Muhammad Noman (Electrical Engineer) : Curriculum Vitae Of: 1. Personal Details
Muhammad Noman (Electrical Engineer) : Curriculum Vitae Of: 1. Personal Details
Muhammad Noman (Electrical Engineer) : Curriculum Vitae Of: 1. Personal Details
1.
PERSONAL DETAILS:
NAME:
MUHAMMAD NOMAN
DATE OF BIRTH:
22 MARCH 1991
NATIONALITY:
PAKISTANI
E-MAIL: engr.muhammadnoman@gmail.com
MOBILE No. 0346-8482210
Skype ID : engr.muhammadnoman
2.
EDUCATIONAL QUALIFICATION
S/No.
Certificate
Discipline /
College /
Year of Passing
Diploma / Degree
Subject
University
B.sc (Hons), Electrical
Power
University of
Engineering
1
Engineering
and Technology
2007
Peshawar,
Pakistan
TOTAL YEARS OF EXPERIENCE: 10 years
.Responsible for the development, execution, supervision, and coordination of all technical
aspects of field engineering assignments including development of plans, schedules,
contracts, procedures, and construction methods and systems.
Maintains first-level quality assurance to confirm that the installation of all work within his/her discipline is
in accordance with the plans, specifications, and industry standards
Ensures that tests and inspections are performed, witnessed, and documented in
accordance with approved procedures.
Project # 1:
9004.
Key Responsibilities:
Perform quality audit and to verify work activities are in accordance with the approved
Project Quality Plan.
Attend to Witness and Hold point inspections of approved Inspection & Test Plans (ITPs).
Attend to witness system FAT in supplier shop and SAT during pre-commissioning.
Monitor and surveillance of cables and cable tray routing, installation and terminations to
junction boxes and panels are in compliance with the applicable codes and standards..
Monitor to ensure Contractors documentation is compiled progressively as required and of
acceptable quality.
Inspect and report on compliance with regulations and standards including technical codes of
practice applicable to licensees and consumers in relation to supply and consumption of
electricity issued in terms of the Act.
Inspect and report on the electrical condition, suitability for purpose, and compliance with
safety standards under Regulations made in terms of Section 56 (1) & 56 (2) of the Act of
electric line and electric plant and in relation to the transmission system and distribution
system, monitor system reliability performance and investigate, review and report on major
failures.
Inspect and report on the quality and quantity of the generation, transmission, distribution and
supply of electricity.
PROJECTS
1.
132kV
U/G
Cable
Circuits
June
July
2.
115kv U/G Cable from Qatif
2013
2015
services
3.
132kv
U/G
Cable Circuit
8192.
4.
132kv U/G Cable route b/w S/
8114
and
&
termin
compound.
Key Responsibilities:
Coordinating with Client and other related offices for work permissions
Position:
Site
Engineer
(Electrical)
March 2012
May Project # 1
Company: Nour
2013
132/33/13.8kv S/S 8783 in Wadi Al
Communication
Dawaser, KSA.
Key Responsibilities:
Supervise Installation of 132kV Switchgear (GIS), 33kv and 13.8kv SWGR Control Panels
associated with its connection arrangements.
Cross checking the openings for 132kv GIS room, 33kv, and 13.8kv SWGR room with the
civil drawings inside the S/S building.
Daily planning, daily progress monitoring and accordingly reporting to Head office.
Daily assessment of manpower/Equipment requirements and its arrangement for next day
as per Schedule.
Co-coordinating with client (SEC) and subcontractor related to daily work activity.
1.
Khan
Khawar
Hydro
power
project
72MW in
Besham Pakistan
July 2010
Jan 2012
2.
Allai Khawar Hydro power
Company: Engineering General
project
121MW
in Allai
Consultant
Pakistan.
3.
Dubair
Khawar
Hydro
power
project
130MWin
Dubair Pakistan.
Key Responsibilities:
Supervise the Erection/installation of Equipments at Power house and switchyard. I.e. power
transformer, current transformer, voltage transformer, capacitive voltage transformer, Busbars and
circuit breaker, isolating switches, bus bar and their relative parts.
Supervise and Monitor the testing of Switchyard Equipment (Busbars,CT, VT, Circuit
breaker, and Power Transformer).
Supervise and Monitor the testing of 132kv, 220kv SWGRs (Busbars,CT, VT, Circuit breaker
relays).
Pre-commissioning co-ordination and preparing relevant test report.
M/Y
M/Y
Nov
May
1. Tecom Tower
Company: Eversafe
2007
2010
General Maintenance
Key Responsibilities:
Responsible for estimating materials, Construction, labor costs and project timescales.