SPMF

RECORD OF HANDOVER

RECORD OF HANDOVER

Project Title:
Project Manager:
Date:

This is to record that the following plant/equipment has satisfactorily completed performance testing and is handed-over into
normal production operation.

Defects and omissions that effect normal production are complete.


Change/modifications requiring completion prior to handover have been completed.
Remaining minor defects/omissions are attached to this record.

Items raised during the nominated warranty period will be undertaken as agreed with operations based on circumstances.

Details of Plant/Equipment

The Plant/Equipment performance tests and outstanding works have been jointly inspected and accepted.

Item Project Operations

Performance Tests

Punch List Items

Change/Modification Items

Project Management Services


Small Project Management Framework Rev 2 Page 1 of 1