Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Order,+ERC+Case+No +2015-024+MC

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

.;G\lI.

ATORve6~
(4.~v

..

~~

~'#/\

~
!YJ"~'1"('l'r"d~~,,~,

f~"n:'

Republic of the Philippines.

r:i';:.,~~i,i:Ph

IN THE MATTER OF THE


APPLICATION
FOR
AUTHORITY
TO
DEVELOP,
OWN
AND
OPERATE
DEDICATED POINT-TO-POINT
LIMITED
TRANSMISSION
FACILITIES
TO CONNECT
THE 41.3 MWP SOLAR POWER
PLANT
OF
MAJESTICS
ENERGY CORPORATION
TO
THE
LUZON
GRID,
WITH
PRAYER FOR PROVISIONAL
AUTHORITY
ERC CASE NO. 2015-024 Me
MAJESTICS
,ENERGY
CORPO~A nON (MEC),
Applicant.

x- - - - - - - - - - .- - - - - - - - - - - - -x

iJ 0 ('11~. ~ ~~
J). te:,~~,,,~
'..::',..,.~ .

...:

..

ORDER
On May 25, 2015, Majesties Energy Corporation (MEC) filed an
. application for authority to develop, own, and operate dedicated
point-to-point limited transmission facilities to connect its 41.3 MWP
solar power plant project to the Luzon Grid, with prayer for provisional
authority.
In the said application, MEC alleged, among others, that:
1.

~to:._

fJ:

r~=~~tl'j

ENERGY REGULATORY COMMISSION


San Miguel Avenue, Pasig City

c c ~."

It is a generation company duly authorized and existing


under the laws of the Republic of the Philippines, with
principal address at Block 3, Cavite Economic Zone II,
General Trias, Cavite.
Copies of its Certificate of
Incorporation, Certificate of Filing of Amended Articles of
Incorporation with the attached Amended Articles of
Incorporation, issued by the Securities and Exchange
Commission, By-Laws and latest General Information
Sheet are attached as Annexes "A" and series;

ERC CASE NO. 2015-024 MC


ORDER/July 27, 2015
Page 2 of 18

Nature of Application
2.

Pursuant to Section 9 of Republic Act No. 9136, or the


"Electric Power Industry Reform Act," and Section 5, Rule 5
of its Implementing Rules and Regulations, the instant
application is submitted to secure authority from the
Commission for it to develop, own and operate dedicated
point-to-point limited transmission facilities connecting its
41.3 MWp Solar Power Plant (MEC Solar Power Plant),
which is located in the Municipalities of Rosario and
General Trias, Cavite, to the Luzon Grid through the
Dasmaririas-Rosario
115 kV line of the National Grid
Corporation of the Philippines (NGCP), via the tap
connection located at around 1.5 km from the Rosario
Substation of NGCP, and through a 115 kV line from the
tapping point to the substation of the said Plant. The said
line is approximately 1.8 km in length;
Statement of Facts

3.

Need for additional long-term power supply in the


Luzon Grid. Notwithstanding the power projects lined up
to augment the existing capacity of the Luzon Grid,
additional capacity is still needed to meet the power
requirements of the Grid;
3.1

Based on the 2013 Supply-Demand Outlook of the


Department of Energy, the Grid still needs 8,100 MW
of additional capacity on top of the committed power
projects in order to meet both the electricity demand
and the required reserve margin of the Grid.1

3.2

The need for additional capacity is expected to


continue due to the steadily increasing electricity
demand of the region. At an average annual growth
rate of 4.13 percent, the peak demand in the Luzon
Grid is projected to increase from 8,892 MW in 2015
to 10,693 MW in 2020 and to 16,477 MW in 2030.

3.3

Worse, the total dependable capacity in the Luzon


Grid is expected to decrease during the long dry

Department of Energy ("DOE") 2013 Supply-Demand

Outlook, p. 2.

ERC CASE NO. 2015-024 MC


ORDER/July 27, 2015
Page 3 of 18
seasons, during which hydro power plants are
expected to have reduced capacities. Notably, hydro
power accounts for 20% of the total dependable
capacity in Luzon.
4.

Significantly, as stated in the Transmission Development


Plan of NGCP,it is critical for the proposed capacities to
come on stream by the year 2016. Otherwise, power
shortage will be experienced;2 :

5.

Utilization of Renewable Energy Sources.


In addition,
legal reforms have been instituted towards increasing the
country's renewable energy (RE) capacities, through
increased investments and activities in the sector, as well
as through priority connections to the grid;
5.1

In particular, Section 11 of the Renewable Energy


Law3 aims to ensure that the proposed RE resources
are integrated in the respective development plans of
NGCP and distribution utilities. Thus, the law states:
"Section 11. Transmission and Distribution
System Development. - TRANSCO or its
successors-in-interest
or
its
buyer/concessionaire and all DUs, shall
include
the
required
connection
facilities for RE-based power facilities in
the
Transmission
and
Distribution
Development Plans: Provided, That such
facilities are approved by the DOE. The
connection facilities of RE power plants,
including the extension of transmission and
distribution lines, shall be subject only to
ancillary
services
covering
such
connections." (emphasis supplied)

5.2

Also, Section 7 of the Renewable Energy Law


mandates the formulation of a feed-in-tariff (FIT) that
will include priority connections for RE sources such
as solar power. Thus, the law states:

National Grid Corporation Transmission Development Plan 2012, Volume I, p. 19.


Republic Act No. 9513.

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 4 of 18

"Section 7. Feed-In Tariff System. - To


accelerate the development of emerging
renewable energy resources, a feed-in
tariff system for electricity produced
from wind, solar, ocean, run-of-river
hydropower and biomass is hereby
mandated. Towards this end, the ERC in
consultation with the National Renewable
Energy Board (NREB) created under
Section 27 of this Act shall formulate and
promulgate feed-in tariff system rules
within one (1) year upon the effectivity of
this Act which shall include, but not limited
to the following:
(a) Priority connections to the grid for
electricity
generated from emerging
renewable energy resources such as
wind, solar, ocean, run-of-river hydropower
and biomass power plants within the
territory of the Philippines;" (emphasis
supplied)
5.3

In fulfillment of the said mandate, the Commission


issued Resolution No. 16, Series of 2010,
establishing the FIT system.
Verily, the said
Resolution allows eligible RE plants to enjoy
priority connection to the transmission system,
subject to compliance with the pertinent standards
and rules of the Commission.

6.

There is, thus, an immediate need to ensure that power


supply in the Luzon Grid will be sufficient to meet its
steadily increasing demand. Otherwise, Luzon may suffer
from outages, adversely affecting, not only the region's
business growth and overall economic development, but
also the quality of people's lives. Notably, RE sources
such as solar power can help address the increasing power
requirements of the Grid in an environment-friendly
manner;

7.

Private Sector Initiated Power Projects. To address the


need for long-term power supply, the government has

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 5 of 18
encouraged and mandated private sector investment in the
electric power industry, particularly in power generation, to
ensure additional capacity in Luzon and the entire country
for the coming years;
8.

Additional supply from MEC. MEC has undertaken to


develop, construct, own, operate and maintain the MEC
Solar Power Plant, which can generate 41.3 MWp. The
said Plant will not only help address the need for additional
supply in the Luzon Grid, but is also consistent with the
government's
efforts to increase the country's
RE
capacities;

9.

Also, considering its significant contribution in power supply


to the Luzon Grid, the operation of the MEC Solar Power
Plant will help encourage the use of RE sources for power
generation within economic zones;

10. As discussed hereunder, in order to dispatch the capacity


to be generated by the MEC Solar Power Plant, MEC
deems it necessary, feasible and cost-effective to connect
the said Plant to the Luzon Grid through dedicated point-topoint limited transmission facilities;
11. Under Republic Act No: 9136, authorization from the
Commission is required for a generation company to
develop,
own,
and
operate
point-to-point
limited
transmission facilities. Hence, this application;
ABSTRACT OF THE PROJECT
THE DEDICATED TRANSMISSION FACILITIES AND
RELATED INFORMATION
12. The MEC Solar Power Plant. As mentioned above, the
MEC Solar Power Plant is located in an approximately 70hectare area in the Municipalities of Rosario and General
Trias, Cavite. The site of the Plant is illustrated in location
maps attached as Annex "B" and series;
12.1 The Plant consists of forty-four (44) 1,200 KVA
transformers, two (2) 400 KVA transformers, eightyone (81) inverters, combiner boxes and solar
modules. It has a capacity of 41.3 MWp. The Plant

ERC CASE NO. 2015-024 MC


ORDER/July 27, 2015

_EClg~_~gfJ?
_

_
includes solar panels that should be installed at the
rooftops of eighteen (18) buildings in Cavite EcoZones I and II.
12.2 The Plant also includes a 34.5 kV line, which will go
through the four (4) feeders of the Plant's
substation, and which will then be stepped up to
115 kV line.
The Plant and its components are illustrated
and more particularly described in single line
diagrams, engineering drawings and layout attached
as Annex "C" and series.

13. Development of the MEC Solar Plant.


MEC has
achieved significant progress in the development of its
Solar Power Plant;
13.1 The Plant is covered by a Solar Energy Service
Contract (SESC No. 2013-10-040) between the
Department of Energy (DOE) and MEC. The DOE
has also issued a Certificate of Commerciality for the
Plant.
Copies of the Confirmation of Commerciality and of
the Amended Confirmation of Commerciality are
attached as Annexes "0" and "0-1," respectively.
13.2 The Department
of Environment
and Natural
Resources has issued Environmental Compliance
Certificates and Certificates of Non-Coverage for the
Plant.
Copies of the said certificates
Annexes "E" and series.
13.3 MEC has likewise filed before
application for the issuance
Compliance on 2 May 2014. As
of the said application, the
conducted a technical inspection
24 April 2015.

are attached

as

the Commission an
of a Certificate of
part of its evaluation
same has already
of the Plant on 23 to

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 7 of 18

14. The Proposed Connection of the MEC Solar Power


Plant to the Grid. The power generated by the MEC Solar
Power Plant will be delivered to the Luzon Grid through the
Dasmaririas-Rosario 115 kV line of NGCP, via the tap
connection located at around 1.5 km from the Rosario
Substation of NGCP, and through a 115 kV line,
approximately 1.8 km in length, from the tapping point to
the substation of the Plant;
14.1 MEC shall own, construct, install, operate and
maintain the dedicated transmission facilities for the
above-said connection of the MEC Solar Power Plant
to the Luzon Grid (Project) in accordance with
Philippine Grid Code and other applicable laws or
regulations.
14.2 Necessity of the Project. It is necessary to connect
the MEC Solar Power Plant to the Luzon Grid in
order to dispatch the capacity that will be generated
by the Plant. Without the said connection, the said
capacity will not be utilized by the Grid.
14.3 Technical Configuration.
1-336.4 MCM ACSR
conductors in concrete pole structures will be utilized
for the proposed connection.
14.4 The power generated from each central inverter will
initially pass through forty-four (44) units of 1.2 MVA,
0.315/0.315/34.5 kV three-winding transformers and
two (2) units of 400 KVA (0.400/34.5), and will then
pass through four (4) feeders. Thereafter, the power
will be delivered to the Grid via a single unit 50 MVA,
34.5/115 kV step-up transformer.
The proposed connection is illustrated and described
further in layouts, drawings and diagrams, copies of
which are attached as Annex uF."
15. Dedicated Transmission Facilities. The Project involves
dedicated point-to-point limited transmission facilities in the
purview of Republic Act No. 9136. They are required only
for the purpose of connecting the MEC Solar Power Plant
to the Luzon grid, and will be used solely by the said Plant.

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 8 of 18
They are not intended to serve end-users or suppliers
directly. The. technical specifications of the dedicated
transmission facilities are described further in documents
attached as Annex "G" and series.
As discussed
hereunder, Annex "G" and series are subject of herein
Motion to Treat Information Confidential (Motion);
16. Selection of the Route. The proposed route was selected
because it is the most feasible, viable and cost-effective
means to dispatch the generated capacity of the MEC
Solar Power Plant;
16.1 In determining the most feasible and cost effective
route, MEC considered connecting the MEC Solar
Power Plant to the Magellan Substation of NGCP,
located in Rosario, Cavite, going to the Rosario
Substation of NGCP.
The said alternative connection is illustrated in the
layout attached as Annex "H."
16.2 The said option is neither feasible nor cost-effective
due to various reasons.
First, the Magellan
Substation
has no available switch allocation
connection for a switching station that will serve as
line protection.
It is not possible to construct an
allocation connection in the Magellan Substation due
to lack of available area. Second, the said option will
require a transmission line from the Substation of the
MEC Solar Power Station to the Rosario Substation,
which will be longer, and thus more costly, than the
line subject of the present Application.
Third, an
additional cost of approximately PhP15,000,000 will
have to be incurred for the acquisition of the land
necessary for the said connection. Fourth, additional
cost will also have to be incurred to replace the old
and rotten wooden poles and old lines or cables,
which will also be unsafe to use. Lastly, the existing
transmission line from the Magellan Substation to the
Rosario Substation is already being used by the
MERALCO-First Cavite Industrial Estate.
Even
assuming the said line can still be utilized, there will
still be no available switch allocation connection.
Thus, the said option poses safety issues.

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 9 of 18

17. Grid Studies. Consistent with the 2006 Open Access


Transmission Service Rules (OATS), MEC engaged the
services of a third-party consultant to undertake the
preparation of the necessary System Impact Study (SIS).
The said study was conducted to determine the impact of
the MEC Solar Power Plant on the Luzon Grid;
17.1 The report on the SIS states that the existing NGCP
transmission facilities are sufficient to accommodate
the Plant. No major transmission reinforcement is
required.
It also states that overall, the said
connection is technically acceptable.
A copy of the report on the results of the SIS is
attached hereto as Annex "I."
As discussed
hereunder, the said report is subject of the Motion.
17.2 In compliance with the OATS Rules, NGCP
conducted the review of the SIS for acceptability of
the evaluation method, simulation results and the
study's conclusions.
17.3

As noted in NGCP's review, the reference plan of the


SIS is the 2012 Transmission Development Plant,
and the assessment
criteria used are found
consistent with the Philippine Grid Code.

17.4 Also, as stated in the said review, NGCP has found


that the conclusions in the SIS report provide an
acceptable assessment of the impact of the proposed
connection of the MEC Solar Power Plant to the
Luzon Grid. Generally, the effect of the operation of
the Plant is the reduction in loading of the 230/115 kV
transformers in Dasmarinas.
A copy of NGCP's review of the SIS is attached as
Annex "J."
17.5 A Facilities Study was likewise conducted on the
MEC Solar Power Plant. The NGCP has approved
the said study.

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 10 of 18

A copy of the Facilities Study is attached as Annex


"K." As discussed hereunder, the said Study is
subject of the Motion.
18. Connection Agreement. NGCP and MEC executed a
Connection Agreement, which lays down the terms and
conditions for the connection of the MEC Solar Power Plant
to NGCP's transmission system.
A copy of the Connection Agreement is attached hereto as
Annex "L." The said Agreement is subject of the Motion.
19. Estimated Project Cost. The total project cost of the
dedicated transmission facilities is estimated at PhP
214,842,411.10.
The breakdown of the said project cost is attached as
Annex "M."
TECHNICAL AND FINANCIAL CAPABILITY OF MEC
20. MEC is fully equipped to own, operate and maintain the
dedicated transmission facilities.
21. Technical Capability.
MEC has acquired considerable
experience in the operation and maintenance of power
distribution system, sufficient for effective operations and
maintenance of the connection assets.
21.1

MEC is located in an1 economic zone in Cavite. It


has operated and maintained its own distribution
system, located in the Cavite Economic Zone II, from
2009 until the present, in order to supply its own
power requirements. It bears emphasizing that such
distribution system is being used to distribute the
power requirements of the entire Cavite Economic
Zone I!.

ERG GASE NO. 2015-024 MG


ORDER/July 27, 2015
Page 11 of 18

..

21.2 MEG is responsible, not only for the installation of the


said distribution system, but also for the operation
and maintenance of its various materials and
equipment.
21.3 To note, in operating and maintaining the 34.5 kV line
for the said distribution system, MEG used facilities
that are applicable to both 34.5 kV line and 115 kV
line. Moreover, the major equipment and materials
for the Gavite Economic Zone II distribution system which MEG has operated and maintained - are of the
same nature, function, capacity and features as those
of the proposed dedicated transmission facilities.
The skills, processes and system, which MEG
adopted in operating and maintaining the said
distribution system, are all applicable for the
operation and maintenance of the said proposed
facilities.
21.4 Thus, MEG clearly has the necessary skills,
experience and system needed to operate and
maintain the proposed
dedicated
transmission
facilities.
21.5 MEG also has a competent manpower to perform the
tasks needed to operate and maintain the said
dedicated transmission facilities in accordance with
the pertinent rules and regulations.
The materials
and equipment
necessary
for the
proposed
connection are likewise already available.
22. Financial Capability.
MEG, on its own, is capable of
financing the cost of the Project.
A copy of MEG's latest Audited Financial Statements
("AFS") is attached as Annex "N." As discussed hereunder,
the AFS is subject of the Motion.

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 12 of 18

ALLEGATIONS IN SUPPORT OF THE MOTION FOR


PROVISIONAL AUTHORITY
23. The Project is necessary in order to dispatch the capacity
that the MEC Solar Power Plant will generate.
24. This Commission's provisional approval of the instant
application will greatly facilitate supply of additional power
to the Luzon Grid.

25. Hence, MEC respectfully moves for the provisional


approval of the same pursuant to Rule 14 of the ERC Rules
of Practice and Procedure.
A copy of a sworn statement supporting the said motion is
attached hereto as Annex "0."
MOTION TO TREAT INFORMATION

CONFIDENTIAL

26. The following documents are hereby submitted


motion to treat information confidential ("Motion"):

under a

26.1 Documents containing the technical specifications of


the dedicated transmission facilities (Annex "G" and
series). - The said documents contain the detailed
features, ratings, service conditions, parameters of
the equipment
and materials constituting
the
dedicated transmission facilities.
They likewise
include the cost of the components
of the
transmission line.
26.2 Report on the System Impact Study (Annex "I"). It
contains the technical details of the various
components of the MEC Solar Power Plant as well as
the connection and technical assessments necessary
for the proposed connection of the Plant to the Luzon
Grid.

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 13 of 18

26.3 Facilities Study (Annex "K"). - It contains a detailed


account of the facilities necessary to implement the
connection of the MEC Solar Power Plant to the
Luzon Grid. These include the technical details of
the components of the Plant, as well as the systems,
arrangements and architecture needed to operate the
Plant and to implement the said connection.
26.4 Connection
(Annex "L").
scheme. It
and Facility
Motion.

Agreement between NGCP and MEC


- It contains the details of the connection
also includes the System Impact Study
Study that are likewise subject of herein

26.5 Audited Financial Statements of MEC (Annex "N"). The said Financial Statements contain the details the
assets and liabilities of MEC.
27. In accordance with Section 1, Rule 4 of the Commission's
Rules of Practice and Procedure ("ERC Rules"), MEC
respectfully moves that the documents attached in the
instant application as Annexes "G" and series, "I," "K," "L"
and "N" be treated as "confidential information," as defined
under Section 2 of the ERC Rules.
28. The ERC Rules define "Confidential Information" as "such
information that has a commercial value or other value that
would be, or could reasonably expected to be, destroyed or
diminished, or where the proprietary interest of any party,
person or entity will be prejudiced, if the information were
disclosed."
The documents subject of herein Motion
contain information that has such commercial value.
29. It bears stressing that the power generation business is a
very highly competitive industry. The combination of the
technical specifications
and designs, the processes,
diagrams, and systems, the equipment and materials used
by a generation company - which are contained in
Annexes "G" and series, "I," "K" and "L" - greatly determine
the competitive advantage that it will have over the other
generation companies.

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 14 of 18

29.1 To note, the said data disclose the vital aspects of


MEC's business of generating and transmitting
power, without which, it would not be able to supply
additional capacity in a timely and competitive
manner.
30. Moreover, the details of the assets and liabilities of MEC
illustrate its financial standing. Information on a company's
financial standing likewise discloses
its competitive
advantage as it illustrates its financial capability that allows
it to operate its business in a competitive manner.
31. Indeed, the public disclosure of the above-said information
would allow competitors of MEC, such as other entities also
engaged in the power generation business, to imitate the
specifications, method and arrangement, to map out the
network of contractors and suppliers, and to otherwise use
the information for their own benefit. Thus, MEC stands to
lose the competitive advantage that it derives from the said
information should the latter be disclosed to the public.
32. In accordance with
copies of Annexes
submitted herewith
and each page of
"Confidential. "

Section 1 (b), Rule 4 of the ERC Rules,


"G" and series " "I" "K ," "L" and "N" are
in a sealed envelope, with the envelope
each proposal stamped with the word

33. In accordance with Sections 3 and 4, Rule 4 of the ERC


Rules, MEC reserves the right to use the said documents
subject of herein Motion as evidence, and respectfully
moves for the issuance of a Protective Order.
PRAYER
34. It prays that the Commission:
1) Issue an Order declaring the following as confidential
information within the purview of Rule 4 of the ERC
Rules, as well as directing that the said documents be
treated with confidentiality and be protected from public
disclosure:

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015
Page 15 of 18

a) Documents
containing
the
technical
specifications of the dedicated transmission
facilities (Annex "G" and series hereof);
b) Report on the System Impact Study (Annex "I"
hereof);
c) Facilities Study (Annex "K" hereof);
d) Connection Agreement between NGCP and
MEC (Annex "L" hereof); and
e) Audited Financial Statements of MEC (Annex "N"
hereof);
2) Issue a Protective Order in accordance with Sections 2
and 4 of the said Rule 4;
3) Immediately issue an Order provisionally approving the
instant Application; and

4) After due hearing, render judgment


instant Application with finality.

approving

the

35. It likewise prays for other just and equitable relief under the
premises.
Finding the said application to be sufficient in form and in
substance with the required fees having been paid, the same is
hereby set for jurisdictional hearing, expository presentation, pre-trial
conference and evidentiary hearing on August 17,2015 (Monday) at
two o'clock in the afternoon (2:00 P.M.) at the ERC Hearing
Room, 15th Floor, Pacific Center Building, San Miguel Avenue,
Pasig City.
MEC is hereby directed to cause the publication of the attached
Notice of Public Hearing, at its own expense, once (1x) in a
newspaper of general circulation in the Philippines, at least ten (10)
days before the scheduled date of initial hearing. It is also directed to
inform the consumers, by any other means available and appropriate,
of the filing of the instant application, its reasons therefor and of the
scheduled hearing thereon.

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015

E!'lRE:!J~2fJ?___

Let copies of the application, this Order, and the attached


Notice of Public Hearing be furnished the Office of the Solicitor
General (OSG), the Commission on Audit (COA) and the Committees
on Energy of both Houses of Congress. They are hereby requested,
if they so desire, to send their duly authorized representatives at the
scheduled hearings.
Likewise, let copies of this Order and the attached Notice of
Public Hearing be furnished the Office of the Governor of Cavite and
the Mayors of General Trias and Rosario, respectively for the
appropriate posting thereof on their respective bulletin boards.
MEC is hereby directed to furnish all those making requests
therefor with copies of the application and its attachments, subject to
reimbursement of reasonable photocopying costs.
On the date of the initial hearing, MEC must submit to the
Commission
its written
Compliance
with the jurisdictional
requirements attaching therewith, methodically arranged and duly
marked, the evidences of the actual posting and publication of the
Notice of Public Hearing consisting of certifications issued to that
effect, signed by the afore-mentioned Governor and Mayors or their
duly authorized representatives, bearing the seals of their offices, and
the affidavit of the Editor or Business Manager of the newspaper
where said Notice of Public Hearing was published together with the
complete issue of the said newspaper, and such other proofs of
compliance with the requirements of the Commission.
MEC and all interested parties are directed to submit, at least
five (5) days before the date of initial hearing and pre-trial conference,
their respective Pre-Trial Briefs containing, among others:
(a) A summary of admitted facts and proposed stipulation of
facts;
(b) The issues to be tried or resolved;
(c) The documents or exhibits to be presented, stating the
purposes thereof and proposed markings therefore; and
(d) The number and names of the witnesses, with their written
testimonies in an individual affidavit form, to be attached to
the Pre-Trial Brief.

ERC CASE NO. 2015-024 MC


ORDER/July 27,2015

_E<:lg~JL()L:1~__________.. ..

_________________.
_

Failure of MEC to submit


Judicial Affidavits of its witnesses
be a ground for cancellation of
resetting of which shall be six
cancellation.

the required Pre-Trial Brief and


within the prescribed period shall
the scheduled hearing, and the
(6) months from said date of

As part of the pre-trial conference, MEC must also be prepared


to make an expository presentation of its application, aided by
whatever communication medium that it may deem appropriate for
the purpose, in order to put in plain words and explain, for the benefit
of the consumers and other concerned parties, what the application is
all about and the reasons and justifications being cited in support
thereof.
SO ORDERED.
Pasig City, July 27, 2015.

FOR AND BY AUTHORITY


OF THE COMMISSION:

ALFR DO~N
Officer-in-Charge and Commissioner

L/

JS

ERC CASE NO. 2015-024 Me


ORDER/July 27,2015

~~g~_t~of_18

Copy Furnished:

1.
~~~i:TI~~~~~t~~~~g~~A~~~HICA
LACHICA & ASSOCIATES
Counsels for Applicant MEC
Suite 2304-B, West Tower
Philippine Stock Exchange Centre
Exchange Road, Ortigas Center
Pasig City

2.

AND

MAJESTIC~ ENERGY CORPORATION (MEC)


Block 3, Cav/te Economic Zone /I
General Trias, Cavite

3.

THE OFFICE OF THE SOLICITOR GENERAL


134 Amorsolo Street, Legaspi Village, Makati City
Metro Manila

4.

THE COMMISSION ON AUDIT


Don Mariano Marcos Avenue
Diliman, Quezon City, Metro Manila

5.

THE SENATE COMMITTEE ON ENERGY


Senate of the Philippines
GSIS Building, Roxas Blvd., Pasay City, Metro Manila

6.

THE HOUSE COMMITTEE ON ENERGY


House of Representatives
Batasan Hills, Quezon City, Metro Manila

7.

OFFICE OF THE PRESIDENT OF PCCI


Philippine Chamber of Commerce and Industry (PCCI)
3'd Floor, ECC Building, Sen. Gil Puyat Avenue
Makati City

8.

OFFICE OF THE PROVINCIAL GOVERNOR


Province of Cavite

9.

OFFICE OF THE MUNICIPAL MAYOR


Gen. Trias, Cavite

10.

OFFICE OF THE MUNICIPAL MAYOR


Rosario, Cavite

11.

THE NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP)


NGCP Building, Quezon Avenue corner BIR Road
Diliman, Quezon City

You might also like