Rule of Gradual Changes: Penampang Luas Ob Dan Coal (M2) Luas Overburden
Rule of Gradual Changes: Penampang Luas Ob Dan Coal (M2) Luas Overburden
Rule of Gradual Changes: Penampang Luas Ob Dan Coal (M2) Luas Overburden
Overburden 18,598,546.50
Coal 2,552,531.09
SR 7.29
RULE OF GRADUAL CHANGES