthly
(Mus)
4797.34

13.17

305.45

307.09

9077.98

1 of 5

Annexure-2

State Load Despatch Center,Airoli (MSETCL)


Hourly Load Data As on 30/Nov/2016

TIME MSPGCL GEN.


SR.
TOTAL WIND
NO. THM HY GAS

CPP / IPP
SOLAR
THM

GAS

Mum. MSEDCL LOAD MSEDCL


CS
CS
MUMBAI STATE FREQ.
NET
DEM. SHEDDI DEM.
SHARE RECPT
DEMAND DEMAND (Hz)
EXCH.
MET
NG
WITH LS

1 5813

179

317

6309

265

3424

3704

3855

-739

13114

13114

1812

14926

49.93

2 5871

134

321

6326

236

3417

3517

3544

-588

12935

12935

1672

14607

49.95

3 5893

119

321

6333

249

3418

3386

3431

-529

12902

12902

1613

14515

49.98

4 5876

119

319

6314

258

3415

3364

3245

-454

12778

12778

1538

14316

49.97

5 5865

139

319

6323

284

3402

3994

3949

-467

13491

13491

1551

15042

49.98

6 5740

119

320

6179

271

3420

4670

4849

-536

14183

14183

1626

15809

49.96

7 6376

693

320

7389

281

3789

5126

4873

-675

15657

15657

1843

17500

49.87

8 6765

836

320

7921

246

4081

21

5578

5425

-510

17184

17184

1950

19134

49.87

9 6620 1086

306

8012

167

4076

82

5632

5267

-697

16907

16907

2290

19197

49.86

10 6353 1499

312

8164

138

4080

129

5675

5855

-816

17550

17550

2546

20096

49.92

11 6272 1637

307

8216

101

4086

161

5782

5740

-964

17340

17340

2789

20129

49.88

12 6265 1383

303

7951

75

4109

182

5789

5798

-1045

17070

17070

2853

19923

49.83

13 6258 1229

289

7776

64

4099

180

5732

5481

-1000

16600

16600

2814

19414

49.93

14 6333 1156

291

7780

75

4075

175

5754

5680

-1048

16737

16737

2694

19431

49.97

15 6306 1100

287

7693

64

4126

140

5769

5639

-1016

16646

16646

2722

19368

49.91

16 6346 1446

297

8089

61

4130

97

5745

5332

-898

16811

16811

2733

19544

49.78

17 6340 1591

297

8228

52

4117

47

5757

5274

-880

16838

16838

2714

19552

49.80

18 6322 1645

293

8260

73

4121

5743

5292

-828

16922

16922

2679

19601

49.76

19 6338 1329

303

7970

89

4078

5794

5784

-947

16974

16974

2742

19716

49.95

20 5954

730

314

6998

73

4003

5798

5567

-836

15805

15805

2608

18413

49.93

21 5753

757

351

6861

73

3895

5549

5560

-1059

15330

15330

2368

17698

49.95

22 5743 1003

371

7117

55

3793

5435

5254

-1164

15055

15055

2258

17313

49.98

23 5740

342

451

6533

71

3763

5261

5019

-1093

14293

14293

2181

16474

49.95

24 5755

174

453

6382

113

3492

4353

4433

-968

13452

13452

2059

15511

49.98

3.43 92.41

0.00

1.22

122.91 120.15 -19.76

372.58

0.00

372.58

54.66

427.23

49.91

146.9
20.45 7.78 175.12
0
NOTE : ALL VALUES IN MW
MUs

Mumbai Net Exch is shown with reference to MSETCL system and (-) sign indicates MSETCL periphery to Mumbai system.

2 of 5

Statement-VI
State Load Despatch Center,Airoli (MSETCL)
Details of Generating Unit Outages/Trippings for 30/Nov/2016
Position as on 6.30 Hrs of 01/Dec/2016
Generating
Company

Name of Generating Unit

Capacity

Tripped
Date

Tripped Sync.Date Sync. Time


Time

Reason of Outage

PLANNED OUTAGE
Economic shutdown,(AOH
for 06.03.2016 To
Continued. 04.04.2016) Unit Test
synch.07.04.2016 (12.03
To 12.30hrs)After overhaul
(Stator Fault)continued
Continued. under AOH.26/10/2016
00.00hrs

TPC-G

Trombay 6

500

15/07/2015

17.08

MSPGCL

Paras Unit 3

250

25/10/2016

08.54

RGPPL

Dabhol 1B

230

28/05/2013

22:02

Continued. Gas Shortage.

RGPPL

Dabhol 1X

290

27/06/2013

21.46

Continued. Gas Shortage

RGPPL

Dabhol 1A

230

27/06/2013

21.47

Continued. Gas Shortage

IPP

Dhariwal

300

28/05/2014

02.27

Continued. No PPA.

MSPGCL

Koradi Unit 6

210

20/03/2015

01.02

Continued. Economic shutdown

MSPGCL

Parli Unit 4

210

05/07/2015

18.45

Continued. Water Shortage

MSPGCL

Parli Unit 5

210

06/07/2015

14:55

Continued. Water Shortage

IPP

WPCL U-1

135

16/02/2016

17.09

Continued. No PPA.

IPP

WPCL U-2

135

29/02/2016

21.46

Continued.

MSPGCL

Bhusawal Unit 2

210

14/06/2016

19.35

IPP

RPL(AMT) U-3

270

29/06/2016

03.01

Continued. Zero Shedule By MSEDCL.

MSPGCL

Uran Unit 8

108

14/08/2016

07.56

Continued. Maintenance work

RGPPL

Dabhol 2A

230

24/08/2016

13.31

Continued. Change Over.

FORCED OUTAGE

Change over against Unit


III
Boiler Tube
Leakage(Converted to Zero
Continued.
Shedule By MSEDCL. from
00.00Hrs dt.19-6-16)

MSPGCL

Koradi Unit 5

200

05/09/2016

00.21

ID Fan problem, Converted


to Zero Schedule By
MSEDCL from 00.00hrs/22Continued. 9-16. Shutdown taken on
18.10.2016 at 00:00Hrs for
Turbine inspection and
maintenance work

MSPGCL

Bhusawal Unit 3

210

16/09/2016

00.02

Continued. Zero Schedule by MSEDCL

MSPGCL

Koyna Unit 11

80

24/09/2016

03.20

Continued. Stator Earth Fault

IPP

Adani U-1

660

06/11/2016

11.10

Continued. Coal Shortage

MSPGCL

Nasik Unit 5

210

12/11/2016

19.20

Economizer Tube Leakage


Continued. (continued under zero
schedule).

IPP

RPL(AMT) U-5

270

15/11/2016

20.00

Continued. Zero schedule

IPP

JSW (J) U1

300

16/11/2016

14.38

Continued. Due To CW Duct Leakage.

IPP

RPL(AMT) U-4

270

16/11/2016

21.03

Continued.

IPP

RPL(AMT) U-2

270

16/11/2016

22.36

IPP

RPL(AMT) U-1

270

17/11/2016

17.23

Continued. Zero Schedule.

MSPGCL

Koradi Unit 7

210

18/11/2016

01.17

Continued. Zero Schedule.

MSPGCL

Parli Unit 8

250

18/11/2016

16.23

Continued. For COD Confirmation.

Zero Schedule By
MSEDCL.
Zero Schedule By
Continued.
MSEDCL.

3 of 5

Expected
Date

Statement-VI
State Load Despatch Center,Airoli (MSETCL)
Details of Generating Unit Outages/Trippings for 30/Nov/2016
Position as on 6.30 Hrs of 01/Dec/2016
Generating
Company

Name of Generating Unit

Capacity

Tripped
Date

Tripped Sync.Date Sync. Time


Time

Reason of Outage

PGPL

PGPL U1

262

23/11/2016

19.30

Continued. No schedule.

PGPL

PGPL U2

126

23/11/2016

19.33

Continued. No schedule.

MSPGCL

Uran Unit 5

108

28/11/2016

00.25

MSPGCL

Koradi Unit 10

660

30/11/2016

05.05

Continued. Loss of fuel

MSPGCL

Bhusawal Unit 4

500

01/12/2016

05.31

Continued.

30/11/2016

19.07

Boiler Leakage

Electrical Protection
Operated.

4 of 5

Expected
Date

State Load Despatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 30/Nov/2016

Statement-VII

Position as on 6.30 Hrs of 01/Dec/2016


Name of Line

Inter State /
Intra State

Tripped
Date

Tripped
Time

Sync. Date

Sync.
Time

Outage
Type

Reason of Outage

Dhule Sar'Sarovar I

InterState

29/11/2016

19.17

30/11/2016

07.26

HT

Over Voltage

Dabhol Nagothane II

InterState

30/11/2016

09.42

30/11/2016

19.24

EO

Attending Hot Spot

Dhule Sar'Sarovar II

InterState

30/11/2016

20.04

Continued.

HT

Over Voltage

Ektuni-Bableshwar ckt I

IntraState

09/10/2016

12.29

Continued.

HT

Padghe - Kalwa- I

IntraState

21/11/2016

12.50

30/11/2016

13.24

PO

Karad - Jaigad - II

IntraState

29/11/2016

19.57

30/11/2016

09.33

HT

Over Voltage

karad -kolhapur-I

IntraState

29/11/2016

20.09

30/11/2016

11.13

HT

Over Voltage

Akola II - Akola I Ckt-II

IntraState

30/11/2016

09.54

30/11/2016

15.39

PO

Quarterly Maintainance Work

Koradi-Khaperkheda I

IntraState

30/11/2016

10.42

30/11/2016

17.59

PO

Testing Work

koaradi II - Wardha(PG)

IntraState

30/11/2016

12.58

30/11/2016

18.00

PO

Attending Hot Spot

Akola II - Akola I Ckt-I

IntraState

30/11/2016

15.57

30/11/2016

18.23

PO

Testing Work

N.Koyna-Karad -Ckt II

IntraState

30/11/2016

20.01

Continued.

HT

Over Voltage

Karad-Jaigad - I

IntraState

30/11/2016

20.04

Continued.

HT

Over Voltage

Chandrapur GCR - Warora - I

IntraState

05/04/2015

09.13

Continued.

PO

Chandrapur GCR - Wani

IntraState

05/04/2015

09.15

Continued.

PO

Bableshwar- Ranjangaon

IntraState

06/06/2016

07.22

Continued.

HT

Bableshwar -Bhenda

IntraState

24/10/2016

06.57

Continued.

HT

Kalwa - Borivali

IntraState

27/10/2016

08.32

Continued.

HT

Mulund - GIS Bhandup

IntraState

27/10/2016

08.53

Continued.

HT

Nashik-Airoli Knowledge Park

IntraState

14/11/2016

18.45

30/11/2016

05.49

PO

Butibori-Inox

IntraState

30/11/2016

10.06

30/11/2016

17.36

PO

Parli 3(Old Gcr)- Girwali Ckt 4

IntraState

30/11/2016

10.34

30/11/2016

14.41

PO

Replace Flashover R Ph String.

Osmanabad - Solapur (Bale)

IntraState

30/11/2016

10.42

30/11/2016

18.22

PO

Maintenance Work.

IntraState

21/09/2014

09.16

Continued.

Failed on internal Fault(Now


repaired and ready for
commissioning)

IntraState

30/11/2016

18.22

19.40

R Ph CC Burst.

400 KV LINE Outages/Trippings

Hot Spot on Isolator(RFC from


17.36HrsDt.10-10-2016)
Outage up to 29.11.2016 for
construction work.

220 KV LINE Outages/Trippings


Bunching of conductor Loc no 86
Disconnecting of jumer at Loc no
86 & 107 and de-energising the
line bet.86 to 107.
Bunching of conductor Loc no 86
Disconnecting of jumer at Loc no
86 & 107 and de-energising the
line bet.86 to 107.
Hand Tripped for Ranjangaon
End.
Alephata line loading.
Outage availed on28.10.2016 at
08:09 hrs for construction activity
of Mumbai strenghtning work
outage availed on 28.10.2016 at
09:30hrs for construction activity
of mumbai strenghtning work.
Diverting 100kv padghe-sahapur
line THR nasik-know park line.
Isolator Maint.& Relay Testing
Work.

220 KV ICT Outages/Trippings


220/100 Kv 200 MVA ICT III
@Borivali
132 KV LINE Outages/Trippings
Paranda - Bhairavnath Cogeneration

30/11/2016

HT : Hand Tripping, MT : Multiple Tripping, T : Tripping, PO : Planned Outage, EO : Emergency Outage, OO : Opportunity Outage