New Austrian Tunnelling Method
New Austrian Tunnelling Method
New Austrian Tunnelling Method
Presented by
by-SAURABH SUGANDH
15--11
15
11--2007
Principles
Th NATM iis an approach
The
h off philosophy
hil
h
integrating the principles of the behaviors of
rock masses under load and monitoring the
performance of underground construction
during construction.
construction The fact is that the NATM
is not a set of specific excavation and support
techniques.
q
15--11
15
11--2007
What is shotcrete?
15--11
15
11--2007
10
15--11
15
11--2007
11
Key features
the keyy features of the design
g philosophy
p
p y refer
to:
The strength of the ground around a tunnel is
deliberately mobilized to the maximum extent
possible.
Mobilisation of ground strength is achieved by
allowing
ll i controlled
t ll d d
deformation
f
ti control
t l off th
the
ground.
Initial pprimaryy support
pp is installed having
g loadloaddeformation characteristics appropriate to the
ground conditions, and installation is timed with
respect to ground deformations.
Instrumentation is installed to monitor
deformations in the initial support system, as well
as to form the basis of varying the initial support
design and the sequence of excavation
15--11
15
11--2007
12
13
15--11
15
11--2007
14
Thiss sshows
o s tthe
e co
construction
st uct o o
of a
alte
te be
berg
g tu
tunnel
e
15--11
15
11--2007
15
15--11
15
11--2007
16
Inntaltunnel
A t i rail
Austria,
il road
d tunnel,
t
l length
l
th 12696m
12696
15--11
15
11--2007
17
15--11
15
11--2007
18
Sitina Tunnel
15--11
15
11--2007
19
Thank you.!