LINE OF BALANCE TECHNIQUES
Q1. Write short note on Line of Balance method.
Ans. LOB is used to plan the construction of repetitive structural units.
It was developed by U.S. Navy during Second World War and modified in
1960 by National Building Agency in U.K.
It is used for projects having repetitive activities such as high rise
commercial and residential construction and newer low rise housing societies
The resources needed for each operation are calculated so upcoming activity
is not disturbed and target is achieved.
LOB technique includes arranging, selecting, finding and presenting in
graphical form all activities.
It calculates time required.
It helps to find weak points and suggests possible remedies
It is used in casting of foundation, sheds, slum buildings etc.
The two LOB methods are:
1. Use of optimum gang sizes ( i.e. number of workers) and calculate
completion date (time required)
2. Using a set completion time (fixed time period) and variable gang
sizes.
Q2. Explain the procedure of LOB technique
Ans. The procedure for LOB technique is as follows:
1. Prepare logic diagram
2. Find time required for each repeated activity
3. Allocate (introduce) buffer time to guard against interference between
operations. Buffers are put between the activities.
4. Calculate required output rate to find completion date
5. Calculate time required for completion of one activity. Also calculate
time from start of first repetition to start of last repetition.
6. Draw the schedule
Operations
Foundation
External wall
Roof construction
Internal finishes
External works
Solution:
Logic Diagram showing sequence of operations:
CPM network:
Number of crew
2
3
1
3
2
LOB calculations:
Sr.
No.
Operations
1
2
3
Foundation
External wall
Roof
construction
Internal finishes
External works
4
5
Duration per
unit in weeks
(D)
2
4
1
Number of
crew
(Ca)
2
3
1
Total float
Rate
R = Ca/D
0
0
0
1
0.75
1
4
2
3
2
0
0
0.75
1
= 3 + 36
3
= 19 weeks
= 15 weeks
Roof construction:
Duration per unit = 1 week
No. of crew = 1
Consider rate of construction between the two operations i.e. external walls and roof construction
Slope of external walls balance line = R = Ca/D = 3 /4 = 0.75
Slope of the roof construction balance line = R = Ca/D = 1/1 = 1
Since slope i.e. rate of roof construction is greater than external wall construction, the
relationship will begin at the finish of external wall balance line
Start of unit 10: 19 week + 1 week buffer = 20 week
Finish of unit 10: 20 week + 1 weeks duration= 21 week
Start of unit 1: 20 week - (10units 1) 1 week
1 crew
= 20 - 9
= 11 weeks
= 25 weeks
= 29 weeks
External works:
Duration per unit = 2 week
No. of crew = 2
Consider rate of construction between the two operations i.e. internal finishes and external works
Slope of internal finishes balance line = R = Ca/D = 3 /4 = 0.75
Slope of the external works balance line = R = Ca/D = 2/2 = 1
Since slope i.e. rate of construction of external works is greater than internal finishes, the
relationship will begin at the finish of internal finishes balance line
Start of unit 10: 29 week + 1 week buffer = 30 week
Finish of unit 10: 30 week + 2 weeks duration= 32 week
Start of unit 1: 30 week - (10units 1) 2 week
2 crew
= 30 - 9
= 21 weeks
Q5. Consider the construction of multi-storey building. Each storey construction involves 7
activities. Project has total 40 units. Draw LOB schedule and determine total duration required
for completion of project.
Activity
1
2
3
4
5
6
7
Description
Erect forms
Reinforcing
Pour concrete
Cure concrete
Strip forms
Construction brick wall
Install windows
Solution:
Logic diagram showing sequence of activities:
CPM network:
LOB calculations:
Sr.
No
.
1
2
3
4
5
6
7
Operations
Erect forms
Reinforcing
Pour concrete
Cure concrete
Strip forms
Construction brick wall
Install windows
Number of crew
(Ca)
Total float
Rate
R = Ca/D
6
3
3
7
2
12
8
2
1
1
1
3
2
0
0
0
0
0
0
0
0.333
0.333
0.333
0.5
0.25
0.25
Erect forms:
Start of unit 1: 0 day
Finish of unit 1: 6 days (6 days duration)
Start of unit 40: 0 + (40units 1)
0.333
= 117.12
= 117 days
Since slope i.e. rate of construction of reinforcing and pour concrete is same, the relationship is
parallel balance lines
Start of unit 1: 9 days
Finish of unit 1: 9 days + 3 days duration= 12 days
Start of unit 40: 126 days
Finish of unit 40: 126 days + 3 days duration = 129 days
Cure concrete:
Duration per unit = 7 days
No. of crew is not mentioned
Consider slope i.e. rate of construction between the two activities i.e. pour concrete and cure
concrete same, the relationship is parallel balance lines
Start of unit 1: 12 days
Finish of unit 1: 12 days + 7 days duration= 19 days
Start of unit 40: 129 days
Finish of unit 40: 129 days + 7 days duration = 136 days
Strip forms:
Duration per unit = 2 days
No. of crew = 1
Consider rate of construction between the two operations i.e. Cure concrete and strip forms
Slope of cure concrete balance line = R = Ca/D = 0.333
Slope of the strip forms balance line = R = Ca/D = 0.5
Since slope i.e. rate of strip forms is greater than cure concrete work, the relationship will begin
at the finish of cure concrete balance line
Start of unit 40: 136 days
Finish of unit 40: 136 days + 2 days duration= 138 days
Start of unit 1: 136 days - (40units 1)
0.5
= 58days
= 60 days
= 216 days
= 228 days
Install windows:
Duration per unit = 8 days
No. of crew = 2
Consider slope i.e. rate of construction between the two activities i.e. construct brick wall and
install windows same, the relationship is parallel balance lines
Start of unit 1: 72 days
Finish of unit 1: 72 days + 8 days duration= 80 days
Start of unit 40: 228 days
Finish of unit 40: 228 days + 8 days duration = 236 days
Total duration of entire project is 236 days
Q6. The activities required in construction of one kilometer of pipeline are given along with
number of crew required. The project includes 10 kilometers of pipeline. Deadline of completion
of project is 40 days. Draw LOB schedule assuming one day buffer time between activities.
Activity
No.
1
2
3
4
5
6
Activity Name
Duration (days)
Preceding activities
1
3
1
4
1
2
1
1
2,3
4
5
Solution:
CPM network for single unit of project considering on day buffer time in between activities
TL = 40 days
N = 10 units
Ri =
(10 - 1)
40 15 + TFi
Ri =
9
25 + TFi
LOB calculations:
Activity
1
2
3
4
5
6
Duration,
Di
1
3
1
4
1
2
Total
float
0
0
2
0
0
0
Ri = 9/ (25+ TFi)
Ci= Di Ri
0.36
0.36
0.333
0.36
0.36
0.36
0.36
1.08
0.333
1.44
0.36
0.72
Cai = Round up
Ci
1
2
1
2
1
1
Rai = Cai/ Di
1
0.667
1
0.5
1
0.5