Vitae Dec 2010
Vitae Dec 2010
Vitae Dec 2010
Ari Sulistiono
Male, 26 years old
Jl. Garuda II No. 47
Kel. Pasir Gunung Selatan
Cimanggis Depok 16951
Phone: (+62 21) 8771 6951
Hp: +62 813 1584 8490
Email: ari.sulistiono@gmail.com or
me@ari-sty.cz.cc, website: www.ari-sty.cz.cc
Objective
Graduate
Personal Data
th
Place / Birthday: Kediri / March 27 , 1984
Sex: Male
Status: Single
Religion: Moslem
Nationality: Indonesian
Page 1 12/14/2010
Education Attainments
FORMAL EDUCATION
2002-2005: D3 State Polytechnic of Jakarta (Polytechnic of Indonesia University)
majoring Electrical Engineering
1999-2002: Senior High School SMUN 1 Grogol in Kediri, East Java
1996-1999: Junior High School SMPN 1 Tarokan in Kediri, East Java
1990-1996: Elementary School SDN 02 Jati in Kediri, East Java
Additional Skills
Computer Skills:
Drawing: AutoCAD 2D - 3D, El-CAD, Protel PCB & Schematic, AutoCAD Electrical
2011, Microsoft Visio, Photoshop, Flash (3D), Freehand.
Database: Microsoft Access, Microsoft Jet ADODB, Microsoft SQL Server, MySQL,
XML
Page 2 12/14/2010
Programming Language: Visual Basic 6.0, Visual Studio.Net, C++, Assembler, PHP,
HTML, ASP, PERL.
Software which I have been made: Software MMI/SCADA for Batch Plant,
Microcontroller Programmer, Fuzzy Logic Evaluator, Multimedia Laboratory for
Electrical Simulation, CPM 3P, Database HME, Servo Control, Control PLC Tester,
Water Treatment Monitoring System, PLN CBM Monitoring & Data Logging System,
etc.
Control System:
Electro-Mechanical (Conventional):
Panel Design & Panel Making, SAT and Modification for ACDB, DCDB,
Control Panel, Protection Panel.
Digital Control:
Data Link and Monitoring System: PC/Server to Devices via Modbus, DNP,
IEC or other open protocols using software (citect, excel/vb script, .Net, etc).
Power Electronic:
Protective Relays: UR Relay - GE, Siprotec series Siemens, ABB REL series,
Toshiba GRZ & GRL, Areva Micom, Schneider - SEPAM.
Page 3 12/14/2010
Design and develop a software/HMI/SCADA for Power & Energy Monitoring over
devices protocol using any digital devices which support open protocols and data
communication capability.
Primary & Secondary Injection test for HV Equipments nor Protective Relaying.
Capable for operate any injection kits (Omicron CPC series and CMC series, ISA
DRTS series, KoCoS, GE Programma, etc.)
Partial Discharge Test & Detection for Underground Cable and switchgear.
Practical Work: - P.T. Cipta Rantau Mandiri Comp. As freelance (2004, 1 Months)
- P.T. Hibec Indonesia as freelance (2003, 1 month), Assembly Connector
Cable for Musical Instrument Test Set.
- P.T. Citra Langgeng as freelance: digital display, error-assembling
detectors (for Yamaha Music Manufacturing Asia).
- C.V. Pratama teknik terapan as PLC trainer: PLC training in Neomax,
Krakatau Steel Industrial Estate (2005), and PLC Training for the student
in PNJ (2005).
- P.T. Anavasi as staff production: high frequency detector for analyzes the
pianos tweeter, March November 2005.
Organization Experiences
Page 4 12/14/2010
9 As Coordinator in LIMAPO (Liga Mahasiswa Politeknik)
9 As Coordinator in socialization of majors electro (2005).
Experiments
Achievements
Page 5 12/14/2010
Work Experiences
1. PT. Dinamika Elektra Mandiri, as Senior Electrical Engineer start in January 2006 February
2008. Project Experiences at PT Dinamika Elektra Mandiri:
1. Change over ES PLTG to PLTD and Installation of Double Feeder from ES1 to SWS1
Pertamina UP II Dumai Indonesia: Programming and Setting of relays protection, UR GE
Multilin - Canada, such as protection element, logic control, TCP/IP address, transfer &
remote operation, Auto Synchronous Transformator, Auto transfer Switch (ATS), Relay
Blocking, Metering and Display Configurations, etc. January March 2006.
4. Design software Multifunction Power Quality Meter: this software pooling the data each
hour from any revenue meters via ModBus protocol. Tested and implemented at PLN
using energy meter Shark 100 & 100 T (Electro Industries). April 2006.
5. Installation of battery (NiCad) and battery charger 230V 600Ah. Location: Indonesia
Power. March 2006.
7. As Trainer in Automatic Relay Test System Training, Oil & Gas Comp., Cnooc SES
Offshore, August 06.
8. Installation & Commissioning Digital Power Meter: PLTU Indonesia Power Semarang,
September 2006.
9. Site Acceptance Test for Generator Protection Relay Elin + CT Saturation contracted by
GE Turbine France: Cikarang Listrindo, Cikarang, April 06.
10. Test & Calibration Star-Relay contracted by GE Turbine France: Pupuk Kujang,
Kerawang, April 06.
11. Design Power & Energy Monitoring + Installation of Digital Power & Energy Meter
Shark100 PLN P3B Region Center of Java & DIY, November 2006.
12. Test & Callibration Elin - Differential Relay for Generator contracted by GE Turbine
France: Cikarang Listrindo, June 06.
13. Test & Callibration Distance Relay REL511 C1*2.5 + Overcurrent Relay contracted by
ABB Transmission & Distribution Tangerang, November 2006.
Page 6 12/14/2010
14. Installation & Commissioning of Digital Power and Energy Meter Shark100 Electro
Industries (USA) + Build Real Time Monitoring Software for Supporting CBM (Condition
Base Maintenance) CrazPro.exe VB.Net. Location: PLN P3B RJTD : UPT Solo, UPT
Kudus, UPT Purwokerto, UPT Jogja, UPT Semarang on December, 2006.
15. Installation & Commissioning of Online Partial Discharge Monitoring Indipard May
Elektronik, Gambh for Switchgear 12kV, Location: CNOOC South East Sumatra on
November, 2006.
16. Installation of Retraceable Grounding Assembly (RGA) 44 Units at Tank Farm Area.
Location: Total E&P Balikpapan, January - February 2007.
17. Perform Relay Test & Callibration for Generator Protection Relay Generator #2015 UA.
Location: Pertamina UPIII Plaju, Palembang, March 2007.
18. Conduct Training: Installation and Operation of Revenue Meter, 0.06 Class Accuracy
Nexus 1262 EIG (USA) for PLN P3B Jawa Bali. Location: Hotel Nikki, Denpasar, Bali
on 27th 29th March 2007.
19. Installation & Commissioning of Online Partial Discharge Monitoring Indipard May
Elektronik, Gambh for Generator and CB Cubicle, Location: PT Freeport Indonesia:
Puncak Jaya Power (FMI) Papua on May 2007.
20. Contract Service To Perform Calibration And Verification For Unit 7 Protection Relay
13.8KV Medium Voltage Switchgear. Location: IPMOMI Paiton, Situbondo, East Java.
June 2007.
21. Repair & Calibration Digital Revenue Meter 0.06% Class, 12 Units Nexus 1262 PLN P3B
JB, June 2007.
22. As Sub Contractor Toshiba Corporation, Japan: Data collection for Renewal of
Transmission Line Protection Relay Project at Siguragura P/S, Tangga P/S, and Kuala
Tanjung S/S: GRZ100 Protection Relay 275kV. Indonesia Asahan Alumunium, July 2007.
23. Power Quality Analysis & Data Collecting, Indah Kiat Pulp and Paper, PT. Contracted by
GE Energy, Singapore. September 2007.
24. Design Bay Monitoring System for Trafo, Line, Coupler, & Feeder: CrazPro Power &
Energy Monitoring 7 (develop using Visual Studio 2005, supporting Digital Power Meter
0.2S Shark 100) for PLN P3B JB RJTD UPT Solo & UPT Kudus. October 2007.
25. Installation & Commissioning of Online Partial Discharge Monitoring Indipard May
Elektronik, Gambh for New Feeder Cubicle (Scneider), Location: Pertamina UP V
Balikpapan, August 2007.
26. Sub Contract with Toshiba Corporation Japan (as Commissioning Engineer & Relay Test
Operator): Execution of Renewal of 275 kV Transmission Line Protection Relay at
Siguragura P/S (Nov. 2007), Tangga P/S (Dec. 2007), and Kuala Tanjung S/S (Jan. 2007):
GRZ100. Client: Indonesia Asahan Alumunium, PT. Responsibility: Relay Testing,
Erection & Cable Termination, Insulation Test, Sequence Check, Ass. Built Drawing, etc.
Page 7 12/14/2010
2. Sumitomo Corporation Switchyard & Substation (SCSS) under Toshiba Plant Service &
System Corp., as Test & Commissioning Engineer for 150kV Muara Karang Gas Power
Plant Project (MKGPP), Contract Period: 7th March 2008 up to 6th September 2010
(extended):
1. Assistance to Construction Service for procurement material and construction for PLTU
Muara Karang (PLN) - Gas Power Plant Project (JBIC Loan).
2. Electrical studies: starting from basic design up to detail design of 150kV RCPP,
Substation Automation & replacement method for Substation & Switchyard of PLTU Muara
Karang, PLTGU Muara Karang, Duri Kosambi S/S, Petukangan S/S, Budi Kemuliaan S/S,
Angke S/S.
a) Design Protection Panel (schematic and operation hierarchy), ACDB, and Marshaling
Kiosk.
b) Design cable connection list and schematic drawing for Switchyard HV Equipments to
Main Control Panel.
d) Conduct Individual Test for 150kV GIS (Gas Insulation System) & AIS (Air Insulation
System) Switchyard (CT, CVT, CCVT, CB, DS, SA, LT, etc.) and analyzing data
(based on IEC standard) per Diameter/Bay. Test included: Contact Resistance Test
for Installation, SF6 moisture test, CT ratio test (Current Injection Method for AIS &
Voltage Injection Method for GIS), CT secondary burden test, CT characteristic test
(kneepoint), CT polarity test up to prot. panel, CVT ratio test, CVT secondary burden
test, CVT polarity test, CB timing test, Contact Resistance Test for CB (Main Contact),
Insulation Resistance for all Equipments, Disconnector Insulation Test, Disconnector
Contact Resistance Test and High Voltage Test.
e) Conduct battery capacity test, rectifier and UPS test, and test and commissioning for
ACDB and DCDB panel.
g) Conduct individual test for Control & Protection Panel Siemens using Relay test
System Omicron CMC356: Line Differential Protection, Line Distance Protection
Relay, OCR, Auto re-close, Bus Protection Relay, GFR, Soft Logic Interlocking, Bay
Control Unit, GFR, Outstation metering, etc.
h) Collect and analyzing parameter of protection elements of the existing system and
recalculate for change over to the new system arrangement (up-rating S/Y
equipments & OHL from 1200A to 4000A).
Page 8 12/14/2010
j) Programming and modification HMI for Substation Automation System: Siemens-
WinCC as per PLN standard (Teleinformasi plan) via IEC 60850 industrial standard
protocol.
k) Test & commissioning for Substation Control System and new telecommunication
system (gateway, fiber optic and server) up to RCC (Region Control Center) and JCC
(Jawa-Bali Control Center) SCADA System.
a) Replacement of Bus Coupler, Bus Section, Busbar Conductor and Feeder Kebon
Jeruk.
b) Conduct Individual Test (AIS) for HV Equipments (CT, CVT, CB, DS, etc.) and
analyzing data (based on IEC standard) per Diameter/Bay. Test included: Contact
Resistance Test for Installation, SF6 moisture test, CT ratio test (Current Injection
Method for AIS & Voltage Injection Method for GIS), CT secondary burden test, CT
characteristic test (kneepoint), CT polarity test up to prot. panel, CVT ratio test, CVT
secondary burden test, CVT polarity test, CB timing test, Contact Resistance Test for
CB (Main Contact), Insulation Resistance for all Equipments, Disconnector Insulation
Test, Disconnector Contact Resistance Test and High Voltage Test.
c) Site survey and design cable connection list (cable schedule) for new control cable
that connects new HV equipment installation to existing system installation.
b) Design cable connection list for new bus protection panel up to existing system.
d) Test & commissioning for Substation Control System and new telecommunication
system (gateway, fiber optic and server) up to RCC and JCC SCADA System.
f) Conduct Individual Test (AIS) for HV Equipments (CT, CVT, CB, DS, etc.) and
analyzing data (based on IEC standard) per Diameter. Test included: contact
resistance test, insulation resistance test, SF6 moisture test, CT ratio-burden-
kneepoint and polarity test, CVT ratio-burden and polarity test, CB and DS test.
Page 9 12/14/2010
6. 150kV PLTGU Muara Karang Switchyard & Substation:
d) Conduct Individual Test (GIS and AIS) for HV Equipments (CT, CVT, CB, DS, etc.)
and analyzing data (based on IEC standard) per Diameter. Test included: contact
resistance test, insulation resistance test, SF6 moisture test, CT ratio-burden-
kneepoint and polarity test, CVT ratio-burden and polarity test, CB and DS test.
g) Conduct protection relay individual test (also End to End test): Line Differential
Protection, Line Distance Protection Relay, OCR, Single Phase Autoreclose, Busbar
Protection Relay, etc.
h) Collect and analyzing parameter of protection elements of the existing system and
recalculate for change over to the new system arrangement.
i) Test & commissioning for Substation Control System (Substation Automation) and
new telecommunication system (gateway, fiber optic and server) up to RCC and JCC
SCADA System.
3. TOA Corporation (under Wasamitra Engineering), as Chief Electrical Engineer for Paiton 3
Expansion Project, 815MW Coal Fired Power Plant, Contract Period: 20th September 2010
up to 21th February 2010:
1. Design Construction of Temporary Power Distribution System at Project Site as per Load
Analysis.
2. Manage All Electrical Group to Perform a Safety Work and Safety Electrical System at
Project Site.
3. Manage Permit To Work for All Electrical Works at Live/Energized Electrical Distribution
Board.
4. Coordination of Electrical Works with Paiton Energy (owner) and All Sub-Contractor for
Safety and Electrical System Reliability.
5. Design and Submission of Distribution Board Schematic Diagram / Single Line Diagram
As Built Drawing to Owner (Paiton Energy).
6. Modification, Test and Inspection of Distribution Board with Owner (Paiton Energy).
7. Manage Monthly and Quarterly Inspection of Distribution Panels, Tools and Equipments
for All Sub-Contractor at Project Site then Report to Owner (Paiton Energy).
Page 10 12/14/2010
8. Design Cable Routing, Calculate Cable Ampicity for All Electrical Distribution Network at
Project Site to Comply Owners Requirements of Safety and Reliability Electrical
Installation at Plant.
Personal Characteristics
Self-motivated, hard working, have good analyses and problem solving capability, good
interpersonal and communication skills, high responsibility, able and easy to work with other (in
group), have a good leadership, trustworthy, adaptable and responsible.
I declare that the particulars stated in these curriculum vitae are true of the best of my knowledge
and belief that I have not willfully suppressed any material or facts.
Ari Sulistiono
Page 11 12/14/2010