T.Y. B.Arch.: Time: 3 Hours) (Max. Marks: 100 Instructions To The Candidates
T.Y. B.Arch.: Time: 3 Hours) (Max. Marks: 100 Instructions To The Candidates
T.Y. B.Arch.: Time: 3 Hours) (Max. Marks: 100 Instructions To The Candidates
SECTION - I
c) Draw enlarged detail at the top and bottom of the door shutter. [10]
c) Draw railing fixing detail, tread and riser finishing detail at 1:10 [10]
P.T.O.
Q3) Draw proportionate sketches with nomenclature of any Three of the following.[30]
a) Draw a section through RCC lift shaft for a G+4 storey building
showing installation provisions in civil work.
b) Joinery details for single bed to be assembled with solid wood sections
for framing and provided with plywood top.
c) Mass retaining wall and Counterfort retaining wall with reinforcement
detail.
d) Single Basement construction with internal tanking.
e) Plan and section of single skin T.W. Partition showing framing and
finishing material.
f) Draw fixing detail of steel truss to steel stanchion and steel stanchion to
stub column.
SECTION - II
Q4) Answer any five of the following. [40]
a) What is light weight concrete? Explain its advantages.
b) Explain with sketches types of Raft foundations.
c) Explain with sketches construction of reinforced brick work.
d) Explain any four types of glass used in building industry.
e) Explain the uses of stainless steel in building industry.
f) What is Guniting? Explain the process of Guniting.
g) Explain the process of polishing of new woodwork.
h) Modular coordination system by CBRI any two.
eee
[4962]- 301 2
Total No. of Questions : 8] SEAT No. :
SECTION - I
P.T.O.
Q3) Design a R.C.C doglegged staircase for a residential building for the following
data
c) Riser - 150 mm
d) Tread - 275 mm
h) Draw reinforcement sketch and make a schedule for the same. [4]
Angle of repose - 28
Height of wall 5 m
[4962]- 302 2
SECTION - II
a) Plate girder
f) Explain the difference between ultimate load method and limit state
method
Q7) a) Two column of size 380 mm 380 mm and 580 mm 580 mm carry
loads of 750 kN and 1230 kN respectively and are spaced 1.7 m apart
centre to centre and rest in a soil of S.B.C of 200 kN/m2. Find the plan
dimensions of the combined footing. Draw a sketch of the plan. [9]
i) Raft foundation
[4962]- 302 3
Q8) A compound Stanchion is made of 2 number ISMC 300 placed back to
back and these are to be laced.
Find the distance between the two so that they take maximum load. [3]
Find the maximum load it can carry if the stanchion is fixed at one end and
hinged at the other end. It has a height of 3.75 m. Multiply the slenderness ratio
by 1.1 for battened connections and by 1.05 for Laced connections. [4]
Design the Lacing System and Draw a sketch of the same. [7]
10 218
20 215
30 197
40 179
eee
[4962]- 302 4
Total No. of Questions : 4] SEAT No. :
SECTION - I
Q1) Answer any two questions from the following: [2 15 = 30]
a) What are the types of blowers used in Mechnical Ventilation system in
an enclosed space? Describe with sketches.
b) What are the different kinds of contaminants or air pollutants that are
harmful to the users? State the different kinds of filters and explain how
they are effective in purifying the air in air-conditioning system.
c) Calculate the number of exhaust fans required for a community kitchen
measuring 10m 5m 3m. Show the position of fans in plan and section.
Data to be assumed Fan dia. Air handling capacity
(mm) (cu.m / hr.)
305 1900
380 4000
457 6800
Q2) Short notes (with sketches wherever necessary) (Any Four): [4 5 = 20]
a) Stack effect
b) Split A.C. System
c) Plenum system of ventilation
d) Evaporator
e) Cooling tower
f) A.C. Ducting system
P.T.O.
SECTION - II
Q4) Short notes (with sketches wherever necessary) (Any Four): [4 5 = 20]
a) Defects of sound
d) Classification of fire
e) Smoke detectors
eee
[4962]- 303 2
SEAT No. :
1) PREAMBLE:
Pune city is contributing for the education of adults through few government
and NGO institutes. The Institute of Adult education is one of the prime
state level institute for training the teachers for adult education. The primary
teachers from all over the state are sent for short term training programmes.
The site is located within Pune University. The plot is totally leveled.
2) SPACE PROGRAM
i) Plot area : 4800 Sq.M
ii) Maximum Permissible ground coverage : 35%
iii) Front set back : 6.00 M
iv) Side set backs : 4.50 M
v) F.S.I : 1:1
vi) Staircases, passages, lobby etc. as per design concept.
vii) Proper provision for circulation, landscaping, ramps are to be provided.
viii) Storied building with maximum utilities of available F.S.I and proper
floor wise segregation of activities is envisaged.
P.T.O.
3) BUILDING REQUIREMENTS
a) ACADEMIC REQUIREMENTS :
i) Entrance 10 sq.m.
(16 persons)
(40 persons)
(40 persons)
b) ADMINISTRATIVE OFFICE :
(12 persons)
[4962]- 304 2
c) ACCOMODATION (TRAINEES) :
2 elevations - 1:100
90
Principal's Bungalow
60.00M
open land
90
eee
[4962]- 304 4
Total No. of Questions : 4] SEAT No. :
SECTION - I
Q1) A corporate office is to be provided with straight sliding single shutter door
to an opening between the general office and conference hall. Opening size
is 1200 2100mm.
a) Draw a plan to the scale of 1:20. [10]
b) Draw elevation and section to the scale of 1:20. [10]
c) Draw enlarged detail at the top and bottom of the door shutter. [10]
P.T.O.
Q3) Draw sketches of any Three of the following. [30]
a) Draw a section through an escalator for a mall building.
b) Joinery details for Dining table to be assembled with solid wood
sections for framing and provided with glass top.
c) Terminology of retaining wall and types of retaining wall.
d) Single Basement construction with external tanking.
e) Plan and section of T.W. Bay window.
f) Any three CBRI roofing systems.
SECTION - II
Q4) Write short notes with sketches any five of the following. [40]
a) Ready mix concrete.
b) Guiniting.
c) Pile foundation.
d) Setting out structure.
e) Use of glass in building industry.
f) Use of stainless steel in building industry.
g) Castellated beam.
h) Explain with sketches natural stone cladding to building.
eee
[4962]- 31 2
Total No. of Questions :5] SEAT No. :
SECTION - I
Q1) A) Workout the quantities of the following items of work for the structure
shown in the drawing (Fig-1), based on the details and data specified
below. (Any eight) [40]
i) Brick work for steps
ii) P.C.C. for footing
iii) R.C.C. Columns in plinth
iv) Neeru finish wall plaster for kitchen & bedroom only (Wall & ceiling)
v) Floor tiles for Living/dining and kitchen only (without skirting)
vi) Skirting for Living/dining and kitchen only
vii) Aluminium windows and ventilator
viii) Dado for toilet
ix) Painting for Bedroom (Wall & Ceiling)
x) Door frame for D1 of section 100 mm 75 mm
P.T.O.
Data:
Thickness of the slab: 125 mm Column Sizes : 230 mm 450 mm
Column footing sizes : 1.20 m 1.50 m D : 600 mm d : 150 mm
Thickness of P.C.C. : 150 mm
Bearing of lintel : 75 mm on one side Dado in toilets : 2.10 m high
B) State the unit of measurement as per I.S. code 2000 (Any ten) [10]
Structural steel Brick masonry 150 mm thick
P.C.C. for footing Gully Trap
OH Water tank External wall plaster
Kitchen sink R.C.C Columns
Rubble soling T.W. Railing
R.C.C. Chajja Towel rod
SECTION - II
Q2) Prepare Rate analysis based on the rates given below (Any three) [15]
a) Tor Steel reinforcement for 1.0 metric ton (MT)
b) P.C.C. (1:3:6) for floor base
c) R.C.C. Columns (1:2:4)
d) Brick work for steps in 1:6 CM
Material Rate Labour Rate
Cement : Rs 300/- per bag P.C.C. : Rs 800/- Cum
Sand : Rs 1000/- per cu meter Steel : Rs 3000/- per MT
Aggregate : Rs 750/- per cu meter R.C.C column : Rs 4000/ CUM
Steel : Rs 42000/- per MT Brick work : Rs 1500/sqm
Binding wire : Rs 50/- per Kg
Bricks : 8.0 / No
[4962]- 34 2
Q3) Write short notes on the topics given below (Any three) [15]
a) Detailed Estimate.
b) Spot items
c) Measurement sheet
d) Overhead Charges
Q4) Describe the following items of work as described in the BOQ (Any two) [10]
d) Aluminium windows.
Q5) Prepare the indent of material for following items of work (Any two) [10]
[4962]- 34 3
eee
[4962]- 34 4
Total No. of Questions : 7] SEAT No. :
P2641
[Total No. of Pages : 2
[4962]-35
Third Year B.Arch-Bridge
SPECIFICATION WRITING
(2008 Pattern)
Time : 3 Hours] [Max. Marks : 100
Instructions to the candidates:-
1) Questions two and seven are compulsory.
2) Answer to the two sections should be written in two separate books.
3) Neat diagrams must be drawn wherever necessary.
4) Figures to the right indicate full marks.
SECTION - I
Q1) What aspects are considered in writing detail specification? Discuss any one
type by writing specifiaction in detail. [15]
OR
Discuss the relation between working drawing and specification writing. Discuss
the relation between bill of quantities and specification writing.
Q7) Write names of the manfacturers for the materials (any ten) [10]
a) Awnings
b) Cement
c) Glazed tiles
d) Lift
e) Wash Basin
f) Water storage tank
g) External paint
h) Roofing tiles
i) Escalators
j) Kitchen sinks
k) Water taps
l) Drainage pipes
\\\
[4962]-35 2
Total No. of Questions : 10] SEAT No. :
SECTION - I
Q3) Write a detailed note on The indian institute of Architects, its History in brief ,
and its Role and Activities as an institution of Architects [15]
P.T.O.
Q5) Write short Notes on ANY THREE of the following : (5 Marks Each) [15]
a) Architectural supervision of construction work
b) Professional Fees for Architectural services
c) Composition and Layout of an Architects office
d) Professional Liabilities of Architects
e) Architects Agreements with other consultants
f) Stages of Architects work from Design to completion
SECTION - II
Q6) Write a comprehensive note on TENDERING, highlighting various types
of Tenders, Systems of Tendering and their advantages and disadvantages. [20]
Answer ANY TWO of the following:
Q7) What are EASEMENTS? Describe different types of Easements, and elaborate
with sketches where necessary. [15]
Q9) Compare and contrast ANY THREE of the following (5 marks each) :[15]
a) Bonus Clause and Penalty Clause in Tenders
b) Proprietory and Partnership practice
c) Defects Liability Period and Extended period
d) Earnest Money Deposit and Security Deposit
e) Cost, Price and Value
f) Open and Invited Tender
Q10)Write short notes on ANY THREE of the following (5 marks each) : [15]
a) Running Account Bills
b) Virtual Completion
c) Advertising by Architects
d) Sentimental Value
e) Pre-qualification system
f) Tender Notice
eee
[4962]- 402 2
Total No. of Questions : 10]
[4962] - 402
Fourth Year B. Arch
PROFESSIONAL PRACTICE
(2008 Bridge Pattern)
Time : 3 Hours] [Max. Marks : 100
Instructions to the candidates :-
1) Question nos. 1 and 6 are compulsory. Out of the remaining attempt 2 questions
from Section I and 2 questions from Section II.
2) Answer to the two sections should be written in separate books.
3) Figures to the right indicate full marks.
SECTION - I
Q1) Describe a typical Organisation structure and Layout of an Architects
OFFICE. What are the services commonly provided by a Professional
Architect? [20]
Q3) What is the Council of Architecture? What is its composition, and what is its
function and role in the Architectural profession in India? [15]
SECTION - II
Q6) Write a comprehensive note on the TENDERING PROCESS by PRE-
QUALIFICATION method, and discuss its advantages and dis-advantages. [20]
Q9) Compare and contrast ANY THREE of the following (5 marks each) : [15]
a) Payment of mobilization and Material Advance
b) Earnest Money Deposit and Security Deposit
c) Cost, Price and Value
d) Freehold and Leasehold Land Tenure
e) Proprietory and partnership practice
f) Dominant Heritage and Servient Heritage
Q10)Write short notes on ANY THREE of the following (5 marks each) : [15]
a) Extension of Time limit
b) Extra items of Work
c) Distress Value of a property
d) Scrutiny of Tenders
e) Pre-Bid Conference
f) Site Visit Reports
eee
[4962]- 402 4
Total No. of Questions :5] SEAT No. :
SECTION - I
Q1) A) Workout the quantities of the following items of work for the structure
shown in the drawing (Fig-1), based on the details and data specified
below. (Any eight) [40]
i) R.C.C. column footing
ii) Ceramic tiles dado for all toilets
iii) Painting only for Master bedroom (walls & ceiling)
iv) R.C.C. slab
v) Floor tiles for Bedrooms and living only (without skirting)
vi) R.C.C. staircase (waist slab and steps)
vii) Brick masonry walls 230 mm for ground floor
viii) Oil paint for doors only
ix) R.C.C. beams (external and internal)
x) Door frame for D1 of section 125 mm 75 mm
P.T.O.
Data:
Thickness of the slab: 150 mm Floor to floor height: 3.05 m
Height of the parapet: 0.90 m External Beams: 230 mm 600 mm
Internal beams: 230 mm 450 mm
Column Sizes : C1 : 230 mm 500 mm, C2 : 230 mm 230 mm
Offset at footing : 100 mm
Column footing sizes : C1: 1.0m 1.20 m, C2 : 1.0 m 1.0m
D: 650 mm, 2: 150 mm size of P.C.C. for C1 : 1.20 m 1.40m,
C2 : 1.20 m 1.20 m
Thickness: 150 mm
Depth : 1.50 m from ground level Bearing of lintel :150 mm on
Dado in -toilets : 2. 10 m high one side
Doors Windows
D: 1.20 m 2.10 m W : 1.50 m 1.20 m
D1 : 0.90 m 2.10 m W1 : 0.900 mm 1.20 m
D2 : 0.750 m 2.10 m V : 0.30m 0.45 m
B) State the unit of measurement as per I.S. code 2000 (Any ten) [10]
Teak wood door frames P.V.C. overhead water tanks
Bib cocks 16 amp electrical points
Water closet Column footing
Excavation work Site clearance
Manhole D.P.C. layer
R.C.C. beams Sewage pipes
SECTION - II
Q2) Prepare Rate analysis based on the rates given below (Any three) [15]
a) Brick masonry in CM 1:6 for 230 mm thick wall
b) U.C.R in CM 1:6 for boundary wall
c) Sand faced plaster work in CM 1:6 for external wall
d) Dado glazed tiles on wall
[4962]- 403 2
Material Rate Labour Rate
Cement : Rs 300/- per bag Brick Work : Rs 1500/- per cu
meter
Sand : Rs 1400/- per cu meter U.C.R. masonry : Rs 700/- per cu
meter
Brick : Rs 8000/- per 1000 nos. External plaster work : Rs 200/- per
sq meter
Stone/rubble : Rs 290/- per cu meter Dado tiles : Rs 350/- per sq
meter
Dado tiles : Rs 650/- per sq meter
colour cement : Rs 50/ - per Kg
Q3) Write short notes on the topics given below (Any three) [15]
a) Work order
b) Guidelines for entering a measurement sheet
c) Abstract sheet
d) Volumetric measurement
e) Bill of quantities
Q5) Prepare the indent of material for following items of work (Any two) [10]
a) 20-25 mm thick external sand faced plaster for 50 sq meter
b) Brick masonry wall (230 mm) in CM 1:6 for 24 cu meter
[4962]- 403 3
Fig. 1. Ground Floor Plan Note : All dimensions are in meters
eee
[4962]- 403 4
Total No. of Questions : 7] SEAT No. :
P2642
[Total No. of Pages : 2
[4962]-404
Fourth Year B. Arch.
SPECIFICATION WRITING
Time : 3 Hours] [Max. Marks : 100
Instructions to the candidates:-
1) All questions are compulsory.
2) Figures to the right side indicate marks.
Q2) Explain with examples how to write open specifications & closed
specifications. [10]
OR
Write detailed specifications for excavation in Hard Murum.
P.T.O.
Q5) Write short notes on (any four) [20]
a) Toilet facilities for disabled persons
b) Biogas plant
c) Types of pipes ideal for water supply
d) Defects of sound
e) Portable fire extinguishers
Q7) Write names of manufacturer for the materials (any ten) [10]
a) Tinted Glass
b) Internal paint
c) Drainage pipes
d) 53 grade cement
e) Vitrified tiles
f) European water closet
g) Asbestos cement sheets
h) Light weight doors
i) Water storage tank
j) Roofing tiles
k) MS windows
\\\
[4962]-404 2
Total No. of Questions : 10] SEAT No. :
SECTION - I
Q2) Write a note on Natural Growth & Planned Growth of Towns & Cities.[12]
Q5) Describe Rectangular, Concentric & Radial street system of roads. [12]
P.T.O.
SECTION - II
eee
[4962]- 41 2