Move Order Number Generation
Move Order Number Generation
Move Order Number Generation
Move Order:
SET UP FOR MOVE ORDER FUNCTION
Setup Steps For Move Orders At A Glance:
Item Level
Optional:
Navigate: Inventory>Setup>Organizations>Parameters
Move Order Time Out:
Use if you want to require approvals for the Move Orders in your
organization.
Time-Out Period:
The length of time, in days, you will let your Move Orders sit in a pendingapproval queuing status.
a. After one time-out period, a reminder is sent to the approver.
b. After two time-out periods, the Move Order Time-Out Action is
performed.
c. The Time-Out Action is, either Approve or Reject.
d. If the Time-Out period is 0, all Move Orders are automatically
approved.
e. If the Time-Out period is left blank, the setting defaults to 0.
Item Level Set Up Planner
Picking Rules
Navigate: Inventory>Setup>Rules>Picking
Move Orders use the standard picking rules of Oracle Inventory to source
material.
Set Up Item-Subinventory-Locator Defaults