Stortemelk 4.5 MW
REH Asset Summary
Installed O&M
Power Plant COD Generation M&E Contractor
Capacity Contractor
Sol Plaatje Nov-09 2.3 MW 16 GWh BFL (India) REH O&M
Merino Aug-10 3.7 MW 25 GWh BFL (India) REH O&M
Stortemelk Jul-16 4.5 MW 28 GWh Andritz (Austria) REH O&M
Integrated Hydro Model
Weighted Maintenance Objects
(WMOs)
Asset Management
Plan
Introduction
Process
Planning Framework
Life Cycle Managm
GENERATION & TRANSMISSION ASSETS
Plan
Example
Performance Planning
REFURBISHMENTS/
N UPGRADING - NEEDS??
OPERATE &
MONITOR PLAN UNAVAILABILITY COMPLY WITH
POWER OPERATIONAL
GENERATION STANDARDS
Business Plan Asset Management Plan (AMP)
The AMP shall include overall processes required for
managing the assets.
Business Management Documentation System(BMDS) -
(Integrated Management System)
Business Plan
KPI/Goals
Operation and Maintenance Strategy
HSE in an Operational phase.
Risk And Vulnerability Assessment (RAV)
Root Cause Analysis (RCA)
Reliability Centered Maintenance (RCM)
Maintenance Strategy
IMPACT
Small Moderate Major Severe
Injury/illness with Injury/illness with Injury leads to permanent Event leads to fatality
minor absence or short extended temporary disability
temporary disability disability
Safety
Minor on-site damage Minor off-site damage. Moderate off-site damage. Major off-site damage.
Environment Resititution time < month Resititution time < year Resititution time > year
Moderate local impact. Major local impact, Major national impact. Criminal proceedings
May cause project moderate regional impact. Threaten position of against REH top managers.
delay or require May cause procject company in country. May May efect possibility to
disciplinary action. cancellation or production lead to criminal charges continue as company.
Reputation, stop. May lead to criminal against senior management
charges against local senior or widespread fraud by local
CSR, ethics management. management.
Tests:
PCBs
Furan
Water
kV
Acidity
DGA
FURAN Analysis (Transformer)
Analysis (Transformer)
Preventative maintenance
Scheduled maintenance &
inspections
Visual inspection
Measuring of clearances
Oil replacement
Seal replacement
Condition monitoring
Light Analysis
Identify equipment as per maintenance strategy
Method of monitoring (oil analysis, thermal imaging, vibration
monitoring etc.)
Parameters as per manufacturer's specification
Convert the data into a life curve model
Data to be summarized into a high level Light analysis Report
Maintenance gates
Intake Structure
Cooling System
Hydraulic unit
Overall Plant
Transformer
Power Plant
Switchgear
Generator
Condition
Gearbox
Turbine
Merino 11/2015
Stortemelk
The Bottom Line