Chap014 - JIT and Lean Operations
Chap014 - JIT and Lean Operations
Chap014 - JIT and Lean Operations
Operations Management
William J. Stevenson
8th edition
S P CHHEDA & CO
14-2 JIT and Lean Operations
S P CHHEDA & CO
14-3 JIT and Lean Operations
JIT/Lean Production
S P CHHEDA & CO
14-4 JIT and Lean Operations
Goal of JIT
The ultimate goal of JIT is a balanced
system.
S P CHHEDA & CO
Summary JIT Goals and Building
14-5 JIT and Lean Operations
Blocks
Figure 14.1
Ultimate A
Goal balanced
rapid flow
Supporting
Goals Eliminate disruptions
Make the system flexible Eliminate waste
S P CHHEDA & CO
14-6 JIT and Lean Operations
Supporting Goals
Eliminate disruptions
Make system flexible
Eliminate waste, especially excess
inventory
S P CHHEDA & CO
14-7 JIT and Lean Operations
Sources of Waste
Overproduction
Waiting time
Unnecessary transportation
Processing waste
Inefficient work methods
Product defects
S P CHHEDA & CO
14-8 JIT and Lean Operations
S P CHHEDA & CO
14-9 JIT and Lean Operations
S P CHHEDA & CO
14-10 JIT and Lean Operations
Product Design
Standard parts
Modular design
Highly capable production systems
Concurrent
engineering
S P CHHEDA & CO
14-11 JIT and Lean Operations
Process Design
Small lot sizes
Setup time reduction
Manufacturing cells
Limited work in process
Quality improvement
Production flexibility
Little inventory storage
S P CHHEDA & CO
14-12 JIT and Lean Operations
S P CHHEDA & CO
14-13 JIT and Lean Operations
Production Flexibility
Reduce downtime by reducing
changeover time
Use preventive maintenance to
reduce breakdowns
Cross-train workers to help clear
bottlenecks
S P CHHEDA & CO
14-14 JIT and Lean Operations
S P CHHEDA & CO
14-15 JIT and Lean Operations
Quality Improvement
Autonomation
Automatic detection of defects during production
Jidoka
Japanese term for autonomation
S P CHHEDA & CO
14-16 JIT and Lean Operations
Personnel/Organizational Elements
Workers as assets
Cross-trained workers
Continuous
improvement
Cost accounting
Leadership/project
management
S P CHHEDA & CO
14-17 JIT and Lean Operations
S P CHHEDA & CO
14-18 JIT and Lean Operations
Pull/Push Systems
S P CHHEDA & CO
14-19 JIT and Lean Operations
S P CHHEDA & CO
14-20 JIT and Lean Operations
Kanban Formula
DT(1+X)
N =
C
N = Total number of containers
D = Planned usage rate of using work center
T = Average waiting time for replenishment of parts
plus average production time for a
container of parts
X = Policy variable set by management
- possible inefficiency in the system
C = Capacity of a standard container
S P CHHEDA & CO
14-21 JIT and Lean Operations
Buyer
Buyer
Supplier
Supplier Supplier
Supplier
Supplier
Supplier
Supplier
Supplier Supplier
Supplier Supplier
Supplier Supplier
Supplier
S P CHHEDA & CO
14-22 JIT and Lean Operations
S P CHHEDA & CO
14-23 JIT and Lean Operations
S P CHHEDA & CO
14-25 JIT and Lean Operations
Obstacles to Conversion
S P CHHEDA & CO
14-26 JIT and Lean Operations
JIT in Services
The basic goal of the demand flow technology in
the service organization is to provide optimum
response to the customer with the highest
quality service and lowest possible cost.
Eliminate disruptions
Make system flexible
Reduce setup and lead times
Eliminate waste
Minimize WIP
Simplify the process
S P CHHEDA & CO
14-27 JIT and Lean Operations
JIT II
S P CHHEDA & CO
14-28 JIT and Lean Operations
S P CHHEDA & CO
14-29 JIT and Lean Operations
S P CHHEDA & CO
14-30 JIT and Lean Operations
Elements of JIT
Table 14.4
Smooth flow of work (the ultimate goal)
Elimination of waste
Continuous improvement
Eliminating anything that does not add
value
Simple systems that are easy to manage
Use of product layouts to minimize
moving materials and parts
Quality at the source
S P CHHEDA & CO
14-31 JIT and Lean Operations
S P CHHEDA & CO