(B)
Floor Tiles
2.5.1
All floor shall be clean from debris, dusts and dirts.
2.5.2
Use string marker to mark the control levels on all four walls (for rooms without wall
tiles).
2.5.3
Provide level pegs to control the levels at 1.2 mm center to center.
2.5.4
Cement screed the floor with cement and sand mortar mix 1:3 to 2% fall to floor trap.
2.5.5
Allow all cement screed to be fully set and cured.
2.5.6
Take the permanent features (such as long wall) to provide the X-Y axis base line and
marked with string marker.
2.5.7
Selected non-slip ceramic floor tiles shall then be laid with cement paste applied on the
base using wet method of laying.
2.5.8
Ensure that the tile joints shall be 3-4mm maximum wide and all joints shall be
consistent.
2.5.9
Ensure fall in wet areas like kitchen and toilets must be towards the floor traps or
discharge points(2% fall gradient).
2.5.10
All gaps shall then be fully filled.
2.6
Point of inspection and checking and their frequency:
2.6.1
Ensure concrete surfaces clean and free from dust and dirt.
2.6.2
Setting out alignment, levels, gradient, verticality will be correct.
2.6.3
Tile size, thickness, evenness, squareness shall be checked correctly.
2.6.4
Joints are aligned and consistent with skirting and wall tiles.
2.6.5
Check squareness, vertically of boxing up.
2.6.6
Check tiling around door & window frame / openings.
2.6.7
Ensure wall & floor tile joints are in line & consistent in thickness.
2.6.8
Ensure door opening drop to be 25 mm.
2.6.9
Ensure 2% flow towards floor trap.
2.6.10
Ensure dimension coordination at
a.
floor trap / floor tile junction
b.
wall tile / floor tile junction.
c.
Window opening / frame / wall tile junction.
d.
Door frame / wall tile junction.
2.7
Post installation.
2.7.1
Site cleaning.
2.7.2
Evenness of tiles and colour.
2.7.3
No chipping, cracks or mortar droppings.
2.7.4
No hollowness (up to 85 %)
2.7.5
Protection of all laid tiles
3
Checklist and inspection form.
Page:of 6
Automatic Zoom
(B)
Floor Tiles
2.5.1
All floor shall be clean from debris, dusts and dirts.
2.5.2
Use string marker to mark the control levels on all four walls (for rooms without wall
tiles).
2.5.3
Provide level pegs to control the levels at 1.2 mm center to center.
2.5.4
Cement screed the floor with cement and sand mortar mix 1:3 to 2% fall to floor trap.
2.5.5
Allow all cement screed to be fully set and cured.
2.5.6
Take the permanent features (such as long wall) to provide the X-Y axis base line and
marked with string marker.
2.5.7
Selected non-slip ceramic floor tiles shall then be laid with cement paste applied on the
base using wet method of laying.
2.5.8
Ensure that the tile joints shall be 3-4mm maximum wide and all joints shall be
consistent.
2.5.9
Ensure fall in wet areas like kitchen and toilets must be towards the floor traps or
discharge points(2% fall gradient).
2.5.10
All gaps shall then be fully filled.
2.6
Point of inspection and checking and their frequency:
2.6.1
Ensure concrete surfaces clean and free from dust and dirt.
2.6.2
Setting out alignment, levels, gradient, verticality will be correct.
2.6.3
Tile size, thickness, evenness, squareness shall be checked correctly.
2.6.4
Joints are aligned and consistent with skirting and wall tiles.
2.6.5
Check squareness, vertically of boxing up.
2.6.6
Check tiling around door & window frame / openings.
2.6.7
Ensure wall & floor tile joints are in line & consistent in thickness.
2.6.8
Ensure door opening drop to be 25 mm.
2.6.9
Ensure 2% flow towards floor trap.
2.6.10
Ensure dimension coordination at
a.
floor trap / floor tile junction
b.
wall tile / floor tile junction.
c.
Window opening / frame / wall tile junction.
d.
Door frame / wall tile junction.
2.7
Post installation.
2.7.1
Site cleaning.
2.7.2
Evenness of tiles and colour.
2.7.3
No chipping, cracks or mortar droppings.
2.7.4
No hollowness (up to 85 %)
2.7.5
Protection of all laid tiles
3